007

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 94

H.Alzahrani@pillararabian.

com

From: a.alhakeem@pillararabian.com
Sent: Thursday, March 24, 2022 9:47 AM
To: H.Alzahrani@pillararabian.com; m.aboshabanah@pillararabian.com; hishamadel415
@gmail.com; a.refaai@pillararabian.com
Cc: 'Eng Hatem'; DCC.SFMC-JEDDAH@pillararabian.com; A.AlGhoul@pillararabian.com;
h.elgendy@pillararabian.com
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI villa zone four corner for blinding for MH F10-1.


2. RFI villa zone four corner for blinding for MH PS2-1-4.
3. RFI single zone four corner for blinding for MH F4-1-1-2A, F4-1-2-1A and F5-10-1A.
4. RFI family zone four corner for blinding for MH F6-19, F6-18.
5. RFI single zone four corner for blinding for MH F4-1-3-3 to F4-1-3-6.
6. RFI single zone leak test from MH F4-10-7 to MH F4-10-8.
7. RFI single zone flexible joint from MH 4-1-3-1 to F4-1-3-6.
8. RFI single zone flexible joint from MH F4-10-7 to F4-10-4.
9. RFI single zone flexible joint from MH 5-10-1 to F5-10-1-1
10. RFI single zone flexible joint from MH 5-10-1 to F5-10-3
11. RFI single zone flexible joint from MH 4-1-1-5 to F4-1-1-1
12. RFI single zone flexible joint from MH 4-1-2-3 to F4-1-2-1

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, March 23, 2022 12:22 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
1
Please find below requests for today:
1. RFI single zone pipes installation from MH PS2-40-5-4 to MH PS2-40-5-1.
2. RFI single zone leak test from MH F4-10-5 to MH F4-10-4.
3. RFI single zone leak test from MH F4-10-9 to MH F4-10-8.
4. RFI single zone FDT 2nd layer backfill from PS2-52 to ps2-53.
5. RFI Single zone FDT above pipes 3nd layer from MH PS2-52 to MH PS2-44. (Rectify )
6. RFI villa zone FDT backfill 2nd layer above pipes from MH PS2-7-21 to MH PS2-7-17
7. RFI villa zone RDT sand blanket over pipes from MH F8-12 to MH F8-7.
8. RFI villa zone RDT sand around manholes 1st layer at MH PS2-7-22 to PS2-7-16.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, March 22, 2022 1:22 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone flexible joint from MH 5-5-2 to F5-5-8


2. RFI family zone FDT for manhole F6-18 and F6-19
3. RFI single zone FDT backfill 3nd layer around manhole from MH F5-7-1 to MH F5-7-5.
4. RFI single zone FDT backfill 3nd layer around manhole from MH F4-3-2 to MH F4-3-10.
5. RFI single zone pipe installation form MH F4-3-2-1 to F4-3-2.
6. RFI single zone leak test from MH-PS2-25 to MH-PS2-21 A.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer
2
a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, March 20, 2022 4:16 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. Single zone RDT sand above pipes from MH-F5-5-2 to MH-F5-5-8.


2. Single zone RDT sand above pipes from MH-F5-6-3 to MH-F5-6.
3. Villa zone FDT below house connection at HC1 PS2-7-12, HC2 PS2-7-12, HC3 PS2-7-12, HC2 PS2-7-11 and HC3
PS2-7-11.
4. RFI villa zone pipes leak test for house connection (from HC2 PS2-7-19 to HC1 PS2-7-19) and (from HC1 PS2-7-19
to MH PS2-7-19).
5. RFI villa zone pipes leak test for house connection (from HC2 PS2-7-18 to HC1 PS2-7-18) and (from HC1 PS2-7-18
to MH PS2-7-18).
6. RFI villa zone pipes leak test for house connection (from HC2 PS2-7-17 to HC1 PS2-7-17) and (from HC1 PS2-7-17
to MH PS2-7-17) and (from HC4 PS2-7-17 to HC3 PS2-7-17) and (from HC3 PS2-7-17 to MH PS2-7-17).
7. RFI single zone RDT backfill 2nd layer around manhole from MH F5-7 to MH F5-7-5.
8. RFI single zone RDT backfill 2nd layer around manhole from MH F4-3-2 to MH F4-3-10.
9. RFI villa zone pipes leak test from MH F8-11 to F8-12.
10. RFI Single zone FDT above pipes 2nd layer from MH PS2-52 to MH PS2-44.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, March 16, 2022 4:13 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;

3
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:
1. Single zone pipe leak test from MH F13-45 to F13-48.
2. Single zone pipe leak test from MH F4-10-6 to F4-10-5.
3. RFI single zone FDT 1ST layer backfill from PS2-52 to ps2-53.
4. RFI single zone backfilling last layer above warning tape from MH F5-11 to MH F5-8.
5. RFI single zone backfilling last layer above warning tape from F5-8 to F5-8-5.
6. RFI single zone backfilling last layer above warning tape from F5-7 to F5-7-5.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, March 15, 2022 10:58 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI villa zone pipes leak test from MH F8-8 to F8-7.


2. RFI single zone pipe leak test from MH F5-10-1-1 to MH F5-10-1.
3. RFI single zone pipe leak test from MH F5-10-3 to MH F5-10-2.
4. RFI single zone pipe leak test from MH PS3-31 to PS3-27.
5. RFI single zone RDT backfill 1st layer around manhole from MH F5-7 to MH F5-7-5.
6. RFI single zone RDT backfill 1st layer around manhole from MH F4-3-2 to MH F4-3-10.

Thanks & Best Regards,

4
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, March 14, 2022 8:05 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone pipes installation from F13-43 to F13-50.


2. RFI single zone pipes installation from MH-F4-2*-1 to MH-F4-2*-1-4.
3. RFI single zone pipes installation from F4-4 to F4-3.
4. RFI family zone pipes installation from F1-1-2 to F1-1-2-1.
5. RFI Family zone pipes installation from F1-2 to F1-2-1.
6. RFI Family Zone FDT 1st layer above pipes from MH-F6-19 to MH F6-18.
7. RFI Family Zone FDT 1st layer above pipes from MH-F6-17 to MH-F6-11.
8. RFI single zone FDT 2nd layer backfill from PS2-52 to ps2-53 and from ps2-42 to ps2-44.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, March 13, 2022 1:56 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
5
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone four corner for blinding from MH F4-1-7 to F4-1-13
2. RFI single zone four corner for blinding from PS2-40 to PS2-40-10.
3. RFI single zone four corner for blinding from F4-10 to f4-3
4. RFI single zone manhole FDT from F4-11 to F4-16
5. RFI single zone pipes installation from MH-PS2-25 to MH-PS2-21 A.
6. RFI single zone pipes leak test from F5-5-5A to F5-5-7.
7. RFI villa zone pipes leak test for house connection (from HC2 PS2-7-22 to HC1 PS2-7-22) and (from HC1 PS2-7-22
to MH PS2-7-22).
8. RFI villa zone pipes leak test for house connection (from HC2 PS2-7-21 to HC1 PS2-7-21) and (from HC1 PS2-7-21
to MH PS2-7-21).
9. RFI villa zone pipes leak test for house connection (from HC2 PS2-7-20 to HC1 PS2-7-20) and (from HC1 PS2-7-20
to MH PS2-7-20).
10. RFI villa zone installation pipes for house connection (from HC 4PS2-7- 15to HC 3PS2-7-15) and (from HC 3PS2-7-
1 5to MH-PS2-7-1 5) and (from HC 2PS2-7-15 to HC1PS2-7-15 ) and from (from HC1 PS2-7-1 5to MH-PS2-7-15).
11. RFI villa zone installation pipes for house connection (from HC 4PS2-7-14 to HC 3PS2-7-14) and (from HC 3PS2-7-
14 to MH-PS2-7-14 ) and (from HC 2PS2-7-14 to HC1PS2-7-14 ) and from (from HC1 PS2-7-14 to MH-PS2-7-14).
12. RFI villa zone installation pipes for house connection (from HC 4PS2-7-13 to HC 3PS2-7-13) and (from HC 3PS2-7-
13 to MH-PS2-7-13 ) and (from HC 2PS2-7-13 to HC1PS2-7-13 ) and from (from HC1 PS2-7-13 to MH-PS2-7-13).
13. RFI villa zone installation pipes from F10-2 to F10-1.
14. RFI villa zone pipes leak test from MH F8-10 to F8-11.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, March 10, 2022 4:05 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
6
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

1. Please rectify RFI #4 to family zone RDT sand above pipes from F6-13 to F6-11.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, March 10, 2022 2:02 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone warning tape from MH F5-11 to MH F5-8.


2. RFI single zone warning tape from F5-8 to F5-8-5.
3. RFI single zone warning tape from F5-7 to F5-7-5.
4. RFI family zone RDT sand above pipes from F6-17 to F6-11.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

7
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Tuesday, March 8, 2022 2:02 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI villa zone pipes leak test from MH F8-10 to F8-8.


2. RFI villa zone RDT sand below pipes for house connection (from HC 4 PS2-7- 15to HC 3PS2-7-15) and (from HC 3
PS2-7-1 5to MH-PS2-7-1 5) and (from HC 2PS2-7-15 to HC1PS2-7-15 ) and from (from HC1 PS2-7-1 5to MH-PS2-
7-15).
3. RFI villa zone RDT sand below pipes for house connection (from HC 4 PS2-7-14 to HC 3PS2-7-14) and (from HC 3
PS2-7-14 to MH-PS2-7-14 ) and (from HC 2PS2-7-14 to HC1PS2-7-14 ) and from (from HC1 PS2-7-14 to MH-PS2-
7-14).
4. RFI villa zone RDT sand below pipes for house connection (from HC 4 PS2-7-13 to HC 3PS2-7-13) and (from HC 3
PS2-7-13 to MH-PS2-7-13 ) and (from HC 2PS2-7-13 to HC1PS2-7-13 ) and from (from HC1 PS2-7-13 to MH-PS2-
7-13).
5. RFI single zone FDT for manhole from MH-PS2-25 to MH-PS2-21 A.
6. RFI single zone four corner for blinding from PS2-17 to PS2-21A.
7. RFI single zone FDT 5th layer above pipes from MH F5-10 to MH F5-8.
8. RFI single zone FDT 5th layer above pipes from F5-8 to F5-8-3.
9. RFI single Zone FDT 1st layer above pipes from MH-PS2-44 to MH-PS2-42.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, March 7, 2022 3:46 PM

8
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone pipes installation from MH-F4-2*-3 to MH-F4-2*-6.


2. RFI single zone pipes installation pipes from MH-F4-1-3-6 to MH-F4-1-3-2.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, March 6, 2022 4:04 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone RDT sand below pipes from C5-24 to C5-23.
2. RFI single zone pipe installation from C5-25 to C5-24.
3. RFI single zone pipe installation from PS3-27 to PS3-31.
4. RFI single zone RDT sand below pipes from F13-43 to F13-50.
5. RFI single zone RDT sand below pipes from MH-F4-2*-1 to MH-F4-2*-1-4.
6. RFI single zone RDT sand below pipes from MH-F4-2*-3 to MH-F4-2*-5.
7. RFI single zone RDT sand below pipes from MH-F4-1-3-6 to MH-F4-1-3-2.
8. RFI villa zone RDT sand above pipes from MH-PS2-1-5 to PS2-1-4
9. RFI single zone RDT sand below pipes from MH-PS2-25 to MH-PS2-21 A.
10. RFI single zone FDT below manhole F4-1-1-2A, F4-1-2-1A and F5-10-1A.
11. RFI family zone RDT sand below pipes from MH- PS2-25-7 to PS2-25-3.
9
12. RFI family zone RDT sand below pipes from MH- PS2-25-3 to PS2-25-3-2.
13. RFI Family zone RDT sand below pipes from F1-4 and F1-6
14. RFI Family zone RDT sand below pipes from C5-15-1A and C5-15
15. RFI villa zone RDT sand below pipes for house connection (from HC2 PS2-7-17 to HC1 PS2-7-17) and (from HC1
PS2-7-17 to MH-PS2-7-17 ) and (from HC4 PS2-7-17 to HC3 PS2-7-17) and (from HC3 to PS2-7-17)
16. RFI villa zone RDT sand below pipes for house connection (from HC3 PS2-7-16 to HC2 PS2-7-16) and (from HC2
PS2-7-16 to MH-PS2-7-16 ) and (from HC1 PS2-7-16 to MH-PS2-7-16 )
17. RFI villa zone pipe installation for house connection (from HC2 PS2-7-17 to HC1 PS2-7-17) and (from HC1 PS2-7-
17 to MH-PS2-7-17 ) and (from HC4 PS2-7-17 to HC3 PS2-7-17) and (from HC3 to PS2-7-17)
18. RFI villa zone pipe installation for house connection (from HC3 PS2-7-16 to HC2 PS2-7-16) and (from HC2 PS2-7-
16 to MH-PS2-7-16 ) and (from HC1 PS2-7-16 to MH-PS2-7-16 )

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, March 2, 2022 10:15 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone leak test from F5-5-2 to F5-5-5A.


2. RFI single zone leak test from F4-22 to F4-21.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

10
a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, March 1, 2022 3:25 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone FDT 4th layer above pipes from MH F5-10 to MH F5-8.
2. RFI single zone FDT 4th layer above pipes from F5-8 to F5-8-5.
3. RFI single zone FDT last layer above warning tape from MH F5-5-1 to MH F5-5-1-6.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, March 1, 2022 8:21 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone leak test from F4-1-13 to F4-1-11.


2. RFI single zone leak test from F5-5-7 to F5-5-8.
11
3. RFI Family zone FDT below manhole from PS2-25-7 to PS2-25-4
4. RFI Family zone FDT below manhole from PS2-25-3 to PS2-25-3-2
5. RFI Family zone FDT below manhole from F1-4 and F1-5
6. RFI Family zone FDT below manhole from C5-15-1A and C5-15

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, February 27, 2022 3:20 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI villa zone manhole FDT from MH-F10-1 and MH-PS2-1-4.


2. RFI single zone FDT last layer above warning tape from MH F4-3-2 to MH F4-3-10.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

12
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Thursday, February 24, 2022 1:50 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single Zone RDT sand above pipes from MH-PS2-44 to MH-PS2-42.
2. RFI single zone manhole FDT from MH-F4-2*-1 to MH-F4-2*-1-4.
3. RFI single zone manhole FDT from MH-F4-2*-3 to MH-F4-2*-5.
4. RFI single zone manhole FDT from MH-F4-1-3-3 to MH-F4-1-3-6.
5. RFI single zone FDT 1ST layer from MH-F4-3-2-1 to MH-F4-3-2-5.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, February 21, 2022 2:28 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone manhole four corner from F4-10 to F4-10-4.


2. RFI Family zone leak test storm from F6-12 to F6-11.

Thanks & Best Regards,

13
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, February 20, 2022 12:00 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:
1. RFI single zone warning tape from MH F5-5-1 to MH F5-5-1-6.
2. RFI Single zone leak test storm from F4-5-2-1 to F4-5-2.
3. RFI Single zone leak test over flow from PS2-21 to PS2-21A.
4. RFI single zone leak test from PS2-15-18-9 to PS2-15-18-6.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, February 17, 2022 3:03 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI
14
Dear Gent,
Please find below requests for today:

1. RFI single zone FDT 2nd layer above pipes from MH F4-3-2 to MH F4-3-7.
2. RFI single zone warning tape from MH F4-3-2 to MH F4-3-10.
3. RFI single zone FDT 3nd layer above pipes from MH F5-10 to MH F5-8.
4. RFI single zone pipes installation from MH F4-10-4 TO F 4-10-5.
5. RFI single zone pipes installation from MH F4-10 TO F 4-10-1.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, February 16, 2022 8:43 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone FDT 3nd layer above pipes from F5-8 to F5-8-5.
2. RFI single zone manhole four corner for blinding from PS2-15-18 to PS2-15-25.
3. RFI single zone manhole four corner for blinding from PS2-15-18-12 to PS2-15-18-6.
4. RFI Villa Zone RDT sand around manhole 3nd layer for MH-F8-8 to MH-F8-14.
5. RFI Villa Zone RDT sand around manhole 3nd layer for MH-PS2-7-3-9, MH-PS2-7-3-8, MH-PS2-7-3-7, MH-PS2-7-3-
6.
6. RFI Villa Zone RDT sand around house connection chamber 3 nd layer (HC2 PS2-7-22 and HC1 PS2-7-22)
7. RFI Villa Zone RDT sand around house connection chamber 3 nd layer (HC2 PS2-7-21 and HC1 PS2-7-21)
8. RFI Villa Zone RDT sand around house connection chamber 3 nd layer (HC2 PS2-7-20 and HC1 PS2-7-20)
9. RFI Villa Zone RDT sand around house connection chamber 3 nd layer (HC2 PS2-7-19 and HC1 PS2-7-19)
10. RFI Villa Zone RDT sand around house connection chamber 3 nd layer (HC2 PS2-7-18 and HC1 PS2-7-18)
11. RFI Villa Zone RDT sand around house connection chamber 2 nd layer (HC1 PS2-7-3-9, HC2 PS2-7-3-9, HC4 PS2-7-
3-9, HC3 PS2-7-3-9 and HC5 PS2-7-3-9).
12. RFI Villa Zone RDT sand around house connection chamber 2 nd layer ( HC1 PS2-7-3-8, HC2 PS2-7-3-8, HC4 PS2-7-
3-8 and HC3 PS2-7-3-8)
15
13. RFI Villa Zone RDT sand around house connection chamber 2 nd layer (HC2 PS2-7-3-7, HC1 PS2-7-3-7, HC4 PS2-7-
3-7 and HC3 PS2-7-3-7)
14. RFI Villa Zone RDT sand around house connection chamber 2 nd layer (HC2 PS2-7-3-6, HC1 PS2-7-3-6, HC4 PS2-7-
3-6 and HC3 PS2-7-3-6)

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, February 14, 2022 2:45 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone pipes installation from F4-10-1 to F4-10-4


2. RFI villa zone pipes installation from F10-4 to F10-2.
3. RFI single FDT RFI single zone FDT 2nd layer above pipes line F5-7 from F5-7 to F5-7-3.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, February 13, 2022 10:48 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
16
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone pipes installation form F4-19A to F4-10. Change to ( F4-19A to F4-13).
2. RFI villa zone FDT below House connection from HC3 Ps2-1-17 to HC3 Ps2 -1-9
3. RFI villa zone FDT below House connection from HC4 Ps2-1-16 to HC4 Ps2-1-9
4. RFI single zone FDT above pipes 1ST layer from F4-3-2 to F4-3-10.
5. RFI single zone RDT sand below pipes from C5-25 to C5-24.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, February 10, 2022 3:35 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,
Please find below requests for today:

1. RFI single zone pipes installation form F4-19A to F4-10.


2. RFI single zone RDT sand above pipes from PS2-53 to PS2-52.
3. RFI villa zone FDT below House connection from HC1 Ps2-1-5-3 to HC1 Ps2 -1-5-13
4. RFI villa zone FDT below House connection from HC2 Ps2-1-5-4 to HC2 Ps2-1-5-12
5. RFI Single zone leak test over flow from PS2-21 to PS2-17.
6. RFI single zone RDT above pipes from F4-3-2-5 to F4-3-2-1.

17
Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, February 8, 2022 2:54 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1- RFI Villa Zone RDT sand around manhole 2nd layer for MH-F8-8 to MH-F8-14.
2- RFI Villa Zone RDT sand around manhole 2nd layer for MH-PS2-7-3-9, MH-PS2-7-3-8, MH-PS2-7-3-7, MH-PS2-7-3-
6.
3- RFI Villa Zone RDT sand around house connection chamber 2 nd layer (HC2 PS2-7-22 and HC1 PS2-7-22)
4- RFI Villa Zone RDT sand around house connection chamber 2 nd layer (HC2 PS2-7-21 and HC1 PS2-7-21)
5- RFI Villa Zone RDT sand around house connection chamber 2 nd layer (HC2 PS2-7-20 and HC1 PS2-7-20)
6- RFI Villa Zone RDT sand around house connection chamber 2 nd layer (HC2 PS2-7-19 and HC1 PS2-7-19)
7- RFI Villa Zone RDT sand around house connection chamber 2 nd layer (HC2 PS2-7-18 and HC1 PS2-7-18)
8- RFI Villa Zone RDT sand around house connection chamber 1 st layer (HC1 PS2-7-3-9, HC2 PS2-7-3-9, HC4 PS2-7-
3-9, HC3 PS2-7-3-9 and HC5 PS2-7-3-9).
9- RFI Villa Zone RDT sand around house connection chamber 1 st layer ( HC1 PS2-7-3-8, HC2 PS2-7-3-8, HC4 PS2-7-
3-8 and HC3 PS2-7-3-8)
10- RFI Villa Zone RDT sand around house connection chamber 1 st layer (HC2 PS2-7-3-7, HC1 PS2-7-3-7, HC4 PS2-7-
3-7 and HC3 PS2-7-3-7)
11- RFI Villa Zone RDT sand around house connection chamber 1 st layer (HC2 PS2-7-3-6, HC1 PS2-7-3-6, HC4 PS2-7-
3-6 and HC3 PS2-7-3-6)
12- RFI single zone FDT above pipes 2nd layer from MH F5-5-1 to MH F5-5-1-6.
13- RFI Family zone RDT above pipes line F6 from MH F6-19 to F6-18.

Thanks & Best Regards,

18
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, February 7, 2022 3:22 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI Villa Zone RDT sand around house connection chamber 1 st layer (HC2 PS2-7-22 and HC1 PS2-7-22)
2. RFI Villa Zone RDT sand around house connection chamber 1 st layer (HC2 PS2-7-21 and HC1 PS2-7-21)
3. RFI Villa Zone RDT sand around house connection chamber 1 st layer (HC2 PS2-7-20 and HC1 PS2-7-20)
4. RFI Villa Zone RDT sand around house connection chamber 1 st layer (HC2 PS2-7-19 and HC1 PS2-7-19)
5. RFI Villa Zone RDT sand around house connection chamber 1 st layer (HC2 PS2-7-18 and HC1 PS2-7-18)

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, February 7, 2022 2:01 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
19
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI single zone pipe installation line F4 from F4-3 to F4-10.


2. RFI single zone pipe installation line PS2-40 from PS2-40 to PS2-40-5.
3. RFI single zone leak test from F4-5-3 to F4-5-4.
4. RFI single zone leak test from F5-6 to F5-6-3. Revision
5. RFI single zone leak test from PS2-15-18-12 to PS2-15-18-9.
6. RFI villa zone leak test from PS2-1-5 to PS2-1-4.
7. RFI single zone FDT 1ST layer above pipes line F5-7 from F5-7 to F5-7-5.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, February 6, 2022 3:37 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI single zone manhole FDT from PS3-27 to PS3-31-1.


2. RFI single zone manhole FDT from F13-43 to F13-50.
3. RFI Single zone four corner for manholes blinding for storm for MH F5-5-8.
4. RFI Single zone flexible joint connected to manhole Line (5-7) from (MH F5-7-5 TO MH-F5-7).

20
Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, February 3, 2022 2:52 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI single zone manhole FDT from PS2-15-18 to PS2-15-25.


2. RFI single zone manhole FDT from F4-1-13 to F4-1-7.
3. RFI single zone manhole FDT from PS2-15-18-12 to PS2-15-18-6.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, February 2, 2022 2:02 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'm.aboshabanah@pillararabian.com'
<m.aboshabanah@pillararabian.com>; 'hishamadel415@gmail.com' <hishamadel415@gmail.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
21
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI single zone manhole FDT from F4-10 to F4-3.


2. RFI single zone manhole FDT from F4-10 to F4-10-4.
3. RFI single zone RDT above pipes from F4-3-2 to F4-3-10.
4. RFI family zone flexible joint connected to manhole Line (F3-1) from (MH F3-1-5 TO MH-F3-1-2).
5. RFI family zone flexible joint connected to manhole Line (F3-1-1-1) from (MH F3-1-1-1-4 TO MH-F3-1-1-1-1).
6. RFI family zone flexible joint connected to manhole Line (F3-1-1) from (MH F3-1-1-7 TO MH-F3-1-1-4).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, February 1, 2022 3:43 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'h.elgendy@pillararabian.com'
<h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI single zone FDT second layer above pipes from F5-11 to F5-8 and from F5-8 to F5-8-5.

Thanks & Best Regards,

22
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, February 1, 2022 12:37 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'h.elgendy@pillararabian.com'
<h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI Family zone leak test for storm 400 DIA line F6 from MH F6-19 to F6-18.
2. RFI single zone leak test for storm 300 DIA line F4-5 from MH F4-5-5 to F4-5-4.
3. RFI single zone leak test for storm 300 DIA line F4-5-3 from MH F4-5-3-2 to F4-5-3.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, January 31, 2022 3:04 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
23
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'h.elgendy@pillararabian.com'
<h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:


1. RFI single zone pipe installation 200 DIA from PS2-15-18-12 to PS2-15-18-6.
2. RFI single zone pipe installation 400, 500 and 700 DIA from F4-1-13 to F4-1-7.
3. RFI single zone pipe installation 700 DIA from F10-2-3 to F10-2.
4. RFI single zone FDT below manholes from PS2-40 to PS2-40-10.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, January 30, 2022 1:08 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'h.elgendy@pillararabian.com'
<h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:


1. RFI single zone RDT below pipes from F4-10-5 to F4-10.
2. RFI single zone RDT below pipes from F4-3 to F4-10.
3. RFI single zone RDT below pipes from PS2-40 to PS2-40-4.
4. RFI single zone RDT below pipes from PS2-40-5-4 to PS2-40-5.
5. RFI single zone leak test from MH-F5-6 to F5-6-3.

Thanks & Best Regards,

24
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, January 26, 2022 1:21 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'h.elgendy@pillararabian.com'
<h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:


1. RFI single zone RDT above pipes line F5-7 from F5-7 to F5-7-5.
2. RFI utility zone RDT below pipes from F13-43 to F13-50.
3. RFI utility zone RDT below pipes from PS3-27 to PS3-31.
4. RFI single zone leak test from MH-PS2-15-21 To MH-PS2-15-18.
5. RFI single zone leak test from PS2-53 to PS2-52.
6. RFI family zone leak test from F6-13 to F6-12.
7. RFI family zone RDT above pipes from F6-17 to F6-13.
8. RFI villa zone pipe installation from PS2-1-5 to PS2-1-4.
9. RFI family zone four corner for blinding from F6-10 to F6-17.
10. RFI single zone four corner for blinding from F4-22 to F4-17.
11. RFI single zone four corner for blinding from F5-5-2 to F5-5-7.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

25
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Tuesday, January 18, 2022 1:31 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:


1. RFI Single zone pipes installation for storm line F5-5 from F5-5-2 to F5-5-8.
2. RFI family zone leak test for 300 DIA from F4-5-6 to F4-5-5.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, January 17, 2022 11:12 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:


1. RFI single zone RDT below pipes from F4-1-13 to F4-1-7.
2. RFI single zone RDT below pipes from PS2-15-18-12 to PS2-15-18-6.
3. RFI family zone leak test for 500 DIA from F6-17 to F6-16.
4. RFI family zone leak test for 600 DIA from F6-14 to F6-13.
5. RFI Family zone leak test for storm line F6 from MH F6-19 to F6-18.
6. RFI single zone pipes installation from F5-5 to F5-8.

26
Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, January 13, 2022 2:12 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI Single zone pipes installation for sewer line PS2 from PS2-53 to PS2-52.
2. RFI Family zone pipes installation for storm line F6 from MH F6-19 to F6-18.
3. RFI single zone RDT below pipes for sewer from PS2-40-10 to PS2-40-4.
4. RFI single zone RDT below pipes for storm from F4-17 to F4-8.
5. RFI single zone leak test for storm line F4-1-2 from MH F4-1-2 to F4-1-2-1.
6. RFI single zone leak test for storm line F5-7 from MH F5-7-1 to F5-7.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

27
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Wednesday, January 12, 2022 3:57 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI single zone leak test for storm line F5-7 from MH F5-7-3 to F5-7-1.
2. RFI single zone leak test for storm line F4-5 from MH F4-5-2 to F4-5-3.
3. RFI Single zone RDT below pipes for sewer line PS2 from PS2-53 to PS2-52.
4. RFI single zone backfill 2nd layer for sewer from PS2-53 to PS2-44.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, January 11, 2022 1:12 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

28
1. RFI Single zone RDT below pipes for storm line F5-5 from F5-5-2 to F5-5-8.
2. RFI Single zone RDT below pipes for sewer line PS2-1 from PS2-1-5 to PS2-1-4.
3. RFI Single zone RDT below pipes for storm line F10 from F10-2 to F10-1.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, January 6, 2022 3:40 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI single zone leak test for storm line F5-7 from MH F5-7-5 to F5-7-3.
2. RFI Family zone leak test for storm line F6 from MH F6-16 to F6-14.
3. RFI single zone installation pipes for Over flow line PS2 from PS2-21A to PS2-17.
4. RFI single zone backfill 1st layer for Storm from (F5-11 to F5-8) and (F5-8 to F5-8-5).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446
29
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Wednesday, January 5, 2022 4:08 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI Family zone RDT below pipes for Storm line F6 from MH F6-19 to F6-18.
2. RFI single zone installation pipes for storm line F4-10 from F4-10-6 to F4-10-5.
3. RFI single zone installation pipes for storm line F4 from F4-22 to F4-19A.
4. RFI Single zone FDT below manholes for storm line F5-5 for (F5-5-8).
5. RFI Single zone FDT below manholes for over flow line PS2 from FPS2-21A to PS2-17.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, January 4, 2022 3:45 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

30
Please find below requests for today:

1. RFI Single zone FDT below manholes for storm line F5-5 from F5-5-2 to F5-5-7.
2. RFI Single zone FDT below manholes for storm line F5 from F5-3 to F5-5.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, January 3, 2022 3:46 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI Single zone pipes installation for sewer line PS2-15 from PS2-15-25 to PS2-15-18.
2. RFI Single zone pipes installation for storm line F5 from MH F5-3 to MH F5-5.
3. RFI Family zone pipes installation for storm line F6 from MH F6-11 to MH F6-8.
4. RFI single zone leak test for sewer line PS2-40-5 from MH PS2-40-5-7 to PS2-40-5-4

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446
31
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Monday, January 3, 2022 12:24 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>;
'hishamadel415@gmail.com' <hishamadel415@gmail.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Gent,

Please find below requests for today:

1. RFI Family zone RDT below pipes for sewer line PS2-19 from PS2-19-3 to PS2-19-5.
2. RFI Family zone RDT below pipes for Storm line F6 from MH F6-21 to F6-19.
3. RFI single zone RDT below pipes for Over flow line PS2 from MH PS2-21A to PS2-17.
4. RFI Family zone pipes installation for storm line F6 from MH F6-17 to MH F6-11.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, December 28, 2021 1:28 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>; 'hishamadel415@gmail.com'
<hishamadel415@gmail.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>
Subject: RE: RFI

32
Dear All,

Please find below requests for today:

1. RFI Family zone RDT below pipes from MH F6-11 to F6-8.


2. RFI Family zone manhole FDT from MH F6-10 to F6-8.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, December 27, 2021 12:20 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>; 'hishamadel415@gmail.com'
<hishamadel415@gmail.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Single zone manhole four corner for Storm Line (F4-1-3) from (MH F4-1-3 to MH F4-1-3-2).
2. RFI single zone manhole four corner for Storm Line (F4-5) for MH F4-5-2, F4-5-3, F4-5-4, F4-5-5 and F4-5-6.
3. RFI single zone manhole four corner for Storm Line (F4-5-3) for MH F4-5-3-1 and F4-5-3-2.
4. RFI single zone manhole four corner for Storm Line (F4-5-2) for MH F4-5-2-1.
5. RFI Single zone manhole four corner for Storm line F4-10 from F4-10-9 to F4-10-5.
6. RFI Single zone manhole four corner for Sewer line PS2-40-5 from MH PS2-40-5-7 to MH PS2-40-5-4.
7. RFI single zone manhole FDT for Storm line F4 from MH F4-22 to MH F4-17.
8. RFI Family zone manhole FDT from MH F6-11 to F6-17.
9. RFI single zone RDT below pipes for storm line (F5) from MH F 5-2 to F5-5.
10. RFI single zone pipes installation for manhole sewer line PS2-40-5 from MH PS2-40-5-7 to MH PS2-40-5-4.

Thanks & Best Regards,

33
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, December 26, 2021 12:02 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>; 'hishamadel415@gmail.com'
<hishamadel415@gmail.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI single zone FDT for manholes (F4-1-3-2, F4-1-3-1 and F4-1-3).
2. RFI single zone FDT for manhole F4-5-2, F4-5-3, F4-5-4, F4-5-5 and F4-5-6.
3. RFI single zone FDT for manhole F4-5-3-1 and F4-5-3-2.
4. RFI single zone FDT for manhole F4-5-2-1.
5. RFI single zone leak test 300 DIA storm line from F4-3-8 to F4-3-10.
6. RFI single zone leak test 400 DIA storm line from F5-10-1 to F5-10-2.
7. RFI Family zone RDT below pipes from MH F6-11 to F6-17.
8. RFI Single zone manhole four corner for Storm Line (F5-6) from (MH F5-6 to MH F5-6-3).
9. RFI Single zone manhole four corner for Storm Line (F5-7) from (MH F5-7 to MH F5-7-5).
10. RFI Single zone manhole four corner for Storm Line (F4-1-3) from (MH F4-1-3 to MH F4-1-3-2).
11. RFI Single zone FDT for manhole storm line F4-10 from F4-10-9 to F4-10-5.
12. RFI single zone FDT for manhole sewer line PS2-40-5 from MH PS2-40-5-7 to MH PS2-40-5-4.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446
34
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Thursday, December 23, 2021 1:42 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>; 'hishamadel415@gmail.com'
<hishamadel415@gmail.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI single zone pipes installation from F4-1-3 to F4-1-3-2.


2. RFI single zone pipes installation from F4-1-2 to F4-1-2-3.
3. RFI single zone four corner for blinding concrete from F4-1-1 to F4-1-1-5.
4. RFI single zone RDT sand bedding below pipes from F5-5 to F5-8.
5. RFI villa zone pipes installation for house connection (from HC2 PS2-7-22 to HC1 PS2-7-22) and (from HC1 PS2-7-
22 to MH PS2-7-22).
6. RFI villa zone pipes installation for house connection (from HC2 PS2-7-21 to HC1 PS2-7-21) and (from HC1 PS2-7-
21 to MH PS2-7-21).
7. RFI villa zone pipes installation for house connection (from HC2 PS2-7-20 to HC1 PS2-7-20) and (from HC1 PS2-7-
20 to MH PS2-7-20).
8. RFI villa zone pipes installation for house connection (from HC2 PS2-7-19 to HC1 PS2-7-19) and (from HC1 PS2-7-
19 to MH PS2-7-19).
9. RFI villa zone pipes installation for house connection (from HC2 PS2-7-18 to HC1 PS2-7-18) and (from HC1 PS2-7-
18 to MH PS2-7-18).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, December 21, 2021 12:14 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'

35
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>; 'hishamadel415@gmail.com'
<hishamadel415@gmail.com>; 'm.aboshabanah@pillararabian.com' <m.aboshabanah@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI manhole installation (F10-5-1, F10-5-3, PS2-1-5-10, PS2-1-5-9, PS2-1-5-8, PS2-1-5-7 and C4-12).
2. RFI single zone Pipe installation from F4-5-2 to F4-5-6.
3. RFI single zone Pipe installation from F4-5-3 to F4-5-3-2.
4. RFI single zone Pipe installation from F4-5-2 to F4-5-2-1.
5. RFI Single zone RDT for storm line F4-10 below pipes F4-10-9 to F4-10-5
6. RFI single zone RDT below pipes for sewer line PS2-40-5 from MH PS2-40-5-7 to MH PS2-40-5-4
7. RFI Family zone flexible joint connected to manhole line C5-15 from MH C5-15-1 to C5-15-16.
8. RFI Single zone pipes installation Line F5-7 from MH F5-7 to MH F5-7-5.
9. RFI single zone RDT below pipes for storm line F4 from MH F4-22 to MH F4-17.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, December 20, 2021 1:05 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>; 'hishamadel415@gmail.com'
<hishamadel415@gmail.com>
Subject: RE: RFI
36
Dear All,

Please find below requests for today:

1. RFI single zone leak test storm 300 DIA from MH F4-3-6 to F4-3-8.
2. RFI single zone leak test storm 500 DIA from MH F5-10 to F5-10-1.
3. RFI villa zone of 2st external coating manhole for Storm Line (C5-4) from (MH C5-4-11 - TO MH-C5-4-1).
4. RFI Single zone manhole FDT for Storm Line (F5-6) from (MH F5-6 to MH F5-6-3).
5. RFI Single zone manhole FDT for Storm Line (F5-7) from (MH F5-7 to MH F5-7-5).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, December 19, 2021 9:42 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>; 'hishamadel415@gmail.com'
<hishamadel415@gmail.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Single zone pipes installation for Storm Line (F5-6) from (MH F5-6 to MH F5-6-3).
2. RFI Single zone pipes installation for Storm Line (F5-7) from (MH F5-7 to MH F5-7-5).
3. RFI villa zone of 1st external coating manhole for Storm Line (C5-4) from (MH C5-4-11 - TO MH-C5-4-1).

Thanks & Best Regards,

37
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, December 16, 2021 4:27 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI villa zone house connection installation (HC3 PS2-1-5-5, HC4 PS2-1-5-5, HC3 PS2-1-5-6, HC1 PS2-7-7, HC2
PS2-7-7, HC4 PS2-7-8, HC5 PS2-7-8, HC6 PS2-7-8, HC7 PS2-7-8).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, December 15, 2021 1:20 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
38
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI single zone leak test storm from MH F4-3-2 to F4-3-6.


2. RFI villa zone flexible joint connected 700 DIA to manhole for Storm Line (F8) from (MH 8-7 TO MH-F8-2).
3. RFI villa zone grout around flexible joint connected to manhole 700 DIA for Storm Line (F8) from (MH 8-7 TO
MH-F8-2).
4. RFI villa zone shuttering for house connection backdrop MH PS2-7-3-8, MH PS2-7-3-7, MH PS2-7-3-6.
5. RFI single zone RDT below pipes from F4-5-2 to F4-5-5.
6. RFI single zone RDT below pipes from F4-5-3 to F4-5-3-1.
7. RFI single zone RDT below pipes from F4-5-2 to F4-5-2-1.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, December 15, 2021 8:30 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI villa zone of manhole benching manhole for Over flow Line (C5-4) from (MH C5-4-11 - TO MH-C5-4-1).
2. RFI villa zone of grout around flexible joint connected to manhole for Storm Line (C5-4) from (MH C5-4-11 - TO
MH-C5-4-1).
3. RFI villa zone for house connection 3st external coating with protection board HC1 PS2-7-3-9, HC2 PS2-7-3-9, HC3
PS2-7-3-9, HC4 PS2-7-3-9, HC5 PS2-7-3-9 and HC6 PS2-7-3-9 .
39
4. RFI villa zone for house connection 3st external coating with protection board HC1 PS2-7-3-8, HC2 PS2-7-3-8,
HC3 PS2-7-3-8 and HC4 PS2-7-3-8.
5. RFI villa zone for house connection 3st external coating with protection board HC1 PS2-7-3-7, HC2 PS2-7-3-7,
HC3 PS2-7-3-7 and HC4 PS2-7-3-7.
6. RFI villa zone for house connection 3st external coating with protection board HC1 PS2-7-3-6, HC2 PS2-7-3-6, HC3
PS2-7-3-6 and HC4 PS2-7-3-6.

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, December 14, 2021 1:28 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Single zone of RDT below pipes for Storm Line (F5-7) from (MH F5-7 to MH F5-7-5).
2. RFI villa zone for house connection 2st external coating HC1 PS2-7-3-9, HC2 PS2-7-3-9, HC3 PS2-7-3-9, HC4 PS2-7-
3-9, HC5 PS2-7-3-9 and HC6 PS2-7-3-9 .
3. RFI villa zone for house connection 2st external coating HC1 PS2-7-3-8, HC2 PS2-7-3-8, HC3 PS2-7-3-8 and HC4
PS2-7-3-8.
4. RFI villa zone for house connection 2st external coating HC1 PS2-7-3-7, HC2 PS2-7-3-7, HC3 PS2-7-3-7 and HC4
PS2-7-3-7.
5. RFI villa zone for house connection 2st external coating HC1 PS2-7-3-6, HC2 PS2-7-3-6, HC3 PS2-7-3-6 and HC4
PS2-7-3-6.
6. RFI villa zone four corner for blinding concrete for (MH F4-1-1 to MH F4-1-1-5).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

40
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Sunday, December 12, 2021 3:46 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear Eng. Hussin,


Please Rectify below request number 12 to ( F10-2-9 instead of F10-2-10 )

1. RFI villa zone four corner for blinding concrete for (MH F10-2-9).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, December 12, 2021 2:38 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Single zone of leak test for Sewer Line (PS2) from (MH PS2-44 to MH PS2-42).
2. RFI Single zone of leak test for Storm Line (F4-3-2) from (MH F4-3-2-1 to MH F4-3-2-2).
3. RFI Single zone of RDT below pipes for Storm Line (F5-6) from (MH F5-6 to MH F5-6-3).

41
4. RFI villa zone sand blanket above pipes for house connection (from HC2 PS2-7-3-6 to HC1 PS2-7-3-6) and (from
HC1 PS2-7-3-6 to MH PS2-7-3-6) and (from HC4 PS2-7-3-6 to HC3 PS2-7-3-6) and (from HC3 PS2-7-3-6 to MH
PS2-7-3-6).
5. RFI villa zone sand blanket above pipes for house connection (from HC2 PS2-7-3-7 to HC1 PS2-7-3-7) and (from
HC1 PS2-7-3-7 to MH PS2-7-3-7) and (from HC4 PS2-7-3-7 to HC3 PS2-7-3-7) and (from HC3 PS2-7-3-7 to MH
PS2-7-3-7).
6. RFI villa zone sand blanket above pipes for house connection from (HC5 PS2-7-3-9 to HC4 PS2-7-3-9) and from
(HC4 PS2-7-3-9 to HC3 PS2-7-3-9) and from (HC3 PS2-7-3-9 to HC1 PS2-7-3-9) and from (HC2 PS2-7-3-9 to HC1
MH PS2-7-3-9) and from (HC1 PS2-7-3-9 to MH PS2-7-3-9) and (HC6 PS2-7-3-9 to MH PS2-7-3-9).
7. RFI villa zone sand blanket above pipes for house connection from (HC2 PS2-7-3-8 to HC1 PS2-7-3-8) and from
(HC1 PS2-7-3-8 to MH PS2-7-3-8) and from (HC4 PS2-7-3-8 to HC3 PS2-7-3-8) and from (HC3 PS2-7-3-8 to MH
PS2-7-3-8).
8. RFI villa zone for house connection 1st external coating HC1 PS2-7-3-9, HC2 PS2-7-3-9, HC3 PS2-7-3-9, HC4 PS2-7-
3-9, HC5 PS2-7-3-9 and HC6 PS2-7-3-9 .
9. RFI villa zone for house connection 1st external coating HC1 PS2-7-3-8, HC2 PS2-7-3-8, HC3 PS2-7-3-8 and HC4
PS2-7-3-8.
10. RFI villa zone for house connection 1st external coating HC1 PS2-7-3-7, HC2 PS2-7-3-7, HC3 PS2-7-3-7 and HC4
PS2-7-3-7.
11. RFI villa zone for house connection 1st external coating HC1 PS2-7-3-6, HC2 PS2-7-3-6, HC3 PS2-7-3-6 and HC4
PS2-7-3-6.
12. RFI villa zone four corner for blinding concrete for (MH F10-2-10).
13. RFI villa zone four corner for blinding concrete for (MH F4-1-2 to MH F4-1-2-3).
14. RFI villa zone sand bedding below pipe for house connection (from HC2 PS2-7-22 to HC1 PS2-7-22) and (from
HC1 PS2-7-22 to MH PS2-7-22).
15. RFI villa zone sand bedding below pipe for house connection (from HC2 PS2-7-21 to HC1 PS2-7-21) and (from
HC1 PS2-7-21 to MH PS2-7-21).
16. RFI villa zone sand bedding below pipe for house connection (from HC2 PS2-7-20 to HC1 PS2-7-20) and (from
HC1 PS2-7-20 to MH PS2-7-20).
17. RFI villa zone sand bedding below pipe for house connection (from HC2 PS2-7-20 to HC1 PS2-7-19) and (from
HC1 PS2-7-20 to MH PS2-7-19).
18. RFI villa zone sand bedding below pipe for house connection (from HC2 PS2-7-18 to HC1 PS2-7-18) and (from
HC1 PS2-7-18 to MH PS2-7-18).
19. RFI Single zone of pipes installation for Storm Line (F5-10) from (MH F5-10 to MH F5-10-3). For reference
20. RFI Single zone of pipes installation for Storm Line (F4-1-1) from (MH F4-1-1 to MH F4-1-1-5). For reference
21. RFI Single zone of pipes installation for Sewer Line (PS2) from (MH PS2-44 to MH PS2-42). For reference
22. RFI Single zone of pipes installation for Storm Line (F4-3-2) from (MH F4-3-2-1 to MH F4-3-2-2). For reference

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

42
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Tuesday, December 7, 2021 3:44 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Family zone of external coating third layer with protection board to manhole for Storm Line (F9) from (MH
F9-1-17 to MH F9-1-10).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, December 6, 2021 3:57 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Single zone RDT sand above pipes from MH F5-8 to MH F5-8-5.

43
Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, December 5, 2021 3:16 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please Add below requests for today:

1. RFI Single zone leak test storm 400 Dia from MH F4-3-2-5 to MH F4-3-2-3.
2. RFI Single zone leak test storm 500 Dia from MH F4-3-2-3 to MH F4-3-2-2.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, December 5, 2021 1:31 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
44
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Family zone of external coating 2th layer to manhole for Storm Line (F9) from (MH F9-1-17 to MH F9-1-10).
2. RFI villa zone pipe leak test for house connection (from HC2 PS2-7-3-6 to HC1 PS2-7-3-6) and (from HC1 PS2-7-3-
6 to MH PS2-7-3-6) and (from HC4 PS2-7-3-6 to HC3 PS2-7-3-6) and (from HC3 PS2-7-3-6 to MH PS2-7-3-6).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, December 2, 2021 1:25 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Villa zone flexible joints Over Flow from MH F10-2-13 to MH F10-2-10.
2. RFI villa zone of external coating 3th layer to manhole for Storm Line (F8) from (MH F8-14 - TO MH-F8-8).
3. RFI Family zone FDT above pipes 3th layer storm from MH F9-1-10 to MH F9-1-11.
4. RFI Family zone manhole benching for Storm Line (F9) from (MH F9-1-17 to MH F9-1-10).
5. RFI Family zone of external coating first layer to manhole for Storm Line (F9) from (MH F9-1-17 to MH F9-1-10).

45
Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, December 1, 2021 2:53 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Single zone leak test storm 500 Dia from MH F5-8-2 to MH F5-8-3.
2. RFI Villa zone flexible joints Over Flow from MH F10-2-13 to MH F10-2-8 without MH F-10-2-7
3. RFI villa zone of external coating 2th layer to manhole for Storm Line (F8) from (MH F8-14 - TO MH-F8-8).
4. RFI villa zone pipe leak test for house connection (from HC2 PS2-7-3-7 to HC1 PS2-7-3-7) and (from HC1 PS2-7-3-
7 to MH PS2-7-3-7) and (from HC4 PS2-7-3-7 to HC3 PS2-7-3-7) and (from HC3 PS2-7-3-7 to MH PS2-7-3-7).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

46
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Tuesday, November 30, 2021 4:05 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Family zone FDT above pipes 2th layer storm from MH F9-1-10 to MH F9-1-11.
2. RFI Single zone leak test storm 400 Dia from MH F5-8-3 to MH F5-8-5.
3. RFI Family zone of grout around flexible joint connected to manhole for Storm Line (F9) from (MH F9-1-17 to MH
F9-1-10).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, November 29, 2021 3:39 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'h.elgendy@pillararabian.com' <h.elgendy@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Villa zone flexible joints Over Flow from MH C5-4-1 to MH C5-4-11
2. RFI Single zone FDT above pipes first layer Sewer from MH PS2-52 to MH PS2-44.

47
3. RFI Single zone leak test storm 500 Dia from MH F5-8-1 to MH F5-8-2.
4. RFI Single zone leak test storm 600 Dia from MH F5-8to MH F5-8-1.
5. RFI single zone FDT above pipes first layer from MH F5-5-1 to MH F5-5-1-6.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, November 28, 2021 1:06 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Single zone RDT sand above pipes storm from MH F5-8 to MH F5-11.
2. RFI villa zone RDT fourth layer backfilling around manhole MH F9-15, MH F9-14, MH F9-13, MH F9-12 and MH
F9-11.
3. RFI Family zone FDT above pipes first layer storm from MH F9-1-10 to MH F9-1-11.
4. RFI villa zone manhole blinding concrete formwork for Over flow Line (C4) (MH C4-11).
5. RFI villa zone of external coating first layer to manhole for Storm Line (F8) from (MH F8-14 - TO MH-F8-8).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

48
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Wednesday, November 24, 2021 7:25 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI villa zone pipe installation 1200 Dia for Over flow Line (C4) from (MH C4-11 - TO MH-C4-12).
2. RFI villa zone manhole FDT for Over flow Line (C4) (MH C4-11).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, November 23, 2021 8:14 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI villa zone of grout around flexible joint connected to manhole for Storm Line (F8) from (MH F8-14 - TO MH-
F8-8).

49
2. RFI Single zone leak test storm 500 Dia from MH F5-9 to MH F5-10.
3. RFI Single zone leak test storm 300 Dia from MH F5-10 to MH F5-11.
4. RFI villa zone RDT third layer backfilling around manhole MH F9-15, MH F9-14, MH F9-13, MH F9-12 and MH F9-
11.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, November 22, 2021 1:28 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Family zone flexible joints storm from MH F9-1-17 to MH F9-1-10.


2. RFI Single zone leak test storm 500 Dia from MH F5-8 to MH F5-9.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

50
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Sunday, November 21, 2021 3:14 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI single zone RDT sand blanket above pipes from MH F5-5-1 to MH F5-5-1-6.
2. RFI villa zone RDT second layer backfilling around manhole MH F9-15, MH F9-14, MH F9-13, MH F9-12 and MH
F9-11.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, November 17, 2021 12:49 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI installation for 32 house connection (HC1-PS2-1-5-2, HC2-PS2-1-5-2, HC3-PS2-1-5-2, HC4-PS2-1-5-2, HC1-
PS2-1-5-1, HC2-PS2-1-5-1, HC1-PS2-1-5, HC1-PS2-1-6, HC2-PS2-1-6, HC3-PS2-1-6, HC1-PS2-1-7, HC2-PS2-1-7,
HC1-PS2-1-10, HC2-PS2-1-10, HC1-PS2-1-11, HC2-PS2-1-11, HC1-PS2-1-12, HC2-PS2-1-12, HC1-PS2-1-13, HC2-

51
PS2-1-13, HC5-PS2-1-13, HC6-PS2-1-13, HC1-PS2-1-14, HC2-PS2-1-14, HC1-PS2-1-16, HC2-PS2-1-16, HC1-PS2-1-
17, HC2-PS2-1-17, HC1-PS2-1-18, HC2-PS2-1-18, HC3-PS2-1-18, HC4-PS2-1-18).
2. RFI villa zone RDT backfilling around manhole MH F9-15, MH F9-14, MH F9-13, MH F9-12 and MH F9-11.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, November 16, 2021 9:29 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI Single zone leak test for 400 mm from MH F5-5-1-1 to MH F5-5-1-3.
2. RFI Single zone leak test for 300 mm from MH F5-5-1-3 to MH F5-5-1-5.
3. RFI villa zone of upvc Pipes flexible joint connection to manhole for Storm Line (F9) from (MH F9-11 - TO MH-F9-
10).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

52
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Sunday, November 14, 2021 11:14 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI villa zone RDT sand below pipes from MH C4-11 to MH C4-12.
2. RDI Single zone leak test for 400 mm from MH F5-5-1 to MH F5-5-1-1.
3. RFI single zone leak test for 300 mm from MH F5-5-1-5 to MH F5-5-1-6.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, November 10, 2021 3:54 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:


1. RFI villa zone of manhole benching manhole for Storm Line (F8) from (MH F8-14 - TO MH-F8-8).
2. RFI villa zone of Pipes leak test for flexible connection to manhole for Storm Line (F8) from (MH F8-14 - TO MH-
F8-13).

53
3. RFI villa zone pipe installation for house connection (from HC2 PS2-7-3-7 to HC1 PS2-7-3-7) and (from HC1 PS2-
7-3-7 to MH PS2-7-3-7) and (from HC4 PS2-7-3-7 to HC3 PS2-7-3-7) and (from HC3 PS2-7-3-7 to MH PS2-7-3-7).
4. RFI villa zone pipe installation for house connection (from HC2 PS2-7-3-6 to HC1 PS2-7-3-6) and (from HC1 PS2-
7-3-6 to MH PS2-7-3-6) and (from HC4 PS2-7-3-6 to HC3 PS2-7-3-6) and (from HC3 PS2-7-3-6 to MH PS2-7-3-6).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, November 8, 2021 3:16 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI villa zone of Installation upvc Pipes flexable connection to manhole for Storm Line (F8) from (MH F8-14 - TO
MH-F8-8).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

54
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Sunday, October 31, 2021 8:28 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI four corner for blinding in single zone MH F5, F5-1 and F5-2.
2. RFI four corner for blinding in single zone from MH F5-5-1 to F5-5-1-6
3. RFI villa zone installation chamber for 20 house connection (HC1-PS2-1-5-14, HC2-PS2-1-5-14, HC3-PS2-1-5-14,
HC2-PS2-1-5-13, HC3-PS2-1-5-13, HC4-PS2-1-5-12, HC3-PS2-1-5-12, HC4-PS2-1-5-11, HC3-PS2-1-5-11, HC2-PS2-1-
5-10, HC3-PS2-1-5-10, HC2-PS2-1-5-9, HC3-PS2-1-5-9, HC4-PS2-1-5-8, HC3-PS2-1-5-8, HC3-PS2-1-5-7, HC4-PS2-1-
5-7, HC4-PS2-1-5-6 , HC2-PS2-1-5-3, HC3-PS2-1-5-3).

4. RFI four corner for 32 house connection (HC1-PS2-1-5-2, HC2-PS2-1-5-2, HC3-PS2-1-5-2, HC4-PS2-1-5-2, HC1-
PS2-1-5-1, HC2-PS2-1-5-1, HC1-PS2-1-5, HC1-PS2-1-6, HC2-PS2-1-6, HC3-PS2-1-6, HC1-PS2-1-7, HC2-PS2-1-7,
HC1-PS2-1-10, HC2-PS2-1-10, HC1-PS2-1-11, HC2-PS2-1-11, HC1-PS2-1-12, HC2-PS2-1-12, HC1-PS2-1-13, HC2-
PS2-1-13, HC5-PS2-1-13, HC6-PS2-1-13, HC1-PS2-1-14, HC2-PS2-1-14, HC1-PS2-1-16, HC2-PS2-1-16, HC1-PS2-1-
17, HC2-PS2-1-17, HC1-PS2-1-18, HC2-PS2-1-18, HC3-PS2-1-18, HC4-PS2-1-18).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, October 27, 2021 7:52 AM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>

55
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear All,

Please find below requests for today:

1. RFI villa zone installation of house connection HC3-PS2-7-13, HC4-PS2-7-13, HC1-PS2-7-14, HC2-PS2-7-14, HC3-
PS2-7-14,HC4-PS2-7-14, HC1-PS2-7-15, HC2-PS2-7-15, HC3-PS2-7-15,HC4-PS2-7-15, HC1-PS2-7-16, HC2-PS2-7-
16,HC3-PS2-7-16, HC1-PS2-7-17, HC2-PS2-7-17, HC3-PS2-7-17, HC4-PS2-7-17, HC1-PS2-7-18, HC2-PS2-7-18, HC1-
PS2-7-19, HC2-PS2-7-19, HC1-PS2-7-20, HC2-PS2-7-20, HC1-PS2-7-21, HC2-PS2-7-21, HC1-PS2-7-22, HC2-PS2-7-
22.
2. RFI Villa zone FDT last layer above warning tape from MH F9-13 to F9-11.
3. RFI Villa zone FDT last layer above warning tape from MH ps2-7-3-8 to ps2-7-3-6.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, October 24, 2021 1:45 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Subject: RE: RFI

Dear all,

Please find below requests for today:

56
1. RFI villa zone leak test for house connection from (HC4 PS2-7-3-9 to HC3 PS2-7-3-9) and from (HC3 PS2-7-3-9 to
HC1 PS2-7-3-9) and from (HC2 PS2-7-3-9 to HC1 PS2-7-3-9) and from (HC1 PS2-7-3-9 to MH PS2-7-3-9) and from
(HC5 PS2-7-3-9 to MH PS2-7-3-9).
2. RFI villa zone leak test for house connection from (HC2 PS2-7-3-8 to HC1 PS2-7-3-8) and from (HC1 PS2-7-3-8 to
MH PS2-7-3-8) and from (HC4 PS2-7-3-8 to HC3 PS2-7-3-8) and from (HC3 PS2-7-3-8 to MH PS2-7-3-8).
3. RFI installation of manhole grade slab for MH F9-15 and MH F9-14.
4. RFI installation of manhole transition for MH PS2-7-3-8, MH PS2-7-3-7, MH ps2-7-3-6 and F9-13.
5. RFI manhole benching for MH F9-15, MH F9-14, MH F9-13 and MH F9-12, MH F8-14, MH F8-13, C5-8-5, C5-8-4
and C5-8-3.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, October 21, 2021 2:44 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Subject: RE: RFI

Dear all,

Please find below requests for today:


1. RFI Villa zone warning tape from MH F9-13 to F9-11.
2. RFI Villa zone warning tape from MH ps2-7-3-8 to ps2-7-3-6.
3. RFI Villa zone FDT last layer above warning tape from MH F9-15 to F9-13.
4. RFI Villa zone FDT last layer above warning tape from MH ps2-7-3-9 to ps2-7-3-8.
5. RFI single zone RDT sand bedding below pipes from MH F4-1-3 to MH F4-1-3-2.
6. RFI Villa zone manholes protection board and external coating from MH F9-15 to MH F9-11.

Thanks & Best Regards,

57
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, October 17, 2021 2:45 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>;
'rt.manampan@pillararabian.com' <rt.manampan@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI four corner for blinding for 23 house connection (HC1-PS2-1-5-14, HC2-PS2-1-5-14, HC3-PS2-1-5-14, HC2-
PS2-1-5-13, HC3-PS2-1-5-13, HC4-PS2-1-5-12, HC3-PS2-1-5-12, HC4-PS2-1-5-11, HC3-PS2-1-5-11, HC2-PS2-1-5-
10, HC3-PS2-1-5-10, HC2-PS2-1-5-9, HC3-PS2-1-5-9, HC4-PS2-1-5-8, HC3-PS2-1-5-8, HC3-PS2-1-5-7, HC4-PS2-1-5-
7, HC3-PS2-1-5-6, HC4-PS2-1-5-6, HC3-PS2-1-5-5, HC4-PS2-1-5-5, HC2-PS2-1-5-3, HC3-PS2-1-5-3).
2. RFI Villa zone warning tape from MH F9-15 to F9-13.
3. RFI Villa zone warning tape from MH ps2-7-3-9 to ps2-7-3-8.
4. RFI Villa zone FDT first layer above pipes from MH F9-13 to F9-11.
5. RFI Villa zone FDT third layer above pipes from MH ps2-7-3-8 to ps2-7-3-5.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

58
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Thursday, October 14, 2021 1:35 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI Family zone FDT first layer storm from MH F9-1-16 to F9-1-15.
2. RFI Family zone warning tape from MH F9-1-17 to F9-1-15.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, October 14, 2021 12:27 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI villa zone FDT final layer sewer from MH PS2-1-18 to PS2-1-16.
2. RFI villa zone FDT final layer storm from MH F10-2-13 to MH F10-2-10.

59
3. RFI Family zone FDT final layer storm from MH F9-1-17 to F9-1-11.
4. RFI Single zone installation pipes storm from MH F5-10-1-1 to F5-10-1.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, October 12, 2021 3:13 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI villa zone installation of house connection manhole (HC1 PS2-7-13, HC2 PS2-7-13, HC1 PS2-7-11, HC1 PS2-7-
10, HC2 PS2-7-10, HC3 PS2-7-10, HC4 PS2-7-10, HC1 PS2-7-9, HC2 PS2-7-9, HC1 PS2-7-8, HC2 PS2-7-8, HC3 PS2-7-
8).

2. RFI FDT for 32 house connection (HC1-PS2-1-5-2, HC2-PS2-1-5-2, HC3-PS2-1-5-2, HC4-PS2-1-5-2, HC1-PS2-1-5-1,
HC2-PS2-1-5-1, HC1-PS2-1-5, HC1-PS2-1-6, HC2-PS2-1-6, HC3-PS2-1-6, HC1-PS2-1-7, HC2-PS2-1-7, HC1-PS2-1-10,
HC2-PS2-1-10, HC1-PS2-1-11, HC2-PS2-1-11, HC1-PS2-1-12, HC2-PS2-1-12, HC1-PS2-1-13, HC2-PS2-1-13, HC5-
PS2-1-13, HC6-PS2-1-13, HC1-PS2-1-14, HC2-PS2-1-14, HC1-PS2-1-16, HC2-PS2-1-16, HC1-PS2-1-17, HC2-PS2-1-
17, HC1-PS2-1-18, HC2-PS2-1-18, HC3-PS2-1-18, HC4-PS2-1-18).

Thanks & Best Regards,

60
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, October 12, 2021 1:45 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI villa zone of Installation upvc Pipes flexable connection to manhole for Storm Line (F9) from (MH F9-15 - TO
MH-F9-13).
2. RFI villa zone of manhole benching for Storm Line (F9) manholes (MH F9-15, MH-F9-14).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, October 10, 2021 3:52 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
61
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI Family zone RDT sand above pipes from MH F9-1-11 to F9-1-10.
2. RFI Single zone RDT sand above pipes from MH PS2-48 to MH PS2-44.
3. RFI villa zone of Installation upvc Pipes flexable connection to manhole for Storm Line (F9) from (MH F9-13 - TO
MH-F9-11).
4. RFI villa zone pipe installation for house connection from (HC4 PS2-7-3-9 to HC3 PS2-7-3-9) and from (HC3 PS2-
7-3-9 to HC1 PS2-7-3-9) and from (HC2 PS2-7-3-9 to HC1 PS2-7-3-9) and from (HC1 PS2-7-3-9 to MH PS2-7-3-9)
and from (HC5 PS2-7-3-9 to MH PS2-7-3-9).
5. RFI villa zone pipe installation for house connection from (HC2 PS2-7-3-8 to HC1 PS2-7-3-8) and from (HC1 PS2-
7-3-8 to MH PS2-7-3-8) and from (HC4 PS2-7-3-8 to HC3 PS2-7-3-8) and from (HC3 PS2-7-3-8 to MH PS2-7-3-8).
6. RFI villa zone pipe installation for house connection from (HC2 PS2-7-3-7 to HC1 PS2-7-3-7) and from (HC1 PS2-
7-3-7 to MH PS2-7-3-7) and from (HC4 PS2-7-3-7 to HC3 PS2-7-3-7) and from (HC3 PS2-7-3-7 to MH PS2-7-3-7).
7. RFI villa zone pipe installation for house connection from (HC2 PS2-7-3-6 to HC1 PS2-7-3-6) and from (HC1 PS2-
7-3-6 to MH PS2-7-3-6) and from (HC4 PS2-7-3-6 to HC3 PS2-7-3-6) and from (HC3 PS2-7-3-6 to MH PS2-7-3-6).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, October 6, 2021 12:54 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
62
<rt.manampan@pillararabian.com>; 'mohamedshabana270@gmail.com' <mohamedshabana270@gmail.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI Single zone RDT sand above pipes from MH PS2-52 to MH PS2-48.
2. RFI Single zone pipe installation from MH F5-5-1-6 to MH F5-5-1.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, October 5, 2021 3:28 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>; 'mohamedshabana270@gmail.com' <mohamedshabana270@gmail.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please add below request for today:

1. RFI Family zone RDT above pipes from MH F9-1-17 to F9-1-15.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

63
a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, October 5, 2021 2:49 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>; 'mohamedshabana270@gmail.com' <mohamedshabana270@gmail.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI Family zone warning tape from MH F9-1-17 to F9-1-11.


2. RFI Single zone pipe installation from MH F5 to F5-2.
3. RFI FDT for 23 house connection (HC1-PS2-1-5-14, HC2-PS2-1-5-14, HC3-PS2-1-5-14, HC2-PS2-1-5-13, HC3-PS2-1-
5-13, HC4-PS2-1-5-12, HC3-PS2-1-5-12, HC4-PS2-1-5-11, HC3-PS2-1-5-11, HC2-PS2-1-5-10, HC3-PS2-1-5-10, HC2-
PS2-1-5-9, HC3-PS2-1-5-9, HC4-PS2-1-5-8, HC3-PS2-1-5-8, HC3-PS2-1-5-7, HC4-PS2-1-5-7, HC3-PS2-1-5-6, HC4-
PS2-1-5-6, HC3-PS2-1-5-5, HC4-PS2-1-5-5, HC2-PS2-1-5-3, HC3-PS2-1-5-3).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, October 4, 2021 3:00 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;

64
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>; 'mohamedshabana270@gmail.com' <mohamedshabana270@gmail.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI Single zone pipe test leak test from MH PS2-47 to PS2-44.
2. RFI villa zone pipe leak test from MH F9-11 to F9-10.
3. RFI Single zone manhole FDT from MH F5 to F5-2.
4. RFI Family zone FDT backfill fourth layer from MH F9-1-13 to F9-1-11.
5. RFI villa zone RDT sand blanket above pipes from MH F9-13 to F9-11.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, October 3, 2021 2:11 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>; 'mohamedshabana270@gmail.com' <mohamedshabana270@gmail.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI RDT for UPVC pipes for overflow line (C5-15) from MH-C5-15-6 To MH-C5-15-7.
2. RFI FDT for 3nd layer backfilling above UPVC pipes for overflow line (C5-15) from MH-C5-15-1 To MH-C5-15-6.
3. RFI FDT for First layer backfilling above UPVC pipes for Sewer line (PS2-7) from MH-PS2-7-7 To MH-PS2-7-4.

65
Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, September 30, 2021 3:27 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>; 'mohamedshabana270@gmail.com' <mohamedshabana270@gmail.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI Single zone pipe installation from MH PS2-47 to PS2-44.


2. Family zone FDT backfill third layer from MH F9-1-14 to F9-1-11.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, September 29, 2021 3:45 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
66
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>; 'mohamedshabana270@gmail.com' <mohamedshabana270@gmail.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI Single zone pipe leak test from MH PS2-49 to PS2-46.


2. Family zone FDT backfill second layer from MH F3-1-1 to MH F3-1-5.
3. Family zone last layer BSG storm from MH F3-1-1-1 to MH F3-1-1-1-4.
4. Family zone FDT backfill second layer from MH F3-1-1-3 to MH F3-1-1-6.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, September 28, 2021 3:06 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>; 'mohamedshabana270@gmail.com' <mohamedshabana270@gmail.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. Family zone FDT backfill second layer from MH F9-1-15 to F9-1-11.

Thanks & Best Regards,

67
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, September 27, 2021 12:40 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>; 'mohamedshabana270@gmail.com' <mohamedshabana270@gmail.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:


1. Family zone FDT backfill first layer from MH F3-1-1 to MH F3-1-5.
2. RFI Family zone pipe leak test from MH F9-1-11 to F9-1-10.
3. RFI Single zone pipe leak test from MH PS2-52 to PS2-49.
4. Family zone warning tape storm from MH F3-1-1-1 to MH F3-1-1-1-4.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, September 26, 2021 3:39 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
68
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>; 'mohamedshabana270@gmail.com' <mohamedshabana270@gmail.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:


1. Family zone FDT backfill layer 2 from MH F3-1-1-1 to MH F3-1-1-1-1.
2. RFI villa zone pipe leak test from MH F9-12 to F9-11.
3. RFI Villa Zone manholes installation ( C4-4, C4-5, C4-6, C4-7, C4-13, F9) and (F10-2, F10-3, F10-4).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, September 22, 2021 3:48 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'rt.manampan@pillararabian.com'
<rt.manampan@pillararabian.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI Family zone manholes installation (F9-1-17, F9-1-16, F9-1-15, F9-1-14, F9-1-13, F9-1-12, F9-1-11, F9-1-10)
and (F1-6, F1-7, F1-8, F1-9, F1-10).
2. Villa zone pipe installation Dia 800 from MH F8-1 to F8.
3. Villa zone house connection sand bedding below pipes from MH PS2-7-3-9 to MH PS2-7-3-6
4. Villa zone warning tape sewer from MH PS2-1-18 to PS2-1-16.
69
5. Villa zone warning tape storm from MH F10-2-13 to MH F10-2-10.
6. Family zone warning tape storm from MH F3-1-1-1 to MH F3-1-1-1-4.
7. Family zone FDT backfill layer ** from MH F3-1-1-1 to MH F3-1-1-1-4.
8. Family zone FDT backfill layer ** from MH F3-1-1-3 to MH F3-1-1-7.
9. Family zone FDT backfill layer ** from MH F9-1-17 to MH F9-1-11
10. Single zone RDT sand bedding below pipes from MH F5 to F5-2.
11. RFI villa zone RDT sand blanket above pipes from MH PS2-7-7 to PS2-7-4.
12. Family zone FDT last layer above warning tape from MH F1-10 to MH F1-6. Reminder

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, September 21, 2021 12:02 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear Eng. Hussan,


Dear Mr. Essam,

Please find below requests for today:

1. RFI villa zone pipe leak test from MH F9-13 to F9-12.


2. Villa zone four corner for blinding concrete MH F8 and F8-1. Reminder
3. Villa zone house connection excavation from MH PS2-7-3-9 to MH PS2-7-3-6
4. Villa zone backfill sewer (LAYER **) from MH PS2-1-18 to PS2-1-16.
5. Villa zone backfill storm (LAYER **)From MH from MH F10-2-11 to MH F10-2-10.

Thanks & Best Regards,

70
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, September 19, 2021 3:27 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>; 'DCC.SFMC-
JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com'
<A.AlGhoul@pillararabian.com>; 'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Subject: RE: RFI

Dear Eng. Ezz,


Dear Mr. Essam.

Please add below requests:


1. Single zone four corner for blinding concrete from MH PS2-42 to MH PS2-53 and MH F5-11 to MH F5-8 and from
MH F5-10 to MH F5-10-3 & MH F5-10-1-1 and from MH F5-8 to MH F5-8-5 and from MH F4-3-2-5 to MH F-4-3-2
and from MH F4-3-2 to MH F4-3-10 and F8 and F8-1.
2. Family zone sand blanket RDT from MH F3-1-3 to MH F3-1-1.
3. RFI villa zone pipe leak test from MH PS2-7-7 to PS2-7-4.
4. Family zone FDT last layer above warning tape from MH F1-10 to MH F1-6.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, September 16, 2021 3:17 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'ezz.elsheikh@pillararabian.com'
<ezz.elsheikh@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
71
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Subject: RE: RFI

Dear Eng. Ezz,


Dear Mr. Essam.

Please add below requests:


1. Single zone pipes installation from MH f4-3-10 to MH F4-3-6.
2. Villa zone Backfill FDT from MH PS2-1-5-12 to MH PS2-2-1-5.
3. Villa zone backfill FDT from MH PS2-7-17 to MH PS2-7-7.
4. Villa zone backfill FDT from MH PS2-1-15 to PS2-1-5.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, September 13, 2021 1:07 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI Family zone RDT sand blanket from MH F9-1-15 TO MH F9-1-12 and C5-15-6 to C5-15-7.
2. RFI single zone FDT manholes from MH F4-1-2 to MH F4-1-2-3.
3. RFI single zone RDT sand bedding from MH F5-5-1-6 to MH F5-5-1.
4. RFI Villa zone pipe installation 1200 Dia from MH C4-13 to F9.

Thanks & Best Regards,

Abdullah Alhakeem

72
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, September 12, 2021 1:12 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Regarding backfill activity, Please add any RFI for which you already have survey sheet to match the as-built on site.

Please find below requests for today:

1. RFI Family zone warning tape for storm line from MH F1-10 to MH F1-6.
2. RFI Family zone FDT Backfill second layer from MH C5-15-1 to C5-15-6 and MH C5-15-7 to MH C5-15-16.
3. RFI single zone new excavation from MH F4-1-1 to MH F4-1-1-5.
4. RFI Family zone FDT backfill first layer from F3-1-1-1-4 to F3-1-1-1.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, September 9, 2021 2:25 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

73
Regarding backfill activity, Please add any RFI for which you already have survey sheet to match the as-built on site.

Please find below requests for today:

1. RFI Villa zone manholes installation ( PS2-7-4 to PS2-7-6), (F10-2-13 to F10-2-10), (F10-2-8 to F10-2-2), ( C5-4-1
to C5-4-6 ) and (F10-6 ).
2. RFI Family zone pipe leakage test from MH F9-1-13 TO MH F9-1-11 and MH C5-15-6 to C5-15-7

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, September 8, 2021 1:09 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Regarding backfill activity, Please add any RFI for which you already have survey sheet to match the as-built on site.

Please find below requests for today:

1. RFI Family zone FDT Backfill first layer from MH C5-15-1 to C5-15-6 and MH C5-15-7 to MH C5-15-16.
2. RFI Family zone FDT Backfill first layer from MH F1-10 to MH F1-6
3. RFI Villa zone manholes installation ( PS2-1-5-5, PS2-1-5-6)
4. RFI single zone Manholes FDT from MH F5-5-1-6 to MH F5-5-1.
5. RFI single zone new excavation from MH F4-1-2 to MH F4-1-2-3.
6. RFI villa zone sand blanket above pipes from MH F10-14 to MH F10-11

Thanks & Best Regards,

74
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, September 7, 2021 6:33 AM
To: 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'essam.hassan@pillararabian.com'
<essam.hassan@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'a.refaai@pillararabian.com' <a.refaai@pillararabian.com>
Subject: RE: RFI

Dear Eng. Ezz,

Based on survey sheet given by Mr. Essam, Please add below requests :

1*. RFI villa zone FDT backfill from MH PS2-7-3-5 to MH PS2-7-3-9. Layer 2
4. RFI villa zone FDT backfill from MH Ps2-7-8 To MH ps2-7-7. LAYER 5
5. RFI villa zone FDT backfill from MH PS2-1-17 to MH PS2-1-5 . Layer 7
6. RFI villa zone FDT backfill from MH PS2-1-5-6 to MH PS2-1-5 . Layer 4

Dear Mr. Essam,

Please find below request:

7. RFI villa zone manholes FDT MH F8 and MH F8-1

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, September 6, 2021 1:38 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
75
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,

Regarding backfill activity, Please add any RFI for which you already have survey sheet to match the as-built on site.

Please find below requests for today:

1. RFI villa zone FDT backfill from MH PS2-7-3-1 to MH PS2-7-3-9.


2. RFI Family zone RDT sand blanket above pipes from MH C5-15-1 to C5-15-4 and MH C5-15-13 to MH C5-15-16.
3. RFI Family zone leakage test from MH F9-1-15 TO MH F9-1-13.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, September 5, 2021 1:56 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>; 'A.AlGhoul@pillararabian.com' <A.AlGhoul@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI Villa zone manholes installation ( PS2-1-5-1, PS2-1-5-2, PS2-1-5-3 and PS2-1-5-4)
2. RFI single zone new excavation from MH F5-5-1-6 to MH F5-5-1.
3. RFI single zone RDT sand bedding from MH F4-3-2-5 to MH F4-3-2.
4. RFI single zone RDT sand bedding from MH PS2-47 to PS2-42

76
Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, September 1, 2021 1:55 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>; 'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-
JEDDAH@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI Villa zone manholes installation ( PS2-1-11, PS2-1-12, PS2-1-13, PS2-1-14, PS2-1-15, PS2-1-16, PS2-1-17 and
PS2-1-18)

Dear Eng. Ezz,

Please provide which layer we submitted as RFI to ABV up to date for below lines:

1. RFI villa zone FDT backfill from MH PS2-7-8 to MH PS2-7-7.


2. RFI villa zone FDT backfill from MH Ps2-7-8 To MH ps2-7-17.
3. RFI villa zone FDT backfill from MH PS1-17 to MH PS1-5.
4. RFI villa zone FDT backfill from MH PS1-5-13 to MH PS1-5-6.
5. RFI villa zone FDT backfill from MH PS1-5-6 to MH PS1-5.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

77
From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>
Sent: Tuesday, August 31, 2021 12:59 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI single zone RDT below pipes from MH F4-3-10 to F4-3-2.


2. RFI villa zone RDT below pipes from MH F10-5 to F10-2
3. RFI villa zone RDT below pipes from F10-2 F10-2-2.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, August 30, 2021 1:32 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI single zone pipe installation from MH F5-11 to F5-8.


2. RFI single zone pipe installation from MH PS2-52 to PS2-48.
3. RFI villa zone pipe installation from MH PS2-7-7 to PS2-7-4.

78
Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, August 29, 2021 2:05 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please add below requests

4. RFI single zone manholes FDT from MH F10-4 to F10-2


5. RFI Villa zone FDT backfill from MH PS2-1-12 to PS2-1-5.
6. RFI Villa zone FDT backfill from MH PS2-1-17 to PS2-1-12

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, August 29, 2021 12:42 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>
Subject: RE: RFI
79
Dear Mr. Essam,
Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI single zone manholes FDT from MH F4-3-3 to F4-3-10


2. RFI Villa zone FDT backfill from MH PS2-7-8 to PS2-7-17.
3. RFI Villa zone FDT backfill from MH PS2-7-7 to PS2-7-8.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, August 24, 2021 1:58 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI single zone manholes FDT from MH PS2-42 to PS2-46


2. RFI single zone manholes FDT from MH F4-3-2 to F4-3-2-5
3. RFI Single zone RDT sand bedding sewer below pipes from MH PS2-47 to PS2-48.
4. RFI Villa zone FDT reach excavation level from MH F10-2 to F10-2-2.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

80
a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, August 23, 2021 1:02 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI single zone manholes FDT from MH PS2-53 to PS2-47


2. RFI villa zone FDT sewer backfill second layer from MH PS2-1-5-7 to MH PS2-1-5-13.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, August 22, 2021 1:19 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please update RFI #1

1. RFI single zone manholes FDT from MH F5-8-5, F5-8-4, F5-8-3, F5-8-2, F5-8-1,F5-8 , F5-9, F5-10-3, F5-10-2, F5-10-
1, F5-10-1-1, F5-10, and F5-11.

Please add:

81
5. RFI Single zone sewer FDT for manholes From MH PS2-53 to MH PS2-47

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, August 22, 2021 12:46 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI single zone manholes FDT from MH F5-8-5 TO MH F5-8 and from MH F5-8 to MH F5-11
2. RFI villa zone RDT STORM below pipes from MH F10-2 to F10-2-7.
3. RFI villa zone FDT sewer backfill second layer from MH PS2-1-5 to MH PS2-1-5-7.
4. RFI villa zone RDT sewer below pipe from MH PS2-7-7 to PS2-7-6.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, August 19, 2021 11:47 AM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
82
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>; 'DCC.SFMC-JEDDAH@pillararabian.com' <DCC.SFMC-JEDDAH@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI villa zone FDT sewer backfill third layer from MH PS2-1-18 to PS2-1-12.
2. RFI villa zone FDT sewer backfill second layer from MH PS2-1-12 to PS2-1-5.
3. RFI villa zone RDT over flow from C4-7 to F8 and Storm F8 to F8-1.
4. RFI Villa zone RDT Over flow from C4-8 to c4-9.
5. RFI villa zone RDT over flow from C4-13 to F9.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, August 18, 2021 1:41 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI Single zone RDT sand bedding sewer backfill from MH PS2-52 to PS2-48.
2. RFI villa zone HC four corner for blinding (HC1-PS2-7-7, HC2-PS2-7-7, HC4-PS2-7-8, HC5-PS2-7-8, HC6-PS2-7-8,
HC7-PS2-7-8, HC3-PS2-7-10, HC4-PS2-7-10, HC3-PS2-7-13, HC4-PS2-7-13,HC3-PS2-7-14,HC4-PS2-7-14,HC3-PS2-7-
15,HC4-PS2-7-15,HC2-PS2-7-16,HC3-PS2-7-16, HC1-PS2-7-17, HC2-PS2-7-17, HC3-PS2-7-17, HC4-PS2-7-17, HC1-
PS2-7-18, HC2-PS2-7-18, HC1-PS2-7-19, HC2-PS2-7-19, HC1-PS2-7-20, HC2-PS2-7-20, HC1-PS2-7-21, HC2-PS2-7-
21, HC1-PS2-7-22, HC2-PS2-7-22)

Thanks & Best Regards,


83
Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, August 17, 2021 12:42 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please add this request:

2. RFI Single zone RDT sand bedding sewer backfill from MH PS2-53 to PS2-51.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, August 17, 2021 12:24 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

84
Please find below requests for today:

1. RFI villa zone FDT sewer backfill from MH PS2-1-18 to PS2-1-12.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, August 16, 2021 1:34 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI Single zone Storm RDT sand bedding from MH F5-8-5 to MH F5-8-3.
2. RFI villa zone HC FDT (HC1-PS2-7-7, HC2-PS2-7-7, HC4-PS2-7-8, HC5-PS2-7-8, HC6-PS2-7-8, HC7-PS2-7-8, HC3-
PS2-7-10, HC4-PS2-7-10, HC3-PS2-7-13, HC4-PS2-7-13,HC3-PS2-7-14,HC4-PS2-7-14,HC3-PS2-7-15,HC4-PS2-7-
15,HC2-PS2-7-16,HC3-PS2-7-16, HC1-PS2-7-17, HC2-PS2-7-17, HC3-PS2-7-17, HC4-PS2-7-17, HC1-PS2-7-18, HC2-
PS2-7-18, HC1-PS2-7-19, HC2-PS2-7-19, HC1-PS2-7-20, HC2-PS2-7-20, HC1-PS2-7-21, HC2-PS2-7-21, HC1-PS2-7-
22, HC2-PS2-7-22)

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, August 16, 2021 7:00 AM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
85
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

RFI Family zone Storm manhole installation as below:


1. MH-F3-1-1
2. MH-F3-1-2
3. MH-F3-1-3
4. MH-F3-1-4
5. MH-F3-1-5
6. MH-F3-1-1-1-1
7. MH-F3-1-1-1-2
8. MH-F3-1-1-1-3
9. MH-F3-1-1-1-4
10. MH-F3-1-1-1
11. MH-F3-1-1-3
12. MH-F3-1-1-4
13. MH-F3-1-1-5
14. MH-F3-1-1-6
15. MH-F3-1-1-7.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, August 12, 2021 1:48 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


86
Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI Single zone Storm RDT below pipe from MH F5-11 to MH F5-8. And MH F5-10 to MH F5-10-3 and MH F5-10-1
to MH F5-10-1-1 and MH F5-8 to MH F5-8-3.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Wednesday, August 11, 2021 12:59 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI Villa zone Over flow FDT backfilling last layer from MH C5-8-1 to MH C5-8-5.
2. RFI villa zone manholes four corner for blinding concrete from MH PS2-7-6 to MH PS2-7-4.
3. RFI Villa zone Storm FDT third layer to reach excavation level from MH F10-10 to MH F10-6.
4. RFI Villa zone Storm FDT layer to reach excavation level from MH F10-5 to MH F10-2.
5. RFI Villa zone Storm FDT layer to reach excavation level from MH F10-2-7 to MH F10-2-2.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer
87
a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, August 10, 2021 2:07 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI family zone Storm RDT from MH F3-1-1-7 to F3-1-1-3.


2. RFI family zone Storm RDT from MH F3-1-5 to F3-1-3.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, August 9, 2021 1:35 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI Villa zone Sewer FDT Manhole from MH PS2-7-6 to MH PS2-7-4.


2. RFI villa zone over flow FDT third layer from MH C5-4-6 to MH C5-4-1.

88
3. RFI Villa zone Over flow Warning tape from MH C5-8-1 to MH C5-8-5.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, August 8, 2021 12:25 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI Villa zone Storm FDT from MH F10-10 to MH F10-7.


2. RFI Villa zone Sewer RDT sand Bedding from MH PS2-7-6 to MH PS2-7-4.
3. RFI Villa zone Over flow FDT backfilling from MH C5-8-1 to MH C5-8-5.
4. RFI Villa zone Storm pipe installation 700 Dia from MH F8-4 to MH F8-2.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, August 5, 2021 1:02 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
89
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI family zone Storm RDT sand blanket from MH F3-1-1-1-4 to MH F3-1-1-1.
2. RFI family zone Storm leakage test 400 Dia from F3-1-1-4 to F3-1-1-3.
3. RFI Family zone over flow pipe installation 400 Dia from MH C5-15-6 to MH C5-15-7.
4. RFI Villa zone Storm pipe installation 700 Dia from MH F8-7 to MH F8-5.
5. RFI villa zone HC four corner for blinding concrete (HC1-PS2-7-16, HC1-PS2-7-15, HC2-PS2-7-15, HC1-PS2-7-14,
HC2-PS2-7-14, HC1-PS2-7-13, HC2-PS2-7-13, HC1-PS2-7-11, HC1-PS2-7-10, HC2-PS2-7-10, HC1-PS2-7-9, HC2-PS2-
7-9, HC1-PS2-7-8, HC2-PS2-7-8 and HC3-PS2-7-8).

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, August 3, 2021 1:55 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI family zone Storm FDT second layer from MH C5-4-11 to MH C5-4-1.
2. RFI family zone Storm leakage test 400 Dia from MH F3-1-1-7 to F3-1-1-4.
3. RFI family zone Storm leakage test 500 Dia from MH F3-1-5 to F3-1-3.
4. RFI Villa zone storm pipe installation 500 & 600 Dia from MH F10-2-9 to MH F10-2-7.
5. RFI villa zone HC (HC1-PS2-7-16, HC1-PS2-7-15, HC2-PS2-7-15, HC1-PS2-7-14, HC2-PS2-7-14, HC1-PS2-7-13, HC2-
PS2-7-13, HC1-PS2-7-11, HC1-PS2-7-10, HC2-PS2-7-10, HC1-PS2-7-9, HC2-PS2-7-9, HC1-PS2-7-8, HC2-PS2-7-8 and
HC3-PS2-7-8).
90
Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Sunday, August 1, 2021 11:50 AM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI family zone Storm RDT Sand blanket from MH-F1-10 to MH-F1-6.
2. RFI family zone over flow leakage test 400 Dia from MH F3-1-1-1-2 to MH F3-1-1-1.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, July 29, 2021 7:50 AM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI
91
Please add below RFI for today:

4. RFI family zone storm pipe installation 300 Dia branch from MH F1-2-1 to MH F1-2.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Thursday, July 29, 2021 7:20 AM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI Family installation storm manholes No. ( MH-F1-10, MH-F1-8 and MH-F1-7 and MH-F1-6) without MH F1-9
2. RFI Family installation storm manholes No. MH-F3-1-1, MH-F3-1-2, MH-F3-1-3, MH-F3-1-4 and MH-F3-1-5.
3. RFI family zone storm pipe installation from MH F1-1-3 to MH F1-3 and branch from MH F1 to MH F1-1.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Tuesday, July 27, 2021 12:54 PM
To: 'H.Alzahrani@pillararabian.com' <H.Alzahrani@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
92
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>
Subject: RE: RFI

Dear Mr. hussan,

Please find below request for today:

1. RFI family zone over flow leakage test 500 Dia from MH C5-15-3 to C5-15-5.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, July 26, 2021 12:00 PM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RE: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI installation Sewer manholes No. PS2-1-6, PS2-1-7, PS2-1-8, PS2-1-9 and PS2-1-10.
2. RFI family zone over flow leakage test 400 Dia from MH F3-1-1-1-4 to MH F3-1-1-1-2.
3. RFI Villa zone over flow leakage test 600 Dia from MH F10-12 to MH F10-13.
4. RFI family zone over flow leakage test 300 Dia from MH F9-1-17 to MH F9-1-15.

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

93
a.alhakeem@pillararabian.com
Mobile: +966 501166446

From: a.alhakeem@pillararabian.com <a.alhakeem@pillararabian.com>


Sent: Monday, July 26, 2021 6:21 AM
To: 'essam.hassan@pillararabian.com' <essam.hassan@pillararabian.com>; 'a.refaai@pillararabian.com'
<a.refaai@pillararabian.com>
Cc: 'Eng Hatem' <hatem@pillararabian.com>; 'A.Khalil@pillararabian.com' <A.Khalil@pillararabian.com>;
'ezz.elsheikh@pillararabian.com' <ezz.elsheikh@pillararabian.com>; 'H.Alzahrani@pillararabian.com'
<H.Alzahrani@pillararabian.com>
Subject: RFI

Dear Mr. Essam,


Dear Mr. Ibrahim,

Please find below requests for today:

1. RFI Family zone storm line FDT manhole from MH F1-10 to MH F1-6.
2. RFI Family zone storm line RDT Sand bedding from MH F1-1-3 to MH F1-3 and branches from MH F1-1-2-1 to MH
F1-1-2 and MH F1 to MH F1-1 and MH F1-2-1 to MH F1-2.
3. RFI family zone over flow leakage test 500 Dia from MH C5-15-1 to C5-15-3.
4. RFI villa zone RDT storm line sand bedding MH F10-2-9 to MH F10-2-7.
5. RFI villa zone RDT storm line sand bedding MH F8-7 to MH F8-2.
6. RFI Villa zone FDT second layer backfilling MH PS2-7-8 to PS2-7-17
7. RFI installation storm manholes No. F10-14, F10-13, F10-12, F10-11, F10-10, F10-9, F10-8, F9-1-12, F9-1-13, F9-1-
14.
8. RFI Family zone four corner for blinding concrete from MH F3-1-5 to MH F3-1-1 and from MH F3-1-1-1-4 to MH
F3-1-1-1 and from MH F3-1-1-7 to MH F3-1-1-3

Thanks & Best Regards,

Abdullah Alhakeem
Civil engineer

a.alhakeem@pillararabian.com
Mobile: +966 501166446

94