Sac Inspection Checklist
Sac Inspection Checklist
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SAEP-1160,
B2 Weld Identification – Basic Information ... Attachment 1 Section
6
SAEP-1160,
B3 Weld Fit-up Inspection ... Attachment 1 Section
6
SAEP-1160,
B4 In-Process Weld Inspection ... Attachment 1 Section
6
SAEP-1160,
B5 Completed Weld Visual Inspection ... Attachment 1 Section
6
C PHYSICAL MARKING OF WELD ID NUMBERS BY SYSTEM (SEE ATTACHMENT 1, SAEP-1160, SECTION 6.2)
Sch Q Att. IV
Weld Identification Numbering System - The following weld identification
SAEP-1160,
numbering system shall be used to identify and track Complete joint
Para
C1 penetration joints and other full penetration joints welds as a minimum.
6.4
Weld numbering shall be consecutive. Each weld shall be identified by joint
number, line number, and spool number.
In addition to the mark number & drawing number identification, each weld Sch Q Att. IV
(W-01) shall be identified as per Attachment 1, Section 6.4. SAEP-1160,
Suffixes shall be R1, R2, T1, T2, & RW (RW for "cut out" joint) Para
C2
Note 1: Tracers can have repairs (W- 6.4
01T1R1, R2) Note 2: Cut out joints can
have repairs (W-01RWR1, R2)
Sch Q Att. IV
Welds fabricated in field shall be prefixed with letter "F" SAEP-1160,
Para
C3 Welds fabricated in approved weld shops with 6.4
letter "S"
Sch Q Att. IV
SAEP-1160,
Weld numbering identification system for welds shall be approved by the Para
C4
Insp Dept. Representative prior to the start of work. 6.4.1
Sch Q Att. IV
SAEP-1160,
Contractors/fabricators may propose alternative numbering systems for
Para
C5 approval by PQM. The identification system shall be used to identify all
6.4.2
examinations, surveys, inspections, etc.
SAEP-1160,
Welder performance data shall be tracked and recorded on a daily basis
Para
and reported to Saudi Aramco weekly during the Weekly Meeting. Welder
C6 7.1
performance rejection rate shall be calculated and reported on a per joint
and linear basis.
The contractor shall track and report the following welder performance
SAEP-1160,
data:
Para
1. Total number of pressure welds made per weld type (e.g., fillet, groove,
C7 7.2
butt)
2. Total number of pressure welds made per weld process
3. Total number of pressure welds rejected by NDT method
D WELD MODIFICATIONS AFTER FINAL ACCEPTANCE SEE SACIC-W-2013, SACIC-W-2036 & SACIC-W-2091)
REMARKS:
ACTOR
F SINOHYDRO
TD and
PLANT NO.
MCC NO.
TRAVEL TIME
RE-INSP DATE
ACTOR
F SINOHYDRO
TD and
ACTOR
F SINOHYDRO
TD and
ACTOR
F SINOHYDRO
TD and
ACTOR
F SINOHYDRO
TD and
Work Verified
Work Verified
Work Verified
YES N = NO F = FAILED