O&M Project: Equipment Reference To Manual
O&M Project: Equipment Reference To Manual
1. Before performing the described procedure, ensure that 1. High voltages are
TXG application is properly closed and exit. present in the system
equipment. Always
2. Switch off the computer and monitor. disconnect the power
supply before
3. Disconnect the following: performing any
Display Monitor power cord. maintenance. Failure to
Display Monitor video cable from computer. do so could result in
Mouse and keyboard cable from computer. serious injury.
Serial port connector cable from computer.
Computer mains power cord. 2. Only qualified
personnel should carry
4. Remove the TXG server and client on the cabinet rack. out internal cleaning of
the computer.
5. Unlock and remove the cover of the computer.
9. Remove dust from the power supply using electric air blower
or a vacuum cleaner.
12. Remove the dust from inside the computer using electric air
blower or a vacuum cleaner.
15. Clean and clear its vents for any obstruction, internal and
external surfaces of the computer cover using a clean cloth
and a liquid cleaning agent (e.g. 409 glass cleaner).
C. Keyboard Cleaning
2. Taking care not to damage the plastic locks, unlock all the
lock located on the bottom of the keyboard using a small flat
screw driver.
Note: This Preventive Maintenance Instruction applies to the Equipment as mentioned per related PM task sheet and/or work order. Works when
done Tick, data, remarks and the like are to be entered on the task sheet and/or work order. If required and as a result of this PMI, a follow-up work
order shall be raised to cover corrective Maintenance works.
OM-SF-08: Preventive Maintenance Instruction Form (Rev.02/2017)
ITL
O&M PROJECT IT LAN System
Note: This Preventive Maintenance Instruction applies to the Equipment as mentioned per related PM task sheet and/or work order. Works when
done Tick, data, remarks and the like are to be entered on the task sheet and/or work order. If required and as a result of this PMI, a follow-up work
order shall be raised to cover corrective Maintenance works.
OM-SF-08: Preventive Maintenance Instruction Form (Rev.02/2017)