Presentation by:

INDIA CYCLES4CHANGE & STREETS4PEOPLE CHALLENGE


SEASON 2 | WORKSHOP 1 | 2022.04.04
“People Oriented
Design ”
Since 2013, POD has worked relentlessly to push the boundaries of urban design in the global context.
We have worked in India and the UAE on projects including urban planning, urban design, transport
about the brand

planning, campus planning, landscape urbanism and streetscapes.

We have now completed 50 projects globally and have now set up an office in the USA as well.

2 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


OUR EXPERIENCE: 50+ DIVERSE PROJECTS

Detailed Master Toolkits & Initiatives &


Strategic Planning Planning Transport Planning Landscape Urbanism Feasibility Study Competitions

~ 32,500 acres ~ 6,500 acres ~ 200 km ~ 55 acres ~25,225 acres ~500 lives

PEOPLE ORIENTED DESIGN

3 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


Streets are public spaces

“ Streets typically represent the largest area of public space a city has;
streets and footpaths typically represent 30-40% percent of the city’s
land area. Streets are also the most used public spaces; they are
not only conduits for the movement of people but are a significant

element of the city’s public realm

4 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


STREET DESIGN PRINCIPLES

Equitably Pedestrians Street furniture, Promote non- Place making Celebration of


distributed friendly signage, and motorised and activities local art and
ROW intersections wayfinding mobility options for all craft

5 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


PRESENTATION OUTLINE

1. TACTICAL URBANISM TRIALS


Case Study of Karla Phata Intersection on Mumbai-Pune Old Highway

2. VISION FOR TRANSFORMING STREETS OF MUMBAI


Case Study of One Green Mile: Senapati Bapat Marg, Lower Parel, Mumbai

PEOPLE ORIENTED DESIGN

6 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


TACTICAL URBANISM TRIAL
Case Study of Karla Phata Intersection on Mumbai-Pune Old Highway
Name of project Tactical Urbanism trial to increase road safety at Karla
Phata on the NH-48
Client /Owner or sponsoring SaveLife Foundation
authority
Project Timeline 2020- January 2021
Project Area/ Length 6000 SQ.M
Scope of work Tactical Urbanism trial to increase road safety, Detailed
design to addressed the traffic and geometry challenges
of the junction, Tender Drawings, GFC & BOQ, Site
execution, Post implementation impact analysis.

Consultant Team StudioPOD Design Private Limited | Urban Design Lead


Sustainancy Team | Traffic Consultants
Dronitech | Drone documentation

7 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


SITE CONTEXT & UNDERSTANDING

Takve Khud
Karla Buddha Caves natural caves

From 2018 - 2020 Shirota Shri Ekvira Dahivali Devi Mandir


Devi Mandir

18
Valvan Dam Takve
Vitthal Temple
Karandoli

10
KM
Wet
Accidents Karla Buddha Ekvira Devi i-Pune
N Joy
umba Water
Caves Temple Old M
ay park
Highw

17
ressway Karla
bai Pune Exp
Old Mum Phata
Lonavala Karla MTDC Karla Path
Maval
Phata

Fatalities sw ay
Devghar
Lonavala River Mum
bai-P
u ne

xpres way
u n e E High
bai P camping
Mum

23
Malawali
Dongargaon

Patan

Lohagad Fort
Injured Visapur Fort Malawali

0 0.5 1km

8 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


IMPLEMENTATION PROCESS

1 - MONTH 1 - MONTH 1 - MONTH

PRE-TRIAL TACTICAL
SURVEYS & POST-TRIAL FINAL
ANALYSIS & TU URBANISM
INTERVIEWS ANALYSIS RECOMMENDATION
DESIGN TRIALS

• 3 DAY TRAFFIC + PEDESTRIAN • DESIGN OPTIONS • SITE PREPARATION • POST TRIAL ANALYSIS • PERMANENT DESIGN
SURVEY • MATERIAL SELECTION • IMPLEMENTATION WITH PAINTING, • TRIAL LEARNINGS RECOMMENDATION
• USER EXPERIENCE SURVEY • TENDER DOCUMENTATION BARRICADES AND CONES
• CASE STUDIES • COSTING (BOQ)
• BEST PRACTICE RESEARCH

Removing illegal structures to provide continuou


footpath and IPT stops

Chart Title N
1
2
RESTAURANT UNDER CONSTRUCTION

4
2.5m
3.5m

25% 1.8m 3.5m


3.0m

Dedicated IPT
stops

Table top ramp


75%
75%
SHOPS

Bus lane Street lights 3. 3M wide


Rumblers 0m
and Bus Stop crosswalks
Signages

1.8m
3.5m 3.5m

3.0m
Chart Title

1.8m
.\06.Reference\sign 2.png

5m
.\Desktop\png.png

3.

3.
5m
BUS
1.8m
1 2

4.7m
1.

3.5m 3.5m
5m

5.5m
5m
1.

7.0m
3.3m 3.3m
6.6m

5.0m
25.7m

3.0m

6.0m
21%

6.0m

3.0m
6.0m
0.8m
3.0m

4.7m

BUS

2.5m
1.8m

3.0m
Road studs Rumblers

1.8m
Bus lane Intersection paint
Extending Median
1.8m wide raised walkway
79%
(1.5x1.5m c/c, 0.15mm thick)

79%
and Bus Stop Red or Yellow Thermoplastic paint

3.5m 3.5m

RESTAURANT
RESTAURANT

1 2
RESTAURANT

9 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


PROPOSED INTERVENTION
1 Proposed Bus Bay

2 Speed limits marked on road


with help of synthetic enamel
paint

3 IPT stops

4 Proposed Signages

4 3 5 Traffic cones at 2m c/c

6 Proposed barricades to prevent


8 jay-walking

7 Intersection marked with help of


synthetic enamel paint

8 Shoulder Space created after


11
road geometry correction

9 9 Proposed pedestrian crossing


10
1 10 Waiting space created for
5 pedestrians using traffic cones in
the middle of the road

7
11 Proposed water filled barricades
for altered road geometry
6

10 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


Mumbai
to
Karla
44%
Kamshet
to
Mumbai
Direction

14%
Mumbai
to
Kamshet

34% Fig 7.2: Picture highlights horizontal speed limit markings

Speed (km/hr)

Pre-trial
Post-trial

Geometry correction and carriageway width


reduction in the Mumbai to Pune direction =
24% reduction in speed.

11 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


Fig 7.1: Image showing vehicular route
Creating safer public realm and pedestrian crossing

Fig 7.3: Plan highlights safer public realm and


pedestrian crossing created through Tactical Urbanism Fig 7.5: Picture highlights safer footpath created for
pedestrians

Refuge area : 148.1 Sq.m.


Pedestrian refuge area : 36.76 Sq.m.
Vehicular refuge area : 111.34 Sq.m.

383% increase in total refuge area


Fig 7.4: Probability of fatal injury of the pedestrian by
the speed of the car on impact As a result of road geometry correction 35% reduction in
Legend Pre-trial 45 km/hr
speed of vehicles travelling in that direction.
Post-trial 35 km/hr
12 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
Pre-Trial - Pedestrians Post-Trial - Pedestrians
Chart Title Chart Title
1. Do you feel safe while crossing the 1. Do you feel safe while crossing the
junction? 10%
junction?
90% people say they do not feel safe 100% people say feel very safe while
while crossing the junction. High speed crossing the junction after intervention.
on the highway is the biggest threat
90%
90% 100%
100%

Chart Title Chart Title


1 2 1 2

2. Do you feel the junction design is 2. Are vehicles slowing down near
11%
convenient for merging traffic? crossing?
30%
70% people say the junction design is 89% people say the intervention has helped in
not safe for merging traffic. slowing the vehicles approaching the intersection.
70%
70%
89%
89%

Chart Title Chart Title


1 2 1 2
3. Do you use the existing footpath? 3. Do you use the existing footpath?
70% people do not use footpath due to 20%
75% people have started using footpath now.
25%
its poor condition.

75%
75%
70%
80%

Chart Title Chart Title


1 2 1 2
4. Do you feel safe using the junction 4. Do you feel safe crossing the
at night? 10%
junction at night?
21%
90% people say they do not feel safe 79% people say they have started feeling safe
using the junction at night as there is no using the junction at night.
lighting provision.
90%
90% 79%
79%

1 2 1 2

13 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


14 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
15 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
16 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
17 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
18 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
Pre Mumbai to Ekvira
devi road: 40 km/hr
Trial
Post Mumbai to Ekvira
devi road: 26 km/hr
Trial

19 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


20 Tactical Urbanism Trials on NH 48
21 Tactical Urbanism Trials on NH 48
22 Tactical Urbanism Trials on NH 48
2. VISION FOR TRANSFORMING STREETS OF MUMBAI
Case Study of One Green Mile: Senapati Bapat Marg, Lower Parel, Mumbai
(i) Site Context & Understanding
(ii) Implementation Process
(iii) Concept Design
(iv) Tactical Urbanism Trials
(v) Implementation
(vi) Key Takeaways

PEOPLE ORIENTED DESIGN

23 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


ONE GREEN MILE, SENAPATI BAPAT MARG, MUMBAI
Name of project One Green Mile, Senapati Bapat Marg, Mumbai

Client /Owner or Nucleus Office Parks


sponsoring authority Municipal Corporation of Greater Mumbai (MCGM)

Project Timeline Mar 2020 - January 2022

Project Area/ Length 1.8 km

• Concept Design, Detailed design and preparation of tender


& GFC drawings and BOQ (Design of NMT & Cycle Track
Infrastructure, Street Furniture Design, Transport Planning &
Scope of Work
Signal Design)
• Co-ordination with MCGM, Traffic Police & other authorities
• Implementation supervision

• StudioPOD Design Pvt Limited - Urban Design Lead


• AMS Consultants & Enviroscape - Landscape
• Sustainancy Consultancy - Traffic Simulation
• Lighting Concepts - Lighting Design
Consultant Team • JW Consultants - Structural
• Arkk Consulting - MEP
• St+Art - Public Art
• MVRDV - Underflyover Collaborator
• Turner Construction Company - PMC

Public - Private Collaboration


+
Design + Engineering + Expertise:
A multi-disciplionary effort showcases how collaboration,
process and dialogue of different expertise is important

24 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


SENAPATI BAPAT MARG CONTEXT

arg
tM
a pa
ti B
a pa
Sen
25 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
PEDESTRIAN AND VEHICULAR MOVEMENT CHALLENGES

Unused Space
Under flyover

Unauthorised Parking
Dangerous Crossing

Unstructured Street causing


confusion, chaos and
accidents

Conflict of traffic at the entry/exit of OIC and under the flyover.

Encroached
Truck Parking

Unsafe Pedestrian
Movement

Lack of safe walking space Shoulder occupied by illegal parking

26 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


PEDESTRIAN AND VEHICULAR MOVEMENT CHALLENGES

4.5m

Unused
Blocked Carriage Way Space
Unsafe Drop-off Taxi Parking
Encroaching Bus Stop

Existing Footpath
Pedestrians on insufficient for
carriage way current flux of people

27 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


UNDERUTILIZED AND NEGLECTED UNDERFLYOVER SPACES

28 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


DEVELOPMENT VISION

STATE-OF-THE-ART STREETSCAPE
THAT WILL SERVE AS A MODEL FOR
STREET DESIGN IN MUMBAI.

29 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


CREATE A COMPLETE STREET THAT ADDRESS NEEDS OF ALL USERS
PROPERTY ACCESS SHADED WALKWAY
TACTICLE ZONE REPAIR OF EXISTING FOOTPATH
TREE GRATE

TACTICLE FLOORING
LANDSCAPE AREA

TACTICLE FLOORING

Safe pedestrian crossings and


1
PEDESTRIAN CROSSING PROPERTY ACCESS

public realm
SEATING
BOLLARDS
PEDETRIAN CROSSING BOLLARDS

GREEN BUFFER
BOLLARDS

SEATING

GREEN BUFFER

OIC INTERSECTION OIC U-TURN OWC ENTRANCE


DEDICATED CYCLE TRACK

DEDICATED CYCLE TRACK

DEDICATED CYCLE TRACK

BOLLARDS

Seamlessly integrated NMT


2 infrastructure CYCLE CROSSING

GREEN BUFFER
BOLLARDS

PLANTERS

CYCLE CROSSING
CYCLE STOP STAND

BOLLARDS

CYCLE STOP STAND

GREEN BUFFER

OIC INTERSECTION
SHARED STREET OIC U-TURN OWC ENTRANCE

PROPOSED SIGNAL
GREEN BUFFER

PROPOSED SIGNAL

RAISED CROSSING
BOLLARDS

BOLLARDS

3 Streamlining vehicular movement LANDSCAPE AREA


PROPOSED UTURN GREEN BUFFER
PLANTERS

ADDITIONAL LANE TO ACCESS SHARED STREET

GREEN BUFFER
PEDESTRIAN CROSSING

GREEN BUFFER BOLLARDS

PROPERTY ACCESS

PROPERTY ACCESS

PROPOSED STREETLIGHTS

30 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


CREATE A TIME BOUND IMPLEMENTATION PLAN IN COORDINATION WITH ALL STAKEHOLDERS

Mar Jun Sep Oct Dec Jan Mar Jun Aug Sep Oct Dec Jan
2020 2020 2020 2020 2020 2021 2021 2021 2021 2021 2021 2021 2021
Project Inception & Street design Analysis Start of Construction Under Flyover Project
Start of Construction (Streets- Phase I)
Site Analysis and Finalisation (Under Flyover) Construction Completion

Concept presentation Project Tactical


Start of Construction (Streets- Phase II)
to MCGM Inauguration Urbanism Trials

MoU signed
Final NOC received
with MCGM - in
from MCGM (Streets)
principle approval

Tender Set Tender Set Submission


GFC Submission (Phase I) GFC Submission (Phase II)
Submission (Phase II)

1. Analysis and Design 2. Tactical Urbanism Trials 3. Final Implementation

31 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


CONDUCT PRE-IMPLEMENTATION TOPOGRAPHIC AND TRAFFIC SURVEYS
1. Topographic Survey including:
• Complete ROW
• Physical structures & utilities
• Landscape & street furniture Elphinstone
Bridge
Junction 6
NM Joshi

1 2 3 4 5 Marg

Baburao Parulekar Naman Fitwala Junction

Kakasaheb Gadgil Marg


Matkar Marg
Baburao Purulekar Marg

One Rd
Rd Junction Midtown
International Junction
Junction
Centre
U-Turn

2. Traffic Survey including:


• 24 hour vehicle counts
• Turning movement counts
• Mode split SAYANI SL
873

847

873

847
ROAD MATKAR
• Signal timings RD
797

735

675
192
753
Traffic data Traffic data
37

39

39

73

36
89
0
37 73 0 753
1168 195 195 1057 1168 583 583 1057
936 789 39 31
LOWER PAREL DADAR LOWER PAREL DADAR

39 39 675 89
1832 684 1832 684
269 269 1817 1817
1524 376 38 136
1524
797
789

936
735
376

192
136
38
36
31

39
Indicates
Volume of Indicates
PRABHADEVI Volume of FITWALA RD
3110

2047

3110

2047
vehicles
STATION vehicles

4. Elphinstone Bridge Junction 5. Fitwala Rd Junction


32 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
PROOF OF CONCEPT THROUGH TACTICAL URBANISM TRIALS

• Based on the concept design, prepare plans


for installing bollards, cones and other
temporary traffic control devices

• Coordinate with the MCGM and Traffic


Police for the placement of traffic control
devices

• Ensure adequate deployment of Traffic


Police officers and wardens at the start of
the study

• Detailed evaluation of the trials including:


Vehicular movement pattern and speeds
Queue lengths
Use of re-claimed pedestrian spaces
Pedestrian and vehicular safety indicators Creating of public realm using paint and bollards Modifying turning radius & streamlining Adjustment of bollards during trial

• Adjust turning radii and public realm as per


site conditions.

• Based on the trials update the concept


designs and prepare tender/GFC drawings

33 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


PROOF OF CONCEPT THROUGH TACTICAL URBANISM TRIALS

India Bulls Sky S51

Towards Elphistone Bridge

S28 S29 S30 S31 S32 S33 S34 S35 S36 S37 S38 S39 S40 S41 S42 S43 S44 S45 S46 S47
Fitwala Road
Foot Path

m
4.8

m
5.

1.8
4m
STOP STOP 3.
3m
Geometry

2.9m
2.6m

3.6m
correction of the

E
crossing

3.2m

m
Existing Foot Path

2.2m
2.9m
6.3

3.3m
TL

5.8m
Existing Foot Path
Existing Foot Path

6.3m

TL
Geometry Existing Foot Path
13.6m

3.0m
Existing Foot Path

m
correction of the
E E

3.0m

1.6
Existing Foot Path

5.2m
crossing Bus Stop Bus Stop
2.7 6.1m
E

3.0m
m
E E 6.8
8.5m

3.1
m

2.2m
2.3m

0m

2.2m
2.7m
Extended Pedestrian Extended Pedestrian
2. 1.6m

m
Cycle Stand

3.
1m m Realm Realm

1.8m
5 cycles 0.8 1.7m

0m
3.0m

8.
Extended Pedestrian
m 6. R2.0m

m
1m

1m
Realm 0.8 R2.0

2.9
3.2
m

2.
7.0m 1.6m

m
4.6m 6.7m
ET Cycle

0m
2.1m 5.3m 2.6m 9.1m 8.8m R4.0 7.1m 11.6m 15.6m 11.6m 7.5m 15.2m

.5m
19.3m m 2.8m

STOP
0.9 3.0m 3.0m

2.
m 1.2m
Only
Cycle

STOP STOP STOP


Track

11.8m
1.8m

2m
m

R4
9.5m 7.5m

9.9m
0.7
1.
66.4m

7.
6m
TL
19.4m 19.6m 4.0m 3.0m 0.9m
1.8m
1.2m
STOP STOP STOP

10.1m
9.9m
10.0m
3.0m Cycle Track

12.1m
12.0m
12.1m
12.2m
12.3m

11.9m

STOP
9.5m
9.5m
9.5m
9.5m

14.3m

1.8m
Senapati Bapat Marg Senapati Bapat Marg

5.8m 3.8m 1.9m


8.8m 25.9m 19.4m

1.8m
21.3m

0.4m
LT

2.7m
STOP
2.4m

2.7m
1.8m

2.7m
14.5m

2.4m
Only
Cycle

Cycle
Only
3.0m 1.8m Cycle Track
Cycle Track
4.3m 2.0m

6.0m
4.0m

Existing Under Flyover Landscape

6.5m
E

30.5m

12.0m
0.8m
0.6m 1.5m

Phase 3 Package 2 0.8m


5.8m

7m
9.5m
1.5m
1.5m

3.0m

1.
Shared Street 7.6m 3.0m

0.7m
83.3m 2.3m

0.6
m
8.3m
8.1m

7.5m

3.9m
16.2m ET

m
6.0m

2.5m
6.0m
6.0m

7.4
2.6m 7.1

1.2m
m
1.8m
3.0m 18.3m 19.3m 17.0m
14.1m 9.7m

3.
5.6m 7.8m

STOP
0.7m

1m
19.4m 19.8m 5.1m 3.0m 1.5m
Geometry correction of the
7.
1.3m

0.6m 0

crossing
1.6 6m 1m
m 1. ET

0.8m
3.0m
2.1m
m Senapati Bapat Marg

STOP STOP
.5
0.8m

.7

E
1
m

9.0m

9.7m
Tactical Urbanism Geometry correction of the
8m 1.9m crossing
4.7m
4.6m

TL
1.
3.

P
9m

OP STO
E 5.

0. 9.2m
2.7m
6m

STOP ST
7m
2.7m

LT

5.
1.9m
1.8m

0.7m

9m
Existing footpath 7.8m
1.0m 1.0m

E
1.0 12.5m 6.9m 3.8m 1.0m 3.8m 1.0m 8.3m 3.8m 3.8m 7.0m 9.4m 3.8
m 1.2m 2.1m m
6.5m

ET 2.
6m 6.8m
3.0m

9m
9m
P

2.5m
2.
Tactical Urbanism Two Wheeler Parking

2.5m

2.5m

2.

16.3m
1m

9m
8m
STO

2.
m 1.9 3.

2.
S28 9.2m

0m
m
5.0
7.9m
1.4m

2m ET

3.
3.
TL

4.

8m
2.5m 10.7m 55.1m

16.4m
TOP
m
Cycle Track
0.8

Cycle
Cycle Track
2.1m

Cycle

Only
Only
Geometry
8.7m

STOP STO
E 55.9m

S
correction of the

5.0m
LT

1.6

5.3m

E
m

P STOP
Shop crossing
0.8 m
3.4m

16.3m

5.
8.0m
3.2m

8.3m

2m
E S.L Matkar Road
3.3m Tactical Urbanism Tactical Urbanism
1.6m
ET 31.0m
10.1m

m
ET .0
10
ET 3.3m
7.0m
1.2 2m
9.

2.
ET

2
m
ET

m
Existing footpath

6m
Shop
4.
ET E
2.8m

J.B. Road
Sayani Road
ET 10
.7
m
9 m
ET 7.
Tactical Urbanism
4.9m

29
.8
m
Tactical Urbanism

S29 S30 S31 S32 S33 S34 6.8m


S35 S36 S37 S38 S39 7.
7m
S40 Suparshwa Apt. S41 S42 S44 S45 S46 S47
4.
2m

S43

Suparshwa Apt.

8m
6.

7.
8m

14.3
m
34 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TACTICAL TRIALS IMPLEMENTATION IMAGE

35 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


PHASE 1- EXISTING PLAN

Ambedkar Road
Key Plan

One International Centre

Bhavan

Bhavan

3.4m
6m
2.5m
S.B.Marg 9.5m

11.8m
S.B.Marg
6m
08
3m

Essgee
Group
Existing Footpath Rishabh
Tower
KG Marg

Existing Carriageway
0 10 20 50 100

N
Under Flyover Space

36 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


PHASE 1- DESIGN INTENT

Ambedkar Road
Key Plan

One International Centre

Location for
Proposed Signal
Bhavan

Bhavan
Location for
Proposed Signal

3.4m
01 6m 04
10 2.5m 02 03
09
S.B.Marg 9.5m
05 05
05
06 11.8m 09
07 S.B.Marg
6m
08
3m
Location for
Essgee
Proposed Signal
Group
Location for Rishabh
Proposed Signal Tower
KG Marg

Proposed Extension of Pedestrian Realm


0 10 20 50 100

N
Under Flyover Space Upgradation

37 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


PHASE 1- PROPOSED DESIGN

Ambedkar Road
Key Plan

One International Centre

Location for
Proposed Signal
Bhavan

Bhavan
Location for
Proposed Signal

3.4m
01 6m 04
10 2.5m 02 03
09
S.B.Marg 9.5m
05 05
05
Proposed Cycle Track 06 11.8m 09
07 S.B.Marg
Proposed Footpath 6m
08
Tactical Urbanism for corrected road widths 3m
Location for
Essgee
Carriageway Proposed Signal
Group
Proposed Greens Location for Rishabh
Proposed Signal Tower
KG Marg

Repair of Existing
Footpath 0 10 20 50 100

N
Shared Street

38 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


TRANSFORMATION FROM A VEHICULAR DOMINATED STREET

9m shoulder

SEP 2020
39 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TO A COMPLETE STREET

Footpath

Landscape
Cyc
le tr
ack

JAN 2022
40 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TRANSFORMATION FROM ENCROACHED PARKING SPACES

9m shoulder

SEP 2020
41 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TO A PEOPLE-FRIENDLY STREET

JAN 2022
42 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TO A PEOPLE-FRIENDLY STREET

43 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


TRANSFORMATION FROM DISCONTINUOUS AND BROKEN FOOTPATHS

SEP 2020
44 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TO CONTIGUOUS WALKING SPACE AND AN INCLUSIVE PUBLIC REALM

JAN 2022
45 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TRANSFORMATION FROM NARROW FOOTPATHS TO WIDER PUBLIC REALM

SEP 2020 SEP 2020

JAN 2022 JAN 2022

46 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


TRANSFORMATION OF UNDERUTILIZED UNDERFLYOVER SPACES

SEP 2020
47 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TO A TRULY PUBLIC SPACE FOR ALL AGES

JAN 2022
48 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
49 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
SPACE FOR KIDS

50 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


TRANSFORMATION FROM UNDERUTILIZED SPACES

51 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


TO A VIBRANT PEOPLE’S PLACE

52 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


PUBLIC ART, DESIGN AND PEOPLE

Vachanalay Seating area


53 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
PUBLIC ART, DESIGN AND PEOPLE

54 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


NEW OPEN BUS-STOPS

55 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


WAY-FINDING AND SIGNAGE

56 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


A STREET FOR ITS PEOPLE

57 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


ONW GREEN MILE - PART OF A LARGER NETWORK

DADAR
DADAR
SIDDHIVINAYAK

M
5K
1.
G
Cycling track in the immediate context of intervention

AR
M
900

AT
site. The network will connect Parel Station, Dadar

AP
B
M

TI
PA
Station and the upcoming Metro Station.

NA
SE
OIC PAREL

WORLI
1.5KM OWC PRABHADEVI
M
3K

ACHARYA
ATRE
CHOWK 2KM
The extended cycling network can connect Lower
Parel Station and 3 other Metro station while the
overall network distance can be upto 10kms. This will
LOWER ensure seamless movement all along S.B.Marg and
PAREL make it a complete street for Mumbai.
CURREY
SCIENCE ROAD
CENTRE

58 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


KEY TAKEAWAYS

2.3 acres

9,500sqm
Reclaimed public space
for walking, cycling, plazas, landscape

2,000 sqm
Optimization of underutilized spaces:
of urban park and plaza below the flyover

120 trees
trees in one km stretch

59 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1


701, Oracle Point, 7th Floor
3 Gurunanak Road
Bandra West
Mumbai - 400050

THANK YOU
Phone: (+91) 9833201666

www.studiopod.in

You might also like