Professional Documents
Culture Documents
THESL 31-4015 - PMH Clearances
THESL 31-4015 - PMH Clearances
(20'-3")
3000
(10'-0")
SEE NOTE 4
2000 2000
(6'-7") (6'-7")
PAD-MOUNT FOUNDATION
STD. 31-4050
7980
SWITCHGEAR
(26'-2")
GROUNDING GRID
DOORS
4830
4067 (15'-10")
(13'-4")
1- 3-
1500 1500
PHASE 1500 1500
PHASE
(5'-0") TRANSF. (5'-0")
(5'-0") TRANSF. (5'-0")
5820 6330
(19'-1") (20'-9")
DOORS
3000
3000
(10'-0")
(10'-0")
NOTES:
1) ANY AND ALL OBJECTS WITHIN THE CLEARANCE ZONE AREA, ARE SUBJECT TO REMOVAL WITHOUT ANY PRIOR
2) TORONTO HYDRO SHALL NOT BE HELD RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH THE REMOVAL OR
RESULTING DAMAGE TO ANY OBJECTS WITHIN THE CLEARANCE ZONE AREA. THE DEVELOPER/OWNER
ASSUMES ALL RESPONSIBILITY FOR ENCROACHING WITHIN THE CLEARANCE ZONE AREA.
4) IN CASES WHERE THE DESIGN REQUIRES A VALUE LESS THAN THE SPECIFIED LIMITATION, CONTACT
DI
STRI
BUTI
ON CONSTRUCTI
ON STANDARD
Ci
vilConst
ruct
ion PAD-
M OUNTS
Appr
oved By:
es
ch
et
Sk
ft
ra
D
x = NUMBER OF 100mm DUCTS
FOR REVIEW ONLY
TO CUSTOMER
12
5 7
10.3
2
1.
1 1
0
4 4
3.
31-4015 (CLEARANCE)
18-5500 (GROUNDING)
0
4
8.
31-4050 (PAD)
31-4080 (BOLLARDS)
0.7
2.0
2.0 12
2.0
12
2 2
MIN.
14 14
TO THESL SYSTEM 30 2