CURRICULUM VITAE (CV)

1. Name: RAJVEER GUPTA

2. Date of Birth: 24/06/1969

3. Nationality: Indian

4. Personal Address: 214 A, Shiv Shakti Nagar A, Jagatpura Road Model Town, Jaipur 302017

Telephone No.: 7976923806

Mobile No.: 9166222293

Fax No.: NA

E-Mail Address: rajveergupta98@gmail.com

5. Education

College / University Degrees Obtained Duration

B.E. (Civil) MBM Engineering College, Jodhpur Full Time 1987 to 1991

6. Other Training: Formation Rehabilitation & Quality Control, (RDSO, LKO)

7. Language & Degree of Proficiency: Read Write Speak

English Excellent Good Good

Hindi Excellent Excellent Excellent


8. Countries of Work Experience India

9. EMPLOYMENT RECORD: (Starting with present position, list in reverse order every employment held and state the start and end dates of each employment)

Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

Jul 2018 Till Date RITES Ltd. Name of the Project: Resident In-charge of the Main Project Features: NA
(Client: Gujarat  Construction of Elevated Metro Engineer Project For Metro Stations;
Metro Rail Rail Station-Five Stations  Pretensioned (PSC) Girder span 17.00 meter
Corporation Limited) (Motera, Sabarmati, AEC,
 Post Tensioned (PSC) Girder Span 17.00 meter
Sabarmati Rail & Ranip) in N-S
corridor for Ahmedabad Metro  There are 5 stations, each station @ 170 numbers
Rail Project Phase-I. of girders.
 Construction of Viaduct Corridor For Viaduct Corridor:
from North End of Ranip Station  Span Length Varies from 22.00 Meter to 37.00
to Dead End of Motera from Meter. Segmental Span (PSC)
chainage (+)12300.20 to  Total 150 Spans.
(+)17147.20 on package 4a of
 Total Cost of both Package; Rs 500 Crore.
N-S Corridor.
Description of Duties:
 Construction Supervision of day-to day work
Client: Gujarat Metro Rail
including quality and quantity which include all
Corporation. (GMRC) Ltd.
ancillary works such as enabling works, utility
shifting, tree cutting, dismantling of existing
Location: Ahmedabad, India structures etc.
 Ensure performance of work in strict compliance
with the plans and specifications.
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

Length: 5.6 KM  To hold site review meeting and review the


program of work.
 Inspect the records. Certification, determination,
instruction, opinion or evaluation of disputes.
 Submit the recommendation to GMRC from time
to time.
 Submit the recommendations to GMRC with
reference to proposals of additional work and/or
variations.
 Certification of Interim payment applications.
Safety, health and environment monitoring.
Maintenance of all relevant records.
 Attending various meetings such as Monthly
Progress review meetings, Interface meetings, SHE
committee meetings etc.

Sept Jul 2018 RITES Name of the Project: Senior Next to the Main Project Features: NA
2015 (On deputation from  Construction of Elevated Metro Section In-charge of the That was Short Duration Targeted Work to Construct
Indian Railways) Rail Station-Five Stations Engineer Section of the 48 Seated Hostel for Railway Drivers & Guards.
Client : Gujarat Metro (Motera, Sabarmati, AEC, Project
Rail Corporation Sabarmati Rail & Ranip) in N-S
Description of Duties:
Limited corridor for Ahmedabad Metro
Rail Project Phase-I.  Construction, Supervision of day-to day work
including quality and quantity which include all
 Construction of Viaduct Corridor
ancillary works such as enabling works, utility
from North End of Ranip Station
shifting, tree cutting, dismantling of existing
to Dead End of Motera from
structures etc.
chainage (+)12300.20 to
(+)17147.20 on package 4a of  Ensure performance of work in strict compliance
with the plans and specifications.
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

N-S Corridor.  To submit the measurements & Bill of Executed


work from time to time.
Client: Gujarat Metro Rail  Approving design for enabling work. Inspect the
Corporation. (GMRC) Ltd. records. Certification, determination, instruction,
opinion or evaluation of disputes.

Location: Ahmedabad, India

Length: 5.6 KM

Aug Sep Indian Railways Name of the Project: Sikar-Churu Senior In-charge of the Main Project Features: NA
2014 2015 Gauge conversion Project (90 Section Section of the  This Project Was the Part of providing “Alternate
Kms) Engineer Project Railway Broad Gauge Route Between Jaipur-
Formation in Embankments / Bikaner”
Cuttings, Bridges, Structures (Civil  The project was important From Strategic Point
Works for Bridges and Formation
 Almost all Railway Crossings were eliminated by
in Embankment / cutting and
Providing “Precast RCC Box Under passes”
Structures in approaches for
150m length from Abutments), Description of Duties:
Buildings, Ballast on Formation, As a Section Engineer responsible for Preparation of
 E/W Formation / Blanketing Tenders for
 Under Passes -21 Numbers a) Under passes
 Running Room Building (50 b) Misc. Civil Works
seated) c) Running Room
 Station Buildings - 2 Numbers  Construction Supervision of day-to day work
 Platform Works including quality and quantity which include all
ancillary works such as enabling works, utility
a) Platform Surfacing
shifting, tree cutting, dismantling of existing
b) Platform Covering Shed
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

Specific Section of Project: Sikar- railway structures etc.


Churu Section  Ensure performance of work in strict compliance
Client: Indian Railways with the plans and specifications as per RDSO
Location: Sikar- Churu, Rajasthan guidelines.
Length: 90 Kms  Verification of bar bending schedules, checking
alignment and formwork.
 To hold site review meeting and review the
program of work.
 Submitting design for enabling work. Inspect the
records. Certification, determination, instruction,
opinion or evaluation of disputes.
 Submit the recommendation to Dy CE from time
to time till the final bill is paid and Defect Liability
Period is over.
 Submit the recommendations to Dy CE with
reference to proposals of additional work and/or
variations.).
 Certification of Interim payment applications.
Maintenance of all relevant records.

Aug Aug Indian Railways Name of the Project: Sikar- Senior In-charge of the Main Project Features: NA
2012 2014 Loharu Gauge Conversion Project Section Section of the This Project was the Part of Uniform gauge Policy of
(120 Kms) Engineer Project Indian Railway. After Completion of this Project the
Formation in Embankments / Area was connected to Delhi & Jaipur Directly by
Cuttings, Bridges, Structures (Civil Train Route.
Works for Bridges and Formation  Construction of Road Under Bridge (Box Bridges)
in Embankment / cutting and 24No. Box size 5.00m x 5.00 m
Structures in approaches for
 widening of Existing Meter Gauge Formation E/W
150m length from Abutments),
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

Buildings, Ballast on Formation,  Construction of New Station Building Works


 E/W Formation/ Blanketing  Structural Steel Works (Foot Over Bridge)
 Under Passes -24 Numbers Description of Duties:
 Station Buildings – 2 Numbers  Construction Supervision of day-to day work
 Platform Works including quality and quantity which include all
ancillary works such as enabling works, utility
a) Platform Surfacing
shifting, tree cutting, dismantling of existing
b) Platform Covering Shed railway structures etc.
Specific Section of Project: Sikar-  Ensure performance of work in strict compliance
Loharu Section with the plans and specifications as per RDSO
Client: Indian Railway guidelines.
Location: Jhunjhanu-Loharu,  Verification of bar bending schedules, checking
Rajasthan alignment and formwork.
Length: 120 Kms  To hold site review meeting and review the
program of work.
 Submitting design for enabling work. Inspect the
records. Certification, determination, instruction,
opinion or evaluation of disputes.
 Submit the recommendation to Dy CE from time
to time till the final bill is paid and Defect Liability
Period is over.
 Submit the recommendations to Dy CE with
reference to proposals of additional work and/or
variations.).
 Certification of Interim payment applications.
Maintenance of all relevant records.

Dec Aug Indian Railways Name of the Project: Double Line Senior In-charge of the Main Project Features: NA
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

2009 2012 Project Alwar- Rewari (72Kms) Section Section of the Box Bridge 3.05 X4.5m
1*Construction of Major Bridge Engineer Project 1.83X1.5m
3*18.3-meter PSC Girder Span 1.5mX1.5m
Between Alwar-Parisal.
Description of Duties:
2*Construction of Minor Bridges
 Construction Supervision of day-to day work
a. Pipe Culverts 450mm dia. including quality and quantity which include all
b. Box Bridge 3.05 X4.5m ancillary works such as enabling works, utility
1.83X1.5m shifting, tree cutting, dismantling of existing
railway structures etc.
1.5mX1.5m
 Ensure performance of work in strict compliance
3*Formation in Embankments /
with the plans and specifications as per RDSO
Cuttings, Bridges, Structures
guidelines.
(Civil Works for Bridges and
Formation in Embankment /  Verification of bar bending schedules, checking
cutting and Structures in alignment and formwork.
approaches for 150m length  To hold site review meeting and review the
from Abutments), Buildings, program of work.
Ballast on Formation,  Submitting design for enabling work. Inspect the
(i) E/W Formation/ Blanketing records. Certification, determination, instruction,
Specific Section of Project: Alwar- opinion or evaluation of disputes.
Rewari Section  Submit the recommendation to Dy CE from time
Client: Indian Railway to time till the final bill is paid and Defect Liability
Location: Alwar, Rajasthan Period is over.
Length: 72Kms  Submit the recommendations to Dy CE with
reference to proposals of additional work and/or
variations.).
 Certification of Interim payment applications.
Maintenance of all relevant records
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

Nov Dec Indian Railways Name of the Project: Jaipur- Section In-charge of the Main project features: NA
2008 2009 Dausa Double Line Project Engineer Section of the The Project was part of Delhi -Ahmedabad Doubling.
I Construction of major Bridge Project So as to avoid Delay in Train Due to Crossing of
No. 178 Consists of 4 X 12.2m Trains Coming from opposite Directions & to feed
PSC Girders. the increasing Traffic Demand.
Pile Foundation Description of Duties:
ii* Construction of Minor Bridges  Construction Supervision of day-to day work
a Pipe Culverts 600mm dia. including quality and quantity which include all
ancillary works such as enabling works, utility
b Box Bridge3.05 X3.05m
shifting, tree cutting, dismantling of existing
1.83X1.5 railway structures etc.
1.5mX1.5m  Ensure performance of work in strict compliance
c PSC Slab 6.10m Span with the plans and specifications as per RDSO
iii Preparation of Formation By guidelines.
a E/W Cutting, Filling Etc.  Verification of bar bending schedules, checking
b Introducing "Blanketing alignment and formwork.
Material".  To hold site review meeting and review the
iv Road Over bridge at program of work.
Kishangarh yard  Inspect the records. Certification, determination,
Consists of 39.8 m PSC span instruction, opinion or evaluation of disputes.
Specific Section of Project: Jaipur-  Submit the recommendation to Dy CE from time
Dausa Section to time till the final bill is paid and Defect Liability
Period is over.
Client: Indian Railways
 Submit the recommendations to Dy CE with
Location: Rajasthan
reference to proposals of additional work and/or
Length: 54.00 km variations.).
 Certification of Interim payment applications.
Maintenance of all relevant records
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

Sep Nov Indian Railways Name of the Project: Jaipur- Section In-charge of the Main project features: NA
2005 2008 Phulera Double Line Project Engineer Section of the 4 X 18.3m. PSC. Girder Span
i Initial Survey Work & Planning Project
Description of Duties:
of Alignment
 Construction Supervision of day-to day work
ii Preparation of "Longitudinal including quality and quantity which include all
Section "Sheets”. ancillary works such as enabling works, utility
iii Estimation of Quantities. shifting, tree cutting, dismantling of existing
iv Preparation of Tenders. railway structures etc.
v Demolition of Existing Old  Ensure performance of work in strict compliance
Stone Bridges After taking all with the plans and specifications as per RDSO
the safety Parameters of guidelines.
Running BG Track.  Verification of bar bending schedules, checking
vi Construction of major Bridge alignment and formwork.
No. 245  To hold site review meeting and review the
Consists of 4 X 18.3m. PSC program of work.
Girder Span  Submitting design for enabling work. Inspect the
vii Construction of Minor Bridges records. Certification, determination, instruction,
a Pipe Culverts1200mm dia. opinion or evaluation of disputes.
b Box Bridge 3.05 X3.05m  Submit the recommendation to Dy CE from time
to time till the final bill is paid and Defect Liability
1.83X1.5
Period is over.
1.5mX1.5m
 Submit the recommendations to Dy CE with
c PSC Slab 6.10m Span reference to proposals of additional work and/or
viii Preparation of Formation By variations.).
a. E/W Cutting Filling Etc.  Certification of Interim payment applications.
b. Introducing "Blanketing Maintenance of all relevant records.
Material".
Specific Section of Project: Jaipur-
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

Phulera Section
Client: Indian Railways
Location: Jaipur, Rajasthan
Length: 60.00 Km

Apr Aug Indian Railways Name of the Project: Khairthal & Junior One Level below Main project features: NA
2004 2005 Harssollie (Alwar) Additional Loop Engineer the In-charge of The Project was Required to enhance Train crossing
Line Work the Section of capacity of to avoid delay in trains.
Specific Section of Project: the Project
 Shifting of Structural Steel Covering Shed on PF of
Khairthal & Harssollie (Alwar) Khairthal Station.
Section
 Complete removal of PF 2 and Re-construction at
Client: Indian Railways new Location.
Location: Rajasthan  E/W Formation and Blanketing as per RDSO
Length: Work Executed in guidelines
Railway Yard. Concentrated  Realignment of Track as per Changed YARD PLANS
work.
Description of Duties:
 Construction Supervision of day-to day work
including quality and quantity which include all
ancillary works such as enabling works, utility
shifting, tree cutting, dismantling of existing
railway structures etc.
 Ensure performance of work in strict compliance
with the plans and specifications as per RDSO
guidelines.
 Verification of bar bending schedules, checking
alignment and formwork.
 To hold site review meeting and review the
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

program of work.
 Inspect the records. Certification, determination,
instruction, opinion or evaluation of disputes.
 Submit the recommendation to Dy CE from time
to time till the final bill is paid and Defect Liability
Period is over.
 Submit the recommendations to Dy CE with
reference to proposals of additional work and/or
variations.).
 Certification of Interim payment applications.
Maintenance of all relevant records.

Jul 2003 Mar Indian Railways Name of the Project: Agra Fort -- Junior One Level below Main project features: NA
2004 BandiKui Gauge Conversion Engineer the In-charge of The Project was important to impart Direct
Project the Section of connectivity between Jaipur-Agra
the Project
Description of Duties:
Specific Section of Project: Agra Supervision/Execution of E/W for track formation as
Fort –BandiKui Section per RDSO guidelines. Maintained Layer wise
Client: Indian Railways compaction Record for CRS requirements. Preparing
Location: Rajasthan of Sub Banks at high banks. Supervision of Railway
crossings Works to make them fit for CRS inspection.
Length: 8.00 km

Mar Jul 2003 Indian Railways Name of the Project: Railway Junior One Level below Main project features: NA
2002 Major Bridge No.223.at Jaipur Engineer the In-charge of 4*18.3m PSC Girder Span; Pile foundation
the Section of
the Project
Client: Indian Railways Description of Duties:
Location: Jaipur  Overall supervision of work from railway side like
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

Length: It was Bridge work . survey checking, quality of material, quality of


work, measurements of work done.
 Calculation and supervision of Prestressing of Post
Tensioned Girders.

Apr Mar Indian Railways Name of the Project: Junior One Level below Main project features: NA
2001 2002 Construction of Foot Over Bridge Engineer the In-charge of The Work was executed under Running Railway
at Jaipur Plat Form the Section of Traffic condition. Since the Jaipur station is very busy
the Project Station, the safety of passengers was very important
Client: Indian Railways factor.
Location: Jaipur Description of Duties:
Length: It was Bridge work  Lesioning with Railway Operating Staff for Short
Duration” Traffic Blocks” to execute the work with
safety.
 Construction Supervision of day-to day work
including quality and quantity which include all
ancillary works such as enabling works, utility
shifting, tree cutting, dismantling of existing
railway structures etc.
 Verification of bar bending schedules, checking
alignment and formwork.
 Inspect the records. Certification, determination,
instruction, opinion or evaluation of disputes.
 Submit the recommendation to Dy CE from time
to time till the final bill is paid and Defect Liability
Period is over.
 Submit the recommendations to Dy CE with
reference to proposals of additional work and/or
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

variations).
As a Junior Engineer responsible for looking after the
structural steel works, RCC works and launching of
truss girders over very busy passenger platforms of
Jaipur railway station

Mar Apr Indian Railways Name of the Project: Junior One Level below Main project features: NA
2000 2001 Construction of ROB Gopalpura Engineer the In-charge of 32m PSC Girder Span, Pile foundation
(Jaipur) (Railway Portion) the Section of
the Project
Description of Duties:
Client: Indian Railways
As a Junior Engineer Responsible
Location: Jaipur
 Lesioning with Railway Operating Staff for Short
Length: It was Bridge work Duration” Traffic Blocks” to execute the work with
safety.
 Construction Supervision of day-to day work
including quality and quantity which include all
ancillary works such as enabling works,
 Preparation of bar bending schedules, checking
alignment and formwork.
 Preparation of the records. Certification,
determination, instruction, opinion or evaluation
of disputes.
As a Junior Engineer responsible for looking after the,
RCC works PSC Girders.

May Mar Indian Railways Name of the Project: Yard Junior One Level below Main project features: NA
1999 2000 Remodelling work at Kanak Pura Engineer the In-charge of Yard Remodeling was required to Establish Container
(Jaipur) the Section of
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

the Project Depot. Main Features of the Project;


Client: Indian Railways  Shifting of Station Building i.e. New construction.
Location: Jaipur  Construction of Foot Over Bridge.
Length: 2.00 km  E/W for formation of New Alignments
 Construction of Passenger and Loading Platforms.
 Passengers Amenities.
Description of Duties:
 *To ensure the Safety of vehicles plying near
track.
 *To liaison with Railway operating staff for short
duration Railway Traffic BLOCKS
 Construction Supervision of day-to day work
including quality and quantity which include all
ancillary works such as enabling works,
 Preparation of bar bending schedules, checking
alignment and formwork.
 Preparation of the records. Certification,
determination, instruction, opinion or evaluation
of disputes.
As a Junior Engineer responsible for looking after the,
RCC works PSC Girders

Mar Apr Indian Railways Name o.00f the Project: Junior One Level below Main project features: NA
1998 1999 Construction of Road Over Bridge Engineer the In-charge of 29m PSC Girder Span and Pile foundation
(ROB) at JLN Marg. the Section of
Description of Duties:
the Project
To ensure the Safety of vehicles plying near track.
Client: Indian Railways
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

Location: Jaipur  *To liaison with Railway operating staff for short
Length It was Bridge work: duration Railway BLOCKS
 Construction Supervision of day-to day work
including quality and quantity which include all
ancillary works such as enabling works,
 Preparation of bar bending schedules, checking
alignment and formwork.
 Preparation of the records. Certification,
determination, instruction, opinion or evaluation
of disputes.

Jul 1996 Dec Indian Railways Name of the Project: Supervision Junior One Level below Main project features: NA
1998 of Construction of 68unit type iii Engineer the In-charge of Formation of New Railway Zone (i.e. NWR) was in
staff quarters colony the Section of process, hence, to accommodate the new Head
the Project Quarter Staff, construction work was executed.
Client: Indian Railways Description of Duties:
Location: Jaipur  Construction Supervision of day-to day work
including quality and quantity which include all
ancillary works such as enabling works, utility
shifting, tree cutting, dismantling of existing
railway structures etc.
 Ensure performance of work in strict compliance
with the plans and specifications
 Verification of bar bending schedules, checking
alignment and formwork.
 To hold site review meeting and review the
program of work.
 Inspect the records. Certification, determination,
Any
From To Name of the Project, Specific
Position Description of Duties Discharged Including Works other
(Month/ (Month/ Name of Employer section of Project, location & Capacity
Held Undertaken relevant
Year) Year) length
facts

instruction, opinion or evaluation of disputes.


 Submit the recommendation to Dy CE from time
to time till the final bill is paid and Defect Liability
Period is over.
 Submit the recommendations to Dy CE with
reference to proposals of additional work and/or
variations).
 Certification of Interim payment applications.
Maintenance as a Junior Engineer responsible for
looking after the construction activity of the staff
quarters

Jun Jun Mulkveer Builders Name of the Project: Site One Level below  Construction Supervision of day-to day work NA
1995 1996 Construction of Residential Engineer the In-charge of including quality and quantity which include all
Bungalows the Section of ancillary works such as enabling works, utility
the Project shifting, tree cutting, dismantling of existing
railway structures etc.
Client: Mulkveer Builders
 Verification of bar bending schedules, checking
Location: Jaipur
alignment and formwork.
 Certification of Interim payment applications.
Maintenance as a Site Engineer responsible for
looking after the construction activity of the
residential bungalows