Manish Masonry Ground Floor
Manish Masonry Ground Floor
2"X1" MS plaster
PERGOLA @
A
STOP @ 8' 8' LVL STOP @ 8'
rcc lintel 3" thk
SILL @ 1'1" planter chajja
upvc
inside
19 mm
8 mm
LINTEL @ 8'2"
thk granite
A
groove
LVL + 1' 6" 3" thk pcc
3" skirting
A A
seating
12mm
UP thk tiles
1
2
STOP @ 7'2" LVL + 2' 1" STOP @ 7"
STOP @ 8' typical details of openings
3 4 5 6
STOP SILL @ 1'1"
STOP @ 9'5" 4" deep niche @ 4' roof slab
@ 1'6"
from FFL (3'x1')
LINTEL @ 7'2"
19 mm groove
parking
11'0" x 32'6" plastering groove details
LINTEL @ 7'2" 12 mm thk
STOP @ 7'2"
toughened glass
LINTEL @ 7'2" fixed on MS
STOP @ 9'5" STOP @ 7'2" STOP @ 7'2" frame with
SILL @ 2'8" required slop
LINTEL @ 7'2" roof slab
gutter (4" dia)
6"x6" RCC
bedroom beam
section-AA
5 mm
LVL + 0'-0" chamfer
19 mm thk jet black
leather finished granite
2 21 " thk
RCC as a
platform
CEMENT SAND RATIO FOR
RATIO(CEMENT:SAND) THICKNESS entrance steps details
block joint (6" THK) 1:5 12-15 MM HORIZONTAL 10-12 MM VERTICAL
block joint (4" THK) 1:4 12-15 MM HORIZONTAL 10-12 MM VERTICAL
brick joint (9" THK) 1:6 10-12 MM HORIZONTAL 8-10 MM VERTICAL
brick joint (4" THK ) 1:4 15- 18 MM
internal plastering 1:6 12- 15 MM N remark
external plastering 1:4 12- 15 MM
ceiling plastering 1:4 8- 12 MM 8" thk wall
* FOR 4" THK WALL :the walls be reinforced with 2 nos of 8mm mild steel bars with tie bars at 1m
interval on the top of the first course and at every fifth course there after. 6" thk wall
* WATER CURING FOR
RCC - 21 days 4" thk wall
wall and plastering - 14 days
rcc
CLIENT: TITLE :
PROPOSED RESIDENCE GROUND FLOOR MASONRY
FOR MR. MANISH PLAN