Introduction to Environmental Stewardship
PUREHARVESTS FOODS
BETTER FARMS BETTER FOODS 2
BIO WASTE MANAGEMENT MADE SAFE
PUREHARVESTS FOODS
BETTER FARMS BETTER FOODS
3
Environmental Issues and BIOECO Benefits
Environmental Waste Issues;
Multiple waste streams in the animal protein and
vegetable industry ranging from manure to
slaughterhouse, and food waste.
Spreading of manure on the farm is no longer allowed
As it poses risk of pathogens contamination and
polluting soil and crops.
Storing solid wastes in pits to decompose takes a long
period of time, produces offensive smell and pollutes the
environment.
PUREHARVESTSFOODS
BETTER FARMS BETTER FOODS
4
ENERGY, CAPACITY AND OPPERATIONS
1. Regardless of whether a batch from cold storage or fresh kills or frozen, it will operate under the
same conditions with the same energy demand.
2. You would need other dry inputs to a ratio of 30% dry organic materials (sawdust, husks, paper,
cardboard…etc) are required with 70% feedstock . This is to get to an ideal of 50% - 60% moisture at
start of process. This would be something our engineers will work with your team on-site during
installation and testing and we will be running trials over 2-3 days.
3. For the 4000L system, 1-2 operators for input of raw materials and output of end product removal.
In general material loading and end product removal take 1 hour with front loader. Overall, we
recommend maximum 24 man hours. This includes packaging/bagging for the end product. When the
machine is turned on, it will be operating on auto for the next 24 hours.
PUREHARVESTS FOODS
BETTER FARMS BETTER FOODS
5
ENERGY, CAPACITY AND OPPERATIONS
The following are BIOMAX DIGESTER energy consumptions;
1. Regardless of whether a batch from cold storage or fresh kills or frozen, it will operate under the
same conditions with the same energy demand.
2. Other dry input to a ratio of 30% dry organic materials (sawdust, husks, paper, cardboard ... etc) are
required with 70% feedstock. This admixture offers an ideal of 50% - 60% moisture content at the start
of process. Our engineers will work with your team on-site during installation and testing with full
operational trials over 2-3 days.
3. For the 22,000L system, requires 1-2 operators for raw materials input and end product removal.
In general material loading and end product removal take 1 hour with front loader. Overall, we
recommend maximum 34 man hours. This includes packaging/bagging for the end product. When the
machine is turned on, it will be operating on auto for the next 24 hours.
PUREHARVESTS FOODS
BETTER FARMS BETTER FOODS
6
BIOECO COST AND SET UP
To develop the Final cost for your BIOECO program we take all of the needs
and calculate the size of the BIOMAX BIO-DIGESTER based on your capacity
need and if requested we identify your monitoring and training needs for
regulatory reporting with the online BIOECO program;
• We have three sizes of BIOMAX digester
– 4,000L 3 ton per/day
– 22,000L 15 ton per/day
– 80,000L 50 ton per/day
• Finalizing your individual Waste Management Plan (if you need one we
can help develop it) to include;
– Understanding of Local, State and National regulations (Cloud Based
Reporting)
– Training needs for operators (Ongoing Cloud Based Training)
– End product Labeling , storage and distribution (organic and pathogen free
nutrient values)
PUREHARVESTS FOODS
BETTER FARMS BETTER FOODS
8
BIOECO BIOMAX DIGESTER SETUP
When your ready to setup your BIOECO program using the BIOMAX technology we will review the site
preparations with your engineers for the installations of the selected Digester
• Digester Pricing
– US$650,000 . for the 4,000L 3 ton per/day (two units per/order)
– US$1,500,000. for the 22,000L 15 ton per/day
– US$3.500,000 for the 80,000L 50 ton per/day
• Allowing for a manufacture equipment lead time approx. 3-4 months and Shipping time approx. 1 month,
you can be set up 6 months with permitting approval
Costs of Setup
• Selected BIOMAX Bio-digester Cost: (this will come with initial installation onsite setup and testing
along with online training and formulation assistance)
• Cost of BM1 enzymes – US$33.60/kg for waste capacity
• Payment Terms 50% with order and balance FOB before shipping
• Consultation on Site setup will be based on a time and travel budget. Most setup can be handled
with online correspondence.
• Shipping, Delivery and Handling
• Additional end product storage, bagging and handling equipment are separate
• Consulting on training regulatory compliance reporting other project components separate (time
and expense)