(1) ABB India Limited, a company incorporated in INDIA with registration number whose registered office is
at ABB India Ltd, Plot no. 5 and 6. 2nd Stage Peenya Industrial Area, Bengaluru-560058, (Customer), and
(2) M/s 3a Associates Inc a company incorporated in INDIA whose registered office is at Chincholi Bunder
Road, Malad (W) MUMBAI 400064 (Supplier),
each of them a Party and both together the Parties.
WHEREAS
(A) Supplier is offering Goods and/or Services as specified in this Local Sourcing Frame Agreement;
(B) Customer wishes to purchase such Goods and/or Services from Supplier on a long-term basis and on the
terms specified in this Local Sourcing Frame Agreement.
the Parties therefore agree as follows:
1. DEFINITIONS
1.1 For purposes of this Local Sourcing Frame Agreement, the following definitions apply:
ABB GTC: the ABB General Terms and Conditions for Purchase of Goods and/or Services (2018-1), as
attached to this Local Sourcing Frame Agreement as Annex 3;
Contract: a written agreement and/or the Order for the purchase of Goods and/or Services by Customer from
Supplier, including any other documents submitted by Customer to form part thereof, such as but without
limitation to any specifications;
Goods: the items to be delivered and/or all materials, documents, or other items which are the result of
Services (in any form or media, including but without limitation to data, diagrams, drawings, reports and
specifications) to be provided by Supplier which are covered by this Local Sourcing Frame Agreement as
defined in Annex 1 and specified further in the individual Contract;
Order: Customer’s order issued to Supplier for the purchase of Goods and/or Services;
Services: the services to be provided by Supplier which are covered by this Local Sourcing Frame Agreement
as defined in Annex 1 and specified further in the individual Contract.
1.2 The headings in this Local Sourcing Frame Agreement do not affect its interpretation.
1.3 Capitalized terms used in this Local Sourcing Frame Agreement are defined terms and have the meaning
given to them in this Local Sourcing Frame Agreement or in the ABB GTC.
1.4 The Annexes form part of this Local Sourcing Frame Agreement and have effect as if set out in full in the
body of this Local Sourcing Frame Agreement. In the event of a conflict between the provisions of the
Annexes and the provisions set out in the body of this Local Sourcing Frame Agreement, the latter will
prevail.
3. ORDER PROCESS
3.1 Customer may order Goods and/or Services from Supplier under this Local Sourcing Frame Agreement by
individual Contracts.
3.2 Any Contract must refer to and incorporate this Local Sourcing Frame Agreement and its terms and
conditions.
3.3 Any Contract will be subject to and governed by the ABB GTC, to the extent that the ABB GTC are not
expressly amended
3.3.1 in this Local Sourcing Frame Agreement for all Contracts; or
3.3.2 in the individual Contract.
6. COMPLIANCE, INTEGRITY
6.1 Supplier shall provide the Goods and/or Services in compliance with all relevant laws, regulations, and codes
of practice.
7. GENERAL
7.1 The invalidity or unenforceability of any term of this Local Sourcing Frame Agreement will not adversely
affect the validity or enforceability of the remaining terms. This Local Sourcing Frame Agreement will be
given effect as if the invalid or unenforceable term had been replaced by a term with a similar economic
effect.
7.2 No variation or amendment of this Local Sourcing Frame Agreement or of any of the documents referred to
in it will be valid unless it is in writing and duly signed by authorized representatives of both Parties.
7.3 The Parties shall do and execute all such further acts and things as are reasonably required to give full effect
to the rights given and the transactions contemplated by this Local Sourcing Frame Agreement.
9. ENTIRE AGREEMENT
This Local Sourcing Frame Agreement and the documents referred to in it, constitute the entire agreement
and understanding of the Parties and replace any previous agreement, understanding or arrangement between
the Parties relating to the subject matter of this Local Sourcing Frame Agreement.
SUPPLIER CUSTOMER
M/s 3a Associates Inc M/s ABB India Limited, MOMG, Vadodara
signature: ...................................................
Mr.Ashish Sharma
LPG Financial Controller
signature: ...................................................
Mr.Indraneel Dhaneshwar
LPG Location Manager
Supplier will take prior approval from ABB before changing any Raw Material or any Process change.
Proper identification is to be done by Supplier and traceability record is to be kept for verification. It should be available
during ABB QA audit time.
Supplier will inspect raw material & keep records & provide the customer
For the traceability point of view all records to be kept for 20 years.(Hard or Soft Copy).
Conformity means that the product complies with all of the requirements defined for it in the relevant documents (e.g.
drawings, Purchase order, ABB Process instructions, P-standards or any communication by e-mail etc).The Supplier is
responsible for the conformity of the Supplied product, correctness of the information provided. The Supplier shall
prevent the delivery of defective products to ABB in case if the defect is found prior to dispatch.
In the event of a defect or failure occurring in the Supplier's process/product, and as a consequence of which a part
requires repair or delivery is in danger of being delayed, the Supplier is obliged to contact ABB's Quality team without
delay. Based on the information provided by supplier, ABB will decide to accept the product with deviation or not.
In cases where changes occur in the Supplier's manufacturing process, manufacturing methods, materials or quality
assurance process, or changes in qualified/ certified persons, the Supplier must send a written communication ( along
with Qualification reports/certificates) to ABB and obtain prior approval before the actual changes takes place
This is to ensure that undetected changes are not effecting product conformity. Failure to do so, may result in difficult
problem solving later. This is also to ensure traceability during product's lifecycle.
ABB is entitled to conduct quality reviews at the Supplier’s manufacturing facility. ABB may, at its discretion, audit the
Supplier's process at the Supplier's plant. The purpose of such audits and quality reviews is to ensure that the Supplier's
processes are capable of producing the desired quality and product. The date for an audit or quality review shall be
agreed upon in advance.
ABB recommends to its Suppliers a quality system conforming to the requirements of latest issue of the ISO 9001 quality
standard or an equivalent standard. Implementing procedures described in ISO14001 Environmental Management
System is strongly encouraged.
Detailed Gap report will be shared along with audit score after the audit. Based on the final score, suppliers needs to
submit action plan within a week and close all gaps as per table below. Suppliers will be blocked in case of non-
compliance to below requirement. Suppliers can be re-activated only after ABB conducts a fresh audit and the supplier
falls in Green zone.
Average Poor
Good Needs to close all Needs to close major
Work to improve NCRs within 3 months NCRs within 30days and
further to continue supplies gain audit score > 85%
to ABB within 3 months
System Audit
>85% 60%-85% < 60%
score
Process Audit
> 90% 70% - 90% < 70%
score
The Supplier shall continuously improve its process capability and follow-up in order to prevent the delivery of defective
goods, or goods not in conformance with the required specification to ABB. In case of repetitive defects or Lot
rejections, ABB is entitled to visit the supplier manufacturing facility with a 24 hour notice. ABB can differ this visit only
in case of special events / local holidays.
7. Handling of Non-conformity
In the event of defects being detected against the conformity of the products delivered by the Supplier, ABB is entitled
to request a 100% inspection (Rework, if necessary) of the tolerated products with respect to dimensions and
requirements. If supplier is not able to complete inspection, ABB will deploy their approved resources and debit the
cost of inspection/ rework back to the supplier (with prior intimation but will not wait for confirmation to back charge
costs incurred)
Sr.
NO Material Code Material reference Size INR Prices/Meter
1 9871525 BOPO/K 30 X 0.22/55/A 1.80
2 13806454 BOPO/K 20 X 0.22/A 1.45
3 99869659 BOPO/K 10 X 0.22 1.32
4 13806233 BOPO 10 X 0.15 1.20
5 10211247 BPRUG 25 mm 7.75
• All the packages / supplies shall be packed adequately to avoid rust & transit damages
• Packaging charges are part of above prices and will not charge separately
Lead Time: 30 Days – From date of Placing order to delivery at Vadodara Plant
Prices: Prices will undergo into negotiation in case raw material prices vary.
Taxes & Duties: As applicable by Government rules and regulations time to time.