Download as pdf or txt
Download as pdf or txt
You are on page 1of 27

Submittal Transmittal

design coordinates, inc.


GSC PHASE 1- Retail Area .
Ortigas Avenue, Greenhills San Juan, 1502 Metro Manila
18 Mechanical Works
contract package no. : CP-____: 03/16/2022
* refer to approved submittal schedule dated _______________

transmittal to : DESIGN COORDINATES, INC. from : CITIAIRE INDUSTRIAL SERVICES CORP.


I Construction Project Managers Contractor

submittal no. : GSC1-CPMEC18-RE-SUT-130 previous no. :


✔ new submittal
 date : 03/16/2022
 resubmittal ___1st ___2nd ___3rd date :
qty. title / description / manufacturer specs. section, title and paragraph / drawing, detail reference
Proposed Steel Louver for CEF and CSF at Basement Shop Drawing
1 set
1,2 and 3
name, title and signature of contractor's authorized representative date received date required +/-
from contractor from contractor *
16 March 2022 16 March 2022 0
4PM
received
MO by: DESIGN COORDINATES, INC.
Ariel R. Lambon (CISC-QA/QC Engr.) Construction Project Managers
other remarks on above submission :

transmittal to : DCCD Eng'g Corp./GF & P/SY2 date received received by:
II from : Consultant
DESIGN COORDINATES, INC.
by consultant DCCD Eng'g Corp./GF & P/SY2
Consultant
Construction Project Managers
other remarks on above submission :

transmittal to : DESIGN COORDINATES, INC. from : DCCD Eng'g Corp./GF & P/SY2
III Construction Project Managers Consultant
action (encircle one)
A approved B approved as noted C revise and resubmit as noted D disapproved / new submittal required
Notes

name, title and signature of approving authority date returned date required from +/-
by consultant consultant *
04 April 2022

received by: DESIGN COORDINATES, INC.


Construction Project Managers
other remarks on above submission :

date returned date required +/-


transmittal to : CITIAIRE INDUSTRIAL SERVICES CORP. to contractor by contractor*
IV Contractor 04 April 2022
from : DESIGN COORDINATES, INC.
Construction Project Managers received by: CITIAIRE INDUSTRIAL SERVICES CORP.
Contractor
copies : Owner Architect Quantity Surveyor Others _____________

DCI-SUT rev. 01 Page 1 of 1


pioneer
design coordinates, inc. suite 202, itc building 337 sen.gil puyat ave., makati city 1209  phone: +63 2 8961981-84
people
construction project managers fax: +63 2 8999276  email: info@dci.com.ph  website: www.dci.com.ph
performance
Copyright Design Coordinates, Inc. Any rights not expressly granted herein are reserved.
1.J'
1.K'

1.L'
1.6'
1.M'
1.N'
1.P'
1.6''

UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100

1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100
100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V
BLOW-UP VIEW
KEYPLAN

BASEMENT 1 STEEL LOUVER


4350(W)x2900(H)x100
GAUGE #16
BLADE SPACING
4350

4250

°
55
1250
50 100
2500 1800 50
50 25 DIVIDE INTO 2 EQUAL PARTS 25 50

145
125
1 35°
2
10
800

3 64
4 20
5 20
6
10
7
35°
2800

2700

2610

8
2800

2700

9 A1 = 125 (4200)(18) A 2= 64 (4200)(18)


2900

°
A1 = 9.45000 A 2=4.83840

55
10
11 NET FREE AREA=A1 - A 2
2100

12 NET FREE AREA= 9.45000-4.83840


2
13 NET FREE AREA= 4.6116 m
14
NET FREE AREA
15 % NET FREE AREA =
A1
16
4.6116
17 % NET FREE AREA = 9.45000
18
100 ISOMETRIC VIEW % NET FREE AREA = 48.80%
50 50 SCALE: MTS.

100
4200
SIDE VIEW
FRONT VIEW
SCALE: MTS.
SCALE: MTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.J'
1.K'

1.L'
1.6'
1.M'
1.N'
1.P'
1.6''

UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.
1.1

1.2

1.3

100

1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100
100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN
BLOW-UP VIEW

BASEMENT 1 STEEL LOUVERS


2500(W)x2300(H)x100 TYP. TO 2
GAUGE #16
DIVIDE INTO 2 EQUAL PARTS
2500
100
BLADE SPACING
2400 50
50 25 25 50
50

°
55
1
2

145
125
3 35°
10
4
5 64
2300

2200

20
2030

6
2300

2200

10 20
7
8 A1 = 125 (2350)(14) A 2= 64 (2350)(14)
9
A1 = 4.11250 A 2=2.10560 35°
10 NET FREE AREA=A1 - A 2

°
55
11 NET FREE AREA= 4.11250-2.10560
2
12 NET FREE AREA= 2.0069 m
13 NET FREE AREA
14 50 % NET FREE AREA =
A1
1250 2.15025
50 % NET FREE AREA =
2350 4.40625
ISOMETRIC VIEW
FRONT VIEW SIDE VIEW
SCALE: MTS.
SCALE: MTS. % NET FREE AREA = 48.80%
SCALE: MTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.J'
1.K'

1.L'
1.6'
1.M'
1.N'
1.P'
1.6''

UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100

1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100
100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN

BLOW-UP VIEW

BLADE
BASEMENT 1 STEEL LOUVER SPACING
5000(W)x2300(H)x100
GAUGE #16

°
DIVIDE INTO 4 EQUAL PARTS

55
5000
4900
1250 1250 1250 1250

145
125
50 25 25 50
50 50 100
35°
10
1 64
2 20
3
10 20
4
5
6 35°
2300

2200

2300

2200

7
2030

°
8

55
A1 =125 (4850)(14) A 2= 64 (4850)(14)
9 A1 = 8.48750 A 2=4.34560
10
NET FREE AREA=A1 - A 2
11
NET FREE AREA= 8.48750-4.34560
12 NET FREE AREA= 4.1419 m
2

13
14 NET FREE AREA
% NET FREE AREA =
A1
50 50 4.43775
4850 % NET FREE AREA =
9.09375

ISOMETRIC VIEW % NET FREE AREA = 48.80%


FRONT VIEW SIDE VIEW
SCALE: NTS.
SCALE: NTS.
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.J'
1.K'

1.L'
1.6'
1.M'
1.N'
1.P'
1.6''

UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100

1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100
100

1.16

UP DN

1.17

100
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN

BLOW-UP VIEW

BLADE
BASEMENT 1 STEEL LOUVER SPACING
6350(W)x2400(H)x100
GAUGE #16

°
55
6350

DIVIDE INTO 4 EQUAL PARTS

145
125
4500
50 35°
1800
1125 1125 1125 1125
50 10
25 25 25 100
64
300

50 20
1
10 20
2
3
4 35°
5
6

°
55
2300

2200

2300
2400

2400

7
2030
2100

8
A1 =125 (6200)(14) A 2= 64 (6200)(14)
9
A1 =10.85000 A 2= 5.55520
10
11 NET FREE AREA=A1 - A 2
NET FREE AREA= 10.85000-5.55520
12 2
NET FREE AREA= 5.2948 m
13
14 100 50 NET FREE AREA
% NET FREE AREA =
A1
5.2948
100 % NET FREE AREA =
6200 10.85000

48.80%
FRONT VIEW SIDE VIEW
SCALE: NTS.
ISOMETRIC VIEW
% NET FREE AREA =
SCALE: NTS. SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.J'
1.K'

1.L'
1.6'
1.M'
1.N'
1.P'
1.6''

UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100

1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100 100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN
BLOW-UP VIEW

BASEMENT 1 STEEL LOUVER


2850(W)x3200(H)x100
GAUGE #16
BLADE SPACING
2850
DIVIDE INTO 2 EQUAL PARTS 900
1900

°
55
950 950 50 50
50 100
25 25

50

145
1

125
2 35°
10
1100

3
4
64
5
6
20
7 10 20
8
9
35°
3100

3000
3100

3000

10
3200

2755

11

°
55
12
13
2100

14 A1 =125 (2700)(21) A 2= 64 (2700)(21)


15 A1 =7.08750 A 2=3.62880
16
NET FREE AREA=A1 - A 2
17 NET FREE AREA= 7.08750-3.62880
2
18 NET FREE AREA= 3.4587 m
20
21 NET FREE AREA
% NET FREE AREA =
A1
50
50 100 4.2822
100 % NET FREE AREA = 8.775
2700
ISOMETRIC VIEW % NET FREE AREA = 48.80%
FRONT VIEW
SCALE: NTS.
SIDE VIEW SCALE: NTS.

SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.J'
1.K'

1.L'
1.6'
1.M'
1.N'
1.P'
1.6''

UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100

1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100 100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN
BLOW-UP VIEW

BASEMENT 1 STEEL LOUVER


2850(W)x3200(H)x100
GAUGE #16
BLADE SPACING
2850
DIVIDE INTO 2 EQUAL PARTS 900
1900

°
55
950 950 50 50
50 100
25 25

50

145
1

125
2 35°
10
1100

3
4
64
5
6
20
7 10 20
8
9
35°
3100

3000
3100

3000

10
3200

2755

11

°
55
12
13
2100

14 A1 =125 (2700)(21) A 2= 64 (2700)(21)


15 A1 =7.08750 A 2=3.62880
16
NET FREE AREA=A1 - A 2
17 NET FREE AREA= 7.08750-3.62880
2
18 NET FREE AREA= 3.4587 m
20
21 NET FREE AREA
% NET FREE AREA =
A1
50
50 100 4.2822
100 % NET FREE AREA = 8.775
2700
ISOMETRIC VIEW % NET FREE AREA = 48.80%
FRONT VIEW
SCALE: NTS.
SIDE VIEW SCALE: NTS.

SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.J'
1.K'

1.L'
1.6'
1.M'
1.N'
1.P'
1.6''

UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100

1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100 100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN
BLOW-UP VIEW

BASEMENT 1 STEEL LOUVER BLADE SPACING


4600(W)x2300(H)x100
GAUGE #16

°
55
4600

145
4500

125
1150 1150 1150 1150 35°
50
10
50 25 DIVIDE INTO 4 EQUAL PARTS 25 50 100
64
50
20
1 20
2
10
3
4 35°
5

°
6

55
2300

2200

2300

2200

7
2030

8
A1 =125 (4450)(14) A 2= 64 (4450)(14)
9
A1 = 7.78750 A 2=3.98720
10
11 NET FREE AREA=A1 - A 2
12 NET FREE AREA= 7.78750-3.98720
2
NET FREE AREA= 3.8003 m
13
14 NET FREE AREA
% NET FREE AREA =
A1
50
50 ISOMETRIC VIEW
SCALE: NTS. 3.8003
4450 % NET FREE AREA = 7.78750

SIDE VIEW % NET FREE AREA = 48.80%


FRONT VIEW
SCALE: NTS.
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.J'
1.K'

1.L'
1.6'
1.M'
1.N'
1.P'
1.6''

UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100

1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100
100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN
BLOW-UP VIEW

BASEMENT 1 STEEL LOUVER


4950(W)x2400(H)x100
BLADE SPACING
GAUGE #16
4950

°
4850

55
50 900 50
25 DIVIDE INTO 4 EQUAL PARTS 25 50 100
300

50

145
125
1 35°
2 10
3
64
4
20
5
10 20
6
2200

2300

2200

2300
2400

7
2030

A1 =125 (4800)(14) A 2= 64 (4800)(14)


35°
2100

8
A1 = 8.40000 A 2=4.30080
9
NET FREE AREA=A1 - A 2

°
10

55
NET FREE AREA=8.40000-4.30080
11 2
NET FREE AREA= 4.0992 m
12
13 NET FREE AREA
50 % NET FREE AREA =
14 A1
4.2273
% NET FREE AREA =
50 8.6625
100
3850 48.80%
% NET FREE AREA =
4800 SIDE VIEW
SCALE: NTS.
FRONT VIEW
NTS. SCALE:
ISOMETRIC VIEW
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100
1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100 100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN

BLOW-UP VIEW

BASEMENT 2 STEEL LOUVER


3950(W)x2400(H)x100
GAUGE #16 BLADE SPACING
3950
1050 1050

°
55
50 2050 1800 50
25 DIVIDE INTO 2 EQUAL PARTS 25 100
50
50
300

145
125
1 35°
10
2
3
64
20
4
10 20
5
6
A1 =125 (3800)(14) A 2= 64 (3800)(14) 35°
2300

2200

2300
2200
2400

7
2030

A1 = 6.65000 A 2=3.40480
2100

°
55
9 NET FREE AREA=A1 - A 2
NET FREE AREA= 6.65000-3.40480
10 2
NET FREE AREA= 3.2452 m
11
12 NET FREE AREA
% NET FREE AREA =
13 A1
14 3.2452
% NET FREE AREA =
6.65000
50
50 100 % NET FREE AREA = 48.80%
2100 1850
100
3800
ISOMETRIC VIEW
SCALE: NTS.

FRONT VIEW SIDE VIEW


SCALE: NTS.
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100
1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100 100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN
BLOW-UP VIEW

BASEMENT 2 STEEL LOUVER


DIVIDE INTO 3 EQUAL PARTS 2900(W)x2300(H)x100 BLADE SPACING
2900 GAUGE #16
50
2750

°
25 25 50

55
967 967 967 100
50 50

145
125
1 35°
10
2
3 64
4 20
5 10 20
6
2300

2200

2300

2200

7 35°
2030

8 A1 =125 (2750)(14) A 2= 64 (2750)(14)

°
A1 = 4.81250 A 2=2.46400

55
9
10 NET FREE AREA=A1 - A 2
11 NET FREE AREA= 5.15625-2.64
2
12 NET FREE AREA= 2.3485 m
13
NET FREE AREA
14 % NET FREE AREA =
A1
50 50 2.3485
% NET FREE AREA =
2750 4.81250
ISOMETRIC VIEW
FRONT VIEW SIDE VIEW
SCALE: NTS.
SCALE: NTS. % NET FREE AREA = 48.80%
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.M'
1.N'
1.P'
1.6''

UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.17
1.2

1.3
100

1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100 100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN

BLOW-UP VIEW

BASEMENT 2 STEEL LOUVERS


2500(W)x2300(H)x100 TYP. TO 2
GAUGE #16
DIVIDE INTO 2 EQUAL PARTS BLADE SPACING
2500
100
2400

°
50

55
50 25 25 50
50 1250

145
125
1 35°
10
2
64
3
20
4 20
10
5
2300

2200

2030

6
35°
2300

2200

7
A1 =125 (2350)(14) A 2= 64 (2350)(14)

°
8

55
A1 = 4.11250 A 2=2.10560
9
10 NET FREE AREA=A1 - A 2
11 NET FREE AREA= 4.11250-2.10560
2
12 NET FREE AREA= 2.0069 m
13 NET FREE AREA
14 50 % NET FREE AREA =
A1
2.15025
50 % NET FREE AREA =
2350 4.40625
ISOMETRIC VIEW
FRONT VIEW SIDE VIEW
SCALE: NTS.
SCALE: NTS. % NET FREE AREA = 48.80%
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100
1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100 100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN

BLOW-UP VIEW

BLADE SPACING
BASEMENT 2 STEEL LOUVER
5000(W)x2300(H)x100
GAUGE #16

°
55
DIVIDE INTO 4 EQUAL PARTS
5000

145
125
1250 1250
4900
1250 1250
35°
50 25 25 50 10
100
50 50
64
20
1
10 20
2
3
4 35°
5
6

°
55
2300

2200

2300

2200

7
2030

8 A1 =125 (4850)(14) A 2= 64 (4850)(14)


9 A1 = 8.48750 A 2=4.34560
10
NET FREE AREA=A1 - A 2
11
NET FREE AREA= 8.48750-4.34560
12 NET FREE AREA= 4.1419 m
2

13
14 NET FREE AREA
% NET FREE AREA =
A1
50 50 4.43775
4850 % NET FREE AREA =
9.09375

ISOMETRIC VIEW % NET FREE AREA = 48.80%


FRONT VIEW SIDE VIEW
SCALE: NTS.
SCALE: NTS.
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100

1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100 100

1.16

UP DN

1.17

100
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN

BLOW-UP VIEW

BLADE SPACING
BASEMENT 2 STEEL LOUVER
6350(W)x2400(H)x100

°
55
GAUGE #16
6350

145
125
DIVIDE INTO 4 EQUAL PARTS 35°
4500 10
50
1800
1125 1125 1125 1125
50 64
25 25 25 100
20
20
300

50 10
1
2
3 35°
4

°
55
5
6
2300

2200

2300
2400

2400

7
2030
2100

8
A1 =125 (6200)(14) A 2= 64 (6200)(14)
9
A1 = 10.85000 A 2= 5.55520
10
11 NET FREE AREA=A1 - A 2
NET FREE AREA= 10.85000-5.55520
12 2
NET FREE AREA= 5.2948 m
13
14 100 50 NET FREE AREA
% NET FREE AREA =
A1
5.2948
100 % NET FREE AREA =
6200 10.85000

48.80%
FRONT VIEW SIDE VIEW
SCALE: NTS. ISOMETRIC VIEW
% NET FREE AREA =
SCALE: NTS. SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.6''

UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100

1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100 100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN

BLOW-UP VIEW

BASEMENT 2 STEEL LOUVER


2850(W)x2400(H)x100
2850 GAUGE #16
DIVIDE INTO 2 EQUAL PARTS
1900
BLADE SPACING
50
950 950 900
50 25 25 50

°
300

55
1
2

145
125
3 35°
10
4
5 64
6 20
2300

2300

2200

20
2400

7 10
2030
2100

8
9 35°
10 A1 =125 (2700)(14) A 2= 64 (2700)(14)

°
55
11 A1 =4.72500 A 2=2.41920
12
NET FREE AREA=A1 - A 2
13 NET FREE AREA= 8.775-4.4928
14 50 NET FREE AREA= 2.3058 m
2

100 100 NET FREE AREA


875 % NET FREE AREA =
A1
2700 2.3058
% NET FREE AREA = 4.72500
FRONT VIEW
SCALE: NTS.
SIDE VIEW
SCALE: NTS.
ISOMETRIC VIEW
SCALE: NTS. % NET FREE AREA = 48.80%

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.N'
1.P'
1.6''

UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100
1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100 100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN

BLOW-UP VIEW

BASEMENT 2 STEEL LOUVER


2850(W)x2400(H)x100
2850 GAUGE #16
DIVIDE INTO 2 EQUAL PARTS BLADE SPACING
1900
50
950 950 900
50 25 25 50

°
55
300

145
2

125
35°
3 10
4 64
5 20
6 10 20
2300

2300

2200
2400

7
2030

35°
2100

8
9

°
55
10 A1 =125 (2700)(14) A 2= 64 (2700)(14)
11 A1 =4.72500 A 2=2.41920
12
NET FREE AREA=A1 - A 2
13
NET FREE AREA= 8.775-4.4928
14 50 2
NET FREE AREA= 2.3058 m

100 NET FREE AREA


100 % NET FREE AREA =
875 A1
2700 2.3058
% NET FREE AREA = 4.72500
FRONT VIEW
SCALE: NTS.
SIDE VIEW
SCALE: NTS.
ISOMETRIC VIEW
SCALE: NTS. % NET FREE AREA = 48.80%

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100
1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.14

DN DN

UP UP
1.15

UP

100 100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN

BLOW-UP VIEW

BASEMENT 2 STEEL LOUVER


4600(W)x2300(H)x100
GAUGE #16 BLADE SPACING
4600
4500

°
55
1150 1150 1150 1150
50 50 25 DIVIDE INTO 4 EQUAL PARTS 25 50 100

145
125
50
35°
1 10
2
64
3
20
4
10 20
5
6
2300

2200

2300

2200

7 35°
2030

8
A1 =125 (4450)(14) A 2= 64 (4450)(14)

°
9

55
A1 = 7.78750 A 2=3.98720
10
11 NET FREE AREA=A1 - A 2
12 NET FREE AREA= 7.78750-3.98720
2
NET FREE AREA= 3.8003 m
13
14 NET FREE AREA
% NET FREE AREA =
A1
50
50 ISOMETRIC VIEW
SCALE: NTS. 3.8003
4450 % NET FREE AREA = 7.78750

SIDE VIEW % NET FREE AREA = 48.80%


FRONT VIEW
SCALE: NTS.
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.6'
1.K'

1.L'
1.6'
1.M'
1.N'
1.P'
1.6''

UP

DN

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'
UP

DN

1.1

1.2

1.3

100

1.4

100

UP DN

DN UP

1.5

1.6

1.7

1.8

1.9

1.10

DN UP

100

1.11
100

100

1.12

1.13
100
100

100

1.6''
1.14

DN DN

UP UP
1.15

UP

100 100

1.16

UP DN

1.17
100

UP DN

1.18

1.19

1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN

BLOW-UP VIEW

BLADE SPACING
BASEMENT 2 STEEL LOUVER

°
4950(W)x2400(H)x100

55
GAUGE #16
4950

145
125
35°
4850 10
50 900 50
25 DIVIDE INTO 4 EQUAL PARTS 25 50 100
64
20
300

50
1 10 20
2
3
35°
4
5

°
55
6
2200

2300

2200

2300
2400

7
2030
2100

8 A1 =125 (4800)(14) A 2= 64 (4800)(14)


9 A1 = 8.40000 A 2=4.30080
10 NET FREE AREA=A1 - A 2
11 NET FREE AREA=8.40000-4.30080
2
12 NET FREE AREA= 4.0992 m
13
50 NET FREE AREA
14 % NET FREE AREA =
A1

50 4.2273
% NET FREE AREA = 8.6625
100
3850
% NET FREE AREA = 48.80%
SIDE VIEW
SCALE: NTS.
FRONT VIEW
NTS. SCALE:
ISOMETRIC VIEW
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.L'
1.6'
1.M'

1.N'
1.P'
1.6''

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'

1.1

B3W
03

B3W
03

1.2

B3W B3W
03 02

1.3
B3W
03

B3W
03

1.4

UP

1.5

1.6

1.7

1.8

1.9

RAMP UP RAMP DN
TO B2 FROM B2

1.10
5.5% 5.5%
BLEND BLEND

B3W
06
1.11

B3W
06

11% 11%
SLOPE SLOPE

B3W
06
A

1.12

B3W B3W
04 05

1.13
B3W
05

B3W
04

1.14
B3W
01

UP

1.15

1.16

1.17

1.18

1.19

B
1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN BLOW-UP VIEW

BASEMENT 3 STEEL LOUVER BLADE SPACING


3950(W)x2400(H)x100 GAUGE #16
3950

°
55
1050 1050
50 2050 1800 50
25 DIVIDE INTO 2 EQUAL PARTS 25 100

145
50

125
50 35°
300

10
1 64
2 20
3 10 20
4
5 35°
6
A1 =125 (3800)(14) A 2= 64 (3800)(14)
2300

2200

2300
2200

°
2400

55
2030

A1 = 6.65000 A 2=3.40480
2100

8
9 NET FREE AREA=A1 - A 2
NET FREE AREA= 6.65000-3.40480
10 2
NET FREE AREA= 3.2452 m
11
12 NET FREE AREA
% NET FREE AREA =
13 A1
14 3.2452
% NET FREE AREA =
6.65000
50
50 100 % NET FREE AREA = 48.80%
2100 1850
100
ISOMETRIC VIEW
SCALE: NTS.
3800
SIDE VIEW
SCALE: NTS.
FRONT VIEW
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.L'
1.6'
1.M'

1.N'
1.P'
1.6''

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'

1.1

B3W
03

B3W
03

1.2

B3W B3W
03 02

1.3
B3W
03

B3W
03

1.4

UP

1.5

1.6

1.7

1.8

1.9

RAMP UP RAMP DN
TO B2 FROM B2

1.10
5.5% 5.5%
BLEND BLEND

B3W
06
1.11

B3W
06

11% 11%
SLOPE SLOPE

B3W
06
A

1.12

B3W B3W
04 05

1.13
B3W
05

B3W
04

1.14
B3W
01

UP

1.15

1.16

1.17

1.18

1.19

B
1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN BLOW-UP VIEW

BASEMENT 3 STEEL LOUVER


BLADE SPACING
2900(W)x2300(H)x100
DIVIDE INTO 3 EQUAL PARTS GAUGE #16
2900

°
55
967 967 967
2750
25 25 50
50 100

145
50 50

125
35°
10
1 64
2 20
3 10 20
4
5 35°
6
2300

2200

2300

2200

°
55
7
2030

8 A1 =125 (2750)(14) A 2= 64 (2750)(14)


9 A1 = 4.81250 A 2=2.46400
10
NET FREE AREA=A1 - A 2
11
NET FREE AREA= 5.15625-2.64
12 NET FREE AREA= 2.3485 m
2

13
14 NET FREE AREA
% NET FREE AREA =
A1
50 50
2.3485
2750 % NET FREE AREA =
4.81250
ISOMETRIC VIEW
FRONT VIEW SIDE VIEW
SCALE: NTS.
SCALE: NTS. % NET FREE AREA = 48.80%
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.L'
1.6'
1.M'

1.N'
1.P'
1.6''

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'

1.1

B3W
03

B3W
03

1.2

B3W B3W
03 02

1.3

B3W
03

B3W
03

1.4

UP

1.5

1.6

1.7

1.8

1.9

1.1
RAMP UP RAMP DN
TO B2 FROM B2

1.10
5.5% 5.5%
BLEND BLEND

B3W
06
1.11

B3W
06

11% 11%
SLOPE SLOPE

B3W
06
A

1.12

B3W B3W
04 05

1.13
B3W
05

B3W
04

1.14
B3W
01

UP

1.15

1.16

1.17

1.18

1.19

B
1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN BLOW-UP VIEW

BASEMENT 3 STEEL LOUVERS


2500(W)x2300(H)x100 TYP. TO 2
GAUGE #16
DIVIDE INTO 2 EQUAL PARTS
2500 BLADE SPACING
100
2400 50
50 25 25 50

°
50 1250

55
1

145
125
2 35°
10
3
64
4 20
5 20
2300

2200

10
2030

6
2300

2200

7 35°
8 A1 =125 (2350)(14) A 2= 64 (2350)(14)

°
A1 = 4.11250 A 2=2.10560

55
9
10 NET FREE AREA=A1 - A 2
11 NET FREE AREA= 4.11250-2.10560
2
12 NET FREE AREA= 2.0069 m
13 NET FREE AREA
14 50 % NET FREE AREA =
A1
2.15025
50 % NET FREE AREA =
2350 4.40625
ISOMETRIC VIEW
FRONT VIEW SIDE VIEW
SCALE: NTS.
SCALE: NTS. % NET FREE AREA = 48.80%
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.L'
1.6'
1.M'

1.N'
1.P'
1.6''

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'

1.1

B3W
03

B3W
03

1.2

B3W B3W
03 02

1.3
B3W
03

B3W
03

1.4

UP

1.5

1.6

1.7

1.8

1.9

RAMP UP RAMP DN
TO B2 FROM B2

1.10
5.5% 5.5%
BLEND BLEND

B3W
06
1.11

B3W
06

11% 11%
SLOPE SLOPE

B3W
06
A

1.12

B3W B3W
04 05

1.13
B3W
05

B3W
04

1.14
B3W
01

UP

1.15

1.16

1.17

1.18

1.19

B
1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN BLOW-UP VIEW

BASEMENT 3 STEEL LOUVER BLADE SPACING


5000(W)x2300(H)x100
GAUGE #16

°
55
DIVIDE INTO 4 EQUAL PARTS
5000

145
125
4900
35°
50 25
1250 1250 1250 1250
25 50
10
50 100
50
64
20
1 20
2
10
3
4 35°
5

°
6

55
2300

2200

2300

2200

7
2030

8 A1 =125 (4850)(14) A 2= 64 (4850)(14)


9 A1 = 8.48750 A 2=4.34560
10
NET FREE AREA=A1 - A 2
11
NET FREE AREA= 8.48750-4.34560
12 NET FREE AREA= 4.1419 m
2

13
14 NET FREE AREA
% NET FREE AREA =
A1
50 50 4.43775
4850 % NET FREE AREA =
9.09375

ISOMETRIC VIEW % NET FREE AREA = 48.80%


FRONT VIEW SIDE VIEW
SCALE: NTS.
SCALE: NTS.
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.L'
1.6'
1.M' RAMP DN
1.N'
1.P'
FROM B2
1.6''

1.5'

1.4'

1.3'

1.3''
5.5%
1.2'' BLEND
1.2'

1.1

B3W
03

B3W
03

1.2

B3W B3W
03 02

1.3

B3W
03

B3W
03

1.4

UP

1.5

1.6

1.7

1.8

1.9

RAMP UP RAMP DN
TO B2 FROM B2

1.10
5.5% 5.5%
BLEND BLEND

B3W
06
1.11

B3W
06

11% 11%
SLOPE SLOPE

B3W
06
A

1.12

B3W B3W
04 05

1.13
B3W
05

B3W
04

1.14
B3W
01

UP

1.15

1.16

1.17

1.18

1.19

B
1.20

11%
SLOPE
1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN BLOW-UP VIEW


A

BLADE SPACING

BASEMENT 3 STEEL LOUVER

°
55
6850(W)x2400(H)x100
GAUGE #16

145
125
6850 35°
DIVIDE INTO 4 EQUAL PARTS 10
5000 50
50
1800 1250 1250 1250 1250 64
25 25 50
100 20
50
20
300

1
10
2
3
35°
4
5

°
55
6
2200

2300
2400

7
2200

2300
2100

2030

8
9
A1 =125 (6700)(14) A 2= 64 (6700)(14)
10
A1 =11.72500 A2=6.00320
11
12 NET FREE AREA=A1 - A 2
NET FREE AREA= 11.72500-6.00320
13 2
50 NET FREE AREA= 5.7218 m
14
50 NET FREE AREA
% NET FREE AREA =
A1
100
100 5.7218
6700 % NET FREE AREA =
11.72500

FRONT VIEW SIDE VIEW % NET FREE AREA = 48.80%


SCALE: NTS. SCALE: NTS.
ISOMETRIC VIEW
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.J'
1.K'

1.L'
1.6'
1.M'

1.N'
1.P'
1.6''

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'

1.1

B3W
03

B3W
03

1.2

B3W B3W
03 02

1.3
B3W
03

B3W
03

1.4

UP

1.5

1.6

1.7

1.8

1.9

RAMP UP RAMP DN
TO B2 FROM B2

1.10
5.5% 5.5%
BLEND BLEND

B3W
06
1.11

B3W
06

11% 11%
SLOPE SLOPE

B3W
06
A

1.12

B3W B3W
04 05

1.13
B3W
05

B3W
04

1.14
B3W
01

UP

1.15

1.16

1.17

1.18

1.19

B
1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN BLOW-UP VIEW

BASEMENT 3 STEEL LOUVER


2850(W)x3700(H)x100
GAUGE #16

2850
DIVIDE INTO 2 EQUAL PARTS
100
BLADE SPACING
950 950 50
50 50 50
50 25 1900 900
25

°
55
2
3
4
1600

145
5

125
6 35°
10
7
8 64
9 20
3600

3500

10 20
3335

10
3600

11
3700

12
13 35°
14

°
15

55
16
2100

17
18 A1 =125 (2700)(24) A 2= 64 (2700)(24)
20 A1 = 8.10000 A 2= 4.14720
21 NET FREE AREA=A1 - A 2
22 NET FREE AREA= 8.10000-4.14720
2
23 NET FREE AREA= 3.9528 m
50 24 50
NET FREE AREA
100 % NET FREE AREA =
A1
100 1900 900 50
1850 3.9528
% NET FREE AREA = 8.10000
2700
FRONT VIEW SIDE VIEW ISOMETRIC VIEW
SCALE: NTS.
% NET FREE AREA = 48.80%
SCALE: NTS. SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.5'

1.4'

1.3'

1.3''

1.2''

1.2'

1.1

B3W
03

B3W
03

1.2

B3W B3W
03 02

1.3
B3W
03

B3W
03

1.4

UP

1.5

1.6

1.7

1.8

1.9

RAMP UP RAMP DN
TO B2 FROM B2

1.10
5.5% 5.5%
BLEND BLEND

B3W
06
1.11

B3W
06

11% 11%
SLOPE SLOPE

B3W
06
A

1.12

B3W B3W
04 05

1.13
B3W
05

B3W
04

1.14
B3W
01

UP

1.15

1.16

1.17

1.18

1.19

B
1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN BLOW-UP VIEW

BASEMENT 3 STEEL LOUVER


2850(W)x3700(H)x100
GAUGE #16

2850
DIVIDE INTO 2 EQUAL PARTS
950 950 50 100
50 50 50
1900 900
50 25 25
BLADE SPACING
1
2

°
3

55
4
1600

5
6

145
125
7 35°
8 10
9
64
3600

3500

10
3335

20
3600

11
3700

12 10 20
13
14
35°
15
16

°
55
2100

17
18 A1 =125 (2700)(24) A 2= 64 (2700)(24)
20 A1 = 8.10000 A 2= 4.14720
21 NET FREE AREA=A1 - A 2
22 NET FREE AREA= 8.10000-4.14720
2
23 NET FREE AREA= 3.9528 m
50 24 50
NET FREE AREA
100 % NET FREE AREA =
A1
100 1900 900 50
1850 3.9528
% NET FREE AREA = 8.10000
2700
FRONT VIEW
SCALE: NTS.
SIDE VIEW
SCALE: NTS.
ISOMETRIC VIEW
SCALE: NTS.
% NET FREE AREA = 48.80%

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.J'
1.K'

1.L'
1.6'
1.M'

1.N'
1.P'
1.6''

1.5'

1.4'

1.3'

1.3''

1.2''

1.2'

1.1

B3W
03

B3W
03

1.2

B3W B3W
03 02

1.3
B3W
03

B3W
03

1.4

UP

1.5

1.6

1.7

1.8

1.9

RAMP UP RAMP DN
TO B2 FROM B2

1.10
5.5% 5.5%
BLEND BLEND

B3W
06
1.11

B3W
06

11% 11%
SLOPE SLOPE

B3W
06
A

1.12

B3W B3W
04 05

1.13
B3W
05

B3W
04

1.14
B3W
01

UP

1.15

1.16

1.17

1.18

1.19

B
1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN BLOW-UP VIEW

BASEMENT 3 STEEL LOUVER


4600(W)x2300(H)x100 BLADE SPACING
GAUGE #16

°
55
4600
4500
1150 1150 1150 1150

145
125
50 50 25
DIVIDE INTO 4 EQUAL PARTS 25 50 100 35°
10
50 64
1 20
2
10 20
3
4
5 35°
6

°
2300

2200

2300

2200

55
7
2030

8
A1 =125 (4450)(14) A 2= 64 (4450)(14)
9
A1 = 7.78750 A 2=3.98720
10
11 NET FREE AREA=A1 - A 2
12 NET FREE AREA= 7.78750-3.98720
2
NET FREE AREA= 3.8003 m
13
14 NET FREE AREA
% NET FREE AREA =
A1
50
50 ISOMETRIC VIEW
SCALE: NTS. 3.8003
4450 % NET FREE AREA = 7.78750

SIDE VIEW % NET FREE AREA = 48.80%


FRONT VIEW
SCALE: NTS.
SCALE: NTS.

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com
1.6''
1.6'
1.K'

1.L'

1.M'

1.N'
1.P'
1.6'
1.5'

1.4'

1.3'

1.3''

1.2''

1.2'

1.1

B3W
03

B3W
03

1.2

B3W B3W
03 02

1.3
B3W
03

B3W
03

1.4

UP

1.5

1.6

1.7

1.8

1.9

RAMP UP RAMP DN
TO B2 FROM B2

1.10
5.5% 5.5%
BLEND BLEND

B3W
06
1.11

1.6''
B3W
06

11% 11%
SLOPE SLOPE

B3W
06
A

1.12

B3W B3W
04 05

1.13
B3W
05

B3W
04

1.14
B3W
01

UP

1.15

1.16

1.17

1.18

1.19

B
1.20

1.G 1.H 1.J 1.K 1.L 1.M 1.N 1.P 1.Q 1.R 1.S 1.T 1.U 1.V

KEYPLAN BLOW-UP VIEW

BASEMENT 3 STEEL LOUVER


4950(W)x2400(H)x100
GAUGE #16
BLADE SPACING
4950
4850

°
55
DIVIDE INTO 4 EQUAL PARTS
50 900 1000 1000 1000 1000 50
25 25 50 100

145
300

50

125
35°
1 10
2
64
3
20
4
10 20
5
6
35°
2200

2300

2200

2300
2400

7
2030
2100

°
55
9
A1 =125 (4800)(14) A 2= 64 (4800)(14)
10 A1 = 8.40000 A 2=4.30080
11
12 NET FREE AREA=A1 - A 2
NET FREE AREA=8.40000-4.30080
13 NET FREE AREA= 4.0992 m
2

14 50
NET FREE AREA
% NET FREE AREA =
50 A1
3850 100
4.2273
4800 % NET FREE AREA = 8.6625
SIDE VIEW
SCALE: NTS.
FRONT VIEW
SCALE: NTS.
ISOMETRIC VIEW
SCALE: NTS.
% NET FREE AREA = 48.80%

DCCD ENGINEERING CORPORATION


ENGINEERS * CONTRACTORS * FABRICATORS
#25 Road 4 Project 6, Quezon City GSC - PHASE 1
Tel: 355-0549 / 355-0182 / 351-6522
Tel Fax: 928 / 8832 RETAIL & BPO
Email: citiaire@yahoo.com / citiaire_corp@yahoo.com

You might also like