Job Pending R1 April 2022

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

PIT BARAT

KDC - AKG PROJECT


Field Observation and Monitoring
Name ANDI.S
Change Shift SIANG

PIT YAKUT
Easting
Date/Time 1-Apr-22 Northing
Pit / Block YAKUT RL
Clasification

EXCA 46 CONTINUE EXPOSE SEAM Y3

EXCA 88 CONTINUE EXPOSE SEAM Y3

EXCA 005 CONTINUE CLEANING SEAM Y3


EXCA 116 CONTINUE COAL GETTING SEAM
Y3

PT AKG Observer By, Operation PT AKG Operation PT. AKG

(Pit Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

KDC - AKG PROJECT


Field Observation and Monitoring
Name ANDI.S
SIANG

PIT YAKUT
Change Shift Easting
Date/Time 1-Apr-22 Northing
Pit / Block YAKUT RL
Clasification

EXCA 84/107
CONTINUE STRIPPING KE ARAH
BARAT

PT AKG Observer By, Operation PT AKG Operation PT. AKG

(Pit Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )

PT AKG Observer By, Operation PT AKG, Operation PT. AKG

(Pit Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

KDC - KBB PROJECT


Field Observation and Monitoring
Name ANDI.S
Change Shift SIANG Easting
Date/Time
Pit / Block
1-Apr-22
OPD YAKUT
OPD YAKUT Northing
RL
Clasification

CONTINUE PELEBARAN DAN LAMINATING JALAN

FREE DUMP DARI ATAS KE BAWAH

AREA DUMPINGAN MATERIAL


SOIL

NOTE :
ELEVASI AKTUAL TERTINGGI DISPOSAL DI
ELEVASI 138, CONTINUE PERATAAAN

PT AKG Observer By, Operation PT AKG Operation PT. AKG

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

KDC - KBB PROJECT


Field Observation and Monitoring
Name ANDI.S
Change Shift SIANG Easting
Date/Time
Pit / Block
1-Apr-22
YAKUT
PIT YAKUT Northing
RL
Clasification

EXCA 33 CONTINUE PERATAAN WORKSHOP, CUT


IKUTI PITA SURVEI WARNA BIRU

CUT/POTONG 0,8 METER

CUT 9 METER

FILL/TIMBUN 10 METER
RENCANA WORKSHOP NOTE ; EXCA 033 LANJUT GENERAL

PT AKG Observer By, Operation PT AKG, Operation PT. AKG