Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

PRACTICAL QUALIFICATION TEST

Name of the Trainee Date:

Training Module: Trainer/Instructor Name:

CENTRAL OPERATION COURSE (SIG-O-10)

Period: From: To: Location:


COMPLIANCE
REQUIREMENT EVIDENCE COMMENT
Yes No N/A

ATS Operation
ATS desk setup Sign-in and Sign-out
Territory assignment
Password management
Train mission manual Moving trains from
assignment and control stabling tracks to the
main line
Headway separation
traffic control and data
monitoring
Moving trains from the
main line to the stabling
tracks
Moving trains to/from
workshop
Moving trains to/from
test track
Moving trains to/from
interior cleaning
Moving trains to/from
external washing
Main line traffic Setting-up headway
management regulation mode with
trains different missions
Headway performance
monitoring and report
generation
Train commands
operation and
information monitoring
Train hold/ release and
operative report analysis
Platform monitoring and
controls. Dwell and skip
controls
Platform doors and train
doors controls and
monitoring

Wayside devices Device tags


control and support for management

maintenance Track section exclusion


and special controls
Point exclusion and
controls
Signals exclusion and
controls
Maintenance logs
consultation and reports
Operative scenario Areas and trains routing
management modes
Locations functional
control and status
monitoring
Driving modes inhibit
Work zone controls
TSR management

Vehicle regulation Schedule regulation


management setup
Schedule delays control
Adding and deleting
trains in the schedule
Adding and removing
trip for trains in the
schedule
Schedule reports
consultation
Alarms and emergency ATS alarms consultation
cases management and interpretation
ATC subsystem status
monitoring and fault
localization
Emergency controls and
bypass commands

IXL VHMI Operation


Wayside devices Green icons functions
control and route operation

creation in normal Alarms and status


monitoring and reaction
condition
Locations control
Wayside devices Points recovery
control to solve functions

particular conditions Track sections recovery


functions
Signals recovery
functions
Route recovery function
Shed and gates control
PSD manual controls
Wayside devices Route creation and
control to solve cancellation in case of
track circuit failure or
abnormal conditions exclusion
and malfunctions Route creation in case
of point immobilization
and lateral protection
Route creation in case
of LED signal failure
Route creation in case
of shade gate sensors
malfunction

Training Needs:
Additional Comments:

Recommendations:

Learner/Trainee Name

Signature

Assessors Name

Signature

You might also like