12 mm thk

plaster

MS GRILL AS PER
DETAILS rcc lintel 3" thk
chajja
planter SILL @ 3'6" STOP @ 8"6"
LINTEL @ 5'6" upvc
SILL @ 0'6" STOP @ 8"6" window outside
LINTEL @ 8'6"
STOP @ 8"6" inside
19 mm
8 mm thk granite
groove
3" thk pcc
+ 11'2" FFL 3" skirting
+ 11'0" SSL
dining
kitchen 12mm
thk tiles
A

SILL @ 1'0"
LINTEL @ 8'6" STOP @ 7"2" LINTEL @ 7'2" STOP @ 8"6"
LINTEL @ 8'6" typical details of openings
STOP @ 8"0"
2"x1.25" size teakwood hand rail
B
A

SILL @ 4'2"
SILL @ 4'0" LINTEL @ 7'2" 8 mm 12 mm
pooja groove thk toughened glass
A A utility
PERGOLA(2"X1" MS BOX 3" skirting
LINTEL @ 7'2"

SECTION @ 6") 19 mm
2"X1" MS BOX SECTION + 10'11" FFL 12mm thk teak wood plank
C C UP dwn + 10'0" SSL thk tiles 3" thk pcc
+ 11'1" FFL
LINTEL @ 7'2"
+ 10'0" SSL
SILL @ 4'0"
STOP @ 9'6"
STOP @ 8'6"
FFL
STOP @ 5"8"
STOP @ 5"8"
SILL @ 1'8"
STAIRCASE AS LINTEL @ ROOF BEAM section-AA 2"x1.25" size teakwood hand rail
PER DETAILS BOTTOM 19 mm
thk teak wood plank
+ 12'8" FFL
+ 12'6" SSL 8 mm 3" thk pcc
UP living groove
3" skirting
STOP @ 9'6"
12mm
LINTEL thk tiles
roof
+ 12'6" FFL beam
+ 12'4" SSL bottom FFL
STOP @ 9'6" STOP @ 8'6"
SILL @ 0'0"
LINTEL @ roof beam
balcony STOP @ 9'6" bottom
section-BB
+ 10'6" FFL 12 mm thk
+ 10'4" SSL
toughened glass
fixed on MS
frame with
required slop
4"x6" RCC
beam 2"x1" MS box
section @ 6"
4" thk wall

NOTE:
CEMENT SAND RATIO FOR
RATIO(CEMENT:SAND) THICKNESS
block joint (6" THK) 1:5 12-15 MM HORIZONTAL 10-12 MM VERTICAL
block joint (4" THK) 1:4 12-15 MM HORIZONTAL 10-12 MM VERTICAL
brick joint (9" THK) 1:6 10-12 MM HORIZONTAL 8-10 MM VERTICAL
brick joint (4" THK ) 1:4 15- 18 MM
internal plastering 1:6 12- 15 MM remark
external plastering 1:4 12- 15 MM
N
section-CC
ceiling plastering 1:4 8- 12 MM 8" thk wall
* FOR 4" THK WALL :the walls be reinforced with 2 nos of 8mm mild steel bars with tie bars at 1m
interval on the top of the first course and at every fifth course there after. 6" thk wall
* WATER CURING FOR
RCC - 21 days
4" thk wall
wall and plastering - 14 days

rcc

CLIENT: TITLE :
PROPOSED RESIDENCE FIRST FLOOR
FOR MR. MANISH MASONRY PLAN