Professional Documents
Culture Documents
NTPC FGD Tal Aod Un#2 LP8 SHT 1
NTPC FGD Tal Aod Un#2 LP8 SHT 1
R 1-THS-8PL-2#NU-DOA-LAT-DGF-CPTN :oN.GRD
0 BOLT LIST FOR ASSEMBLY:- LP8 - NO.s 8 BILL OF MATERIALS ASSEMBLY MK'D : LP8 ASSY QTY : 8
GRID LOCATION DIA. LENGTH GRADE TYPE QTY./ONE QTY./ALL CONNECTED MAINPART CONNECTED SECONDARIES REMARK
QTY./ WT./ AREA
LP8 A/1 EL. +10.974 20 65 8.8XOX Site 6 48 CL1 LP8 LP8 ITEM PROFILE LENGTH WT./ITEM TOTAL TOTAL 2 MATL.
LP8 A/2 EL. +10.974 MARK ASSEMBLY METER QTY. WEIGHT M
LP8 B/1 EL. +10.974 P131 1 PL12*170 94.20 463.00 7.41 8 59.32 1.38 E250BR
F LP8 B/2 EL. +10.974 F
TOTAL 59.32 1.38
E E
170
40 90 40
40
75
D 12 - 22 Ø HOLES D
75
463
83
P131
LP8
75
75
40
C C
REVISION DESCRIPTION DATE DRN. DATE DES. DATE CHD. DATE APP.
EMPLOYER
NTPC Limited
(A Government of India Enterprise)
B B
PROJECT
ANDRITZ AG
GRAZ - AUSTRIA
DWG. TITLE:
NOTES:-
SIGNATURE DATE
A
A
1. ALL DIMENSIONS ARE IN m.m. & LEVELS ARE IN METER.
DRAWN SRK 13.08.2021 ABSORBER OUTLET DUCT - UNIT#2
DESIGNED NP 13.08.2021
LOOSE PART - LP8
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH DRG. NO. CHECKED GS 13.08.2021
APPROVED CRM 13.08.2021 DEPT. ENGG SCALE: NTS SHEET: 1 SIZE: A2 UNIT DESIG.: -- REV.
---
FILE NAME:
NTPC
---
Tekla Structures
PRELIMINARY
---
RELEASED
DWG.NO.
3. FOR MARKING, REFER ERECTION DRAWING NO. TENDER
FOR
8-PLATES REQD. AS DRAWN MKD. LP8 ENGINEERING
TPL DWG.NO. NTPC-FGD-TAL-AOD-UN#2-LP8-SHT-1 0
ANDRITZ
CONSTRUCTION DWG.NO. --- ---
8 7 6 5 4 3 2 1