PREPARED BY: CHECKED BY: APPROVED BY:

NAME NAME NAME


DESIGNATION CHIEF, PLANNING AND DESIGN DIVISION/SECTION DISTRICT ENGINEER/REGIONAL DIRECTOR
PREPARED DESIGN PLANS - CY ______
(Approved and Advertised)

[Part C]
[Part A] [Part B] [Part D]
DESIGN TEAM
PROJECT DESCRIPTION DESIGN PREP. TIMELINE DESIGN ACTIVITIES and PROJECT COMPONENTS INVOLVED IN THE DESIGN PLANS
(exclude Checkers/Supervisors/Managers)

DRAFTING AND
DATE SUBMITTED TOPOGRAPHIC/ GEOHAZARD/ BRIDGE BUILDING
PROJECT DATE STARTED JOB ORDER? DETAILING DRAINAGES / ROADS / ROAD DIKES / LEVEES / ARCHITECTURAL MECHANICAL/ HVAC ELECTRICAL PLUMBING / FIRE PROTECTION
No. PROJECT ID PROJECT TITLE SCOPE OF WORK ALLOCATION FOR APPROVAL PERSONNEL INVOLVED DESIGNATION HYDROGRAPHIC GEOTECHNICAL/ STRUCTURAL STRUCTURAL REMARKS
CATEGORY (MM/DD/YYYY) (Y/N) (COMPUTER AIDED DITCHES / CANALS DIKES / CAUSEWAY SLOPE PROTECTION DESIGN SYSTEMS SYSTEMS SANITARY SYSTEMS SYSTEMS
(MM/DD/YYYY) SURVEY FOUNDATION SYSTEMS SYSTEMS
DESIGN)

1 21O00065 CONSTRUCTION OF NEW CITY PROSECUTOR'S BUILDING NEW CONSTRUCTION 145,000,000.00 2/1/2020 2/6/2020 Juan Dela Cruz Engineer II N 1 0 1 0 0 0 0 1 0 1 1 1 1 Geotech Inv. And MEPF
Design was outsourced due to
Pedro Montemayor Architect II N 1 0 1 1 0 0 0 0 1 0 1 1 1 lack of equipment and in-
Pablo Medina Engineer I Y 1 0 1 1 0 0 0 1 0 1 1 1 1 house capacity.
Jose Cruz Engg. Asst. Y 1 0 0 0 0 0 0 0 1 0 0 0 0
TOTAL 4 0 3 2 0 0 0 2 2 2 3 3 3
2 21OC0028 CONSTRUCTION OF DRAINAGE MAIN ALONG DRAINAGE NEW CONSTRUCTION 40,000,000.00 4/3/2020 5/8/2020 Juan Dela Cruz Engineer II N 1 0 1 1 0 0 0 0 0 0 0 0 0 Geotech Inv. was outsourced
CHINO ROCES AVENUE FROM CALATAGAN due to lack of equipment and
CREEK TOWARDS BUENDIA AVENUE, Pablo Medina Engineer I Y 1 0 0 0 0 1 1 0 0 0 0 0 0 in-house capacity.
MAKATI CITY, METRO MANILA Jose Cruz Engg. Asst. Y 1 0 0 0 0 1 1 0 0 0 0 0 0
TOTAL 3 0 1 1 0 2 2 0 0 0 0 0 0
PREPARED DESIGN PLANS - CY ______
(Approved and Advertised)

[Part C]
[Part A] [Part B] [Part D]
DESIGN TEAM
PROJECT DESCRIPTION DESIGN PREP. TIMELINE DESIGN ACTIVITIES and PROJECT COMPONENTS INVOLVED IN THE DESIGN PLANS
(exclude Checkers/Supervisors/Managers)

DRAFTING AND
DATE SUBMITTED TOPOGRAPHIC/ GEOHAZARD/ BRIDGE BUILDING
PROJECT DATE STARTED JOB ORDER? DETAILING DRAINAGES / ROADS / ROAD DIKES / LEVEES / ARCHITECTURAL MECHANICAL/ HVAC ELECTRICAL PLUMBING / FIRE PROTECTION
No. PROJECT ID PROJECT TITLE SCOPE OF WORK ALLOCATION FOR APPROVAL PERSONNEL INVOLVED DESIGNATION HYDROGRAPHIC GEOTECHNICAL/ STRUCTURAL STRUCTURAL REMARKS
CATEGORY (MM/DD/YYYY) (Y/N) (COMPUTER AIDED DITCHES / CANALS DIKES / CAUSEWAY SLOPE PROTECTION DESIGN SYSTEMS SYSTEMS SANITARY SYSTEMS SYSTEMS
(MM/DD/YYYY) SURVEY FOUNDATION SYSTEMS SYSTEMS
DESIGN)

TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0
2

TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0

PREPARED BY: CHECKED BY: APPROVED BY:

NAME NAME NAME


DESIGNATION CHIEF, PLANNING AND DESIGN DIVISION/SECTION DISTRICT ENGINEER/REGIONAL DIRECTOR