NTPC FGD Tal Aod Un#2 LP12 SHT 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

8 7 6 5 4 3 2 1

R 1-THS-21PL-2#NU-DOA-LAT-DGF-CPTN :oN.GRD
0 BOLT LIST FOR ASSEMBLY:- LP12 - NO.s 8 BILL OF MATERIALS ASSEMBLY MK'D : LP12 ASSY QTY : 8
GRID LOCATION DIA. LENGTH GRADE TYPE QTY./ONE QTY./ALL CONNECTED MAINPART CONNECTED SECONDARIES REMARK
QTY./ WT./ AREA
LP12 .-B/1 EL. +22.439 20 65 8.8XOX Site 6 48 CL2 LP12 LP12 ITEM PROFILE LENGTH WT./ITEM TOTAL TOTAL 2 MATL.
LP12 .-B/2 EL. +22.439 MARK ASSEMBLY METER QTY. WEIGHT M
LP12 A-./1 EL. +22.439 P134 1 PL12*160 94.20 463.00 6.98 8 55.83 1.30 E250BR
F LP12 A-./2 EL. +22.439 F
TOTAL 55.83 1.30

E E

160

45 70 45

45
70 70
D D

463
93
70 70
45
LP12
P134 12 - 22 Ø HOLES

C C

0 RELEASED FOR CONSTRUCTION 13.08.2021 SRK 13.08.2021 NP 13.08.2021 GS 13.08.2021 CRM

REVISION DESCRIPTION DATE DRN. DATE DES. DATE CHD. DATE APP.

EMPLOYER

NTPC Limited
(A Government of India Enterprise)
B B
PROJECT

FLUE GAS DESULPHURISATION (FGD) SYSTEM PACKAGE FOR


TALCHER STPS STAGE-I (2x500MW) & STAGE-II (4x500MW)
EPC CONTRACTOR

TATA PROJECTS LIMITED


HYDERABAD - INDIA
QFGDM

ANDRITZ AG
GRAZ - AUSTRIA

DWG. TITLE:
NOTES:-
SIGNATURE DATE
A
A
1. ALL DIMENSIONS ARE IN m.m. & LEVELS ARE IN METER.
DRAWN SRK 13.08.2021 ABSORBER OUTLET DUCT - UNIT#2
DESIGNED NP 13.08.2021
LOOSE PART - LP12
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH DRG. NO. CHECKED GS 13.08.2021
APPROVED CRM 13.08.2021 DEPT. ENGG SCALE: NTS SHEET: 1 SIZE: A2 UNIT DESIG.: -- REV.
---
FILE NAME:

NTPC
---
Tekla Structures

PRELIMINARY
---

RELEASED
DWG.NO.
3. FOR MARKING, REFER ERECTION DRAWING NO. TENDER

FOR
8-PLATES REQD. AS DRAWN MKD. LP12 ENGINEERING
TPL DWG.NO. NTPC-FGD-TAL-AOD-UN#2-LP12-SHT-1 0
ANDRITZ
CONSTRUCTION DWG.NO. --- ---
8 7 6 5 4 3 2 1

You might also like