36625
2000 1800 3450 3450 1800 1800 6900 1800 5100 4000 4000 2500
4273
2090
2000 2000
2090 THE SECTION IS DIVIDED INTO TWO SPACING OF LEFT
SIDE OF 2350MM IN SPACING OF COLUMN OF PILES
800 IN X-X AND RIGHTER SIDE IS OF 1875MM IN X-X.
G
THE y-y SPACING OF BOTH PILE IS 2000MM.
1351
13558 PROVIDE 100MM THICK PCC (1:4:8) & 100MM STONE
SOLING BELOW RAFT AS CUSHION.
28350 D 24230 24234 28350
VOLUME OF PCC 1:4:8: 1071.45M2*0.1M=100.252M3
STONE SOLING VOLUME = 107.14M3
800
THE MINIMUM PILE EMBEDMENT OF PILE INTO RAFT
1/B 4700
SHOULD BE ATLEAST 3 INCH.
2350
B 10633
800
A 4001 800
2000 2000
800
2000 1800 3450 3450 1800 1800 3450 3450 1800 3300 4000 4000 2500 1175
954 38195
2000 1800 3450 3450 1800 1800 6900 1800 5100 4000 4000 2500
4273
2090 2090
2000 2000
800
G
4000 4000
F 12764
1351
13558
D 24230 24234
4000 4000
2220
2350
800
1/B 4700
2350
B 10633
800
A 4001 800
800
2000 1800 3450 3450 1800 1800 3450 3450 1800 3300 4000 4000 2500 1175
954 38195
954 2350 2350 2350 2350 2350 2350 2350 2350 2350 1875 1875 1875 1875 1875 1875 1875
SECTION AT J-J
2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000
SECTION AT K-K
900
Ld
Ld
Ld
800
Pile Embeddement 75 mm
100mm thick PCC 1:4:8
100mm Stone/Brick Soiling
1875
SECTION AT A-A
8500
750
150
11800 6400
L2
800 MM L3 200
200 L1
12000
L1= 12000 mm
L2= 12000 mm
REINFORCEMENT IN Y-Y DIRECTION RAFT
L3= 5940 mm
12000
11800
L2 L4
L1 L3
200 12000 200
L1= 12000 mm 4675
L2= 12000 mm
LD (1000) LD (1000) LD (1000)
L3= 12000 mm
L=9150 MM L4= 4070 mm
REINFORCEMENT IN X-X DIRECTION RAFT
8350 MM
REINFORCEMENT IN PILE