Verificación Instalación Interruptores

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
526P338-002 145 PMC Tank Mounted Density Monitor Checklists Page 4 145 PMC Installation and Commissioning Checklist (page 1) Date: ‘Substation: Breaker ID Number: Line or Bus: Item/Conditions to Check (Units) Check Breaker Data: Breaker Type: Serial Number: Maximum Rated Voltage (kV) kv Maximum Rated Continuous Current (A) A Maximum Short Gircuit Current (kA) KA Control Voltage (VDC) voc Auxiliary Voltage (VAC) vac ‘SF6 Pressure at 68°F (20°C) 87 psig (0.60 MPaG) Mechanism Type: Serial Number: Breaker leveled and properly anchored? All grounding connections properly made? Control wiring landed? CTs connected to relaying or metering burden (or short circuited?) If optional capacitors provided, are they installed? ‘SFE Gas Filing Pressure (psig) (MPaG) and Filling Temperature 1) For breakers with three tank-mounted density monitors, measure all three poles. 2) For breakers with only one tank-mounted density monitor, measure the pole with the density gauge. —__psig Pole 1 °F oor —___ psig Pole 2: °F oor —___ psig Pole 3: MPaG MPaG MPaG and Maintenance module. Note: The breaker must be filled was specified on the Density Monitor Calibration Chart as shown in the Installation @danuary 2005 526P338-002 145 PMC Tank Mounted Density Monitor Checklists Page 5 145 PMC Installation and Commissioning Checklist (page 2) Date: ‘Substation: Line or Bus: Breaker ID Number: Item/Conditions to Check (Units) Check ‘Check for loose hardware Clean entrance bushings Check bushing insulators for any cracks ‘Touch up chipped or scratched paint Check the anti-pumping circuit ‘Check control cabinet anti-condensation heaters If your breaker has tank heaters, check that they are oper- ating ‘Check alarms and lock-outs Leak Check Testing Leak check any gas connections and fittings Leak check the SF6 Gas Density Monitor(s) Leak check the pressure gauge fittings Leak check the rupture disks Leak check the bushing flanges. Leak check the rear tank cover assemblies Leak check the bellcrank housings: Leak check the interphase shaft seals with the breaker in the OPEN and CLOSED positions Contact resistance terminal to terminal (Refer to the Customer Data module for specified contact resistance values.) Pole 1 Pole 2: Pole 3: microohms imicroohms imicroohms SF6 Gas Moisture Content (to be taken no sooner than 3 days after filing the breaker with gas) "200 PPMV maximum - Refer to the installation & Mainte- nance module For Breakers with 3 tank-mounted density monitors mea- sure all 3 poles, For breakers with only one, measure the pole with the density gauge. Pole 4 PPMV_at, °F or °C Pole 2: PPMV_at, °F or. c Pole 3: PPMV at, °F or c ‘Complete the Mechanism Commissioning Checklist (in the Mechanism module) Check the breaker timing - complete the Timing Checklist in the Customer Data module. (Refer to the Timing mod- ule for procedures on performing timing tests.) Reading on the operations counter Pole 4 Pole 2: Pole 3: ‘Test performed by: “Refer to the Installation & Maintenance module for further details vanuary 2005

You might also like