the order type, which is a required field when creating an order. Then, the system calculates
overhead expenses using the costing sheet if specified in the valuation variant.
The CONTROL tab displays production order fields relevant to the costing of the order.
Let’s check the fields in the costing selection of the production order CONTROL Tab.
https://skillstek.com/preliminary-costing-sap/ 2/12
4/5/22, 8:54 AM Preliminary Costing in SAP Product Costing - Detailed Overview | Skillstek
Preliminary Costing
It’s important to know the use of available fields in the Production order and how these are
important for the costing system.
Costing Variant for Planned Costs
The costing Variant Plan field specifies which costing variant you use to determine plan costs.
Likewise, the order type determines the default costing variant which in turn determines the
valuation variant.
You can maintain the default values for order types with Transaction OKZ3. This setting further
allows you to display and maintain values for a combination of plant and order type. In my
example, it is ZC11 which in turn determines the valuation variant C11.
https://skillstek.com/preliminary-costing-sap/ 3/12
4/5/22, 8:54 AM Preliminary Costing in SAP Product Costing - Detailed Overview | Skillstek
A costing sheet determines the allocation of overhead costs from cost centers to manufacturing
orders. The costing sheet field from the valuation variant, which in turn is determined by the
costing variant.
Overhead Key
An overhead key allows you to assign specific overhead rates to individual orders or to groups of
orders. This functionality gives you flexibility in assigning overhead for frequent calculation and
maintenance of overhead rates.
Determine Plan Costs
The determine PLAN Costs field determines when the system saves manufacturing order plan
costs. If you click on the field display the three possible entries are available.
This is the most common setting. It indicates that planned costs are calculated when the
manufacturing order is initially created and saved. This allows us to correct any costing errors
earlier than the other two options.
The production order planned costs display in the “Total PLAN Costs column” let’s discuss each
section.
Goods Issue
When you create the production order, the system copies the BOM to the production order. You
can determine the planned goods issues to the production order from the BOM. Then further
display it as a plant and material combination in the origin column.
Confirmation
When you create the production order, the system copies the routing to the production order.
Further, it determines the planned activity confirmations from the operations in the routing. Finally
displays as a cost center and activity combination in the Origin column.
Overhead
https://skillstek.com/preliminary-costing-sap/ 5/12
4/5/22, 8:54 AM Preliminary Costing in SAP Product Costing - Detailed Overview | Skillstek
You determine the Overhead by the costing sheet in the production order Control Tab as
Displayed. A costing sheet determines the allocation of overhead costs from cost centers to
manufacturing orders. Subsequently, the cost center that receives the credit is displayed in the
origin column.
Goods Receipt
You are typically entering a material when you create a production order The production order
contains all of the information necessary to manufacture the material. When you place the
manufactured material into inventory, the production order receives a credit based on the
standard price of the plant and material shown in the Origin column.
In this blog, we looked at preliminary costing for manufacturing orders. We discussed relevant
fields in the production order costing tab and how to display a preliminary cost estimate.
Hence, if you are learning SAP Product Costing as part of your S/4HANA Finance training then
also you should gain a good knowledge of Preliminary costing in SAP.
Since Preliminary Costing is a technical subject of Product Costing, it involves calculation and
analysis. So, you do get in deep studying this subject.
Tags: preliminary cost estimate sap co SAP Controlling SAP Product Costing
https://skillstek.com/preliminary-costing-sap/ 6/12
4/5/22, 8:54 AM Preliminary Costing in SAP Product Costing - Detailed Overview | Skillstek
Search …
Online Training
https://skillstek.com/preliminary-costing-sap/ 7/12
4/5/22, 8:54 AM Preliminary Costing in SAP Product Costing - Detailed Overview | Skillstek
Polular Posts
Categories
SAP Controlling
SAP FICO
Uncategorized
Recent Posts
Subscribe My Blog
https://skillstek.com/preliminary-costing-sap/ 8/12
4/5/22, 8:54 AM Preliminary Costing in SAP Product Costing - Detailed Overview | Skillstek
SUBSCRIBE
Related Posts
SAP CONTROLLING
https://skillstek.com/preliminary-costing-sap/ 9/12
4/5/22, 8:54 AM Preliminary Costing in SAP Product Costing - Detailed Overview | Skillstek
SAP FICO
https://skillstek.com/preliminary-costing-sap/ 10/12
4/5/22, 8:54 AM Preliminary Costing in SAP Product Costing - Detailed Overview | Skillstek
SAP CONTROLLING
https://skillstek.com/preliminary-costing-sap/ 12/12