Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

8 7 6 5 4 3 2 1

R 1-THS-11PL-2#NU-DOA-LAT-DGF-CPTN :oN.GRD
0 BOLT LIST FOR ASSEMBLY:- LP11 - NO.s 2 BILL OF MATERIALS ASSEMBLY MK'D : LP11 ASSY QTY : 2
GRID LOCATION DIA. LENGTH GRADE TYPE QTY./ONE QTY./ALL CONNECTED MAINPART CONNECTED SECONDARIES REMARK
QTY./ WT./ AREA
LP11 .-B/1 EL. +16.963 20 60 8.8XOX Site 8 16 VB28 LP11 LP5 ITEM PROFILE LENGTH WT./ITEM TOTAL TOTAL 2 MATL.
LP11 A-./1 EL. +16.967 MARK ASSEMBLY METER QTY. WEIGHT M
P112 1 PL10*140 78.50 295.00 3.24 2 6.48 0.18 E250BR
F F
TOTAL 6.48 0.18

E E

140
LP11
P112 47 60 33
D D

40
60
295

95
60
40
8 - 22 Ø HOLES

C C

0 RELEASED FOR CONSTRUCTION 13.08.2021 SRK 13.08.2021 NP 13.08.2021 GS 13.08.2021 CRM

REVISION DESCRIPTION DATE DRN. DATE DES. DATE CHD. DATE APP.

EMPLOYER

NTPC Limited
(A Government of India Enterprise)
B B
PROJECT

FLUE GAS DESULPHURISATION (FGD) SYSTEM PACKAGE FOR


TALCHER STPS STAGE-I (2x500MW) & STAGE-II (4x500MW)
EPC CONTRACTOR

TATA PROJECTS LIMITED


HYDERABAD - INDIA
QFGDM

ANDRITZ AG
GRAZ - AUSTRIA

DWG. TITLE:
NOTES:-
SIGNATURE DATE
A
A
1. ALL DIMENSIONS ARE IN m.m. & LEVELS ARE IN METER.
DRAWN SRK 13.08.2021 ABSORBER OUTLET DUCT - UNIT#2
DESIGNED NP 13.08.2021
LOOSE PART - LP11
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH DRG. NO. CHECKED GS 13.08.2021
APPROVED CRM 13.08.2021 DEPT. ENGG SCALE: NTS SHEET: 1 SIZE: A2 UNIT DESIG.: -- REV.
---
FILE NAME:

NTPC
---
Tekla Structures

PRELIMINARY
---

RELEASED
DWG.NO.
3. FOR MARKING, REFER ERECTION DRAWING NO. TENDER

FOR
2-SIDE PLATES REQD. AS DRAWN MKD. LP11 ENGINEERING
TPL DWG.NO. NTPC-FGD-TAL-AOD-UN#2-LP11-SHT-1 0
ANDRITZ
CONSTRUCTION DWG.NO. --- ---
8 7 6 5 4 3 2 1

You might also like