วิธีการคิด Hiab 5 T ยกอุปกรณ์หนัก 2.5 ตัน

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 15

FG TECH

Item : 1 Equipment No. : HPWJ


Weight of lifting B
Equipment for lift :
Weight of equipment : 2.50 ton
Bundle extractor : - ton
Weight of accessory : 0.10 ton
Total weight ( A ) : 2.60 ton A
Lifting condition
Main boom length (B) : 6.06 M.
Counter weight : N/A ton Equipment
Working radius ( C ) : 2.65 M.
Max.load from load chart : 4.50 ton C
S.W.L. ( 75% ) : 3.38 ton Lifting capacity rate = Total weight ( A ) x 100
LIFTING CAPACITY RATE = 57.78 % Max.load from load chart
SAFETY FACTOR = 1.73 = 260.00
* Safety factor value = Max.load from load chart 4.50
( Not few more 1.33 ) Total weight ( A ) = 57.78 %

DATE OF LIFTING START LIFTING FINISH LIFTING


SKETCH / DARWING
B TIME : ……………. TIME : …………….

HIAB TRUCK 5 TON

C
DRAWING BY : CHECKED BY TEI : APPROVED BY CLIENT :
Suttiwat S
DRAWING BY : CHECKED BY TEI : APPROVED BY CLIENT :
Suttiwat S

DATE : DATE : DATE :


24 Mar 2017
CH

LIFTING

…………….

CLIENT :
CLIENT :

DATE :
24 Mar 2017
Item : 1 Equipment No. : HPWJ
Weight of lifting B
Equipment for lift :
Weight of equipment : - ton
Bundle extractor : - ton
Weight of accessory : 0.20 ton
Total weight ( A ) : 0.20 tonA
Lifting condition
Main boom length (B) : 7.00 M.
Counter weight : N/A ton Equipment C
Working radius ( C ) : 2.50 M.
Max.load from load chart : 5.00 ton
S.W.L. ( 75% ) : 3.75 ton Lifting capacity rate = Total weight ( A ) x 100
LIFTING CAPACITY RATE = - % Max.load from load chart
SAFETY FACTOR = 25.00 = -
* Safety factor value = Max.load from load chart 5.00
( Not few more 1.33 ) Total weight ( A ) = 0.00 %

DATE OF START LIFTING FINISH LIFTING


SKETCH / DARWING
B LIFTING
TIME : ……………. TIME : …………….

HIAB TRUCK 7 TON

7.0
0M

A
2.00M

2.50M
CLIENT : Vinythai Public Co., Ltd.
PROJECT : Shutdown 2011
LOCATION : PVC
C
JOB :

DRAWING BY : CHECKED BY TEI : APPROVED BY CLIENT :


DATE : DATE : DATE :
FG TECH
Item : 1 Equipment No. : EQUIPMENT
Weight of lifting B
Equipment for lift :
Weight of equipment : 2.50 ton
Bundle extractor : - ton
Weight of accessory : - ton
Total weight ( A ) : 2.50 tonA
Lifting condition
Main boom length (B) : 3.66 M.
Counter weight : N/A ton EquipmentC
Working radius ( C ) : 2.65 M.
Max.load from load chart : 4.50 ton
S.W.L. ( 75% ) : 3.38 ton Lifting capacity rate = Total weight ( A ) x 100
LIFTING CAPACITY RATE = 74.07 % S.W.L. ( 75% )
SAFETY FACTOR = 1.80 = 250.00
* Safety factor value = Max.load from load chart 3.38
( Not few more 1.33 ) Total weight ( A ) = 74.07 %

DATE OF START LIFTING FINISH LIFTING


SKETCH / DARWING
B LIFTING
TIME : ……………. TIME : …………….

HIAB TRUCK 5 TON

C
DRAWING BY : CHECKED BY FG : APPROVED BY CLIENT :
LIKHIT SINGSOM LIKHIT SINGSOM Suttiwat S

DATE : DATE : DATE :

You might also like