Revision History: Process No: QP/NPM/03 Process: Activity Planning
Revision History: Process No: QP/NPM/03 Process: Activity Planning
Revision History: Process No: QP/NPM/03 Process: Activity Planning
QP/NPM/03
Revision History
Details of revision
8 0 Manjula
2016 requirements 3249 Ragini NA
Patil
07-10- Manjula
8 1 from VP operations after each
3274 Ragini NA
2016 Patil
06-03- Manjula
8 2 all APQP phase wise requirements
3280 Ragini NA
2017 Patil
2020
Patil
Ramesh
01-02- Savitha
9 1 Revised based on the ERP Next Module 3306 Sindhushree MMP
2022 Ramesh
ISSUE No. 09
Rev No: 01
Process No: QP/NPM/03
ISSUE No. 09
COMPETENCE
PROCESS
M/C, TOOLS
Process Objective: :To ensure that all design and development activities Knowledge on
are identified, planned and Implemented in order to achieve defects.
a.Product
free product on time which is applicable to New product, similar part, b.Mfg and Testing Process
ECN/PCN and Plant location change starting from receipt c.On CAD
PC of order to SOP at customer end. d.Competency Requirement
Process owner :Head Engg
A) Definition :
Product quality planning is a structured method of defining
and establishing the steps necessary to assure that a
product satisfies the customer. The goal of product quality
planning is to facilitate communication with everyone
involved to assure that all required steps are completed on
time.
Commercial, SBU,
organisation chart FF OPM 38 with roles and When PO received
Projects
responsibilities.Get approval from director operations in the
organization chart.
NPM-executive
item, include the same in annexure-A to FF NPM 09 - receipt
configuration management plan.
F) Study customer documents. Identify the safety, statutory FF NPM 09
CFT
performance requirements and manufacturing process. receipt
Enter the details in APQP FF NPM 09.
CFT
and customer SOP date (if applicable).Record the details in receipt
APQP FF NPM 09. Make sure that the customer required
quantity is also recorded. Get the Timing plan approved
from TOP management
meeting as per the schedule once in a month and record APQP Owner NPM 09
FF OPM 41
the details in APQP FF NPM 09. Minutes the meeting FF Once in a Month
OPM 41 in ERP run # 3749
nominees. Complete the training as per schedule and As per APQP FF FF HRM 19
CFT
record the details in APQP FF NPM 09. Ensure the training NPM 09
record FF HRM 19 for each nominees, also entered in
ERP.
As per APQP FF FF NPM 09
Discuss the issues with concern resolution team time to As per APQP FF FF OPM 41
CFT
time and close the concern. Record the details in FF NPM NPM 09
feedback from top management and update FF NPM 08 APQP Owner NPM 09
FF OPM 41
APQP if applicable. Minutes the meeting FF OPM 41 after After each phase
each Phase
As per APQP FF
in the CIRA FF NPM 02. Note: Keep the master sample in Process Engineering
NPM 01
NPM with Identification Tag
1.3 Generate Query list FF NPM 03 for all clarification with Process Engineering As per APQP FF FF NPM 03
customer NPM 01
As per APQP FF FF NPM 04
1.5 Study past development records and Record in FF As per APQP FF FF NPM 05
Process Engineering
NPM 05 NPM 01
As per APQP FF
Datasheet for each Items, upload in ERP Run#: 3992, Process Engineering
NPM 01
Upload Make & MPN
As per APQP FF
2.5 Conduct BOM Verification and release to procurement Process Engineering
NPM 01
FF NPM 07
2.2 Generate the following parts list from ERP
FF NPM 08
1.List of LSL Items - FF NPM 07 As per APQP FF
st o S te s 0 As per APQP FF
Process Engineering FF NPM 09
2. List of specific consumables- FF NPM 08 NPM 01 FF NPM 10
3. List of Custom build items - FF NPM 09
FF NPM 11
4.. List of MSD items - FF NPM 10
FF NPM 12
5. List of Critical items - FF NPM 11
FF NPM 13
6. List of Items Requiring Re-finishing - FF NPM 12
FF NPM 14
7. List of Gold removal items - FF NPM 13
FF NPM 15
8. List of EOL parts - FF NPM 14
9. List of Parts having Marks of conformity FF NPM 15
As per APQP FF
2.6 Collect IMDS from Suppliers / Manufactures Process Engineering
NPM 01
As per APQP FF
customer doesn't provide Drawing Process Engineering
NPM 01
Do Balooning for all Drawings
As per APQP FF
Custom built Items Process Engineering
NPM 01
Specific Inspection plan FF NPM 19
As per APQP FF
Inspection Template and Generate inspection BOM FF Process Engineering
NPM 01
NPM 20
Process Engineering
2.10.1 Do Gerber review FF NPM 21 NPM 01
2.10.2 Identify the supplier for PCB , discuss the Gerber
As per APQP FF
with the prospective supplier and get their inputs and Process Engineering
NPM 01
Record in Gerber review
2.10.4 Review with Technical team and Finalise the Panel As per APQP FF
Process Engineering
Gerber NPM 01
2.10.5 Link the gerber and specific drawings if any to the As per APQP FF
Process Engineering
PCB part Number NPM 01
Process Engineering
NPM 26 including appearance items. NPM 01
As per APQP FF
manufacturing process and update in List of Program FF Process Engineering
NPM 01
NPM 28
As per APQP FF
2.17 Prepare list of TJF IMTE required for the product. Process Engineering
NPM 01
Process Engineering
Note 1: Ensure CAD is made for SMD (DNP Locations), TH NPM 01
Masking, TH Stuffing, Hand Soldering & Coating masking
Note 2: Ensure Supporting Pin Layout is made for Pick &
Place and Screen Printing stage if the PCBA is having both
the sides of components
Process Engineering
with QA & Upload OQC Plan NPM 01
2.25 Prepare Proto PFMEA- FF NPM 36 along with CFT As per APQP FF FF NPM 36
Process Engineering
Members .Refer Guidelines for PFMEA WI NPM 04 NPM 01
2.26 Prepare prototype control plan FF NPM 37 with CFT As per APQP FF FF NPM 37
Process Engineering
approach, review and approve. NPM 01
Process Engineering
relating to process capability, rejections, rework, scrap, NPM 01
yield, cycle times, productivity,.
2.28 Identification of required TJFE Equipments, tools, jigs,
fixtures, stencil, wave pallets, nozzles, supporting pin FF NPM 39
As per APQP FF
templates, feeders, Hand soldering,depanelizing jigs, Process Engineering
NPM 01
depanelizing drill bits, ICT, FT, Coating jigs.) on List of tools,
jigs, Fixtures & Equipments FF NPM 39.
2.29 Prepare list of IMTE/Checking Aids used for the As per APQP FF FF NPM 60
Process Engineering
product FF NPM 60 NPM 01
As per APQP FF
required to store and transfer the product from stage to Process Engineering
NPM 01
stage in list of TJFE
As per APQP FF
nozzles, supporting pin templates, feeders, Hand Process Engineering
NPM 01
soldering,depanelizing jigs, ICT, FT.Coating jigs.) on list of
Tools, Jigs, fixtures & Equipments
As per APQP FF
/strain measurement to be conducted and record in FF Process Engineering
NPM 01
NPM 39
2.33 Revise Proto PFC, FMEA & Control Plan If required As per APQP FF FF NPM 27
Process Engineering
and finalise the same NPM 01
Process Engineering
Record in staffing plan FF HRM 20 NPM 01
2.35 Determine the requirement for New Production Line. If As per APQP FF FF EHS 24
Process Engineering
Required Make floor plan in FF EHS 24 NPM 01
As per APQP FF
2.36.1 Share the Finalised gerber to Approved stencil Process Engineering
NPM 01
suppliers
As per APQP FF
2.36.2 Receive the check plot from supplier Process Engineering
NPM 01
2.36.3 Review with Technical team and Finalise the check As per APQP FF
Process Engineering
plot NPM 01
As per APQP FF
2.36.4 Create stencil checklist FF NPM 40 Process Engineering
NPM 01
2.36.5 Link Stencil check plot, DFM File & Pdf file , under As per APQP FF
Process Engineering
the Stencil Part number NPM 01
As per APQP FF
2.36.6 Place Order for Stencil Process Engineering
NPM 01
As per APQP FF
2.37.1 Share the Finalised gerber to Approved wave Process Engineering
NPM 01
palette suppliers
As per APQP FF
2.37.2 Receive the check plot from supplier Process Engineering
NPM 01
2.37.3 Review with Technical team and Finalise the check As per APQP FF
Process Engineering
plot NPM 01
As per APQP FF
2.37.4 Create wave palette ordering checklist FF NPM 38 Process Engineering
NPM 01
2.37.5 Upload wave palette check plot, DFM File & Pdf file As per APQP FF
Process Engineering
under the Wave palette Part number NPM 01
As per APQP FF
2.37.6 Place Order for Wave Palette PM
NPM 01
As per APQP FF
2.38 Depanelizing Fixture Ordering Process Engineering
NPM 01
Process Engineering
Depanelizing suppliers NPM 01
As per APQP FF
2.38.2 Receive the check plot from supplier Process Engineering
NPM 01
2.38.3 Review with Technical team and Finalise the check As per APQP FF
Process Engineering
plot NPM 01
As per APQP FF
2.38.4 Create Depanelizing ordering checklist FF NPM 38 Process Engineering
NPM 01
2.38.5 Upload Depnelizing ordering check list , DFM File & As per APQP FF
Process Engineering
Pdf file, under the Depanelizing Part number NPM 01
As per APQP FF
2.38.6 Place Order for Depanelising fixture Process Engineering
NPM 01
As per APQP FF
2.39.1 Share the Finalised gerber to Approved Process Engineering
NPM 01
handsoldering suppliers
As per APQP FF
2.39.2 Receive the check plot from supplier Process Engineering
NPM 01
2.39.3 Review with Technical team and Finalise the check As per APQP FF
Process Engineering
plot NPM 01
2.39.4 Create Hand soldering ordering checklist FF NPM As per APQP FF FF NPM 40
Process Engineering
40 NPM 01
2.39.5 Upload Hand soldering ordering check list , DFM As per APQP FF
Process Engineering
File & Pdf file under the Depanelizing Part number NPM 01
As per APQP FF
2.39.6 Place Order for Hand soldering Fixture Process Engineering
NPM 01
As per APQP FF
2.40.2 Create ICT Fixture ordering checklist FF NPM 38 Process Engineering
NPM 01
As per APQP FF
2.40.4 Send the ICT Fxiture ordering check list to supplier Process Engineering
NPM 01
As per APQP FF
2.40.5 Place PO PM
NPM 01
2.41 FT Fixture Ordering
FF NPM 40
As per APQP FF
2.41.1 Share the Finalised gerber to Approved FT jig Process Engineering
NPM 01
suppliers
As per APQP FF
2.41.4 Create FT ordering checklist FF NPM 38 Process Engineering
NPM 01
As per APQP FF
2.41.5 Upload the FT Ordering check list Process Engineering
NPM 01
2.41.6 Send the Approved FT Ordering check list to As per APQP FF
Process Engineering
supplier NPM 01
As per APQP FF
2.41.7 Place P.O PM
NPM 01
As per APQP FF
2.42.1 Share the Finalised gerber to Approved coating Process Engineering
NPM 01
Fixture suppliers
2.42.2 Review with Technical team and Finalise the As per APQP FF
Process Engineering
requirements NPM 01
As per APQP FF
2.42.4 Upload the ordering check list in ERP Process Engineering
NPM 01
As per APQP FF
2.42.6 Place P.O Process Engineering
NPM 01
As per APQP FF
2.43.2 Select the supplier for the tool Process Engineering
NPM 01
As per APQP FF
2.43.3 Raise P.O PM
NPM 01
As per APQP FF
2.43.4 Follow up for receipt PM
NPM 01
As per APQP FF
2.44.1 Identify the required Dia of Drill bit required and get Process Engineering
NPM 01
approval from Technical Head
As per APQP FF
2.44.2 Order the required number of bits PM
NPM 01
As per APQP FF
2.45.1 For all other Tools, Jigs and fixtures ensure that Process Engineering
NPM 01
TJFE requirements is updated in FF NPM 40
As per APQP FF
2.45.2 Ensure other Tools, Jigs, Fixtures is ordered Process Engineering
NPM 01
PM
requirements, EHS requirements, Legal requirements etc. NPM 01
and update in the CAPEX form FF ASM 03
PM
CAPEX/REVEX Register FF ASM 05, also hand over a NPM 01
copy to Finance in order to arrange fund.
As per APQP FF
Equipment, including, if applicable, installation & PM
NPM 01
commissioning, on-site service, etc.
2.46.7 Follow up and get the Equipment from the supplier FF WHM 02
As per APQP FF
and manufacturer. Handover the documents to Stores, and PM
NPM 01
get FF WHM 02 GRIN prepared in ERP
2.46.8 Carry out Asset Installation FF ASM 06 and Quality Assurance - As per APQP FF FF ASM 06
As per APQP FF
their competency to develop each of the custom built SCM
NPM 01
parts.FF SCM 07
2.47.3 Conduct supplier audit wherever required as per WI Quality Assurance - As per APQP FF FF SCM 06
2.48.2 In case new suppliers are identified for standard As per APQP FF FF SCM 02
Buyer
parts conduct supplier evaluation on FF SCM 02 NPM 01
2.48.6 Prepare Product Matrix, Review and Release the As per APQP FF FF NPM 42
Process Engineering
product File to the Production NPM 01
2.48.7 Train the Team about the product and update As per APQP FF FF HRM 19
Training
training record FF HRM 19 NPM 01
3.2 Receive the custom Built parts and carry out Incoming FF NPM 43
As per APQP FF
Layout Inspection and sample evaluation and record in FF PM
NPM 01
NPM 43
3.03 If it is a new line, line release to be approved as per As per APQP FF FF NPM 44
Process Engineering
FF NPM 44. NPM 01
3.04 Conduct line side review (LSR) for readiness to start As per APQP FF FF NPM 45
Process Engineering
production using checklist FF NPM 45 NPM 01
3.07 Carry out Stress and Strain measurement for the Quality Assurance - As per APQP FF FF NPM 46
requried process KT-01 NPM 01
3.13 Prepare FAI Documents and obtain approval from QA As per APQP FF FF NPM 50
Process Engineering
and submit to customer NPM 01
As per APQP FF
3.14 Submit IMDS Report in Portal Process Engineering
NPM 01
3.2 Repeat steps 3.01 to 3.14 depending on the number of As per APQP FF
Process Engineering
proto lots requested by customer NPM 01
FF NPM 27
3.4 Revisit the PFC FF NPM 27, PFMEA FF NPM 36 and As per APQP FF FF NPM 36
Process Engineering FF NPM 37
Control Plan FF NPM 37 and make necessary updates NPM 01
4.1.01 Issue Work order for Pilot build as per customer As per APQP FF FF WHM 06
Process Engineering
requirement NPM 01
4.1.05 Carry out Stress and Strain measurement for the As per APQP FF FF NPM 46
Process Engineering
requried process NPM 01
FF QAM 51
4.1.07 Conduct Process capability studies for the required Quality Assurance - As per APQP FF FF QAM 52
processes as defined in the process flow chart. KT-01 NPM 01
4.2 Repeat steps 1.01 to 1.10 depending upon number of Process As per APQP FF
Pilot lots requested by customer Engineering NPM 01
4.6.4 Conduct line side review (LSR) for readiness to start As per APQP FF FF NPM 45
Process Engineering
production using checklist FF NPM 45. NPM 01
As per APQP FF
4.6.5 Carry out PPAP Production ( Customer PPAP) Process Engineering
NPM 01
NPM 54
4.6.7 Prepare PSW FF NPM 56 and get the PSW signed off FF NPM 59
As per APQP FF
by NPD head/QA head and Submit the PPAP document to Process Engineering
NPM 01
customer
As per APQP FF
5.3 Prepare Production Control Plans Process Engineering
NPM 01
APQP MATRIX
Category of
Responsibility
the product
Applic
Phase APQP ELEMENTS Form Format A B C D BD Sales PM NPM SCM QAM HRM System EHS Remarks (If any)
ability
√
5. List of Critical items - FF NPM 11
2.10) GERBER REVIEW
2.10.2) Identify the supplier for PCB , discuss the Gerber with
the prospective supplier and get their inputs and Record in
Gerber review
2.10.3) Receive the panel Gerber from supplier if panalisation
is required
Note 2: Ensure Supporting Pin Layout is made for Pick & Place
and Screen Printing stage if the PCBA is having both the sides
of components
2.19) Prepare Specific CTQ FF NPM 30 if any.