Consultancy Services for carrying out Feasibility Study , Detailed Survey / Investigation, Alignment Option, Preparation of General Arrangement Drawing, Engineering Report SCALE :- DATE :- SHEET NO:- FINAL PROJECT REPORT CONST. OF 2-LANE ROB IN LIEU OF 'SPL' CLASS MANNED L-XING NO. AB - 27 AT RLY K.M. 937/14 -15 BETWEEN JINDALS CONSORTIUM 16-11-2017 01 NATIONAL HIGHWAY AS MENTIONED UDALKCHAR - BORILAND STNS. & NH K.M. 264.00 ON MINISTRY OF ROAD TRANSPORT AND HIGHWAYS for Construction of Proposed ROB's & their approches in replacement of Existing Level ISO 9001-2008
CHATTISGARH AMBIKAPUR - BISHRAMPUR SECTION IN BELBAHARA,
IAHE, PLOT NO. A-5, INSTITUTIONAL AREA, SECTOR- 62 NOIDA - 201301 Crossing as per finalised RFP in the state of Chattisgarh.( Package No. 06 ) DRAWN BY:- CHKD BY:- CHATTISGARH. NISHA AMAN