SANT LONGOWAL INSTITUTE OF ENGINEERING ANDTECHNOLOGY

DEPARTMENT OF MECHANICAL ENGINEERING

Sub. Name: Principle of Industrial Engineering Time Allowed: 1 Hrs.


MINOR-I
Sub. Code: PCME-622 Max. Marks: 30
Teacher’s Name: Dr. Amrik Singh February: 2022

Note: Attempt all questions

Q.1. Answer the following questions.


i. Basic tool in work study is 1
a. Graph paper
b. Process chart
c. Planning chart
d. Stopwatch.
ii Work study is concerned with 1
a. Improving present method and finding standard time
b. Motivation of workers
c. Improving production capability
d. Improving production planning and control
iii Which one of the following charts gives simultaneously information about the progress of work 1
and machine loading?
a. Process chart
b. Machine load chart
c. Man-machine chart
d. Gantt chart
iv Which of the following layouts is suited for mass production? Justify your answer 2
v What is productivity? Define the term partial productivity. 2
vi Distinguish between observed time, normal time and standard time? 2
Q.2. Classify the different types of production system. Discuss the characteristics of any one type in 7
detail.
Q.3. What are the chief functions of Industrial Engineering department? List them 7

Q.4. What is therbligs? State the importance of micro motion study? 7