CONSTRUCTION OF 21-UNITS ASEAN

SUMMIT VILLAS

BILL OF QUANTITIES
BILL OF QUANTITIES

Project Name: CONSTRUCTION OF 21-UNITS ASEAN SUMMIT VILLAS


Location: Clark Freeport Zone

SUMMARY
ITEM NO. DESCRIPTION BID AMOUNT in Php
B.5 Project Signboard
100(1) Clearing & Grubbing
404 Reinforcing Steel, Grade 40
403(a) Structural Steel
1046 Lightweight Wall Partition
1003(a) Dry Wall Partition
103 Structural Excavation
104 Embankment
804(b) Gravel Bedding
405 Structural Concrete
1000(a) Soil Poisoning
1008(a) 12mm Glass Windows PVC Frame
1008(b) 6mm Glass Windows PVC Frame
1010(a) 12mm Glass Doors with Frames & Accessories
1010(b) Solid Narra Door Double Swing
1010(c) Solid Narra Door 0.9x2.6
401(1) Metalworks
1003(b) Carpentry/Ceiling
1003(c) Cabinets
1003(d) Finishes and Accents (Stairs, Baseboards, Cornices, etc)
1018(a) Tileworks (Wall)
1018(b) Tileworks Ceramic (Floor)
1013 Double Rib Type Metal Roofing with Trusses
1027 Cement Plaster Finish
1032 Painting Works
1100 Electrical Works
1002 Plumbing & Sanitary
403(b) Steel Decking
SPL-1 Airconditioning
SPL-2 ICT

TOTAL BID AMOUNT

TOTAL BID AMOUNT:


in Figures:
in Words:

Name and Signature of Bidder :


Name of Company and Official Stamp of Bidder :
Date :

Official Stamp
BILL OF QUANTITIES

Project Name : Construction of 21-Units ASEAN Summit Villas


Location : Clark Freeport Zone

UNIT COST
ITEM NO. DESCRIPTION UNIT QTY. (Pesos) AMOUNT (Pesos)

B.5 Project Signboard lot 1.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)

100(1) Clearing & Grubbing ha. 3.57

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per hectare)

404 Reinforcing Steel, Grade 40 kg. 189,000.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per kilogram)

403(a) Structural Steel kg. 601,860.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per kilogram)

1046 Lightweight Wall Partition sq.m. 7,350.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)

1003(a) Dry Wall Partition sq.m. 4,536.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)

103 Structural Exacavation cu.m. 2,520.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per cubic meter)

104 Embankment cu.m. 6,300.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per cubic meter)

Sub-Total for this Page Php


BILL OF QUANTITIES

Project Name : Construction of 21-Units ASEAN Summit Villas


Location : Clark Freeport Zone

UNIT COST
ITEM NO. DESCRIPTION UNIT QTY. (Pesos) AMOUNT (Pesos)

804(b) Gravel Bedding cu.m. 147.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per cubic meter)

405 Structural Concrete cu.m. 3,360.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per cubic meter)

1000(a) Soil Poisoning lot 1.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)

1008(a) 12mm Glass Windows PVC Frame sq.ft. 31,920.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square foot)

1008(b) 6mm Glass Windows PVC Frame sq.ft. 5,985.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square foot)

1010(a) 12mm Glass Doors with Frames & Accessories sq.ft. 17,850.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square foot)

1010(b) Solid Narra Door Double Swing pc. 21.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per piece)

1010© Solid Narra Door 0.9x2.6 pc. 315.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per piece)

Sub-Total for this Page Php


BILL OF QUANTITIES

Project Name : Construction of 21-Units ASEAN Summit Villas


Location : Clark Freeport Zone

UNIT COST
ITEM NO. DESCRIPTION UNIT QTY. (Pesos) AMOUNT (Pesos)

401(1) Metalworks lot 1.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)

1003(b) Carpentry/Ceiling sq.m. 9,450.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)

1003© Cabinets lot 1.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)

1003(d) Finishes and Accents (Stairs, Baseboards, Cornices, etc) lot 1.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)

1018(a) Tileworks (Wall) sq.m. 5,670.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)

1018(b) Tileworks Ceramic (Floor) sq.m. 11,340.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)

1013 Double Rib Type Metal Roofing with Trusses sq.m. 6,804.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)

1027 Cement Plaster Finish sq.m. 12,600.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)

Sub-Total for this Page Php


BILL OF QUANTITIES

Project Name : Construction of 21-Units ASEAN Summit Villas


Location : Clark Freeport Zone

UNIT COST
ITEM NO. DESCRIPTION UNIT QTY. (Pesos) AMOUNT (Pesos)

1032 Painting Works sq.m. 27,300.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)

1100 Electrical Works lot 1.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)

1002 Plumbing & Sanitary lot 1.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)

403(b) Steel Decking sq.m. 5,376.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)

SPL-1 Airconditioning lot 1.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)

SPL-2 ICT lot 1.00

(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)

Sub-Total for this Page Php