Professional Documents
Culture Documents
NTPC FGD Tal Aod Un#2 VB6 SHT 1
NTPC FGD Tal Aod Un#2 VB6 SHT 1
R 1-THS-6BV-2#NU-DOA-LAT-DGF-CPTN :oN.GRD
0 BOLT LIST FOR ASSEMBLY:- VB6 - NO.s 2 BILL OF MATERIALS ASSEMBLY MK'D : VB6 ASSY QTY : 2
GRID LOCATION DIA. LENGTH GRADE TYPE QTY./ONE QTY./ALL CONNECTED MAINPART CONNECTED SECONDARIES REMARK
QTY./ WT./ AREA
VB6 .-B/2 EL. +16.408 ITEM PROFILE LENGTH WT./ITEM TOTAL TOTAL 2 MATL.
VB6 A-./2 EL. +16.408 MARK ASSEMBLY METER QTY. WEIGHT M
M13 1 SHS132.0X132.0X4.818.71 6096.20 116.87 2 233.74 0.00 YST310
F F
P41 1 PL10*132 78.50 135.00 1.40 2 2.80 0.08 E250BR
P42 2 PL10*165 78.50 165.00 2.14 4 8.55 0.24 E250BR
P43 4 PL8*132 62.80 135.00 0.84 8 6.69 0.14 E250BR
P59 1 PL12*132 94.20 135.00 1.68 2 3.36 0.08 E250BR
TOTAL 255.13 0.55
P43 P43
P42 VB6 P59
66
66
M13
E E
66
66
P41 P42
6386
60 55
P43 P59
P42 P43
P41 CTR'D P42
VB6 CTR'D
17
38
38
M13
55
55
16
D 6 6 6 D
6
P43 55 60
P43
135
165 6096 41 50 41
45 60 30
P41
M13
110
110
4 - 18 Ø HOLES P43
135
38
165
132
55
25
25
132
P42
39
C C
REVISION DESCRIPTION DATE DRN. DATE DES. DATE CHD. DATE APP.
EMPLOYER
NTPC Limited
(A Government of India Enterprise)
B B
PROJECT
ANDRITZ AG
GRAZ - AUSTRIA
DWG. TITLE:
NOTES:-
SIGNATURE DATE
A
A
1. ALL DIMENSIONS ARE IN m.m. & LEVELS ARE IN METER.
DRAWN SRK 13.08.2021 ABSORBER OUTLET DUCT - UNIT#2
DESIGNED NP 13.08.2021
V_BRACE - VB6
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH DRG. NO. CHECKED GS 13.08.2021
APPROVED CRM 13.08.2021 DEPT. ENGG SCALE: NTS SHEET: 1 SIZE: A2 UNIT DESIG.: -- REV.
---
FILE NAME:
NTPC
---
Tekla Structures
PRELIMINARY
---
RELEASED
DWG.NO.
3. FOR MARKING, REFER ERECTION DRAWING NO. TENDER
FOR
2-V_BRACES REQD. AS DRAWN MKD. VB6 ENGINEERING
TPL DWG.NO. NTPC-FGD-TAL-AOD-UN#2-VB6-SHT-1 0
ANDRITZ
CONSTRUCTION DWG.NO. --- ---
8 7 6 5 4 3 2 1