Professional Documents
Culture Documents
Mumbai's Streets Transformation - W1
Mumbai's Streets Transformation - W1
We have now completed 50 projects globally and have now set up an office in the USA as well.
~ 32,500 acres ~ 6,500 acres ~ 200 km ~ 55 acres ~25,225 acres ~500 lives
“ Streets typically represent the largest area of public space a city has;
streets and footpaths typically represent 30-40% percent of the city’s
land area. Streets are also the most used public spaces; they are
not only conduits for the movement of people but are a significant
“
element of the city’s public realm
Takve Khud
Karla Buddha Caves natural caves
18
Valvan Dam Takve
Vitthal Temple
Karandoli
10
KM
Wet
Accidents Karla Buddha Ekvira Devi i-Pune
N Joy
umba Water
Caves Temple Old M
ay park
Highw
17
ressway Karla
bai Pune Exp
Old Mum Phata
Lonavala Karla MTDC Karla Path
Maval
Phata
Fatalities sw ay
Devghar
Lonavala River Mum
bai-P
u ne
xpres way
u n e E High
bai P camping
Mum
23
Malawali
Dongargaon
Patan
Lohagad Fort
Injured Visapur Fort Malawali
0 0.5 1km
PRE-TRIAL TACTICAL
SURVEYS & POST-TRIAL FINAL
ANALYSIS & TU URBANISM
INTERVIEWS ANALYSIS RECOMMENDATION
DESIGN TRIALS
• 3 DAY TRAFFIC + PEDESTRIAN • DESIGN OPTIONS • SITE PREPARATION • POST TRIAL ANALYSIS • PERMANENT DESIGN
SURVEY • MATERIAL SELECTION • IMPLEMENTATION WITH PAINTING, • TRIAL LEARNINGS RECOMMENDATION
• USER EXPERIENCE SURVEY • TENDER DOCUMENTATION BARRICADES AND CONES
• CASE STUDIES • COSTING (BOQ)
• BEST PRACTICE RESEARCH
Chart Title N
1
2
RESTAURANT UNDER CONSTRUCTION
4
2.5m
3.5m
Dedicated IPT
stops
1.8m
3.5m 3.5m
3.0m
Chart Title
1.8m
.\06.Reference\sign 2.png
5m
.\Desktop\png.png
3.
3.
5m
BUS
1.8m
1 2
4.7m
1.
3.5m 3.5m
5m
5.5m
5m
1.
7.0m
3.3m 3.3m
6.6m
5.0m
25.7m
3.0m
6.0m
21%
6.0m
3.0m
6.0m
0.8m
3.0m
4.7m
BUS
2.5m
1.8m
3.0m
Road studs Rumblers
1.8m
Bus lane Intersection paint
Extending Median
1.8m wide raised walkway
79%
(1.5x1.5m c/c, 0.15mm thick)
79%
and Bus Stop Red or Yellow Thermoplastic paint
3.5m 3.5m
RESTAURANT
RESTAURANT
1 2
RESTAURANT
3 IPT stops
4 Proposed Signages
7
11 Proposed water filled barricades
for altered road geometry
6
14%
Mumbai
to
Kamshet
Speed (km/hr)
Pre-trial
Post-trial
2. Do you feel the junction design is 2. Are vehicles slowing down near
11%
convenient for merging traffic? crossing?
30%
70% people say the junction design is 89% people say the intervention has helped in
not safe for merging traffic. slowing the vehicles approaching the intersection.
70%
70%
89%
89%
75%
75%
70%
80%
1 2 1 2
arg
tM
a pa
ti B
a pa
Sen
25 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
PEDESTRIAN AND VEHICULAR MOVEMENT CHALLENGES
Unused Space
Under flyover
Unauthorised Parking
Dangerous Crossing
Encroached
Truck Parking
Unsafe Pedestrian
Movement
4.5m
Unused
Blocked Carriage Way Space
Unsafe Drop-off Taxi Parking
Encroaching Bus Stop
Existing Footpath
Pedestrians on insufficient for
carriage way current flux of people
STATE-OF-THE-ART STREETSCAPE
THAT WILL SERVE AS A MODEL FOR
STREET DESIGN IN MUMBAI.
TACTICLE FLOORING
LANDSCAPE AREA
TACTICLE FLOORING
public realm
SEATING
BOLLARDS
PEDETRIAN CROSSING BOLLARDS
GREEN BUFFER
BOLLARDS
SEATING
GREEN BUFFER
BOLLARDS
GREEN BUFFER
BOLLARDS
PLANTERS
CYCLE CROSSING
CYCLE STOP STAND
BOLLARDS
GREEN BUFFER
OIC INTERSECTION
SHARED STREET OIC U-TURN OWC ENTRANCE
PROPOSED SIGNAL
GREEN BUFFER
PROPOSED SIGNAL
RAISED CROSSING
BOLLARDS
BOLLARDS
GREEN BUFFER
PEDESTRIAN CROSSING
PROPERTY ACCESS
PROPERTY ACCESS
PROPOSED STREETLIGHTS
Mar Jun Sep Oct Dec Jan Mar Jun Aug Sep Oct Dec Jan
2020 2020 2020 2020 2020 2021 2021 2021 2021 2021 2021 2021 2021
Project Inception & Street design Analysis Start of Construction Under Flyover Project
Start of Construction (Streets- Phase I)
Site Analysis and Finalisation (Under Flyover) Construction Completion
MoU signed
Final NOC received
with MCGM - in
from MCGM (Streets)
principle approval
1 2 3 4 5 Marg
One Rd
Rd Junction Midtown
International Junction
Junction
Centre
U-Turn
847
873
847
ROAD MATKAR
• Signal timings RD
797
735
675
192
753
Traffic data Traffic data
37
39
39
73
36
89
0
37 73 0 753
1168 195 195 1057 1168 583 583 1057
936 789 39 31
LOWER PAREL DADAR LOWER PAREL DADAR
39 39 675 89
1832 684 1832 684
269 269 1817 1817
1524 376 38 136
1524
797
789
936
735
376
192
136
38
36
31
39
Indicates
Volume of Indicates
PRABHADEVI Volume of FITWALA RD
3110
2047
3110
2047
vehicles
STATION vehicles
S28 S29 S30 S31 S32 S33 S34 S35 S36 S37 S38 S39 S40 S41 S42 S43 S44 S45 S46 S47
Fitwala Road
Foot Path
m
4.8
m
5.
1.8
4m
STOP STOP 3.
3m
Geometry
2.9m
2.6m
3.6m
correction of the
E
crossing
3.2m
m
Existing Foot Path
2.2m
2.9m
6.3
3.3m
TL
5.8m
Existing Foot Path
Existing Foot Path
6.3m
TL
Geometry Existing Foot Path
13.6m
3.0m
Existing Foot Path
m
correction of the
E E
3.0m
1.6
Existing Foot Path
5.2m
crossing Bus Stop Bus Stop
2.7 6.1m
E
3.0m
m
E E 6.8
8.5m
3.1
m
2.2m
2.3m
0m
2.2m
2.7m
Extended Pedestrian Extended Pedestrian
2. 1.6m
m
Cycle Stand
3.
1m m Realm Realm
1.8m
5 cycles 0.8 1.7m
0m
3.0m
8.
Extended Pedestrian
m 6. R2.0m
m
1m
1m
Realm 0.8 R2.0
2.9
3.2
m
2.
7.0m 1.6m
m
4.6m 6.7m
ET Cycle
0m
2.1m 5.3m 2.6m 9.1m 8.8m R4.0 7.1m 11.6m 15.6m 11.6m 7.5m 15.2m
.5m
19.3m m 2.8m
STOP
0.9 3.0m 3.0m
2.
m 1.2m
Only
Cycle
11.8m
1.8m
2m
m
R4
9.5m 7.5m
9.9m
0.7
1.
66.4m
7.
6m
TL
19.4m 19.6m 4.0m 3.0m 0.9m
1.8m
1.2m
STOP STOP STOP
10.1m
9.9m
10.0m
3.0m Cycle Track
12.1m
12.0m
12.1m
12.2m
12.3m
11.9m
STOP
9.5m
9.5m
9.5m
9.5m
14.3m
1.8m
Senapati Bapat Marg Senapati Bapat Marg
1.8m
21.3m
0.4m
LT
2.7m
STOP
2.4m
2.7m
1.8m
2.7m
14.5m
2.4m
Only
Cycle
Cycle
Only
3.0m 1.8m Cycle Track
Cycle Track
4.3m 2.0m
6.0m
4.0m
6.5m
E
30.5m
12.0m
0.8m
0.6m 1.5m
7m
9.5m
1.5m
1.5m
3.0m
1.
Shared Street 7.6m 3.0m
0.7m
83.3m 2.3m
0.6
m
8.3m
8.1m
7.5m
3.9m
16.2m ET
m
6.0m
2.5m
6.0m
6.0m
7.4
2.6m 7.1
1.2m
m
1.8m
3.0m 18.3m 19.3m 17.0m
14.1m 9.7m
3.
5.6m 7.8m
STOP
0.7m
1m
19.4m 19.8m 5.1m 3.0m 1.5m
Geometry correction of the
7.
1.3m
0.6m 0
crossing
1.6 6m 1m
m 1. ET
0.8m
3.0m
2.1m
m Senapati Bapat Marg
STOP STOP
.5
0.8m
.7
E
1
m
9.0m
9.7m
Tactical Urbanism Geometry correction of the
8m 1.9m crossing
4.7m
4.6m
TL
1.
3.
P
9m
OP STO
E 5.
0. 9.2m
2.7m
6m
STOP ST
7m
2.7m
LT
5.
1.9m
1.8m
0.7m
9m
Existing footpath 7.8m
1.0m 1.0m
E
1.0 12.5m 6.9m 3.8m 1.0m 3.8m 1.0m 8.3m 3.8m 3.8m 7.0m 9.4m 3.8
m 1.2m 2.1m m
6.5m
ET 2.
6m 6.8m
3.0m
9m
9m
P
2.5m
2.
Tactical Urbanism Two Wheeler Parking
2.5m
2.5m
2.
16.3m
1m
9m
8m
STO
2.
m 1.9 3.
2.
S28 9.2m
0m
m
5.0
7.9m
1.4m
2m ET
3.
3.
TL
4.
8m
2.5m 10.7m 55.1m
16.4m
TOP
m
Cycle Track
0.8
Cycle
Cycle Track
2.1m
Cycle
Only
Only
Geometry
8.7m
STOP STO
E 55.9m
S
correction of the
5.0m
LT
1.6
5.3m
E
m
P STOP
Shop crossing
0.8 m
3.4m
16.3m
5.
8.0m
3.2m
8.3m
2m
E S.L Matkar Road
3.3m Tactical Urbanism Tactical Urbanism
1.6m
ET 31.0m
10.1m
m
ET .0
10
ET 3.3m
7.0m
1.2 2m
9.
2.
ET
2
m
ET
m
Existing footpath
6m
Shop
4.
ET E
2.8m
J.B. Road
Sayani Road
ET 10
.7
m
9 m
ET 7.
Tactical Urbanism
4.9m
29
.8
m
Tactical Urbanism
S43
Suparshwa Apt.
8m
6.
7.
8m
14.3
m
34 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TACTICAL TRIALS IMPLEMENTATION IMAGE
Ambedkar Road
Key Plan
Bhavan
Bhavan
3.4m
6m
2.5m
S.B.Marg 9.5m
11.8m
S.B.Marg
6m
08
3m
Essgee
Group
Existing Footpath Rishabh
Tower
KG Marg
Existing Carriageway
0 10 20 50 100
N
Under Flyover Space
Ambedkar Road
Key Plan
Location for
Proposed Signal
Bhavan
Bhavan
Location for
Proposed Signal
3.4m
01 6m 04
10 2.5m 02 03
09
S.B.Marg 9.5m
05 05
05
06 11.8m 09
07 S.B.Marg
6m
08
3m
Location for
Essgee
Proposed Signal
Group
Location for Rishabh
Proposed Signal Tower
KG Marg
N
Under Flyover Space Upgradation
Ambedkar Road
Key Plan
Location for
Proposed Signal
Bhavan
Bhavan
Location for
Proposed Signal
3.4m
01 6m 04
10 2.5m 02 03
09
S.B.Marg 9.5m
05 05
05
Proposed Cycle Track 06 11.8m 09
07 S.B.Marg
Proposed Footpath 6m
08
Tactical Urbanism for corrected road widths 3m
Location for
Essgee
Carriageway Proposed Signal
Group
Proposed Greens Location for Rishabh
Proposed Signal Tower
KG Marg
Repair of Existing
Footpath 0 10 20 50 100
N
Shared Street
9m shoulder
SEP 2020
39 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TO A COMPLETE STREET
Footpath
Landscape
Cyc
le tr
ack
JAN 2022
40 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TRANSFORMATION FROM ENCROACHED PARKING SPACES
9m shoulder
SEP 2020
41 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TO A PEOPLE-FRIENDLY STREET
JAN 2022
42 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TO A PEOPLE-FRIENDLY STREET
SEP 2020
44 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TO CONTIGUOUS WALKING SPACE AND AN INCLUSIVE PUBLIC REALM
JAN 2022
45 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TRANSFORMATION FROM NARROW FOOTPATHS TO WIDER PUBLIC REALM
SEP 2020
47 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
TO A TRULY PUBLIC SPACE FOR ALL AGES
JAN 2022
48 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
49 India Cycles4Change & Streets4People Challenge: Season 2 | Workshop 1
SPACE FOR KIDS
DADAR
DADAR
SIDDHIVINAYAK
M
5K
1.
G
Cycling track in the immediate context of intervention
AR
M
900
AT
site. The network will connect Parel Station, Dadar
AP
B
M
TI
PA
Station and the upcoming Metro Station.
NA
SE
OIC PAREL
WORLI
1.5KM OWC PRABHADEVI
M
3K
ACHARYA
ATRE
CHOWK 2KM
The extended cycling network can connect Lower
Parel Station and 3 other Metro station while the
overall network distance can be upto 10kms. This will
LOWER ensure seamless movement all along S.B.Marg and
PAREL make it a complete street for Mumbai.
CURREY
SCIENCE ROAD
CENTRE
2.3 acres
9,500sqm
Reclaimed public space
for walking, cycling, plazas, landscape
2,000 sqm
Optimization of underutilized spaces:
of urban park and plaza below the flyover
120 trees
trees in one km stretch
THANK YOU
Phone: (+91) 9833201666
www.studiopod.in