Template - Sap Budget - Ah, SMR, FF
Template - Sap Budget - Ah, SMR, FF
Location:
Subject:
Date : 04/01/2022
Area (sqm) :
Percent Profit (MGS) (%): 0%
WBS
DESCRIPTION AMOUNT SAP BUDGET
LEVEL
1 CONSULTANCY - -
2 ARCHITECTURAL - -
2 STRUCTURAL - -
2 PLUMBING & SANITARY - -
2 INTERIOR DESIGN - -
2 ELECTRICAL - -
2 MECHANICAL - -
2 IT - -
2 OTHERS - -
1 BUILDING FIT - OUT - -
2 GENERAL REQUIREMENTS - -
2 CIVIL, STRUCTURAL, AND ARCHITECTURAL WORKS - -
2 GLASSWORKS - -
2 ELECTRICAL WORKS - -
2 MECHANICAL WORKS - -
2 ESCALATOR AND ELEVATOR - -
2 INTERIOR DESIGN WORKS - -
2 CARPENTRY WORKS - -
2 MISCELLANEOUS ITEMS - -
2 IT EQUIPMENTS - -
2 RACKING SYSTEM - -
2 VISUALS - -
1 OPERATIONS RELATED - -
2 CHECK OUT COUNTERS - -
2 SMALL EQUIPMENT - -
2 DELIVERY TRUCKS - -
2 EQUIPMENT & OTHERS - -
Grand Total - -
Cost per SQM - -
Prepared by:
Noted by:
Technical Head
Approved by:
1 XX-0000-1 CONSULTANCY
2 XX-0000-1-01-00-L ARCHITECTURAL - -
2 XX-0000-1-02-00-L STRUCTURAL - -
2 XX-0000-1-03-00-L PLUMBING & SANITARY - -
2 XX-0000-1-04-00-L INTERIOR DESIGN - -
2 XX-0000-1-05-00-L ELECTRICAL - -
2 XX-0000-1-06-00-L MECHANICAL - -
2 XX-0000-1-07-00-L IT - -
2 XX-0000-1-08-00-L OTHERS - -
Subtotal of Consultancy - -
Cost per SQM - -
2 XX-0000-2-01 GENERAL REQUIREMENTS - -
3 XX-0000-2-01-01-G Permits - -
4 Building Permits - -
5 Baranggay Clearance - -
5 Zoning/Locational Clearance - -
5 Fire Safety Evaluation Clerance - -
5 Construction Safety & Health Program - -
5 Building Permit - -
4 Occupational Permits - -
4 Other Items - -
3 XX-0000-2-01-02-L Mobilization / Demobilization - -
3 XX-0000-2-01-03-L Temporary Facilities - -
4 Temporary Power Supply and Fixtures - -
4 Total Water Supply - -
4 Staff House - -
4 Barracks for Workers - -
4 Field Office - -
3 XX-0000-2-01-04-L Safety House Keeping & Other Requirement - -
4 Personnel Protective Equipment - -
4 Site Bulletin and Safety Signages - -
4 Site Clearing and Hauling - -
4 Site Warehouse - -
4 Safety Officer - -
4 Security Guard - -
3 XX-0000-2-01-05-L Support Equipment/Rentals/Etc. - -
3 XX-0000-2-01-06-L Housekeeping/Disposal of Debris - -
3 XX-0000-2-01-07-L Other Items - -
4 Site Management Cost - -
4 As-built Plans (8 sets FCD Permits, 5 sets As-Built Plans, 2 sets Actual As-Built Plans) - -
4 Testing and Laboratory - -
Subtotal of General Requirements - -
Cost per SQM - -
2 XX-0000-2-02 CIVIL, STRUCTURAL, AND ARCHITECTURAL WORKS - -
3 XX-0000-2-02-01-L Demolition & Clearing Works - -
3 XX-0000-2-02-02-L Structural - -
4 Excavation - -
4 Foundation Works - -
4 Beams - -
4 Columns - -
4 Slab on Fill - -
4 Suspended Slab - -
4 Other Items - -
3 XX-0000-2-02-03-L Masonry Works - -
4 Exterior CHB Walls - -
4 Interior CHB Walls - -
4 Plastering Works - -
4 Painting Works on Plastered Walls - -
4 Floor Topping - -
5 Raised Flooring - -
5 Concrete Pads - -
4 Other Items - -
3 XX-0000-2-02-04-L Floor Finishes - -
4 Sub Flooring - -
4 Floor Screed Finish - -
4 Selling Area Finish - -
4 Back of House Finish - -
4 Alfresco/Exterior Finish - -
4 Epoxy Finish - -
4 Other Items - -
3 XX-0000-2-02-05-L Waterproofing - -
4 Restrooms - -
4 Wet/Prep Areas - -
4 Back of House - -
4 Exterior Areas/Concrete Pads - -
4 Other Items - -
3 XX-0000-2-02-06-L Wall Finishes - -
4 Drywall Partitions with Painting - -
4 Column and Wall Cladding with Painting - -
4 Other Items - -
3 XX-0000-2-02-07-L Ceiling Finishes - -
4 Painted Finish on Smooth Rubbed Concrete Finish - -
4 Gypsum (Moisture Resistant) Ceiling Painted Including Framing System - -
4 Gypsum Ceiling Painted Including Framing System - -
4 Acoustic Ceiling Including Framing System - -
3 XX-0000-2-02-08-L Plumbing Works - -
4 Rough-Ins - -
5 Chipping and Coring Works - -
5 Waste Line - -
5 Sewer Line - -
5 Drain Lines - -
5 Cold Water Line - -
5 Hangers and Support - -
5 Water and Sewer - -
4 Fixtures - -
5 Fixtures - -
5 Supply of Fixtures - -
5 Accessories - -
4 Testing and Commissioning - -
4 Trench and Area Drains - -
3 XX-0000-2-02-09-L Hauling and Disposal of Debris - -
3 XX-0000-2-02-10-L Other Items - -
Subtotal of Civil, Structural, and Architectural Works - -
Cost per SQM - -
2 XX-0000-2-03 GLASSWORKS - -
3 XX-0000-2-03-01-L Store Façade - -
3 XX-0000-2-03-02-L Glass Doors - -
3 XX-0000-2-03-03-L Interior Partitions - -
3 XX-0000-2-03-04-L Interior Railings - -
3 XX-0000-2-03-05-L Steel/Aluminum Works - -
3 XX-0000-2-03-06-L Other Items - -
Subtotal of Glassworks - -
Cost per SQM - -
2 XX-0000-2-04 ELECTRICAL WORKS - -
3 XX-0000-2-04-01-E Main and Sub-Main Feeder - -
3 XX-0000-2-04-02-E Panel Boards and Enclosed Circuit Breakers - -
3 XX-0000-2-04-03-E Lighting System - -
4 Wires and Cables - -
4 Pipes and Fittings - -
4 Installation of Lighting Fixtures - -
4 Supply of Lighting Fixtures - -
4 Switches - -
3 XX-0000-2-04-04-E Power System - -
4 Wires and Cables - -
4 Pipes and Fittings - -
4 Installation of Outlets and Devices - -
4 Supply of Outlets/Devices - -
4 Switches - -
3 XX-0000-2-04-05-E Grounding System - -
3 XX-0000-2-04-06-S Fire Detection and Alarm System - -
4 Wires and Cables - -
4 Pipes and Fittings - -
4 Installation of Devices - -
4 Supply of Devices - -
3 XX-0000-2-04-07-E Hangers, Support and Consumables - -
3 XX-0000-2-04-08-E Testing and Commissioning - -
3 XX-0000-2-04-09-E Transformers - -
3 XX-0000-2-04-10-E UPS - -
3 XX-0000-2-04-11-E AVR - -
3 XX-0000-2-04-12-E Other Items - -
Subtotal of Electrical Works - -
Cost per SQM - -
2 XX-0000-2-05 MECHANICAL WORKS - -
3 XX-0000-2-05-01-A Airconditioning System - -
4 Aircon Units - -
4 Air Handling Units - -
4 Ducting and Insulation Works - -
4 Grills and Diffusers - -
4 ACU Refrigerant Piping System - -
4 Drains - -
4 Testing and Commissioning - -
4 Other Items - -
3 XX-0000-2-05-02-L Ventilation System - -
4 Ducting and Insulation Works - -
4 Fans and Blowers - -
4 Exhaust Hoods, Grills, and Diffusers - -
4 Testing and Commissioning - -
3 XX-0000-2-05-03-S Firepro - -
4 Automatic Fire Sprinkler System - -
4 Fire Suppression System - -
4 Testing and Commissioning - -
4 Other Items - -
3 XX-0000-2-05-04-S Gas Lines - -
4 Rough-ins - -
4 Equipment and Devices - -
4 Testing and Commissioning - -
3 XX-0000-2-05-05-S Refrigeration - Cold Room - -
4 Wall Panels - -
4 Piping System - -
4 Drains - -
4 Assembly and Installation - -
4 Supply of Units - -
4 Testing and Commissioning - -
3 XX-0000-2-05-06-S Refrigeration - Chillers and Freezers - -
4 Piping System - -
4 Drains - -
4 Assembly and Installation - -
4 Supply of Units - -
4 Testing and Commissioning - -
3 XX-0000-2-05-07-S Other Items - -
Subtotal of Mechanical Works - -
Cost per SQM - -
2 XX-0000-2-06 ESCALATOR AND ELEVATOR SYSTEM - -
3 XX-0000-2-06-01-V Pits, Beam Support System - -
3 XX-0000-2-06-02-V Hoistway Works - -
3 XX-0000-2-06-03-V Elevator Set - -
4 Passenger - -
4 Freight - -
4 Scenic - -
4 Cladding/Housing - -
3 XX-0000-2-06-04-V Escalator Set - -
4 Outdoor - -
4 Indoor - -
4 Walkalator - -
4 Cladding/Housing - -
Subtotal of Escalator and Elevator System - -
Cost per SQM - -
2 XX-0000-2-07 INTERIOR DESIGN WORKS - -
3 XX-0000-2-07-01-S Hard ID - -
4 Trellises - -
4 Bricks - -
4 Wire Mesh and Other Steel Special Works - -
4 Wall Special Finishes (Mirrors, Wall Papers, Etc.) - -
4 Reclaimed Wood Finish - -
4 Wood Slats and Other Wood Finishes - -
4 Bar Counters, Tables, Etc. - -
4 Other Special Carpentry Works - -
3 XX-0000-2-07-02-L Soft ID - -
4 Furniture - -
4 Baskets, Barrels & Palletes - -
4 Accessories & Decors - -
4 Trees - -
4 Decorative Lighting - -
4 Blinds - -
Subtotal of Interior Design Works - -
Cost per SQM - -
2 XX-0000-2-08 CARPENTRY WORKS - -
3 XX-0000-2-08-01-R Wood Modules - -
3 XX-0000-2-08-02-F BOH Cabinets / Shelves and Other Storage - -
3 XX-0000-2-08-03-L Wooden Doors & Jambs - -
3 XX-0000-2-08-04-F Counters Including Solid Surface - -
Subtotal of Carpentry Works - -
Cost per SQM - -
2 XX-0000-2-09 MISCELLANEOUS ITEMS - -
3 XX-0000-2-09-01-L Roll Up Doors - -
3 XX-0000-2-09-02-L Steel Doors / Louver - -
3 XX-0000-2-09-03-L Steel Matting Partition / Ceiling - -
3 XX-0000-2-09-04-L Vault Door - -
Subtotal of Miscellaneous Items - -
Cost per SQM - -
2 XX-0000-2-10 IT EQUIPMENTS - -
3 XX-0000-2-10-01-S POS - -
4 POS HW System - -
4 Weighing Scale - -
4 Price Verifier - -
3 XX-0000-2-10-02-C Cabling System - -
4 Structured Data Cabling - -
3 XX-0000-2-10-03-S CCTV - -
4 CCTV Camera - -
4 CCTV Monitor - -
4 NVR - -
3 XX-0000-2-10-04-S PA/BGM System - -
3 XX-0000-2-10-05-S PABX System - -
3 XX-0000-2-10-06-C Back Office Equipment - -
4 Computer Desktop - -
4 UPS - -
4 Portable Data Terminal - -
4 Document Printer - -
4 Barcode Printer - -
4 Wireless Access Point - -
4 Switches - -
4 Server - -
3 XX-0000-2-10-07-W Software License - -
Subtotal of IT Equipments - -
Cost per SQM - -
2 XX-0000-2-11 RACKING SYSTEM - -
3 XX-0000-2-11-01-R Warehouse Racking System - -
3 XX-0000-2-11-02-R Selling Gondolas - -
4 8FT Gondola - -
4 6FT Gondola - -
4 5FT Gondola - -
4 End Cap - -
4 Home Pro S - -
4 DIY - -
4 Construction - -
4 End DIY & Construction - -
4 Beyond Basic - -
4 Counter Gondola - -
4 Small Appliance - -
4 Accessories - -
3 XX-0000-2-11-03-R Display Modules - -
4 Furniture - -
4 Tiles - -
4 Sanitary - -
4 Appliances - -
4 Décor - -
4 Homelines - -
4 Outdoor - -
4 Focal/Lifestyle - -
4 Generic Modules - -
4 Accessories - -
Subtotal of Racking System - -
Cost per SQM - -
2 XX-0000-2-12 VISUALS - -
3 XX-0000-2-12-01-S Building ID - -
3 XX-0000-2-12-02-S Store ID - -
3 XX-0000-2-12-03-S Stickers - -
3 XX-0000-2-12-04-S Lighted Signages - -
3 XX-0000-2-12-05-S Nonlighted Signages - -
3 XX-0000-2-12-06-S Marketing Equipment - -
3 XX-0000-2-12-07-S Directional Signages - -
3 XX-0000-2-12-08-S Tarpaulins - -
3 XX-0000-2-12-09-S Lighted Décor - -
3 XX-0000-2-12-10-S Non lighted Décor - -
3 XX-0000-2-12-11-S Murals - -
3 XX-0000-2-12-12-S Other Items - -
Subtotal of Visuals - -
Cost per SQM - -
1 XX-0000-3 OPERATIONS RELATED - -
2 XX-0000-3-01-00-F CHECK OUT COUNTERS - -
2 XX-0000-3-02 SMALL EQUIPMENT - -
3 XX-0000-3-02-01-S Trolleys - -
3 XX-0000-3-02-02-S Baskets - -
3 XX-0000-3-02-03-S Trays - -
3 XX-0000-3-02-04-O Office Items - -
2 XX-0000-3-03 DELIVERY TRUCKS - -
3 XX-0000-3-03-01-H Aluminum Van - -
3 XX-0000-3-03-02-H Drop Side - -
2 XX-0000-3-04 EQUIPMENT & OTHERS - -
3 XX-0000-3-04-01-H Fork Lift - -
3 XX-0000-3-04-02-H Man Lift - -
3 XX-0000-3-04-03-H Reach Truck - -
3 XX-0000-3-04-04-P Hand Pallet - -
Subtotal of Operation Related Items - -
Cost per SQM - -
Grand Total - -
Cost per SQM - -
Prepared by:
Prpject-in-Charge
Noted by:
Technical Head
Approved by: