Release V1.

PM MASTER DATA CREATION


(Maintenance Work center)

Training & User Manual


MAINTENANCE WORK CENTER

Icons

Icon Meaning
Caution

Example

Note

Recommendation

Syntax

Typographic Conventions

Type Style Description


Example text Words or characters that appear on the screen. These include field
names, screen titles, pushbuttons as well as menu names, paths and
options.
Cross-references to other documentation.
Example text Emphasized words or phrases in body text, titles of graphics and tables.

EXAMPLE TEXT Names of elements in the system. These include report names,
program names, transaction codes, table names, and individual key
words of a programming language, when surrounded by body text, for
example, SELECT and INCLUDE.
Example text Screen output. This includes file and directory names and their paths,
messages, source code, names of variables and parameters as well as
names of installation, upgrade and database tools.
EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the
ENTER key.

Example text Exact user entry. These are words or characters that you enter in the
system exactly as they appear in the documentation.
<Example text> Variable user entry. Pointed brackets indicate that you replace these
words and characters with appropriate entries.

Project Chanakya: PM Module Training Material Page 2


MAINTENANCE WORK CENTER

Abbreviations

R Required entry field


(used in the end-user procedures)
O Optional entry field
(used in the end-user procedures)
C Conditional field
(used in the end-user procedures)

Project Chanakya: PM Module Training Material Page 3


MAINTENANCE WORK CENTER

Contents

Maintenance Work Center…………..….…………………...5

1. Creating Maintenance Work center …………………………………………………….7

2. Changing Maintenance work center…………….……………… ……………………..10

3. Displaying Maintenance work center…………………………………………….........11

Project Chanakya: PM Module Training Material Page 4


MAINTENANCE WORK CENTER

Maintenance Work Center


Definition
Operations are carried out at a work center. In the R/3 System work centers are business objects
that can represent the following real work centers, for example:

• Machines, machine groups

• Production lines

• Assembly work centers

• Employees, groups of employees

In the Plant Maintenance (PM) application component, the following work centers exist:

• Main work center

• Performing work center

• Work center as production machine

The work centers are distinguished by work center type (for example, production work center,
maintenance work center). The work center type determines which data can be maintained in the
master record for the work center.

The Main Work Center

The main work center usually represents one person or a department, responsible for ensuring that
the maintenance work in an order header is executed by the work centers performing the individual
operations.

The Performing Work Center

The performing work center usually represents one person or a group of people who perform the
maintenance work in the operations of an order.
Please note: We are not going to have internal activity costing; hence Main work centers in MO
header and performing work centers in MO operation are master date for reporting purpose. They
don’t have any activity type with activity price attached.

Purpose
To carryout the maintenance tasks, related analysis and reporting.

Prerequisites
SAP R/3 component involved: SAP PM. Master Data like Person responsible, plant and other
customized data.

Project Chanakya: PM Module Training Material Page 5


MAINTENANCE WORK CENTER

Process Flow
This scenario shows you how to create new maintenance work center. Change the existing work
center and displaying existing work center.
Maintenance task usually carry in work centers.

USE:
The Main Work Center

The main work center must be entered in the order header, whereupon its master data is copied into
the order as a default.

During internal processing, the main work center is also used as a default for the performing work
center.

The Performing Work Center

In addition to the main work center, you can create a specific employee, who has been represented
in the Human Resources (HR) component with their own master record, as Person responsible. You
can also assign other employees to an operation in the Requirement assignment.

The performing work center is managed in the operation data for the order. It is proposed as a
performing work center for the operations in the order. Since capacities are assigned to the
performing work center and costs assigned using the activity type, the performing work center is
required primarily for capacity planning, scheduling and cost determination.

It is also possible to create operations without entering a performing work center. A control key,
which is not linked to a cost center or an activity type, must then be assigned to these operations. It
may be that the operations are simply used for documentation purposes, for example, operations
that only contain safety instructions or specifications for the production/resources tools to be used.
Operations without a specified performing work center are also used in external processing.

The Work Center as Production Machine

The work center as production machine is managed in the location data for the technical object of an
order. It is only entered if the technical object at which maintenance work should be executed is a
machine in Production.

In case Hazira CMS, All machines which will carry out refurbishment activity like Grinding, Machining,
Turning, Boring, would be performing work center of this category.

Project Chanakya: PM Module Training Material Page 6


MAINTENANCE WORK CENTER

1. Create Maintenance work centers.

1. To create Maintenance work center access the transaction choosing through one of the
following navigation options:

Menu path Plant maintenance ÆTechnical objects Æ Environment Æ


Work Center Æ Create.
Transaction code IR01

2. Enter the following data in the Input screen to create work center.

Field name User action Comment


and values
Plant 2010 Enter the Plant for which you want to create
work center
Work center TESTESTL Enter the name for the work center

Work center category 0005 Plant maintenance Purpose


0001 for all Hazira CMS Machine

3. Choose Enter.

Project Chanakya: PM Module Training Material Page 7


MAINTENANCE WORK CENTER

4. Enter the following relevant basic data and populate the relevant fields.

Field name User action Comment


and values
Description Essar steel Enter the Description for the Work center
work center
Person responsible 100 Who is the responsible person to carryout
maintenance tasks
Usage 004 Purpose or usage of work center

Project Chanakya: PM Module Training Material Page 8


MAINTENANCE WORK CENTER

5. Go to Tab strip Default values and populate the relevant fields.

Field name User action Comment


and values
Control Key M01 As a default control key to carry out maintenance
tasks.

6. Go to Tab strip costing and populate the relevant fields.


Here you have to populate the cost center for the work center and whenever if you assign the work
center in the maintenance order the profit centre field will be updated automatically. Here we assign
the Production cost center to this work center.

Project Chanakya: PM Module Training Material Page 9


MAINTENANCE WORK CENTER

7. Choose SAVE or (Ctrl+S).


At the bottom of the screen, the system outputs the message: work center TESTESTL is
created.

Master data for work center TESTESTL is created.


Message no. CR012

2. Display Maintenance Work Center.

1 To Display work center access the transaction choosing one of the following navigation
options:

Menu path Plant maintenance ÆTechnical objects Æ Environment Æ


Work Center Æ Display
Transaction code IR03

2. Enter the following data:

Field name User action and Comment


values
Work center TESTESTL Enter the Work center for which you want
display.

3. Choose Enter

The created Work center will be displayed.

4. Choose to exist.

Project Chanakya: PM Module Training Material Page 10


MAINTENANCE WORK CENTER

3. Change Work center.

1. To Change work center , access the transaction choosing one of the following navigation
options:

Menu path Plant maintenance ÆTechnical objects Æ Environment Æ


Work Center Æ Change
Transaction code IR02

2. Enter the following data:

Field name User action and Comment


values
Work center TESTESTL Enter the Work center for which you want
Change.

3. Choose Enter.

4. The screen will appear in the changeable mode, Change the required fields in the data
screen.

5. Choose Save (Ctrl + S).

At the bottom of the screen, the system outputs the message: work center TESTESTL in
Plant changed.

Master data for work center TESTESTL is changed.


Message no. CR013

Project Chanakya: PM Module Training Material Page 11