Professional Documents
Culture Documents
NTPC FGD Tal Aod Un#2 VB2 SHT 1
NTPC FGD Tal Aod Un#2 VB2 SHT 1
NTPC FGD Tal Aod Un#2 VB2 SHT 1
R 1-THS-2BV-2#NU-DOA-LAT-DGF-CPTN :oN.GRD
0 BOLT LIST FOR ASSEMBLY:- VB2 - NO.s 4 BILL OF MATERIALS ASSEMBLY MK'D : VB2 ASSY QTY : 4
GRID LOCATION DIA. LENGTH GRADE TYPE QTY./ONE QTY./ALL CONNECTED MAINPART CONNECTED SECONDARIES REMARK
QTY./ WT./ AREA
VB2 .-B/1 EL. +3.024 ITEM PROFILE LENGTH WT./ITEM TOTAL TOTAL 2 MATL.
VB2 .-B/2 EL. +3.024 MARK ASSEMBLY METER QTY. WEIGHT M
VB2 A-./1 EL. +3.024 M10 1 SHS150.0X150.0X5.022.26 6084.27 138.51 4 554.03 0.00 YST310
F VB2 A-./2 EL. +3.024 F
P32 2 PL10*150 78.50 155.00 1.83 8 14.60 0.42 E250BR
P33 2 PL10*180 78.50 180.00 2.54 8 20.35 0.58 E250BR
P34 4 PL8*150 62.80 155.00 1.05 16 16.83 0.37 E250BR
TOTAL 605.81 1.37
10 6084 10
P34 BS P34 BS
VB2 P32
70
70
M10
10
10
70
70
P32 P33
P33
TYP 8
E 8 E
6414
P34 P33
60 55 CTR'D P34
P32
TYP
VB2
15
45
45
M10
60
60
TYP
45
15
P34 TYP
6
TYP P33 P34
D 6 CTR'D 55 60 D
P32
4 - 22 Ø HOLES
45
P33
6084 50 50 50
150
60
P34
180
M10
45
155
55 60 40
180
25
25
155
150
C C
REVISION DESCRIPTION DATE DRN. DATE DES. DATE CHD. DATE APP.
EMPLOYER
NTPC Limited
(A Government of India Enterprise)
B B
PROJECT
ANDRITZ AG
GRAZ - AUSTRIA
DWG. TITLE:
NOTES:-
SIGNATURE DATE
A
A
1. ALL DIMENSIONS ARE IN m.m. & LEVELS ARE IN METER.
DRAWN SRK 13.08.2021 ABSORBER OUTLET DUCT - UNIT#2
DESIGNED NP 13.08.2021
V_BRACE - VB2
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH DRG. NO. CHECKED GS 13.08.2021
APPROVED CRM 13.08.2021 DEPT. ENGG SCALE: NTS SHEET: 1 SIZE: A2 UNIT DESIG.: -- REV.
---
FILE NAME:
NTPC
---
Tekla Structures
PRELIMINARY
---
RELEASED
DWG.NO.
3. FOR MARKING, REFER ERECTION DRAWING NO. TENDER
FOR
4-V_BRACES REQD. AS DRAWN MKD. VB2 ENGINEERING
TPL DWG.NO. NTPC-FGD-TAL-AOD-UN#2-VB2-SHT-1 0
ANDRITZ
CONSTRUCTION DWG.NO. --- ---
8 7 6 5 4 3 2 1