CV - Ratan Kumar Mallick

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

CURRICULUM VITAE

NAME OF EXPERT
RATAN KUMAR MALLICK

DATE OF BIRTH
3rd June 1981

CITIZENSHIP
Indian

EDUCATION B. E. Mechanical Engineering, Jalpaiguri Government Engineering College, 2000 –


2004.
M Tech, Environmental Engineering, Jagan Nath University, Jaipur, 2018 - 2020
EMPLOYMENT RECORD RELEVANT TO THE PROJECT
Employing organization and
Summary of activities performed relevant to the
Period your title/position. Contact Country
Assignment
information for references
April’2021 – Employing Organization: SMEC India Responsible for verify and evaluate the project
Till date India Private Limited. performance indicators in State Water and Sanitation
Title/Position: Electro- Mission (National Rural Drinking Water Program)’s
Mechanical Expert design and monitoring framework and the service
Type of Employment: Full Time benchmark indicators as issued by the UP Jal Nigam.

Contact information for Review and approval of DPR, data sheet and QAP as
references: per technical specifications of contract, Approval of
Name: Owais Ahmad Kuraishy design, drawing of pumping station, pipelines.
Email id: Coordinate with Client/ Contractor for smooth
owais.kuraishy@smec.com implementation of projects. Project including Intake
Tel No: 9198115087 well, rising main, Water Treatment Plant, underground
reservoir, overhead tank, distribution network, etc.

Coordinate with Client/ Contractor for smooth


implementation of projects.
Oct’2018 – Employing Organization: Shah India/ Responsible for verify and evaluate the project
Macrh’2021 Technical Consultant Pvt. Ltd. Vietnam performance indicators in ADB’s design and
Title/Position: Mechanical monitoring framework and the service benchmark
Expert indicators as issued by the Ministry of UD. Compile and
Type of Employment: Full Time prepare on behalf of PMU all the reports including
progress report for the project in the formats
Contact information for acceptable to ADB.
references:
Name: Dadasaheb Chandane Preparation of Detail Project Report and Bid document
Email id: for Water Supply and Sewerage Package of the RUIDP
dadachandane@yahoo.co.in Project. Project Towns are Tonk, Pali, Sri Gangangar,
Tel No:9004788884 Hanumangarh, Kota and Jhunjhunu.

Review and approval of technical submittals of data


sheet and QAP as per technical specifications of
contract, Approval of design, drawing of pumping
station, pipelines.

Coordinate with Client/ Contractor for smooth


implementation of projects.
Feb’ 2016 – Employing Organization: AECOM India Involved in project management activities, interaction
Oct’2018 India Pvt. Ltd. with Client, design Water distribution network
Title/Position: Associate modelling by water GEMS, review of data sheet for all

Curriculum Vitae Ratan Kumar Mallick


Type of Employment: Full Time mechanical items, review plant layouts, design of long
Contact information for rising main, distribution network, GAs drawings, flow
references: diagrams, preparing quantities, attending
Name: Anujit Dutta (Ex AECOM) review/coordination meetings with client.
Email id: anujit.dutta@gmail.com
Tel No:09925070335
June’2013 - Employing Organization: TATA India Involved in review of plant layouts, GAs drawings, flow
Feb’2016 Consulting Engineers Ltd. diagrams, preparing quantities, attending
Title/Position: Assistant Manager review/coordination meetings with client.
/ Manager/Senior Manager
Type of Employment: Full Time
Contact information for
references:
Name: Dheeraj Koushik
Email id: mail@tce.co.in
Tel No: 09818954403
July’2012 – Employing Organization: MWH India Involved in detailed design of various capacities of
June’2013 India Private Limited water and wastewater treatment plants, preparation
Title/Position: Project Engineer of equipment drawings, preparation of bill of
Type of Employment: Full Time quantities of mechanical components and coordination
Name:Anil Kumar with client and vendors.
Email id: info@mwhindia.co.in
Tel No: 09650266778
Oct’2010 – Employing Organization: Mott India Involved in detailed design of various capacities of
July’2012 MacDonald Private Limited water & wastewater treatment plants, drawings, data
Title/Position: Design Engineer sheet approval, factory inspection, coordination with
Type of Employment: Full Time client and vendors.
Contact information for
references:
Name:Mahesh Shah
Email id:
Mahesh.shah@mottmac.com
Tel No: 07506518022
Oct’2008 – Employing Organization: STC Pvt India Involved in detailed design of various capacities of
Oct’2010 Ltd. pumping station, GAs drawings.
Title/Position: Design Engineer
Type of Employment: Full Time
Contact information for
references:
Name: N. R. Paunikar
Email id:stcmumbai@vsnl.com
Tel No: 09322615242
March’2007 Employing Organization: India Involved in design of Booster pumping station, GAs
– Sept’2008 Pratibha Industries Limited. drawings, erection all mechanical items of 10 MGD
Title/Position: Site Engineer Water Treatment Plant (WTP).
Type of Employment: Full Time
Contact information for
references:
Name:Swapan Kumar Biswas
Email id:
swapankbiswas@gmail.com
Tel No:08130193079
Aug’2005 – Employing Organization: Petron India Involved in study GAs drawings through autocad,
Feb’2007 Engineering Construction Limited erection water pipeline of 500 MW NTPC.
Title/Position: Site Engineer
Type of Employment: Full Time
Contact information for
references:

Curriculum Vitae Ratan Kumar Mallick


Name: Mr. Khan
Email id:
corporate@petronengineering.com
Tel No:+91-22-40856200
MEMBERSHIP IN PROFESSIONAL ASSOCIATIONS AND Nil,
PUBLICATIONS Journal: Study on Efficient 24×7 Water Distribution Systems –
A case Study of Jhunjhunu.ISSN:2320-0693, Vo;-19-Issue 15-
May-2020
READ WRITE SPEAK
LANGUAGES SKILL
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent
1. Bengali Excellent Excellent Excellent
DETAILED TASKS ASSIGNED ON REFERENCE TO PRIOR WORK/ASSIGNMENTS THAT BEST ILLUSTRATES
CONSULTANT’S TEAM OF EXPERTS CAPABILITY TO HANDLE THE ASSIGNED TASKS
Employing Organization: SMEC
India Private Limited. Name of Assignment or Project: Bundelkhand PMC to Manage Rural Water
Title/Position: Electro-Mechanical Supply Scheme in the Quality affected areas of Bundelkhand / Vindhya Region
Expert for Zone III Mahoba, Banda & Chitrakoot, Uttar Pradesh | Project Cost - 41.5
Type of Employment: Full Time Crores.
Year: Apr 2021 to till date
Location: Lucknow, Uttar Pradesh
Client: State Water and Sanitation Mission (National Rural Drinking Water
Program), Uttar Pradesh
Main project features: Review and approval of DPR, data sheet and QAP as per
technical specifications of contract, Approval of design, drawing of pumping
station, pipelines. Coordinate with Client/ Contractor for smooth
implementation of projects. Project including pumping station, rising main,
Water Treatment Plant, underground reservoir, overhead tank, distribution
network, etc.
Positions held: Electro-Mechanical Expert
Activities performed: Responsible for verify and evaluate the project
performance indicators in design. Review and approval of technical submittals
of data sheet and QAP of all electro-mechanical items as per technical
specifications of contract, Approval of design, drawing of pumping station,
pipelines, distribution networks, Implementation Plan, Coordinate with Client/
Contractor for smooth implementation of
a) 15 MLD Intake well (Kabrai Dam) and WTP (Gorkha) at Karbai Group of
Villages Water Supply Scheme, Mahoba.
b) 33 MLD Intake well (Kabrai Dam) and WTP (Samshera Phutera) at
Dhawarra Sijwaha Group of Villages Water Supply Scheme, Mahoba.
c) 24 MLD Intake well (Kabrai Dam) and WTP (Samshera Phutera) at
Shivhar Group of Villages Water Supply Scheme, Mahoba.
d) 106 MLD Intake well and WTP at Amli Kaur Group of Villages Water
Supply Scheme, Banda.
e) 29 Tubewell by electricity & solar power at Amli Kaur Group of Villages
Water Supply Scheme, Banda.
f) 158 MLD Intake well (Jalalpur) and WTP (Jalalpur), 28 tube well at
Jalapur Water Supply Scheme, Banda.
g) 83 MLD Intake well (Baru Ahatmali)) and WTP (Atarsui), Silauta-
Mustakil Group of Villages Water Supply Scheme, Chitrakoot.
h) 22 MLD Intake well (Chilli Mal) and WTP (Chilli Mal), Chandu-Bangar
Group of Villages Water Supply Scheme, Chitrakoot.
i) 29 MLD Intake well (Gohra Khas) and WTP (Agarhouda Village), Raipura
Group of Villages Water Supply Scheme, Chitrakoot.
j) 25 MLD Intake well and WTP (Gorkha) at Salaiyya-Nathupura Group of
Villages Water Supply Scheme, ChitraKoot.
k) 14 MLD Intake well and WTP, Bharthaul Group of Village Water Supply

Curriculum Vitae Ratan Kumar Mallick


Scheme, ChitraKoot.
Employing Shah
Organization: Name of Assignment or Project: Southern Binh Duong Province Water
Technical Consultant Pvt. Ltd. Environment Improvement Project (Phase 2), JICA Funded.
Title/Position: Mechanical Expert Year: January 2020 – February 2020
Type of Employment: Full Time Location: Binh Duong, Vietnam
Client: People’s Committee of Binh Duong Province.
Main Project Features: Review and approval of data sheet and QAP as per
technical specifications of contract, Approval of design, drawing of pumping
station, pipelines. Coordinate with Client/ Contractor for smooth
implementation of projects. Project include including sewage pumping station,
rising main, 72 MLD advanced SBR technology under Thu Dau Mot Wastewater
Treatment Plant, underground reservoir.
Position Held: Mechanical Expert
Activities Performed: Responsible for verify and evaluate the project
performance indicators in JIC’s design. Review and approval of technical
submittals of data sheet, drawings and QAP as per technical specifications of
contract, Approval of design, drawing of pumping station, 72 MLD advanced
SBR technology Wastewater Treatment Plant, pipelines, Coordinate with
Client/ Contractor for smooth implementation of projects.

Name of Assignment or Project: Design, Construction, Supervision and


Project Implementation Support Consultants for Bankura under West Bengal
Drinking Water Sector Improvement Project (WBDWSIP). ADB Loan No. 3696-
IND, INR 931.18 Crore (Pakage 1: 158.78 Crore, Pakage 2A: 221.74 Crore,
Pakage 2B: 146.54 Crore, Pakage 3: 188.71 Crore, Pakage 4: 215.14 Crore).
Month & Year: April 2019 – March 2021
Location: Bankura, West Bengal
Client: Public Health Engineering Department (PHED)
Main Project Features: Review and approval of data sheet and QAP as per
technical specifications of contract, Approval of design, drawing of pumping
station, pipelines, Implementation Plan, Coordinate with Client/ Contractor for
smooth implementation of projects. Project include five packages including 44
MLD & 36 MLD Intake well, rising main, 44 MLD WTP at Taldanga, 36 MLD
WTP at Gangajalghati, underground reservoir, overhead tank, clear water
pumping station, distribution network with 24 × 7 water supply for Packages 1,
2A, 2B, 3 and 4.
Position Held: Mechanical Expert
Activities Performed: Review and approval of technical submittals of design,
drawing, data sheet and QAP as per technical specifications of contract.
Approval of design, drawing of pumping station, pipelines, Coordinate with
Client/ Contractor for smooth implementation of projects.

Name of Assignment or Project: Program Management, Design &


Construction Supervision Consultancy Services for Rajasthan Urban Sector
Development Program (ADB Loan No. 3182-IND (Program Loan) ADB Loan
No. 3183-IND (Project Loan) INR 3653 Crore).
Month & Year: October 2018 – March 2021,
Location: Rajasthan
Client: Rajasthan Urban Sector Development Program
Main Project Features: Preparation of detail project report and Bid document,
technical specification for water supply and sewerage package of the RUIDP
Project, Review and approval of technical submittals of data sheet and QAP as
per technical specifications of contract, Approval of design, drawing of pumping
station, pipelines, Implementation Plan, Coordinate with Client/ Contractor for
smooth implementation of projects. Involves preparation of detail project
report and Bid document, technical specification for water supply and
sewerage package of the RUIDP Project. Project towns are Tonk, Pali, Sri
Gangangar, Hanumangarh, Kota and Jhunjhunu.

Curriculum Vitae Ratan Kumar Mallick


Position Held: Mechanical Expert
Activities Performed: Responsible for verify and evaluate the project
performance indicators in ADB’s design and monitoring framework and the
service benchmark indicators as issued by the Ministry of UD. Compile and
prepare on behalf of PMU all the reports including progress report for the
project in the formats acceptable to ADB and Government of India. Determine
project accounting need, prepare necessary specification and assist the PMU in
the procurement of all software necessary for effective management of the
project. Review and approval of technical submittals of data sheet and QAP as
per technical specifications of contract, Approval of design, drawing of pumping
station, pipelines, Implementation Plan, Coordinate with Client/ Contractor for
smooth implementation of projects of
a) 30 MLD WTP at Pali, 20 MLD WTP at Sri Ganganagar, 34 MLD WTP at
Hanumangarh,
b) 40 MLD STP, 15 MLD STP, 10 MLD STP at Kota, 30 MLD STP at
Bhilwara, 7 MLD STP at Jhnujhunu, 4 MLD STP & 16 MLD STP at Tonk,
15 MLD STP at Pali, 20 MLD STP at Bikaner, 2 MLD STP & 4 MLD STP at
Hanumangarh.
Employing Organization: AECOM Name of the assignment or project: Project Management Consultancy (PMC)
India Pvt. Ltd. for Kolkata Environment Improvement Investment Program (KMC) Tranche-I
Title/Position: Associate (ADB Funded) I (ADB Loan No. 3053-IND. INR 74683840.00).
Type of Employment: Full Time Month & Year: July 2016 – October 2018
Location: Kolkata, West Bengal
Client: Kolkata Environment Improvement Investment Program (KMC).
Main Project Feature: The consultants will be responsible for effectively
leading and taking initiative to manage, execute and implement the project,
delineate PMU’s method of working, installing procedures, operationalizing
procedures and reporting systems and assist the Design and Supervision
Consultant (DSC) and the PMU to prepare contracts, designing and
procurement, assisting the PMU in examining and evaluating all necessary
survey and sub-project designs, establishing criteria for supervision,
coordination and management to ensure proper construction supervision by
the DSC.
Positions held: Project Engineer (Mechanical)
Activities performed: To assist PMU to finalize detailed design and bidding
documents prepared by the DSC for the new projects for subsequent ADB
financing,
 Hydraulic analysis of transmission main for Garden Reach Water
Treatment Plant.
 Distribution network design for Mukundapur and Parnashree area,
Kolkata.

Name of the assignment or project: Consultancy Services & Preparation of


DPR for Package 3 – 10 ULBs in the state Viz. Holenarasipura, Kanakapura,
Magadi, Chikkamagalur, Kollegal, Nagamangala, Nanjangud, Sira, T. Narasipura
& Shimoga 1. World Bank funded (Later maintain by department itself).
Month & Year: February 2016 – October 2018
Location: Bangalore
Client: Karnataka Urban Infrastructure Development & Finance Corporation.
Main Project Feature: The objective of the consultancy is to provide overall
management support, formulation of project management plans, planning,
design, detailed engineering services, procurement support, construction
supervision support including reporting and advice on physical, financial, social
and institutional matters for implementation of 4.8 MLD WTP at Magadi,
10.68 MLD Intake, WTP at Nanjangud.
Positions held: Project Engineer (Mechanical)
Activities performed: Preparation of GA drawings for pumping station,
distribution network design of Nanjangud (4 Zone) & Magadi (6 Zone) area by

Curriculum Vitae Ratan Kumar Mallick


WaterGEMs, prepare technical specifications for all mechanical items, data
sheet review and approval for all mechanical items like, design 20 km long clear
water rising main and air valve selection, scour valve selection, clear water
pumping station, preparation of quantities, attending review/coordination
meetings with client. Arriving at different pump layout options, design of
optimum plant layout and pump combinations for present, intermediate and
future water demand.

Name of the assignment or project: Infrastructure Work For Vikram


Udyogpuri near Ujjain, Madhya Pradesh INR 325 Crore (Central Government &
State Government funded).
Month & Year: February 2016 – October 2018
Location: Ujjain, Madhya Pradesh
Client: Vikram Udyogpuri Limited, Ujjain,
Main Project Feature: The objective of the consultancy is to provide overall
management support, formulation of project management plans, planning,
design, detailed engineering services, procurement support, construction
supervision support including reporting and advice on physical, financial, social
and institutional matters for implementation. The works include development
of complete internal infrastructure works in the project area consisting of Site
grading, Road network, Water supply system including feeder mains, Waste
water collection system including intermediate Sewage Pumping Stations,
Recycled water distribution system including feeder mains, Storm water
collection system including Rain water harvesting, Internal Electrical system
including street lighting. Instrumentation system for the proposed
infrastructure components.
Positions held: Project Engineer (Mechanical)
Activities performed: Data sheet review and approval for all mechanical items
like, pumps, EOT, valves, vessel, air blower, etc. Review of GA drawings for
pumping station, prepare technical specifications for all mechanical items,
Employing Organization: TATA Name of the Assignment or Project: Engineering Consultancy Work of Phase
Consulting Engineers Ltd. II at Kalinganagar Project, Jajpur, Odisha.
Title/Position: Assistant Manager / Month & Year: September 2014 – February 2016
Manager/Senior Manager Location: Kalinganagar
Type of Employment: Full Time Client: Tata Steel Ltd
Main Project Features: Project focus on expansion of 3.0 million tons per
annum (MTPA) to 6.0 million tons per annum (MTPA), and covers the design,
basic & detail engineering, manufacturing, procurement, inspection and testing at
Tenderer's and/or his sub Tenderers works, packing, forwarding, insurance,
transportation, loading and delivery at site, submission of all
drawings/documents, O & M manuals, training of owner's personnel, supervision
of erection, testing and commissioning including all commissioning spares,
maintenance spares etc.
Position Held: Project Engineer (Mechanical)
Activities Performed: Involved in preparation of plant layouts, GAs drawings,
P&ID, PFD, specification for different systems like ladle furnace, converter, caster,
RH Degasser of steel melt shop, preparation of quantities, attending
review/coordination meetings with Client, project expediting.

Name of the assignment or project: Preparation of DPR and PMC services for
Integrated Sewerage and SWD System for 13 Towns of Jharkhand (Package 1
and 2). (DMICDC).
Month & Year: September 2014 – February 2016
Location: Jharkhand
Client: Jharkhand Urban Infrastructure Development Company Limited
(JUIDCO)
Main Project Feature: JUIDCO has identified 13 towns as part of their plan to
develop basic urban infrastructure in the state. These towns are packaged

Curriculum Vitae Ratan Kumar Mallick


under two consulting packages and the major components selected are
integrated sewerage system and storm drainage system. The scope of the work
comprises of Preparation of Feasibility Studies, Detailed Project Reports (DPR)
and Bid Documentation for these selected towns of Jharkhand along with
Project Management Consultancy Services (PMC).
Positions held: Project Engineer (Mechanical)
Activities performed: Involved in preparation of layouts of sewage pumping
station, GAs drawings, pump selection, design of optimum plant layout and
pump combinations for present water demand, intermediate and future
demand, cost estimation, BOQ, attending review/coordination meetings with
client.

Name of the Assignment or Project: Improvement of Service Level (24 × 7)


for Water Supply in Mehrauli and Vasant Vihar Project Area for Delhi Jal
Board (DJB).
Month & Year: June 2013 - September 2015
Location: Delhi
Client: Delhi Jal Board / MVV Water Utility Limited
Main Project Features: Project focuses on improvement of service level of
water supply in Mehrauli and Vasant Vihar areas of Delhi. The prime scope of
services includes 100% consumer coverage, 95% of total functionality of
consumer meters, 95% consumer complaint resolution, 100% water quality
and portability of supplied water and 17 m residual pressure at critical
measurement points with 100% compliance at the end of construction period.
Position Held: Project Engineer (Mechanical)
Activities Performed: Involved in preparation of plant layouts, pumping
station GAs drawings, preparation of quantities, attending review/coordination
meetings with Client, project expediting.
Arriving at different pump layout options (Project being Brownfield), design of
optimum plant layout and pump combinations for present water demand,
intermediate and future demand.

Name of the Assignment or Project: (i) Preparation of DPRs for (24 × 7)


water supply, integrated sewerage and SWD systems for 59 towns Package -
10 & Munger - 2, (ii) Preparation of DPRs for (24 × 7) water supply, integrated
sewerage and SWD systems for 25 towns Package – 1.
Month & Year: June 2013 – September 2014
Location: Bihar
Client: Bihar Urban Infrastructure Development Corp Ltd (BUIDCo).
Main Project Features: The project include preparation of feasibility report
(FR), detailed project report (DPR) for sewerage, water supply & storm water
system including underground sewerage pipe network, contract management
in respect of new sewage treatment plant (STP), water treatment plant (WTP)
and operation & maintenance.
Position Held: Project Engineer (Mechanical)
Activities Performed: To identify the location of water works/treatment
plants, preparation of design basis report of pumping station, Water Treatment
Plant, Sewage Treatment Plant (STP), preparation general arrangement
drawing of Sewage pumping station, pump selection.

Name of the assignment or project: Consultancy for design of UGR/ BPS at


Village Rajokri, Bijwasan & Mayapuri for Delhi Jal Board (DJB).
Month & Year: June 2013 – February 2016
Location: Delhi
Client: Delhi Jal Board (DJB).
Main Project Features: Project focuses on improvement of service level of
water supply in Mangalpur kalan, Rajokri, Bijwasan & Mayapuri areas of Delhi.
The prime scope of services includes undertaking detailed investigations of

Curriculum Vitae Ratan Kumar Mallick


project components and achieving minimum service level as below;
100% consumer coverage, preparation Underground Reservoir and booster
pumping station.
Position Held: Project Engineer (Mechanical)
Activities Performed: Involved in Design of Booster pumping stations. Work
involved preparation of plant layouts, GAs, flow diagrams, preparation of
quantities, cost estimates, attending review/coordination meetings with client,
etc.
Employing Organization: MWH Name of the assignment or project: National Ganga River Basin Authority,
India Private Limited (Ministry of Environment and Forests, Government of India), Asian
Title/Position: Project Engineer Development Bank (ADB Funded).
Type of Employment: Full Time Month & Year: July 2012 – May 2013
Location: Dehradun/Haridwar
Client: Uttarakhand Peyjal Sansadhan Vikas Evam Nirman Nigam
Main Project Features: The project include preparation of city sanitation plan
(CSP), feasibility report (FR), detailed project report (DPR), tender document,
sewerage system including underground sewerage pipe network, contract
management in respect of new sewage treatment plant (STP) and operation &
maintenance, Rehabilitation of STP.
Position Held: Project Engineer (Mechanical)
Activities Performed: Involved in Design of new sewage pumping stations (4
Nos) & re design of (22 Nos) existing sewage pumping stations. Preparation
of Plant layouts, GAs drawings, flow diagrams, preparing BOQ, cost estimates.
Data collection from existing sewage treatment plant (STP), sewage pumping
station (SPS), main pumping station (MPS), making conditional assessment for
18 MLD STP, 3 MLD & 27 MLD STP and all SPS, MPS at Haridwar, Rishikesh
and Swargashram

Name of the Assignment or Project: Construction of new 12 MGD Sewage


Treatment Plant and rehabilitation of 20 MGD and 40 MGD Sewage Treatment
Plant, Japan International Cooperation Agency (JICA Aided).
Month & Year: July 2012 – May 2013
Location: Keshopur, Delhi
Client: Delhi Jal Board.
Main Project Features: The project include design, construction,
commissioning, operation & maintenance of (i) 12 MGD capacity raw sewage
pumping station (SPS) and (ii) one module of 12 MGD capacity sewage
treatment plant (STP) on Turnkey Basis at Keshopur, and rehabilitation of 2
existing modules of 20 MGD and 40 MGD capacity sewage treatment plants
(STP) at Keshopur.
Position Held: Project Engineer (Mechanical)
Activities Performed: Extensive site visits of existing sewage pumping
stations including reconnaissance of existing equipments, water booster
pumping stations, sewage treatment plants of Delhi Jal Board to assess the
existing situation for operation & maintenance aspects, and recommend
detailed refurbishment requirements.

Name of the Assignment or Project: Construction of new 30 MGD Sewage


Treatment Plants (STP) at Okhla, New Delhi, Japan International
Cooperation Agency (JICA Aided).
Month & Year: July 2012 – May 2013
Location : Okhla, Delhi
Client : Delhi Jal Board
Main Project Features: The project include design, construction,
commissioning and operation & maintenance (for a period of 10 years) of
136.4 MLD capacity sewage treatment plant at Okhla forms one such separate
package as a turnkey project with an estimated cost of Rs. 149.50 crores.
Position Held: Project Engineer (Mechanical)

Curriculum Vitae Ratan Kumar Mallick


Activities Performed: Extensive site visits of existing sewage pumping
stations including reconnaissance of existing equipments, water booster
pumping stations, sewage treatment plants of Delhi Jal Board to assess the
existing situation for operation & maintenance aspects, and recommend
detailed refurbishment requirements.
Employing Organization: Mott Name of the Assignment or Project: Mumbai IV – Middle Vaitarna Water
MacDonald Private Limited Supply Project (JNNURM Funded).
Title/Position: Design Engineer Month & Year: October 2010 - July 2012
Type of Employment: Full Time Location : Mumbai
Client: Municipal Corporation of Greater Mumbai (MCGM/BMC)
Main Project Feature: Detailed design, tendering and construction
supervision of 1540 MLD Intake at Modaksagar, 3.5 m finished diameter 7.5 km
long tunnel from Modaksagar to Bell Nallah, 3000mm dia M.S. pipeline from
Bell Nallah to Y-Branch, 6.25 m finished diameter 15 Km long tunnel from
Gundovli to Bhandup Complex, 900 MLD WTP, pumping station and 140 Ml
MBR, and feasibility study for Gargai and Pinjal water sources including
location of the dam, type of dam, yield study and feasibility of transmission of
water to the city. Rehabilitation of 64 MLD WTP at Tulsi.
Position Held: Design Engineer (Mechanical).
Activities Performed: As a design engineer, reviewing designs of 900 MLD
WTP, mechanical GAs, equipment datasheets and vendor specifications,
reviewing contractor’s proposals and reports. Preparation of DPRs, tender
documents and drawings. Factory inspection and material testing,
correspondences. Coordination between client, contractors and sub
consultants.

Name of the Assignment or Project: Mumbai Sewage Disposal Project, Stage


II Priority Works.
Month & Year: October 2010 - July 2012
Location: Mumbai
Client: Municipal Corporation of Greater Mumbai (MCGM)
Main Project Feature: Design and supervision for priority works comprising
of new sewage collection system (15 km length, 1050 mm to 2500 mm
diameter relief sewer), rehabilitation of existing sewers (25 km length, 1050
mm to 1800 mm diameter man entry sewers), expansion of existing PS,
construction of new PS and rising mains (17 MLD to 1780 MLD), Waste water
Treatment Facilities.
Position Held: Design Engineer (Mechanical).
Activities Performed: As a design engineer, was responsible for Assisting in
design of IPS (Influent pumping station) at Versova, Malad machinery
pumping station layouts, rising mains.

Name of the Assignment or Project: Dilmunia Health Island Design,


Manama, Bahrain
Year : October 2010 - July 2012
Location: Bahrain
Client: Ithmaar Development Company (IDC)
Main Project Feature: Detail design and producing construction drawings and
bill of quantities for water supply, sewerage, irrigation with treated sewage,
storm water drain, canal and sea water pumping station, street lighting,
highways’, bridges and traffic components.
Position Held: Design Engineer (Mechanical)
Activities Performed: Responsible for hydraulic calculation for Canal Water
Transfer Main Pumping System, general arrangement drawings, complete BOQ
etc.

Name of the Assignment or Project: 90 MLD Water Treatment Plant at Vihar


Month & Year: October 2010 - July 2012

Curriculum Vitae Ratan Kumar Mallick


Location: Mumbai
Client: Municipal Corporation of Greater Mumbai (MCGM)
Position Held: Design Engineer (Mechanical)
Activities Performed: Detailed designs, tendering and construction
supervision of 90 MLD Water Treatment Plant at Vihar.

Name of the Assignment or Project: Design and Supervision consultancy


services-Garhwal Region, Asian Development Bank (ADB Funded).
Month & Year: October 2010 - July 2012
Location: Dehradun
Client: Uttrakhand Urban Sector Development Investment Programme
(UUSDIP)
Main Project Feature: Development of Water supply project, sewerage project
like 68 MLD STP, solid waste management, slum upgradation and other related
systems in 18 town of Uttarakhand state including design, construction
supervision. Total cost of the project INR 13000 Million ($ 280 Million).
Position Held: Design Engineer (Mechanical)
Activities Performed: Data collection from all existing pumping stations,
Treatment plants, and pipelines for further improvement. Design pumping
station, pump selection & sump design, reviewing designs, mechanical GAs,
equipment datasheets and vendor specifications, reviewing contractor’s
proposals and reports.

Name of the Assignment or Project: Maldives Tsunami Infrastructure


Rehabilitation Project- Sewerage System Creation in 4 Islands, Agence
Francaise de Development (AFD Funded).
Month & Year: October 2008 – September 2010
Location: Maldives
Client: Agence Francaise de Developpement (AFD).
Main Project Feature: Construction of sewage system in 4 Islands (Laamu Gan,
Thinadhoo, Velhidhoo and Holhudhoo) - Sewage collection, Treatment and sea
disposal of effluent. Comparison of 3 different sewerage systems i. e. Gravity
System, Septic Tank in Cluster and Small bore System considering the stringent
site conditions like high water table, sandy soil, scattered population, etc.
Project cost is 10 Million euros (approximately).
Position Held: Design Engineer (Mechanical)
Activities Performed: Design Manhole Pumping station for N.Velidhoo
Pumping Main, Mukurimagu Pumping Main and Thinadhoo Pumping Main
(Pump selection, Preparation drawing etc).
Employing Organization: Shah Name of the Assignment or Project: Preparation of Feasibility Report for the
Technical Consultant Pvt. Ltd. Rehabilitation, Augmentation and Operation of the Water Supply and
Title/Position: Design Engineer Sewerage System in Udaipur Town through PPP. Rajasthan.
Type of Employment: Full Time Month & Year: October 2008 – September 2010
Location: Rajasthan
Client: Public Health Engineers Department of Rajasthan Region Udaipur.
Main Project Feature: The objective of this project is to undertake feasibility
studies and prepare a feasibility report for determining the technical feasibility
and financial viability for the upgradation, augmentation and operation of the
water supply, sewerage system and recycled waste water system in Udaipur
town through Public Private Partnership. Total connections were around
60000 and population around 0.7 million. The components included 3 intakes
& WTP’s at Mansi Wakal River intake & 70 MLD WTP, Rajsamand WWTP, 600
KM Sewer Network, Total estimated project cost is INR 10000 million (USD 153
million).
Position Held: Design Engineer (Mechanical)
Activities Performed: As a design engineer, was responsible for design
Pumping station, equipment’s of 70 MLD WTP, GAs, 17 km long Mild Steel
Transmission main pipe line, design 30 km long Mild Steel Gravity main pipe

Curriculum Vitae Ratan Kumar Mallick


line, etc.

Name of the Assignment or Project: Renovation, Rehabilitation and


Upgradation of Cauvery Water Supply Scheme (Stage I, II & III).
Month & Year: October 2008 – September 2010
Location: Bangalore
Client: Bangalore Water Supply and Sewage Board.
Main Project Feature: Augment the carrying capacity from present 540 MLD
to 635 MLD in all three Stages I, II and III for T.K.Halli, Harohalli and Tataguni
through 9 Pure water tanks / nine pumping stations & finally Bangalore City.
Position Held: Design Engineer (Mechanical)
Activities Performed: As a dsign engineer, was responsible for design
Pumping station, GAs, 210 km long Mild Steel Transmission main pipe line,
design 30 km long Mild Steel Gravity main pipe line, etc.

Name of the Assignment or Project: Preparation of Detailed Project Reports


under Jawaharlal Nehru National Urban Renewal Mission for Sewerage System
for Panaji City in the State of Goa, (JNNURM Funded).
Month & Year: October 2008 – September 2010
Location: Goa
Client: Government of Goa
Main Project Feature: Design, Construction, Supply, Erection, Testing and
Commissioning of cyclic Activated sludge process/SBR based 1MLD sewage
Treatment Plant including O&M for 5 years on turnkey basis at EDC Patto.
Position Held: Design Engineer (Mechanical)
Activities Performed: As a design engineer, was responsible for design surge
tank, air receiver, One way Vessel, design 7 km long Mild Steel Transmission
main pipe line, L – section for Transmission main, preparation of BOQ, cost
estimate, etc.

Name of the Assignment or Project: Aurangabad Water Supply Project –


Build, Refurbish, operate and maintain Water Supply System on PPP. Asian
Development Bank (ADB Funded)
Month & Year: October 2008 – September 2010
Location: Aurangabad
Client: Aurangabad Municipal Corporation. Government of Maharashtra.
Main Project Feature: The scope of work include Rehabilitation / Expansion
of Water Distribution System for Aurangabad City for total area under its
jurisdiction i.e. 138.5 sq. kms and 24.7 lacs population for year 2041 provide
maximum water supply coverage and equitable distribution of water with
adequate pressure. The bulk water components included 130 MLD intake, 130
MLD WTP and 35 km 1200 mm diameter rising main and 300 km of
distribution system. The estimated cost for base year 2011 is 147.34 Cr and
target year 2041 is 202.11 Cr.
Position Held: Design Engineer (Mechanical)
Activities Performed: As a design engineer, was responsible for design surge
tank, air receiver, One way Vessel, design 7 km long Mild Steel Transmission
main pipe line, equipment’s of 130 MLD intake pumping station & 130 MLD
WTP equipment, L – section for Transmission main, preparation of BOQ, cost
estimate, etc.
Employing Organization: Pratibha Name of the Assignment or Project: Bhagirathi Water Treatment Plant
Industries Limited. (Recycling Process - Turnkey Basis).
Title/Position: Site Engineer Month & Year: March 2007 – July 2008
Type of Employment: Full Time Location: Delhi
Client: Delhi Jal Board (DJB)
Main Project Feature: Design, Construction, Supply, Erection, Testing and
Commissioning of 10 MGD conventional Water Treatment Plant including O&M
for 3 years on turnkey basis.

Curriculum Vitae Ratan Kumar Mallick


Position Held: Site Engineer (Mechanical)
Activities Performed: As a design engineer, was responsible for design of
Booster pumping station, GA drawings, erection all mechanical items of 10 MGD
Water Treatment Plant (WTP).
Employing Organization: Petron Name of the Assignment or Project: 500 MW NTPC.
Engineering Construction Limited Month & Year: August 2005 – February 2007
Title/Position: Site Engineer Location: Rihand
Type of Employment: Full Time Client: NTPC/BHEL
Main Project Feature: Design, Construction, Supply, Erection, Testing and
Commissioning of pipeline conventional 500 MW Power Plant.
Position Held: Graduate Engineer Trainee
Activities performed: Study the drawing through AUTO-CAD software, study
and root cause analysis of management failure, communicate Upper level &
Lower level, some times Management of labour.

Contact Information: E-MAIL: rattan_mech@yahoo.co.in; PHONE: 8468076599

______________________________________________________________________________________________________ Date: _______________


[Ratan Kumar Mallick] Day/Month/Year

Curriculum Vitae Ratan Kumar Mallick

You might also like