6160

(20'-3")

CLEARANCE LINE (TYP.)

3000

(10'-0")
SEE NOTE 4

2000 2000

(6'-7") (6'-7")

PAD-MOUNT FOUNDATION
STD. 31-4050
7980
SWITCHGEAR
(26'-2")

GROUNDING GRID

DOORS

CLEARANCE ZONE AREA REQUIRED


3000
FOR EQUIPMENT VENTILATION AND
(10'-0") SWITCHING OPERATION. NO PLANTS
OR SHRUBS ALLOWED IN THIS AREA.

4830
4067 (15'-10")
(13'-4")

PAD-MOUNT 1500 PAD-MOUNT


1500 FOUNDATION FOUNDATION
(5'-0")
(5'-0")
STD. 31-4020 STD. 31-4030

1- 3-
1500 1500
PHASE 1500 1500
PHASE
(5'-0") TRANSF. (5'-0")
(5'-0") TRANSF. (5'-0")
5820 6330
(19'-1") (20'-9")

DOORS

3000
3000
(10'-0")
(10'-0")

CLEARANCE ZONE AREA REQUIRED FOR


EQUIPMENT VENTILATION AND SWITCHING OPERATION.
NO PLANTS OR SHRUBS ALLOWED IN THIS AREA.

NOTES:

1) ANY AND ALL OBJECTS WITHIN THE CLEARANCE ZONE AREA, ARE SUBJECT TO REMOVAL WITHOUT ANY PRIOR

NOTICE SHOULD OPERATIONAL OR EMERGENCY CONDITIONS EXIST.

2) TORONTO HYDRO SHALL NOT BE HELD RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH THE REMOVAL OR

RESULTING DAMAGE TO ANY OBJECTS WITHIN THE CLEARANCE ZONE AREA. THE DEVELOPER/OWNER

ASSUMES ALL RESPONSIBILITY FOR ENCROACHING WITHIN THE CLEARANCE ZONE AREA.

3) FINAL FINISHED GRADE WITHIN CLEARANCE ZONE SHALL NOT BE ALTERED.

4) IN CASES WHERE THE DESIGN REQUIRES A VALUE LESS THAN THE SPECIFIED LIMITATION, CONTACT

STANDARDS AND MATERIALS FOR APPROVAL PRIOR TO IMPLEMENTATION.

2 5) REFER TO STD. 31-4080 GUARD POSTS (BOLLARDS) PLACEMENT FOR DETAILS.

DI
STRI
BUTI
ON CONSTRUCTI
ON STANDARD
Ci
vilConst
ruct
ion PAD-
M OUNTS
Appr
oved By:

J.D. 2014-10-02 CLEARANCE ZONE


TORONTO
HYDRO Dr
aft
ed By: Desi
gned By: Or
igi
nalI
ssue: Scal
e: Rev:

Y.A. J.D. J.D. 2013-05-31 N.T.S. 2 31-


4015 1/
1
Add.
TTC Add. Load In-Service PMH Easement
Address Feeders Load Expansion Service?
Location Winter Date required Req
Summer
Kennedy ES-GO rail tracks & Eglin.Ave.E E5-M3/R43-M26 6900 6900 Feb 2025 YES YES YES UG
TPSS1 1269 Danforth Road E5-M22/E5-M25 1770 1770 Oct 2024 YES YES YES OH/UG
EEB3 1346 Danforth Road E5-M23/E5-M3 1383 1383 Q4 2024 YES YES YES OH/UG
EEB5 3030 LAWRENCE AVE E E5-M23/H9-M28 260 260 Q4 2023 YES YES NO UG
TPSS2 H1 Corridor nort of McCowan E5-M24/H9-M31 1700 1700 Sept 2023 YES YES YES UG/OH
SCS/LS/WS 300 BOROUGH DR H9-M27/H9-M28 5600 5600 Sept 2024 YES YES YES UG

es
ch
et
Sk
ft
ra
D
x = NUMBER OF 100mm DUCTS
FOR REVIEW ONLY

TO CUSTOMER

12

5 7

10.3

2
1.
1 1
0
4 4
3.

31-4015 (CLEARANCE)
18-5500 (GROUNDING)

0
4

8.
31-4050 (PAD)
31-4080 (BOLLARDS)
0.7
2.0

2.0 12
2.0
12
2 2
MIN.

14 14

TO THESL SYSTEM 30 2

THIS IS A COMPOSITE SKETCH OF MULTIPLE STANDARDS FOR A


TYPICAL LAYOUT OF TWO PADMOUNTED SWITCH GEARS.

THE NUMBER OF DUCTS AND ARRANGEMENT SHOWN MAY VARY


BASED ON SITE CONDITIONS AND SERVICE REQUIREMENTS.
AN EFFORT HAS BEEN MADE TO ACCOUNT FOR WORST CASE
SCENARIO.

REFER TO STANDARD DRAWINGS FOR OFFICIAL INFORMATION.