Construction Cost Estimate For Subdivision Work: Project Details
Construction Cost Estimate For Subdivision Work: Project Details
Project Details
(a) Property Location
(b)
(c)
(d) Site area (m2)
Item Description Quantity Unit
1 General
Site Establishment, disestablishment, restoration & clean up
Survey setout
Environmental controls
Traffic control
2 Site Preparation
Clear approved trees, chip, stockpile and/or dispose No. Trees
Clear approved vegetation, chip, stockpile and/or dispose m2
Demolish and dispose of structures m2
Decommission, backfill and compact dam m2
Decontamination or remediation m3
3 Earthworks
Balanced cut and fill m3
Excavate for roads, driveways, pathways, batters and site regrade areas m2
Import & compact fill m3
Dispose surplus material off-site to an approved location (including tipping fees) m3
4 Drainage
Interallotment Drainage - excavate trench, supply, bed, lay, cap, joint and backfill PVC pipe
(a) 225mm dia or less m
(b) >225mm dia m
(c) Junction pit No
Concrete Pipe - excavate trench, supply, bed, lay, cap, joint and backfill
(a) 750mm dia or less m
(b) >750mm dia m
(c) Junction pit No
(d) Curb inlet pit No
Stormwater Pollution Control & Water Sensitive Urban Design
(a) Gross Pollutant Trap No.
(b) Litter basket/Pit insert No.
(c) Raingarden No.
(d) Bioswale m
5 Roadworks
Curb and gutter m
Subgrade, sub-base, basecourse m2
Roundabout (standard single lane) No.
Roundabout (dual lane) No.
6 Concrete footpaths, cycleways, layback and driveways
1.5m wide concrete footpath m
2.5m wide concrete cycleway m
Laybacks m
Driveways m2
7 Service Utilities
Water m
Sewer m
Sewer manhole No
Electricity, Telecommunications No of lots
Relocate existing pole and cable No.
8 Landscaping
Retaining Walls
(a) Timber (Max 1200mm high) m2
DIRECT C
Contingency & professional construction related fees Item
Economies of scale factor Item
SUB-T
10 Declaration
(a) I am a suitably qualified person with experience in costing development work of this scale and nature.
(b) I confirm this is a genuine construction cost estimate of the proposed project subject to the accompanying Development Application.
Name:
Signature:
Date:
PHP 0.00
PHP 0.00
PHP 5,000.00 PHP 0.00
PHP 6,500.00 PHP 0.00
PHP 15,000.00 PHP 0.00