Professional Documents
Culture Documents
NTPC FGD Tal Aod Un#2 VB15 SHT 1
NTPC FGD Tal Aod Un#2 VB15 SHT 1
R 1-THS-51BV-2#NU-DOA-LAT-DGF-CPTN :oN.GRD
0 BOLT LIST FOR ASSEMBLY:- VB15 - NO.s 4 BILL OF MATERIALS ASSEMBLY MK'D : VB15 ASSY QTY : 4
GRID LOCATION DIA. LENGTH GRADE TYPE QTY./ONE QTY./ALL CONNECTED MAINPART CONNECTED SECONDARIES REMARK
QTY./ WT./ AREA
VB15 A/2-1 EL. +3.011 ITEM PROFILE LENGTH WT./ITEM TOTAL TOTAL 2 MATL.
VB15 A/2-1 EL. +1.060 MARK ASSEMBLY METER QTY. WEIGHT M
VB15 B/2-1 EL. +3.011 M19 1 SHS150.0X150.0X5.022.26 1945.80 44.29 4 177.18 0.00 YST310
F VB15 B/2-1 EL. +1.060 F
P32 2 PL10*150 78.50 155.00 1.83 8 14.60 0.42 E250BR
P33 2 PL10*180 78.50 180.00 2.54 8 20.35 0.58 E250BR
P34 4 PL8*150 62.80 155.00 1.05 16 16.83 0.37 E250BR
TOTAL 228.95 1.37
2276
10 1946 10
P34
TYP P32
P32 P34
TYP
6 VB15
15
45
M19
E E
120
60
60
45
TYP
P33
15
P34 CTR'D
P33 P34
60 55 CTR'D
55 60 40
TYP
6
2276
70
10
10
70
70
P32 P33 P33
CTR'D CTR'D
TYP 8
8
1946 50 50 50
P33 P32
45
M19 4 - 22 Ø HOLES
150
60
180
155
45
25
25
C C
180 150
P34 55 60 40
155
REVISION DESCRIPTION DATE DRN. DATE DES. DATE CHD. DATE APP.
EMPLOYER
NTPC Limited
(A Government of India Enterprise)
B B
PROJECT
ANDRITZ AG
GRAZ - AUSTRIA
DWG. TITLE:
NOTES:-
SIGNATURE DATE
A
A
1. ALL DIMENSIONS ARE IN m.m. & LEVELS ARE IN METER.
DRAWN SRK 13.08.2021 ABSORBER OUTLET DUCT - UNIT#2
DESIGNED NP 13.08.2021
V_BRACE - VB15
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH DRG. NO. CHECKED GS 13.08.2021
APPROVED CRM 13.08.2021 DEPT. ENGG SCALE: NTS SHEET: 1 SIZE: A2 UNIT DESIG.: -- REV.
---
FILE NAME:
NTPC
---
Tekla Structures
PRELIMINARY
---
RELEASED
DWG.NO.
3. FOR MARKING, REFER ERECTION DRAWING NO. TENDER
FOR
4-V_BRACES REQD. AS DRAWN MKD. VB15 ENGINEERING
TPL DWG.NO. NTPC-FGD-TAL-AOD-UN#2-VB15-SHT-1 0
ANDRITZ
CONSTRUCTION DWG.NO. --- ---
8 7 6 5 4 3 2 1