Professional Documents
Culture Documents
Te-Civil Sem6 Ge2-Cbcgs May19
Te-Civil Sem6 Ge2-Cbcgs May19
Te-Civil Sem6 Ge2-Cbcgs May19
Q.1
39 72 D 4E 1C 10 EA 91 E 64 F FD 07 92 22 B
73 27 2D B4 61 1 7E 9 D B6 F 7F 0 39 72 D 4E
92 2 B E C 0 A 1 EB 4 F7 D 73 27 2 B 6
69088
92 722 2DB 4E6 61C 107 7EA 91DDEB 64F FF7 FD0 073 927 22DDB4 4E61 1C1
7 1 9 F 9 2 0
27 22DDB4 4E61 1C1 07E EA9 1DE EB6 64FF F7F D07 739 272 2DB B4E E61C C10 7EA
22 B E6 C 07 A 1D B 4F 7 D0 39 27 2D 4 61 1 7E 9
72 DB 4E 1C 10 EA 91 E 64 F FD 73 2 22 B E6 C 07 A 1D
2D 4 61 1 7E 9 DE B6 FF 7F 07 92 72 DB 4E 1C 10 EA 91 EB
B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D 4E 61 10 7EA 91 DE 64
E6 C1 07 A 1D EB 4F F7F D0 739 272 2D B4 61 C1 7E 9 DE B6 FF
1C 07 EA 91D EB 64 F7 D 73 27 2D B4 E6 C1 07E A9 1D B6 4F 7F
10 EA 91 E 64 FF FD 073 92 22 B E6 1C 07 A 1D EB 4F F7 D0
7E 9 DE B6 FF 7F 07 92 72 DB 4E 1C 10 EA 91 EB 64 F7 FD 73
foundations
A9 1D B 4F 7F D0 39 72 2D 4E 61 10 7E 91 DE 6 FF FD 07 92
1D EB 64F F7 D0 739 27 2D B4 61 C1 7E A9 DE B6 4FF 7F 07 392 72
consolidation
EB 64F F7 FD 73 27 22D B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D
64 F7 FD 073 927 22D B4 E6 C1 07E A9 1D EB 4F F7F D0 739 272 2D B4E
Attempt any four
FF FD 07 92 22 B E 1C 07 A 1D EB 64 F7 D 73 27 2D B4 6
7F 07 39 72 DB 4E 61C 10 EA 91 E 64 FF FD 07 92 22 B E6 1C
classify accordingly
volumetric changes.
D0 39 27 2D 4 61 1 7E 9 DE B6 FF 7F 07 392 72 DB 4E 1C 10
73 27 22D B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D 4E 61C 10 7EA
2. Question 1 is compulsory
92 22 B E6 C 07 A 1D EB 4F F7 D0 73 27 2D B4 61 1 7E 9
72 DB 4E 1C 10 EA 91 E 64 F FD 73 92 22 B E6 C 07 A 1D
2D 4 61 1 7E 9 DE B6 FF 7F 07 92 72 DB 4E 1C 10 EA 91 EB
B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D 4E 61 10 7EA 91 DE 64
E6 C1 07 A 1D EB 4F F7F D0 739 272 2D B4 61 C1 7E 9 DE B6 FF
7E 9 DE B6 FF 7F 07 92 72 DB 4E 1C 10 EA 91 EB 64 F7 FD 73
A9 1D B 4F 7F D0 39 72 2D 4E 61 10 7E 91 DE 6 FF FD 07 92
Page 1 of 2
92 22 B E6 C 07 A 1D EB 4F F7 D0 73 27 2D B4 61 1 7E 9
(3 Hours)
72 DB 4E 1C 10 EA 91 E 64 F FD 73 92 22 B E6 C 07 A 1D
1C 07 EA 91D EB 64 F7 D 73 27 2D B4 E6 C1 07E A9 1D B6 4F 7F
10 EA 91 E 64 FF FD 073 92 22 B E6 1C 07 A 1D EB 4F F7 D0
7E 9 DE B6 FF 7F 07 92 72 DB 4E 1C 10 EA 91 EB 64 F7 FD 73
A9 1D B 4F 7F D0 39 72 2D 4E 61 10 7E 91 DE 6 FF FD 07 92
1D EB 64F F7 D0 739 27 2D B4 61 C1 7E A9 DE B6 4FF 7F 07 392 72
1DEB64FF7FD07392722DB4E61C107EA9
EB 64F F7 FD 73 27 22D B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D
64 F7 FD 073 927 22D B4 E6 C1 07E A9 1D EB 4F F7F D0 739 272 2D B4E
FF FD 07 92 22 B E 1C 07 A 1D EB 64 F7 D 73 27 2D B4 6
7F 07 39 72 DB 4E 61C 10 EA 91 E 64 FF FD 07 92 22 B E6 1C
D0 39 27 2D 4 61 1 7E 9 DE B6 FF 7F 07 392 72 DB 4E 1C 10
73 27 22D B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D 4E 61C 10 7EA
Q.2 a. A 2m thick layer of saturated clay lies in between two permeable layers. The
c. Mention any two causes of preconsolidation of soil and describe the graphical
be 3.3x10-4cm/s find (i) coefficient of volume change (ii) coefficient of
of soil in undisturbed and remolded state. Also determine sensitivity of soil and
sand γd=18kN/m3 Nq=137.calculate the load capacity of pile assume critical
b Derive the relation between principal stresses at failure in soil mass on the basis
Determine (1) final void ratio of clay (2) settlement of proposed building (3)
middle of clay layer 2 kg/cm2 and is likely increase to 4 kg/cm2 due to
05
05
10
05
05
10
05
05
05
05
05
05
2D 4 61 1 7E 9 DE B6 FF 7F 07 92 72 DB 4
B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D 4E
E6 C1 07 A 1D EB 4F F7F D0 739 272 2D B4
1C 07 EA 91D EB 64 F7 D 73 27 2D B4 E6
10 EA 91 E 64 FF FD 073 92 22 B E6 1
7E 9 DE B6 FF 7F 07 92 72 DB 4E 1C
A9 1D B 4F 7F D0 39 72 2D 4E 61
1D EB 64F F7 D0 739 27 2D B4 61 C1
EB 64F F7 FD 73 27 22D B4 E61 C1
F 0 9 2 0
64 F FD 7 2 2 B E6 C 07
64 FF7 7FD 073 3927 722DDB4 4E6 1C1 107E EA9
F F 0 9 2 B E 1C 0 A 1
FF F7FDD07 7392 2722 2DB 4E 61C 107 7EA 91DDEB
7 3 7 D 4 6
F7 FD 073 927 22D B4 E61 1C1 107E EA9 91D EB6 64F
FD 073 92 22 B E6 C 07 A 1D EB 4F F7
7F 07 9 72 DB 4E 1C 10 EA 91 E 64 F FD
D 3 27 2D 4 6 1 7E 9 D B F 7F 0
D0 0739 927 22D B4 E61 1C1 07E A9 1DE EB6 64FF F7F D07 7392
7 2 B E C 0 A 1 4 D 3
07 392 2722 2DB 4E6 61C 107 7EA 91DDEB B64F FF7 7FD 073 927 722D
39 72 D 4E 1C 10 EA 91 E 64 F FD 07 92 22 B
73 27 2D B4 61 1 7E 9 D B6 F 7F 0 39 72 D 4E
92 2 B E C 0 A 1 EB 4 F7 D 73 27 2 B 6
69088
92 722 2DB 4E6 61C 107 7EA 91DDEB 64F FF7 FD0 073 927 22DDB4 4E61 1C1
7 1 9 F 9 2 0
27 22DDB4 4E61 1C1 07E EA9 1DE EB6 64FF F7F D07 739 272 2DB B4E E61C C10 7EA
22 B E6 C 07 A 1D B 4F 7 D0 39 27 2D 4 61 1 7E 9
72 DB 4E 1C 10 EA 91 E 64 F FD 73 2 22 B E6 C 07 A 1D
2D 4 61 1 7E 9 DE B6 FF 7F 07 92 72 DB 4E 1C 10 EA 91 EB
B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D 4E 61 10 7EA 91 DE 64
E6 C1 07 A 1D EB 4F F7F D0 739 272 2D B4 61 C1 7E 9 DE B6 FF
backfill
1C 07 EA 91D EB 64 F7 D 73 27 2D B4 E6 C1 07E A9 1D B6 4F 7F
10 EA 91 E 64 FF FD 073 92 22 B E6 1C 07 A 1D EB 4F F7 D0
7E 9 DE B6 FF 7F 07 92 72 DB 4E 1C 10 EA 91 EB 64 F7 FD 73
A9 1D B 4F 7F D0 39 72 2D 4E 61 10 7E 91 DE 6 FF FD 07 92
1D EB 64F F7 D0 739 27 2D B4 61 C1 7E A9 DE B6 4FF 7F 07 392 72
EB 64F F7 FD 73 27 22D B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D
64 F7 FD 073 927 22D B4 E6 C1 07E A9 1D EB 4F F7F D0 739 272 2D B4E
FF FD 07 92 22 B E 1C 07 A 1D EB 64 F7 D 73 27 2D B4 6
7F 07 39 72 DB 4E 61C 10 EA 91 E 64 FF FD 07 92 22 B E6 1C
7F 07 39 72 DB 4E 61C 10 EA 91 E 64 FF FD 07 92 22 B E6 1C
D0 39 27 2D 4 61 1 7E 9 DE B6 FF 7F 07 392 72 DB 4E 1C 10
73 27 22D B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D 4E 61C 10 7EA
Page 2 of 2
92 22 B E6 C 07 A 1D EB 4F F7 D0 73 27 2D B4 61 1 7E 9
from pile load test for single and group piles
72 DB 4E 1C 10 EA 91 E 64 F FD 73 92 22 B E6 C 07 A 1D
2D 4 61 1 7E 9 DE B6 FF 7F 07 92 72 DB 4E 1C 10 EA 91 EB
B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D 4E 61 10 7EA 91 DE 64
E6 C1 07 A 1D EB 4F F7F D0 739 272 2D B4 61 C1 7E 9 DE B6 FF
1C 07 EA 91D EB 64 F7 D 73 27 2D B4 E6 C1 07E A9 1D B6 4F 7F
10 EA 91 E 64 FF FD 073 92 22 B E6 1C 07 A 1D EB 4F F7 D0
7E 9 DE B6 FF 7F 07 92 72 DB 4E 1C 10 EA 91 EB 64 F7 FD 73
A9 1D B 4F 7F D0 39 72 2D 4E 61 10 7E 91 DE 6 FF FD 07 92
___________________________
1D EB 64F F7 D0 739 27 2D B4 61 C1 7E A9 DE B6 4FF 7F 07 392 72
1DEB64FF7FD07392722DB4E61C107EA9
EB 64F F7 FD 73 27 22D B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D
64 F7 FD 073 927 22D B4 E6 C1 07E A9 1D EB 4F F7F D0 739 272 2D B4E
FF FD 07 92 22 B E 1C 07 A 1D EB 64 F7 D 73 27 2D B4 6
7F 07 39 72 DB 4E 61C 10 EA 91 E 64 FF FD 07 92 22 B E6 1C
D0 39 27 2D 4 61 1 7E 9 DE B6 FF 7F 07 392 72 DB 4E 1C 10
73 27 22D B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D 4E 61C 10 7EA
92 22 B E6 C 07 A 1D EB 4F F7 D0 73 27 2D B4 61 1 7E 9
72 DB 4E 1C 10 EA 91 E 64 F FD 73 92 22 B E6 C 07 A 1D
2D 4 61 1 7E 9 DE B6 FF 7F 07 92 72 DB 4E 1C 10 EA 91 EB
B4 E61 C1 07E A9 1D B6 4F 7F D0 39 72 2D 4E 61 10 7EA 91 DE 64
Paper / Subject Code: 88881 / Geotechnical Engineering - II
1C 07 EA 91D EB 64 F7 D 73 27 2D B4 E6 C1 07E A9 1D B6 4F 7F
10 EA 91 E 64 FF FD 073 92 22 B E6 1C 07 A 1D EB 4F F7 D0
7E 9 DE B6 FF 7F 07 92 72 DB 4E 1C 10 EA 91 EB 64 F7 FD 73
A9 1D B 4F 7F D0 39 72 2D 4E 61 10 7E 91 DE 6 FF FD 07 92
c. Derive the expression for Taylor’s stability number and explain the uses of it
1D EB 64F F7 D0 739 27 2D B4 61 C1 7E A9 DE B6 4FF 7F 07 392
@ 1.5m center to center in a uniform clay stratum of 16m deep. The depth of
Q.6 a. A rectangular footing 4m wide and 6m long transmits the load of column at a
cut. The C.G of failure mass is 6m from the centre of failure circle. The
c. Derive the expression for Rankine’s active earth pressure for Cohesionless
cut slope and through the point 3 m away on the top ground from the edge of
b. A square group of friction piles 16 in number each of 0.5m diameter are installed
Q.4 a. A cut has to be made 6.5m deep, inclined at an angle 350 to the horizontal. The
strength of clay is 80kN/m2. The clay has wL=56%. (i) calculate the allowable
depth of 1.5m. calculate the safe load which the footing can carry using Vesic’s
Q.5 a. Check the stability of Concrete retaining wall with Cohesionless backfill having
(ii) Determine the settlement of pile group at that load γ=1.8 t/m3 G=2.6 , e=0.65
properties of soil are C=30 kN/m2, ɸ=150 has 𝛾=2.0 t/m3. Find the factor of
10
10
05
05
10
05
05
10