COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-1

1C1 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 189.9 -0.1 1.3 189.9 0.1 -2.7
2 149.7 -0.1 1.0 149.7 0.1 -2.1
3 189.9 -0.1 1.3 189.9 0.1 -2.7
4 189.9 -0.1 1.3 189.9 0.1 -2.7
5 190.2 0.9 1.3 190.2 -0.8 -2.6
6 189.6 -1.1 1.3 189.6 1.1 -2.7
7 191.3 -0.1 2.3 191.3 0.1 -3.6
8 188.5 -0.1 0.3 188.5 0.1 -1.7
9 185.1 0.9 1.2 185.1 -0.8 -2.5
10 184.6 -1.0 1.3 184.6 1.1 -2.5
11 186.2 -0.1 2.2 186.2 0.1 -3.4
12 183.5 -0.1 0.3 183.5 0.1 -1.6
13 138.6 0.7 0.8 138.6 -0.6 -1.7
14 138.2 -0.8 0.9 138.2 0.8 -1.8
15 139.4 0.0 1.6 139.4 0.1 -2.4
16 137.4 0.0 0.2 137.4 0.1 -1.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 189.9 - 189.9
M1 (kN.m) 0.1 3.8 3.8 225
M2 (kN.m) -2.7 -3.8 -3.8
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Slender Column...
Y= 154.6 mm Lambda1/Lim1 = 23.2 > 17.8 !!! 225
Alpha = 19.98 o Lambda2/Lim2 = 23.2 < 58.6
M-add(1/2)= 1.7 / 0.0 kN.m
V-Ed (1/2)= 0.7 / 2.0 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.05 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

2C1 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 100.5 -0.1 2.7 100.5 0.1 -2.4
2 79.3 -0.1 2.1 79.3 0.1 -1.9
3 100.5 -0.1 2.7 100.5 0.1 -2.4
4 100.5 -0.1 2.7 100.5 0.1 -2.4
5 100.7 0.4 2.6 100.7 -0.4 -2.4
6 100.3 -0.7 2.7 100.3 0.7 -2.4
7 100.9 -0.1 3.1 100.9 0.1 -2.9
8 100.1 -0.1 2.2 100.1 0.1 -1.9
9 98.1 0.4 2.5 98.1 -0.4 -2.3
10 97.8 -0.6 2.5 97.8 0.7 -2.3
11 98.3 -0.1 3.0 98.3 0.1 -2.8
12 97.6 -0.1 2.1 97.6 0.1 -1.8
13 73.7 0.3 1.7 73.7 -0.3 -1.6
14 73.5 -0.5 1.8 73.5 0.5 -1.6
15 73.9 -0.1 2.1 73.9 0.1 -1.9
16 73.4 -0.1 1.4 73.4 0.1 -1.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 100.5 - 100.5
M1 (kN.m) 0.1 2.0 2.0 225
M2 (kN.m) 2.7 2.0 3.0
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 85.3 mm Lambda1/Lim1 = 23.2 < 24.5 225
Alpha = 10.87 o Lambda2/Lim2 = 23.2 < 91.6
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.4 / 1.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.96 / 0.96 N/mm2
v-RdMax = 3.81 / 3.81 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-2

3C1 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 10.5 -0.1 2.4 10.5 0.0 -0.1
2 8.4 -0.1 1.9 8.4 0.0 -0.1
3 10.5 -0.1 2.4 10.5 0.0 -0.1
4 10.5 -0.1 2.4 10.5 0.0 -0.1
5 10.6 -0.1 2.4 10.6 0.0 -0.1
6 10.5 -0.2 2.4 10.5 0.1 -0.1
7 10.5 -0.1 2.4 10.5 0.0 -0.1
8 10.5 -0.1 2.4 10.5 0.0 -0.1
9 10.6 -0.1 2.3 10.6 0.0 -0.1
10 10.5 -0.2 2.3 10.5 0.1 -0.1
11 10.5 -0.1 2.3 10.5 0.0 -0.1
12 10.5 -0.1 2.3 10.5 0.0 -0.1
13 8.4 -0.1 1.6 8.4 0.0 -0.1
14 8.4 -0.1 1.6 8.4 0.1 -0.1
15 8.4 -0.1 1.6 8.4 0.0 -0.1
16 8.4 -0.1 1.6 8.4 0.0 -0.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 10.5 - 10.5
M1 (kN.m) -0.1 -0.2 -0.2 225
M2 (kN.m) 2.4 0.2 2.5
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 88.4 mm Lambda1/Lim1 = 24.1 < 230.0 225
Alpha = 45.11 o Lambda2/Lim2 = 29.3 < 189.7
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.1 / 1.2 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.00 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.36 / 3.36 N/mm2
Links = R8-125

1C2 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 87.6 -0.5 1.4 87.6 0.9 -2.8
2 69.6 -0.4 1.1 69.6 0.7 -2.2
3 87.6 -0.5 1.4 87.6 0.9 -2.8
4 87.6 -0.5 1.4 87.6 0.9 -2.8
5 85.6 0.5 1.3 85.6 0.0 -2.7
6 89.6 -1.4 1.4 89.6 1.8 -2.8
7 88.3 -0.5 2.3 88.3 0.9 -3.6
8 86.8 -0.5 0.4 86.8 0.9 -1.9
9 84.6 0.5 1.3 84.6 0.0 -2.7
10 88.4 -1.4 1.4 88.4 1.7 -2.7
11 87.3 -0.4 2.3 87.3 0.9 -3.5
12 85.8 -0.4 0.4 85.8 0.9 -1.9
13 65.8 0.4 1.0 65.8 0.0 -2.0
14 68.7 -1.0 1.0 68.7 1.3 -2.0
15 67.8 -0.3 1.7 67.8 0.6 -2.6
16 66.7 -0.3 0.3 66.7 0.6 -1.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 87.6 - 87.6
M1 (kN.m) 0.9 1.8 1.8 225
M2 (kN.m) -2.8 -1.8 -3.1
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 93.7 mm Lambda1/Lim1 = 23.2 < 87.2 225
Alpha = 16.60 o Lambda2/Lim2 = 23.2 < 84.3
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.1 / 2.0 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.03 / 0.05 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.91 / 0.91 N/mm2
v-RdMax = 3.73 / 3.74 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-3

2C2 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 47.0 -0.9 2.8 47.0 0.5 -2.5
2 37.4 -0.7 2.2 37.4 0.4 -2.0
3 47.0 -0.9 2.8 47.0 0.5 -2.5
4 47.0 -0.9 2.8 47.0 0.5 -2.5
5 46.8 -0.5 2.8 46.8 0.1 -2.5
6 47.3 -1.3 2.8 47.3 1.0 -2.5
7 47.3 -0.9 3.1 47.3 0.5 -3.0
8 46.8 -0.9 2.4 46.8 0.5 -2.1
9 46.3 -0.5 2.7 46.3 0.1 -2.5
10 46.8 -1.3 2.7 46.8 0.9 -2.5
11 46.8 -0.9 3.1 46.8 0.5 -2.9
12 46.3 -0.9 2.3 46.3 0.5 -2.0
13 36.1 -0.3 2.0 36.1 0.0 -1.8
14 36.5 -0.9 2.0 36.5 0.7 -1.9
15 36.5 -0.6 2.3 36.5 0.4 -2.2
16 36.1 -0.6 1.7 36.1 0.3 -1.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 47.0 - 47.0
M1 (kN.m) -0.9 -0.9 -1.1 225
M2 (kN.m) 2.8 0.9 2.9
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 71.9 mm Lambda1/Lim1 = 23.2 < 118.9 225
Alpha = 15.95 o Lambda2/Lim2 = 23.2 < 134.1
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.7 / 1.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.80 / 0.80 N/mm2
v-RdMax = 3.54 / 3.54 N/mm2
Links = R8-125

3C2 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 8.5 -0.5 2.5 8.5 0.0 -0.5
2 6.8 -0.4 2.0 6.8 0.0 -0.4
3 8.5 -0.5 2.5 8.5 0.0 -0.5
4 8.5 -0.5 2.5 8.5 0.0 -0.5
5 8.6 -0.6 2.5 8.6 0.0 -0.5
6 8.4 -0.5 2.5 8.4 0.0 -0.5
7 8.5 -0.5 2.5 8.5 0.0 -0.5
8 8.5 -0.5 2.6 8.5 0.0 -0.5
9 8.6 -0.5 2.5 8.6 0.0 -0.5
10 8.4 -0.4 2.5 8.4 0.0 -0.5
11 8.5 -0.5 2.4 8.5 0.0 -0.5
12 8.5 -0.5 2.5 8.5 0.0 -0.5
13 6.9 -0.4 1.9 6.9 0.0 -0.4
14 6.7 -0.3 1.8 6.7 0.0 -0.4
15 6.8 -0.4 1.8 6.8 0.0 -0.4
16 6.8 -0.3 1.9 6.8 0.0 -0.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 8.5 - 8.5
M1 (kN.m) -0.5 -0.2 -0.5 225
M2 (kN.m) 2.5 0.2 2.6
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 149.5 mm Lambda1/Lim1 = 24.1 < 213.7 225
Alpha = 71.08 o Lambda2/Lim2 = 24.3 < 228.0
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.3 / 1.3 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.68 / 0.68 N/mm2
v-RdMax = 3.35 / 3.35 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-4

1C3 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 146.4 -0.4 1.4 146.4 0.9 -2.8
2 115.6 -0.3 1.1 115.6 0.7 -2.2
3 146.4 -0.4 1.4 146.4 0.9 -2.8
4 146.4 -0.4 1.4 146.4 0.9 -2.8
5 147.1 0.6 1.3 147.1 -0.1 -2.7
6 145.6 -1.4 1.4 145.6 1.8 -2.8
7 147.6 -0.4 2.4 147.6 0.9 -3.7
8 145.1 -0.4 0.4 145.1 0.8 -1.8
9 143.7 0.5 1.3 143.7 -0.1 -2.6
10 142.2 -1.4 1.4 142.2 1.7 -2.7
11 144.2 -0.4 2.3 144.2 0.8 -3.5
12 141.7 -0.4 0.4 141.7 0.8 -1.8
13 108.5 0.4 0.9 108.5 -0.1 -1.9
14 107.4 -1.0 1.0 107.4 1.3 -1.9
15 108.9 -0.3 1.7 108.9 0.6 -2.6
16 107.1 -0.3 0.2 107.1 0.6 -1.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 146.4 - 146.4
M1 (kN.m) 0.9 2.9 2.9 225
M2 (kN.m) -2.8 -2.9 -3.3
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 127.2 mm Lambda1/Lim1 = 23.2 < 69.4 225
Alpha = 17.94 o Lambda2/Lim2 = 23.2 < 66.1
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.1 / 2.0 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.03 / 0.05 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

2C3 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 78.5 -0.9 2.8 78.5 0.5 -2.5
2 62.0 -0.7 2.2 62.0 0.4 -1.9
3 78.5 -0.9 2.8 78.5 0.5 -2.5
4 78.5 -0.9 2.8 78.5 0.5 -2.5
5 78.3 -0.4 2.7 78.3 0.0 -2.4
6 78.6 -1.3 2.8 78.6 1.0 -2.5
7 78.7 -0.9 3.2 78.7 0.5 -3.0
8 78.2 -0.8 2.3 78.2 0.5 -2.0
9 76.6 -0.3 2.6 76.6 0.0 -2.3
10 76.9 -1.3 2.7 76.9 1.0 -2.4
11 77.0 -0.8 3.1 77.0 0.5 -2.8
12 76.5 -0.8 2.2 76.5 0.5 -1.9
13 58.0 -0.2 1.9 58.0 0.0 -1.7
14 58.2 -0.9 1.9 58.2 0.7 -1.7
15 58.3 -0.6 2.2 58.3 0.4 -2.1
16 57.9 -0.6 1.6 57.9 0.4 -1.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 78.5 - 78.5
M1 (kN.m) -0.9 -1.6 -1.6 225
M2 (kN.m) 2.8 1.6 3.1
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 88.5 mm Lambda1/Lim1 = 23.2 < 95.5 225
Alpha = 16.35 o Lambda2/Lim2 = 23.2 < 103.2
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.8 / 1.7 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.89 / 0.89 N/mm2
v-RdMax = 3.70 / 3.70 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-5

3C3 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 8.9 -0.5 2.5 8.9 0.0 -0.2
2 7.1 -0.4 1.9 7.1 0.0 -0.2
3 8.9 -0.5 2.5 8.9 0.0 -0.2
4 8.9 -0.5 2.5 8.9 0.0 -0.2
5 8.7 -0.5 2.5 8.7 0.0 -0.2
6 9.1 -0.5 2.5 9.1 0.0 -0.2
7 8.9 -0.5 2.5 8.9 0.0 -0.2
8 8.9 -0.5 2.5 8.9 0.0 -0.2
9 8.7 -0.5 2.4 8.7 0.0 -0.2
10 9.1 -0.5 2.4 9.1 0.0 -0.2
11 8.9 -0.5 2.4 8.9 0.0 -0.2
12 8.9 -0.5 2.4 8.9 0.0 -0.2
13 7.0 -0.4 1.7 7.0 0.0 -0.2
14 7.3 -0.4 1.7 7.3 0.0 -0.2
15 7.1 -0.4 1.7 7.1 0.0 -0.2
16 7.1 -0.4 1.7 7.1 0.0 -0.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 8.9 - 8.9
M1 (kN.m) -0.5 -0.2 -0.6 225
M2 (kN.m) 2.5 0.2 2.5
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 124.4 mm Lambda1/Lim1 = 24.1 < 215.4 225
Alpha = 63.99 o Lambda2/Lim2 = 29.3 < 212.2
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.3 / 1.2 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.68 / 0.68 N/mm2
v-RdMax = 3.35 / 3.36 N/mm2
Links = R8-125

1C4 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 72.9 -1.7 0.8 72.9 3.5 -1.7
2 58.3 -1.3 0.6 58.3 2.7 -1.3
3 72.9 -1.7 0.8 72.9 3.5 -1.7
4 72.9 -1.7 0.8 72.9 3.5 -1.7
5 71.6 -0.8 0.8 71.6 2.6 -1.6
6 74.2 -2.7 0.9 74.2 4.4 -1.7
7 74.3 -1.7 1.8 74.3 3.4 -2.6
8 71.4 -1.7 -0.2 71.4 3.5 -0.7
9 71.6 -0.7 0.7 71.6 2.5 -1.5
10 74.1 -2.6 0.9 74.1 4.2 -1.7
11 74.2 -1.6 1.8 74.2 3.3 -2.5
12 71.5 -1.7 -0.2 71.5 3.4 -0.7
13 57.3 -0.5 0.5 57.3 1.8 -1.1
14 59.1 -1.9 0.6 59.1 3.1 -1.2
15 59.2 -1.2 1.3 59.2 2.4 -1.8
16 57.2 -1.2 -0.1 57.2 2.5 -0.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 72.9 - 72.9
M1 (kN.m) 3.5 1.5 3.8 225
M2 (kN.m) -1.7 -1.5 -2.0
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 70.7 mm Lambda1/Lim1 = 23.2 < 91.7 225
Alpha = 10.44 o Lambda2/Lim2 = 23.2 < 93.1
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.4 / 1.5 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.06 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.87 / 0.87 N/mm2
v-RdMax = 3.66 / 3.66 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-6

2C4 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 35.3 -3.5 1.7 35.3 2.9 -0.6
2 28.3 -2.7 1.3 28.3 2.2 -0.4
3 35.3 -3.5 1.7 35.3 2.9 -0.6
4 35.3 -3.5 1.7 35.3 2.9 -0.6
5 35.0 -3.1 1.6 35.0 2.4 -0.5
6 35.6 -3.9 1.7 35.6 3.3 -0.6
7 35.5 -3.4 2.1 35.5 2.8 -1.1
8 35.1 -3.5 1.2 35.1 2.9 -0.1
9 35.2 -3.0 1.6 35.2 2.3 -0.5
10 35.8 -3.8 1.6 35.8 3.2 -0.6
11 35.7 -3.3 2.0 35.7 2.7 -1.0
12 35.3 -3.4 1.2 35.3 2.8 -0.1
13 28.5 -2.2 1.1 28.5 1.7 -0.4
14 29.0 -2.8 1.2 29.0 2.4 -0.4
15 28.9 -2.4 1.5 28.9 2.0 -0.7
16 28.6 -2.5 0.8 28.6 2.1 -0.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 35.3 - 35.3
M1 (kN.m) -3.5 -0.7 -3.6 225
M2 (kN.m) 1.7 0.7 1.8
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 51.0 mm Lambda1/Lim1 = 23.2 < 149.4 225
Alpha = 9.52 o Lambda2/Lim2 = 23.2 < 123.4
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.0 / 1.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.05 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.76 / 0.76 N/mm2
v-RdMax = 3.49 / 3.49 N/mm2
Links = R8-125

3C4 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 7.5 -2.9 0.6 7.5 0.4 0.1
2 6.0 -2.2 0.4 6.0 0.3 0.1
3 7.5 -2.9 0.6 7.5 0.4 0.1
4 7.5 -2.9 0.6 7.5 0.4 0.1
5 7.6 -2.9 0.6 7.6 0.4 0.1
6 7.5 -2.8 0.6 7.5 0.4 0.1
7 7.5 -2.8 0.5 7.5 0.4 0.1
8 7.6 -2.9 0.6 7.6 0.4 0.1
9 7.6 -2.8 0.6 7.6 0.4 0.1
10 7.5 -2.7 0.5 7.5 0.4 0.1
11 7.5 -2.7 0.5 7.5 0.4 0.1
12 7.6 -2.8 0.6 7.6 0.4 0.1
13 6.0 -2.0 0.4 6.0 0.3 0.1
14 6.0 -2.0 0.4 6.0 0.3 0.1
15 6.0 -2.0 0.4 6.0 0.3 0.1
16 6.1 -2.1 0.4 6.1 0.3 0.0
Critical Combination:8 - (G+Q-Wy-Ny)
Min Design
N (kN) 7.6 - 7.6
M1 (kN.m) -2.9 -0.2 -2.9 225
M2 (kN.m) 0.6 0.2 0.6
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 24.2 mm Lambda1/Lim1 = 24.2 < 302.5 225
Alpha = 3.72 o Lambda2/Lim2 = 24.1 < 254.3
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.4 / 0.3 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.04 / 0.01 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.68 / 0.68 N/mm2
v-RdMax = 3.35 / 3.35 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-7

1C5 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 262.9 0.2 -0.5 262.9 -0.4 0.9
2 206.8 0.2 -0.4 206.8 -0.3 0.7
3 262.9 0.2 -0.5 262.9 -0.4 0.9
4 262.9 0.2 -0.5 262.9 -0.4 0.9
5 263.3 1.2 -0.5 263.3 -1.4 1.0
6 262.5 -0.8 -0.4 262.5 0.6 0.9
7 261.8 0.2 0.5 261.8 -0.4 0.0
8 264.1 0.2 -1.4 264.1 -0.4 1.8
9 255.3 1.2 -0.5 255.3 -1.4 0.9
10 254.5 -0.8 -0.4 254.5 0.5 0.8
11 253.8 0.2 0.5 253.8 -0.4 0.0
12 256.0 0.2 -1.4 256.0 -0.4 1.8
13 189.2 0.9 -0.4 189.2 -1.0 0.7
14 188.7 -0.6 -0.3 188.7 0.4 0.6
15 188.1 0.2 0.4 188.1 -0.3 0.0
16 189.8 0.2 -1.0 189.8 -0.3 1.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 262.9 - 262.9
M1 (kN.m) -0.4 -5.3 -5.3 225
M2 (kN.m) 0.9 5.3 5.3
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Slender Column...
Y= 212.9 mm Lambda1/Lim1 = 23.2 > 15.1 !!! 225
Alpha = 27.36 o Lambda2/Lim2 = 23.2 > 15.1 !!!
M-add(1/2)= 2.0 / 2.0 kN.m
V-Ed (1/2)= 0.9 / 1.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

2C5 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 140.7 0.4 -0.9 140.7 -0.7 1.2
2 110.8 0.3 -0.7 110.8 -0.5 1.0
3 140.7 0.4 -0.9 140.7 -0.7 1.2
4 140.7 0.4 -0.9 140.7 -0.7 1.2
5 140.7 0.9 -1.0 140.7 -1.2 1.3
6 140.7 -0.1 -0.9 140.7 -0.1 1.2
7 140.5 0.4 -0.5 140.5 -0.7 0.8
8 140.9 0.4 -1.4 140.9 -0.7 1.7
9 136.7 0.9 -0.9 136.7 -1.2 1.2
10 136.7 -0.1 -0.9 136.7 -0.1 1.2
11 136.5 0.4 -0.5 136.5 -0.7 0.7
12 136.8 0.4 -1.3 136.8 -0.7 1.7
13 101.8 0.7 -0.7 101.8 -0.9 0.9
14 101.8 0.0 -0.6 101.8 -0.1 0.9
15 101.7 0.3 -0.3 101.7 -0.5 0.5
16 101.9 0.3 -1.0 101.9 -0.5 1.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 140.7 - 140.7
M1 (kN.m) -0.7 -2.8 -2.8 225
M2 (kN.m) 1.2 2.8 2.8
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 117.3 mm Lambda1/Lim1 = 23.2 < 73.2 225
Alpha = 15.35 o Lambda2/Lim2 = 23.2 < 74.5
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.7 / 0.9 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-8

3C5 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 12.9 0.7 -1.2 12.9 -0.2 0.1
2 10.3 0.5 -1.0 10.3 -0.2 0.1
3 12.9 0.7 -1.2 12.9 -0.2 0.1
4 12.9 0.7 -1.2 12.9 -0.2 0.1
5 12.8 0.7 -1.2 12.8 -0.2 0.1
6 12.9 0.7 -1.2 12.9 -0.2 0.1
7 13.0 0.7 -1.3 13.0 -0.2 0.1
8 12.8 0.7 -1.2 12.8 -0.2 0.1
9 12.8 0.7 -1.2 12.8 -0.2 0.1
10 12.9 0.6 -1.2 12.9 -0.2 0.1
11 12.9 0.7 -1.2 12.9 -0.2 0.1
12 12.8 0.7 -1.2 12.8 -0.2 0.1
13 10.3 0.5 -0.9 10.3 -0.2 0.1
14 10.3 0.5 -0.9 10.3 -0.2 0.1
15 10.4 0.5 -0.9 10.4 -0.2 0.1
16 10.3 0.5 -0.9 10.3 -0.2 0.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 12.9 - 12.9
M1 (kN.m) 0.7 0.3 0.7 225
M2 (kN.m) -1.2 -0.3 -1.3
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 35.9 mm Lambda1/Lim1 = 24.1 < 202.2 225
Alpha = 7.76 o Lambda2/Lim2 = 29.3 < 178.7
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.3 / 0.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.70 / 0.70 N/mm2
v-RdMax = 3.38 / 3.38 N/mm2
Links = R8-125

1C6 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 268.5 -0.5 -0.5 268.5 1.0 1.0
2 209.8 -0.4 -0.4 209.8 0.8 0.8
3 268.5 -0.5 -0.5 268.5 1.0 1.0
4 268.5 -0.5 -0.5 268.5 1.0 1.0
5 268.4 0.5 -0.5 268.4 0.0 1.0
6 268.6 -1.5 -0.4 268.6 2.0 0.9
7 267.5 -0.5 0.5 267.5 1.0 0.0
8 269.5 -0.5 -1.5 269.5 1.0 1.9
9 257.3 0.5 -0.5 257.3 0.0 1.0
10 257.4 -1.4 -0.4 257.4 1.9 0.9
11 256.4 -0.5 0.5 256.4 0.9 0.1
12 258.3 -0.5 -1.4 258.3 0.9 1.9
13 184.9 0.4 -0.4 184.9 -0.1 0.8
14 185.0 -1.0 -0.3 185.0 1.3 0.7
15 184.3 -0.3 0.3 184.3 0.6 0.1
16 185.7 -0.3 -1.1 185.7 0.6 1.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 268.5 - 268.5
M1 (kN.m) 1.0 5.4 5.4 225
M2 (kN.m) 1.0 5.4 5.4
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Slender Column...
Y= 217.4 mm Lambda1/Lim1 = 23.2 > 15.0 !!! 225
Alpha = 27.89 o Lambda2/Lim2 = 23.2 > 15.0 !!!
M-add(1/2)= 2.1 / 2.1 kN.m
V-Ed (1/2)= 1.2 / 1.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.03 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-9

2C6 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 138.1 -1.0 -1.0 138.1 0.9 1.2
2 108.0 -0.8 -0.8 108.0 0.7 0.9
3 138.1 -1.0 -1.0 138.1 0.9 1.2
4 138.1 -1.0 -1.0 138.1 0.9 1.2
5 138.2 -0.5 -1.0 138.2 0.4 1.2
6 138.0 -1.5 -0.9 138.0 1.4 1.2
7 137.9 -1.0 -0.5 137.9 0.9 0.7
8 138.4 -1.0 -1.4 138.4 0.9 1.7
9 132.6 -0.4 -1.0 132.6 0.3 1.2
10 132.4 -1.4 -0.9 132.4 1.4 1.2
11 132.3 -0.9 -0.5 132.3 0.8 0.7
12 132.8 -0.9 -1.4 132.8 0.8 1.6
13 95.7 -0.2 -0.8 95.7 0.2 0.9
14 95.6 -1.0 -0.7 95.6 0.9 0.9
15 95.5 -0.6 -0.4 95.5 0.6 0.5
16 95.8 -0.6 -1.1 95.8 0.6 1.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 138.1 - 138.1
M1 (kN.m) -1.0 -2.8 -2.8 225
M2 (kN.m) 1.2 2.8 2.8
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 115.2 mm Lambda1/Lim1 = 23.2 < 78.8 225
Alpha = 15.06 o Lambda2/Lim2 = 23.2 < 76.5
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.9 / 0.9 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

3C6 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 10.9 -0.9 -1.2 10.9 0.1 0.0
2 8.7 -0.7 -0.9 8.7 0.1 0.0
3 10.9 -0.9 -1.2 10.9 0.1 0.0
4 10.9 -0.9 -1.2 10.9 0.1 0.0
5 11.0 -0.9 -1.2 11.0 0.1 0.0
6 10.8 -0.9 -1.2 10.8 0.1 0.0
7 10.9 -0.9 -1.2 10.9 0.1 0.0
8 10.9 -0.9 -1.2 10.9 0.1 0.0
9 11.0 -0.8 -1.2 11.0 0.1 0.0
10 10.8 -0.9 -1.2 10.8 0.1 0.0
11 10.9 -0.8 -1.2 10.9 0.1 0.0
12 10.9 -0.8 -1.2 10.9 0.1 0.0
13 8.8 -0.5 -0.9 8.8 0.1 0.0
14 8.7 -0.6 -0.9 8.7 0.1 0.0
15 8.7 -0.6 -0.9 8.7 0.1 0.0
16 8.7 -0.6 -0.9 8.7 0.1 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 10.9 - 10.9
M1 (kN.m) -0.9 -0.2 -0.9 225
M2 (kN.m) -1.2 -0.2 -1.3
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 29.5 mm Lambda1/Lim1 = 24.1 < 195.4 225
Alpha = 5.56 o Lambda2/Lim2 = 29.3 < 174.0
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.5 / 0.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.37 / 3.37 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-10

1C7 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 301.0 1.5 0.8 301.0 -2.9 -1.6
2 234.5 1.1 0.6 234.5 -2.3 -1.2
3 301.0 1.5 0.8 301.0 -2.9 -1.6
4 301.0 1.5 0.8 301.0 -2.9 -1.6
5 301.7 2.4 0.8 301.7 -3.8 -1.6
6 300.3 0.5 0.8 300.3 -2.0 -1.7
7 301.1 1.5 1.8 301.1 -2.9 -2.6
8 300.9 1.5 -0.2 300.9 -2.9 -0.6
9 287.4 2.3 0.7 287.4 -3.7 -1.4
10 286.1 0.5 0.8 286.1 -2.0 -1.5
11 286.8 1.4 1.7 286.8 -2.8 -2.4
12 286.7 1.4 -0.3 286.7 -2.8 -0.5
13 203.3 1.7 0.4 203.3 -2.7 -0.9
14 202.3 0.3 0.5 202.3 -1.4 -1.0
15 202.9 1.0 1.2 202.9 -2.1 -1.7
16 202.8 1.0 -0.3 202.8 -2.1 -0.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 301.0 - 301.0
M1 (kN.m) -2.9 -6.0 -6.0 225
M2 (kN.m) -1.6 -6.0 -6.0
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 243.8 mm Lambda1/Lim1 = 23.2 < 47.2 225
Alpha = 30.85 o Lambda2/Lim2 = 23.2 < 48.6
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.1 / 1.5 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.05 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

2C7 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 154.4 2.9 1.6 154.4 -3.0 -1.4
2 120.3 2.3 1.2 120.3 -2.3 -1.1
3 154.4 2.9 1.6 154.4 -3.0 -1.4
4 154.4 2.9 1.6 154.4 -3.0 -1.4
5 154.4 3.4 1.6 154.4 -3.4 -1.4
6 154.3 2.5 1.6 154.3 -2.5 -1.4
7 154.4 2.9 2.2 154.4 -3.0 -2.0
8 154.3 3.0 1.1 154.3 -3.0 -0.8
9 147.3 3.2 1.5 147.3 -3.3 -1.3
10 147.2 2.4 1.5 147.2 -2.4 -1.3
11 147.3 2.8 2.0 147.3 -2.8 -1.8
12 147.2 2.8 1.0 147.2 -2.9 -0.7
13 104.6 2.4 0.9 104.6 -2.4 -0.8
14 104.5 1.8 1.0 104.5 -1.7 -0.9
15 104.6 2.1 1.3 104.6 -2.1 -1.2
16 104.5 2.1 0.6 104.5 -2.1 -0.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 154.4 - 154.4
M1 (kN.m) -3.0 -3.1 -3.5 225
M2 (kN.m) 1.6 3.1 3.1
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 128.0 mm Lambda1/Lim1 = 23.2 < 76.1 225
Alpha = 16.75 o Lambda2/Lim2 = 23.2 < 73.4
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.8 / 1.2 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.05 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-11

3C7 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 10.2 3.0 1.4 10.2 0.0 -0.1
2 8.2 2.3 1.1 8.2 0.0 0.0
3 10.2 3.0 1.4 10.2 0.0 -0.1
4 10.2 3.0 1.4 10.2 0.0 -0.1
5 10.1 2.9 1.4 10.1 0.0 0.0
6 10.3 3.0 1.4 10.3 0.0 -0.1
7 10.2 3.0 1.4 10.2 0.0 -0.1
8 10.2 3.0 1.3 10.2 0.0 0.0
9 10.1 2.8 1.3 10.1 0.0 0.0
10 10.3 2.9 1.3 10.3 0.0 -0.1
11 10.2 2.8 1.3 10.2 0.0 -0.1
12 10.2 2.9 1.2 10.2 0.0 0.0
13 8.1 2.0 0.8 8.1 0.0 0.0
14 8.2 2.1 0.8 8.2 0.0 0.0
15 8.2 2.1 0.9 8.2 0.0 -0.1
16 8.1 2.1 0.8 8.1 0.0 0.0
Critical Combination:6 - (G+Q-Wx-Nx)
Min Design
N (kN) 10.3 - 10.3
M1 (kN.m) 3.0 0.2 3.0 225
M2 (kN.m) 1.4 0.2 1.4
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 239.3 mm Lambda1/Lim1 = 29.3 < 241.6 225
Alpha = 80.99 o Lambda2/Lim2 = 24.1 < 248.1
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.5 / 0.7 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.04 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.36 / 3.36 N/mm2
Links = R8-125

1C8 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 284.7 -2.3 2.0 284.7 4.7 -4.0
2 223.4 -1.8 1.5 223.4 3.7 -3.1
3 284.7 -2.3 2.0 284.7 4.7 -4.0
4 284.7 -2.3 2.0 284.7 4.7 -4.0
5 283.7 -1.4 1.9 283.7 3.8 -3.9
6 285.6 -3.3 2.0 285.6 5.6 -4.1
7 283.5 -2.3 3.0 283.5 4.7 -5.0
8 285.8 -2.3 0.9 285.8 4.7 -3.0
9 274.0 -1.3 1.8 274.0 3.6 -3.7
10 275.8 -3.2 1.9 275.8 5.4 -3.9
11 273.8 -2.2 2.9 273.8 4.5 -4.8
12 276.0 -2.2 0.9 276.0 4.5 -2.8
13 201.0 -0.8 1.3 201.0 2.5 -2.6
14 202.4 -2.2 1.4 202.4 3.7 -2.7
15 200.9 -1.5 2.1 200.9 3.1 -3.4
16 202.5 -1.5 0.6 202.5 3.1 -2.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 284.7 - 284.7
M1 (kN.m) 4.7 5.7 5.8 225
M2 (kN.m) -4.0 -5.7 -5.7
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 230.5 mm Lambda1/Lim1 = 23.2 < 47.6 225
Alpha = 29.38 o Lambda2/Lim2 = 23.2 < 47.8
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 3.0 / 2.7 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.08 / 0.07 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-12

2C8 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 153.7 -4.7 4.0 153.7 4.6 -3.2
2 120.7 -3.7 3.1 120.7 3.6 -2.5
3 153.7 -4.7 4.0 153.7 4.6 -3.2
4 153.7 -4.7 4.0 153.7 4.6 -3.2
5 153.5 -4.3 3.9 153.5 4.1 -3.2
6 154.0 -5.2 4.0 154.0 5.1 -3.3
7 153.6 -4.8 4.5 153.6 4.6 -3.8
8 153.9 -4.7 3.4 153.9 4.6 -2.7
9 148.4 -4.1 3.8 148.4 3.9 -3.1
10 148.9 -4.9 3.8 148.9 4.8 -3.1
11 148.5 -4.5 4.3 148.5 4.4 -3.6
12 148.8 -4.5 3.3 148.8 4.3 -2.6
13 109.3 -2.8 2.7 109.3 2.7 -2.2
14 109.6 -3.4 2.7 109.6 3.3 -2.2
15 109.3 -3.1 3.1 109.3 3.0 -2.6
16 109.6 -3.1 2.3 109.6 3.0 -1.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 153.7 - 153.7
M1 (kN.m) -4.7 -3.1 -5.3 225
M2 (kN.m) 4.0 3.1 4.6
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 146.9 mm Lambda1/Lim1 = 23.2 < 75.6 225
Alpha = 23.79 o Lambda2/Lim2 = 23.2 < 71.8
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.7 / 2.3 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.07 / 0.06 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

3C8 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 13.9 -4.6 3.2 13.9 0.3 -0.4
2 11.1 -3.6 2.5 11.1 0.2 -0.4
3 13.9 -4.6 3.2 13.9 0.3 -0.4
4 13.9 -4.6 3.2 13.9 0.3 -0.4
5 13.9 -4.6 3.2 13.9 0.3 -0.4
6 13.9 -4.6 3.2 13.9 0.3 -0.5
7 14.0 -4.6 3.3 14.0 0.3 -0.5
8 13.9 -4.6 3.2 13.9 0.3 -0.4
9 13.9 -4.4 3.1 13.9 0.3 -0.4
10 13.9 -4.3 3.1 13.9 0.3 -0.5
11 14.0 -4.4 3.1 14.0 0.3 -0.5
12 13.9 -4.3 3.1 13.9 0.3 -0.4
13 11.1 -3.0 2.2 11.1 0.2 -0.4
14 11.2 -3.0 2.2 11.2 0.2 -0.4
15 11.2 -3.0 2.2 11.2 0.2 -0.4
16 11.1 -3.0 2.2 11.1 0.2 -0.3
Critical Combination:5 - (G+Q+Wx+Nx)
Min Design
N (kN) 13.9 - 13.9
M1 (kN.m) -4.6 -0.3 -4.7 225
M2 (kN.m) 3.2 0.3 3.3
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 70.4 mm Lambda1/Lim1 = 29.3 < 212.8 225
Alpha = 20.33 o Lambda2/Lim2 = 24.1 < 223.0
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.3 / 1.6 kN As (Required): %0.22 110.79 mm2 4Y16
v-Ed = 0.06 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.70 / 0.70 N/mm2
v-RdMax = 3.38 / 3.38 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-13

1C9 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 174.0 -1.8 -3.3 174.0 3.7 6.7
2 137.1 -1.4 -2.6 137.1 2.9 5.3
3 174.0 -1.8 -3.3 174.0 3.7 6.7
4 174.0 -1.8 -3.3 174.0 3.7 6.7
5 173.2 -0.8 -3.4 173.2 2.8 6.8
6 174.8 -2.8 -3.3 174.8 4.6 6.7
7 173.2 -1.8 -2.4 173.2 3.7 5.9
8 174.7 -1.8 -4.3 174.7 3.7 7.6
9 168.5 -0.8 -3.2 168.5 2.6 6.5
10 170.0 -2.7 -3.1 170.0 4.4 6.4
11 168.6 -1.7 -2.2 168.6 3.5 5.6
12 170.0 -1.7 -4.1 170.0 3.5 7.3
13 126.1 -0.5 -2.3 126.1 1.8 4.6
14 127.2 -1.9 -2.2 127.2 3.1 4.5
15 126.1 -1.2 -1.6 126.1 2.5 3.9
16 127.2 -1.2 -2.9 127.2 2.5 5.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 174.0 - 174.0
M1 (kN.m) 3.7 3.5 4.3 225
M2 (kN.m) 6.7 3.5 7.4
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 153.9 mm Lambda1/Lim1 = 23.2 < 60.4 225
Alpha = 22.66 o Lambda2/Lim2 = 23.2 < 59.5
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.5 / 4.0 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.06 / 0.10 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

2C9 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 92.1 -3.7 -6.7 92.1 3.6 6.2
2 72.7 -2.9 -5.3 72.7 2.8 4.8
3 92.1 -3.7 -6.7 92.1 3.6 6.2
4 92.1 -3.7 -6.7 92.1 3.6 6.2
5 91.9 -3.3 -6.8 91.9 3.1 6.2
6 92.3 -4.1 -6.7 92.3 4.0 6.2
7 91.9 -3.7 -6.4 91.9 3.5 5.7
8 92.4 -3.7 -7.1 92.4 3.6 6.7
9 89.6 -3.1 -6.5 89.6 2.9 5.9
10 90.0 -3.9 -6.4 90.0 3.8 5.9
11 89.6 -3.5 -6.1 89.6 3.4 5.5
12 90.1 -3.5 -6.8 90.1 3.4 6.3
13 67.4 -2.2 -4.6 67.4 2.0 4.2
14 67.7 -2.7 -4.5 67.7 2.7 4.2
15 67.4 -2.4 -4.3 67.4 2.4 3.9
16 67.7 -2.5 -4.8 67.7 2.4 4.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 92.1 - 92.1
M1 (kN.m) -3.7 -1.8 -4.0 225
M2 (kN.m) -6.7 -1.8 -7.1
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 109.2 mm Lambda1/Lim1 = 23.2 < 97.4 225
Alpha = 21.45 o Lambda2/Lim2 = 23.2 < 95.9
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.1 / 3.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.05 / 0.09 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.93 / 0.93 N/mm2
v-RdMax = 3.76 / 3.77 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-14

3C9 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 12.2 -3.6 -6.2 12.2 0.6 0.9
2 9.8 -2.8 -4.8 9.8 0.5 0.8
3 12.2 -3.6 -6.2 12.2 0.6 0.9
4 12.2 -3.6 -6.2 12.2 0.6 0.9
5 12.2 -3.6 -6.2 12.2 0.6 0.9
6 12.2 -3.5 -6.2 12.2 0.6 0.9
7 12.2 -3.5 -6.2 12.2 0.6 0.9
8 12.2 -3.6 -6.2 12.2 0.6 1.0
9 12.2 -3.4 -5.9 12.2 0.6 0.9
10 12.2 -3.3 -5.9 12.2 0.6 0.9
11 12.2 -3.4 -5.9 12.2 0.6 0.9
12 12.2 -3.4 -5.9 12.2 0.6 1.0
13 9.8 -2.4 -4.2 9.8 0.5 0.8
14 9.8 -2.3 -4.2 9.8 0.5 0.7
15 9.8 -2.4 -4.2 9.8 0.5 0.7
16 9.8 -2.4 -4.2 9.8 0.5 0.8
Critical Combination:5 - (G+Q+Wx+Nx)
Min Design
N (kN) 12.2 - 12.2
M1 (kN.m) -3.6 -0.2 -3.6 225
M2 (kN.m) -6.2 -0.2 -6.3
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 70.8 mm Lambda1/Lim1 = 24.9 < 240.4 225
Alpha = 16.63 o Lambda2/Lim2 = 25.2 < 238.9
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.8 / 3.1 kN As (Required): %0.34 170.74 mm2 4Y16
v-Ed = 0.05 / 0.08 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.37 / 3.37 N/mm2
Links = R8-125

1C10 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 209.8 0.2 -0.8 209.8 -0.4 1.7
2 165.7 0.2 -0.6 165.7 -0.3 1.3
3 209.8 0.2 -0.8 209.8 -0.4 1.7
4 209.8 0.2 -0.8 209.8 -0.4 1.7
5 210.0 1.3 -0.9 210.0 -1.4 1.7
6 209.6 -0.8 -0.8 209.6 0.6 1.6
7 207.9 0.2 0.2 207.9 -0.4 0.7
8 211.6 0.2 -1.8 211.6 -0.4 2.6
9 205.1 1.2 -0.8 205.1 -1.4 1.5
10 204.7 -0.8 -0.7 204.7 0.6 1.5
11 203.1 0.2 0.2 203.1 -0.4 0.6
12 206.7 0.2 -1.7 206.7 -0.4 2.4
13 155.0 0.9 -0.5 155.0 -0.9 1.0
14 154.7 -0.6 -0.4 154.7 0.5 0.9
15 153.6 0.1 0.2 153.6 -0.2 0.3
16 156.1 0.1 -1.2 156.1 -0.2 1.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 209.8 - 209.8
M1 (kN.m) -0.4 -4.2 -4.2 225
M2 (kN.m) 1.7 4.2 4.2
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Slender Column...
Y= 170.2 mm Lambda1/Lim1 = 23.2 > 17.0 !!! 225
Alpha = 22.01 o Lambda2/Lim2 = 23.2 < 57.1
M-add(1/2)= 1.9 / 0.0 kN.m
V-Ed (1/2)= 0.9 / 1.5 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-15

2C10 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 110.7 0.4 -1.7 110.7 -0.3 1.0
2 87.5 0.3 -1.3 87.5 -0.3 0.7
3 110.7 0.4 -1.7 110.7 -0.3 1.0
4 110.7 0.4 -1.7 110.7 -0.3 1.0
5 110.6 1.0 -1.7 110.6 -0.9 1.0
6 110.7 -0.1 -1.7 110.7 0.2 1.0
7 110.4 0.4 -1.2 110.4 -0.3 0.5
8 111.0 0.4 -2.1 111.0 -0.3 1.5
9 108.4 0.9 -1.5 108.4 -0.8 0.9
10 108.5 -0.1 -1.5 108.5 0.2 0.9
11 108.1 0.4 -1.1 108.1 -0.3 0.4
12 108.7 0.4 -2.0 108.7 -0.3 1.4
13 82.5 0.6 -1.0 82.5 -0.6 0.6
14 82.6 -0.2 -0.9 82.6 0.2 0.6
15 82.3 0.2 -0.6 82.3 -0.2 0.2
16 82.7 0.2 -1.3 82.7 -0.2 0.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 110.7 - 110.7
M1 (kN.m) 0.4 2.2 2.2 225
M2 (kN.m) -1.7 -2.2 -2.2
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 93.3 mm Lambda1/Lim1 = 23.2 < 86.6 225
Alpha = 12.02 o Lambda2/Lim2 = 23.2 < 79.1
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.6 / 1.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.99 / 0.99 N/mm2
v-RdMax = 3.85 / 3.86 N/mm2
Links = R8-125

3C10 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 14.6 0.3 -1.0 14.6 -0.1 0.0
2 11.7 0.3 -0.7 11.7 -0.1 0.0
3 14.6 0.3 -1.0 14.6 -0.1 0.0
4 14.6 0.3 -1.0 14.6 -0.1 0.0
5 14.5 0.4 -1.0 14.5 -0.1 0.0
6 14.6 0.3 -1.0 14.6 0.0 0.0
7 14.7 0.3 -1.0 14.7 -0.1 0.0
8 14.5 0.3 -0.9 14.5 -0.1 0.0
9 14.5 0.3 -0.9 14.5 -0.1 0.0
10 14.6 0.3 -0.9 14.6 0.0 0.0
11 14.7 0.3 -0.9 14.7 -0.1 0.0
12 14.5 0.3 -0.9 14.5 -0.1 0.0
13 11.6 0.2 -0.5 11.6 -0.1 0.0
14 11.7 0.1 -0.6 11.7 0.0 0.0
15 11.7 0.2 -0.6 11.7 -0.1 0.0
16 11.6 0.2 -0.5 11.6 -0.1 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 14.6 - 14.6
M1 (kN.m) 0.3 0.3 0.4 225
M2 (kN.m) -1.0 -0.3 -1.0
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 32.9 mm Lambda1/Lim1 = 24.1 < 185.8 225
Alpha = 6.12 o Lambda2/Lim2 = 24.1 < 162.2
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.2 / 0.5 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.00 / 0.01 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.70 / 0.70 N/mm2
v-RdMax = 3.38 / 3.38 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-16

1C11 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 322.9 -1.4 -0.8 322.9 2.9 1.6
2 251.5 -1.1 -0.6 251.5 2.3 1.3
3 322.9 -1.4 -0.8 322.9 2.9 1.6
4 322.9 -1.4 -0.8 322.9 2.9 1.6
5 322.2 -0.4 -0.9 322.2 2.0 1.7
6 323.5 -2.4 -0.8 323.5 3.8 1.6
7 323.9 -1.4 0.2 323.9 2.9 0.6
8 321.9 -1.4 -1.8 321.9 2.9 2.6
9 306.8 -0.4 -0.8 306.8 1.9 1.5
10 308.1 -2.3 -0.7 308.1 3.7 1.5
11 308.4 -1.4 0.2 308.4 2.8 0.5
12 306.5 -1.4 -1.7 306.5 2.8 2.5
13 216.7 -0.3 -0.5 216.7 1.4 1.0
14 217.6 -1.7 -0.4 217.6 2.7 0.9
15 217.9 -1.0 0.3 217.9 2.0 0.2
16 216.5 -1.0 -1.2 216.5 2.0 1.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 322.9 - 322.9
M1 (kN.m) 2.9 6.5 6.5 225
M2 (kN.m) 1.6 6.5 6.5
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 261.7 mm Lambda1/Lim1 = 23.2 < 45.8 225
Alpha = 32.75 o Lambda2/Lim2 = 23.2 < 47.0
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.1 / 1.5 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.05 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

2C11 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 169.8 -2.9 -1.6 169.8 2.9 1.2
2 132.3 -2.3 -1.3 132.3 2.3 1.0
3 169.8 -2.9 -1.6 169.8 2.9 1.2
4 169.8 -2.9 -1.6 169.8 2.9 1.2
5 169.8 -2.4 -1.7 169.8 2.5 1.3
6 169.8 -3.3 -1.6 169.8 3.4 1.2
7 169.8 -2.9 -1.1 169.8 2.9 0.7
8 169.8 -2.9 -2.2 169.8 2.9 1.8
9 161.8 -2.4 -1.5 161.8 2.4 1.2
10 161.9 -3.2 -1.5 161.9 3.3 1.1
11 161.9 -2.8 -1.0 161.9 2.8 0.6
12 161.8 -2.8 -2.0 161.8 2.8 1.7
13 114.6 -1.7 -1.0 114.6 1.7 0.8
14 114.6 -2.3 -0.9 114.6 2.4 0.7
15 114.6 -2.0 -0.6 114.6 2.1 0.4
16 114.6 -2.0 -1.3 114.6 2.1 1.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 169.8 - 169.8
M1 (kN.m) 2.9 3.4 3.6 225
M2 (kN.m) -1.6 -3.4 -3.4
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 139.3 mm Lambda1/Lim1 = 23.2 < 72.2 225
Alpha = 18.10 o Lambda2/Lim2 = 23.2 < 68.0
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.8 / 1.2 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.05 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-17

3C11 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 10.8 -2.9 -1.2 10.8 0.0 0.1
2 8.6 -2.3 -1.0 8.6 0.0 0.1
3 10.8 -2.9 -1.2 10.8 0.0 0.1
4 10.8 -2.9 -1.2 10.8 0.0 0.1
5 10.8 -3.0 -1.2 10.8 0.0 0.1
6 10.7 -2.9 -1.2 10.7 0.0 0.1
7 10.7 -2.9 -1.2 10.7 0.0 0.1
8 10.9 -2.9 -1.3 10.9 0.0 0.1
9 10.8 -2.9 -1.2 10.8 0.0 0.1
10 10.7 -2.8 -1.1 10.7 0.0 0.1
11 10.7 -2.8 -1.1 10.7 0.0 0.1
12 10.9 -2.8 -1.2 10.9 0.0 0.1
13 8.7 -2.1 -0.7 8.7 0.0 0.1
14 8.6 -2.0 -0.7 8.6 0.0 0.0
15 8.5 -2.1 -0.7 8.5 0.0 0.0
16 8.7 -2.1 -0.7 8.7 0.0 0.1
Critical Combination:5 - (G+Q+Wx+Nx)
Min Design
N (kN) 10.8 - 10.8
M1 (kN.m) -3.0 -0.2 -3.0 225
M2 (kN.m) -1.2 -0.2 -1.3
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 255.8 mm Lambda1/Lim1 = 29.3 < 228.2 225
Alpha = 82.19 o Lambda2/Lim2 = 24.1 < 243.3
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.5 / 0.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.04 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.37 / 3.37 N/mm2
Links = R8-125

1C12 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 291.0 2.3 -1.7 291.0 -4.7 3.5
2 228.5 1.8 -1.4 228.5 -3.6 2.7
3 291.0 2.3 -1.7 291.0 -4.7 3.5
4 291.0 2.3 -1.7 291.0 -4.7 3.5
5 291.7 3.3 -1.8 291.7 -5.6 3.5
6 290.2 1.3 -1.7 290.2 -3.8 3.5
7 292.3 2.3 -0.7 292.3 -4.7 2.5
8 289.6 2.3 -2.8 289.6 -4.7 4.5
9 282.1 3.1 -1.7 282.1 -5.3 3.4
10 280.6 1.2 -1.6 280.6 -3.5 3.3
11 282.7 2.2 -0.7 282.7 -4.4 2.4
12 280.0 2.2 -2.6 280.0 -4.4 4.3
13 207.8 2.2 -1.2 207.8 -3.7 2.4
14 206.6 0.8 -1.2 206.6 -2.4 2.3
15 208.2 1.5 -0.4 208.2 -3.0 1.7
16 206.2 1.5 -1.9 206.2 -3.0 3.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 291.0 - 291.0
M1 (kN.m) -4.7 -5.8 -5.8 225
M2 (kN.m) 3.5 5.8 5.8
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 235.6 mm Lambda1/Lim1 = 23.2 < 47.1 225
Alpha = 29.96 o Lambda2/Lim2 = 23.2 < 47.6
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 3.0 / 2.4 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.08 / 0.06 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-18

2C12 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 154.4 4.7 -3.5 154.4 -4.6 2.7
2 121.4 3.6 -2.7 121.4 -3.6 2.1
3 154.4 4.7 -3.5 154.4 -4.6 2.7
4 154.4 4.7 -3.5 154.4 -4.6 2.7
5 154.5 5.1 -3.5 154.5 -5.1 2.8
6 154.3 4.3 -3.5 154.3 -4.2 2.7
7 154.5 4.7 -3.0 154.5 -4.6 2.2
8 154.3 4.7 -4.0 154.3 -4.6 3.3
9 149.6 4.8 -3.4 149.6 -4.8 2.6
10 149.4 4.0 -3.3 149.4 -3.9 2.6
11 149.6 4.4 -2.8 149.6 -4.4 2.1
12 149.4 4.4 -3.8 149.4 -4.4 3.1
13 110.6 3.4 -2.4 110.6 -3.4 1.9
14 110.4 2.7 -2.3 110.4 -2.7 1.8
15 110.5 3.0 -2.0 110.5 -3.0 1.5
16 110.4 3.0 -2.7 110.4 -3.0 2.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 154.4 - 154.4
M1 (kN.m) 4.7 3.1 5.3 225
M2 (kN.m) -3.5 -3.1 -4.1
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 141.2 mm Lambda1/Lim1 = 23.2 < 75.9 225
Alpha = 21.61 o Lambda2/Lim2 = 23.2 < 70.9
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.6 / 2.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.07 / 0.05 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

3C12 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 13.0 4.6 -2.7 13.0 -0.1 0.3
2 10.4 3.6 -2.1 10.4 -0.1 0.3
3 13.0 4.6 -2.7 13.0 -0.1 0.3
4 13.0 4.6 -2.7 13.0 -0.1 0.3
5 13.0 4.6 -2.8 13.0 -0.1 0.4
6 13.0 4.7 -2.7 13.0 -0.1 0.3
7 12.9 4.6 -2.7 12.9 -0.1 0.3
8 13.1 4.6 -2.7 13.1 -0.1 0.3
9 13.0 4.4 -2.6 13.0 -0.1 0.3
10 13.0 4.4 -2.6 13.0 -0.1 0.3
11 12.9 4.4 -2.6 12.9 -0.1 0.3
12 13.1 4.4 -2.6 13.1 -0.1 0.3
13 10.4 3.0 -1.9 10.4 -0.1 0.3
14 10.4 3.0 -1.8 10.4 -0.1 0.3
15 10.3 3.0 -1.9 10.3 -0.1 0.3
16 10.5 3.0 -1.9 10.5 -0.1 0.3
Critical Combination:6 - (G+Q-Wx-Nx)
Min Design
N (kN) 13.0 - 13.0
M1 (kN.m) 4.7 0.3 4.7 225
M2 (kN.m) -2.7 -0.3 -2.8
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 59.3 mm Lambda1/Lim1 = 29.3 < 216.2 225
Alpha = 14.70 o Lambda2/Lim2 = 24.1 < 228.1
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.3 / 1.4 kN As (Required): %0.21 108.59 mm2 4Y16
v-Ed = 0.06 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.70 / 0.70 N/mm2
v-RdMax = 3.38 / 3.38 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-19

1C13 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 110.1 0.9 -0.8 110.1 -1.8 1.6
2 88.0 0.7 -0.6 88.0 -1.4 1.2
3 110.1 0.9 -0.8 110.1 -1.8 1.6
4 110.1 0.9 -0.8 110.1 -1.8 1.6
5 109.7 1.9 -0.8 109.7 -2.8 1.6
6 110.5 -0.2 -0.8 110.5 -0.8 1.6
7 108.2 0.9 0.2 108.2 -1.8 0.7
8 112.0 0.9 -1.8 112.0 -1.8 2.5
9 109.6 1.9 -0.8 109.6 -2.7 1.5
10 110.4 -0.2 -0.7 110.4 -0.7 1.5
11 108.1 0.8 0.2 108.1 -1.7 0.6
12 111.8 0.8 -1.7 111.8 -1.7 2.4
13 87.5 1.4 -0.5 87.5 -2.0 1.1
14 88.0 -0.1 -0.5 88.0 -0.5 1.0
15 86.4 0.6 0.2 86.4 -1.2 0.4
16 89.1 0.6 -1.2 89.1 -1.2 1.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 110.1 - 110.1
M1 (kN.m) -1.8 -2.2 -2.2 225
M2 (kN.m) 1.6 2.2 2.2
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 92.9 mm Lambda1/Lim1 = 23.2 < 76.6 225
Alpha = 11.95 o Lambda2/Lim2 = 23.2 < 76.8
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.6 / 1.4 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.04 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.98 / 0.98 N/mm2
v-RdMax = 3.85 / 3.84 N/mm2
Links = R8-125

2C13 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 57.7 1.8 -1.6 57.7 -1.6 0.6
2 46.2 1.4 -1.2 46.2 -1.3 0.5
3 57.7 1.8 -1.6 57.7 -1.6 0.6
4 57.7 1.8 -1.6 57.7 -1.6 0.6
5 57.7 2.3 -1.6 57.7 -2.2 0.7
6 57.7 1.2 -1.6 57.7 -1.1 0.6
7 57.4 1.8 -1.2 57.4 -1.6 0.2
8 58.1 1.8 -2.1 58.1 -1.6 1.1
9 57.8 2.2 -1.5 57.8 -2.1 0.6
10 57.8 1.2 -1.5 57.8 -1.0 0.6
11 57.5 1.7 -1.1 57.5 -1.6 0.1
12 58.1 1.7 -2.0 58.1 -1.6 1.0
13 46.4 1.6 -1.1 46.4 -1.5 0.4
14 46.4 0.8 -1.0 46.4 -0.7 0.4
15 46.1 1.2 -0.7 46.1 -1.1 0.1
16 46.6 1.2 -1.4 46.6 -1.1 0.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 57.7 - 57.7
M1 (kN.m) 1.8 1.2 2.0 225
M2 (kN.m) -1.6 -1.2 -1.8
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 61.7 mm Lambda1/Lim1 = 23.2 < 121.5 225
Alpha = 9.67 o Lambda2/Lim2 = 23.2 < 99.7
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.2 / 1.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.03 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.83 / 0.83 N/mm2
v-RdMax = 3.60 / 3.60 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-20

3C13 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 10.7 1.6 -0.6 10.7 -0.2 0.0
2 8.6 1.3 -0.5 8.6 -0.2 0.0
3 10.7 1.6 -0.6 10.7 -0.2 0.0
4 10.7 1.6 -0.6 10.7 -0.2 0.0
5 10.8 1.6 -0.6 10.8 -0.2 0.0
6 10.7 1.6 -0.6 10.7 -0.2 -0.1
7 10.8 1.6 -0.7 10.8 -0.2 0.0
8 10.6 1.6 -0.6 10.6 -0.2 -0.1
9 10.8 1.6 -0.6 10.8 -0.2 0.0
10 10.7 1.6 -0.6 10.7 -0.2 -0.1
11 10.8 1.6 -0.6 10.8 -0.2 0.0
12 10.6 1.6 -0.5 10.6 -0.2 -0.1
13 8.6 1.1 -0.4 8.6 -0.2 0.0
14 8.5 1.1 -0.4 8.5 -0.2 0.0
15 8.6 1.1 -0.4 8.6 -0.2 0.0
16 8.5 1.1 -0.4 8.5 -0.2 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 10.7 - 10.7
M1 (kN.m) 1.6 0.2 1.7 225
M2 (kN.m) -0.6 -0.2 -0.7
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 25.3 mm Lambda1/Lim1 = 24.1 < 198.6 225
Alpha = 3.93 o Lambda2/Lim2 = 24.1 < 170.4
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.8 / 0.3 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.01 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.36 / 3.36 N/mm2
Links = R8-125

1C14 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 110.1 -0.9 -0.8 110.1 1.8 1.6
2 88.0 -0.7 -0.6 88.0 1.4 1.2
3 110.1 -0.9 -0.8 110.1 1.8 1.6
4 110.1 -0.9 -0.8 110.1 1.8 1.6
5 110.5 0.2 -0.8 110.5 0.8 1.6
6 109.7 -1.9 -0.8 109.7 2.8 1.6
7 108.2 -0.9 0.2 108.2 1.8 0.7
8 112.0 -0.9 -1.8 112.0 1.8 2.5
9 110.4 0.2 -0.7 110.4 0.7 1.5
10 109.6 -1.9 -0.8 109.6 2.7 1.5
11 108.1 -0.8 0.2 108.1 1.7 0.6
12 111.8 -0.8 -1.7 111.8 1.7 2.4
13 88.0 0.1 -0.5 88.0 0.5 1.0
14 87.5 -1.4 -0.5 87.5 2.0 1.1
15 86.4 -0.6 0.2 86.4 1.2 0.4
16 89.1 -0.6 -1.2 89.1 1.2 1.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 110.1 - 110.1
M1 (kN.m) 1.8 2.2 2.2 225
M2 (kN.m) 1.6 2.2 2.2
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 92.9 mm Lambda1/Lim1 = 23.2 < 76.6 225
Alpha = 11.95 o Lambda2/Lim2 = 23.2 < 76.8
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.6 / 1.4 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.04 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.98 / 0.98 N/mm2
v-RdMax = 3.85 / 3.84 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-21

2C14 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 57.7 -1.8 -1.6 57.7 1.6 0.6
2 46.2 -1.4 -1.2 46.2 1.3 0.5
3 57.7 -1.8 -1.6 57.7 1.6 0.6
4 57.7 -1.8 -1.6 57.7 1.6 0.6
5 57.7 -1.2 -1.6 57.7 1.1 0.6
6 57.7 -2.3 -1.6 57.7 2.2 0.6
7 57.4 -1.8 -1.2 57.4 1.6 0.2
8 58.1 -1.8 -2.1 58.1 1.6 1.1
9 57.8 -1.2 -1.5 57.8 1.0 0.6
10 57.8 -2.2 -1.5 57.8 2.1 0.6
11 57.5 -1.7 -1.1 57.5 1.6 0.1
12 58.1 -1.7 -1.9 58.1 1.6 1.0
13 46.4 -0.8 -1.0 46.4 0.7 0.4
14 46.4 -1.6 -1.1 46.4 1.5 0.4
15 46.1 -1.2 -0.7 46.1 1.1 0.1
16 46.6 -1.2 -1.4 46.6 1.1 0.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 57.7 - 57.7
M1 (kN.m) -1.8 -1.2 -2.0 225
M2 (kN.m) -1.6 -1.2 -1.8
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 63.8 mm Lambda1/Lim1 = 23.2 < 121.5 225
Alpha = 10.52 o Lambda2/Lim2 = 23.2 < 99.7
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.2 / 1.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.03 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.83 / 0.83 N/mm2
v-RdMax = 3.60 / 3.60 N/mm2
Links = R8-125

3C14 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 10.7 -1.6 -0.6 10.7 0.2 0.0
2 8.6 -1.3 -0.5 8.6 0.2 0.0
3 10.7 -1.6 -0.6 10.7 0.2 0.0
4 10.7 -1.6 -0.6 10.7 0.2 0.0
5 10.7 -1.6 -0.6 10.7 0.2 -0.1
6 10.8 -1.6 -0.6 10.8 0.2 0.0
7 10.8 -1.6 -0.7 10.8 0.2 0.0
8 10.6 -1.6 -0.6 10.6 0.2 -0.1
9 10.7 -1.6 -0.6 10.7 0.2 -0.1
10 10.8 -1.6 -0.6 10.8 0.2 0.0
11 10.8 -1.6 -0.6 10.8 0.2 0.0
12 10.6 -1.6 -0.5 10.6 0.2 -0.1
13 8.5 -1.1 -0.4 8.5 0.2 0.0
14 8.6 -1.1 -0.4 8.6 0.2 0.0
15 8.6 -1.1 -0.4 8.6 0.2 0.0
16 8.5 -1.1 -0.4 8.5 0.2 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 10.7 - 10.7
M1 (kN.m) -1.6 -0.2 -1.7 225
M2 (kN.m) -0.6 -0.2 -0.7
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 42.4 mm Lambda1/Lim1 = 24.1 < 198.6 225
Alpha = 11.75 o Lambda2/Lim2 = 24.1 < 170.4
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.8 / 0.3 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.01 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.36 / 3.36 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-22

1C15 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 291.0 -2.3 -1.7 291.0 4.7 3.5
2 228.5 -1.8 -1.4 228.5 3.6 2.7
3 291.0 -2.3 -1.7 291.0 4.7 3.5
4 291.0 -2.3 -1.7 291.0 4.7 3.5
5 290.2 -1.3 -1.7 290.2 3.8 3.5
6 291.7 -3.3 -1.8 291.7 5.6 3.5
7 292.3 -2.3 -0.7 292.3 4.7 2.5
8 289.6 -2.3 -2.8 289.6 4.7 4.5
9 280.6 -1.2 -1.6 280.6 3.5 3.3
10 282.1 -3.1 -1.7 282.1 5.3 3.4
11 282.7 -2.2 -0.7 282.7 4.4 2.4
12 280.0 -2.2 -2.6 280.0 4.4 4.3
13 206.6 -0.8 -1.2 206.6 2.4 2.3
14 207.8 -2.2 -1.2 207.8 3.7 2.4
15 208.2 -1.5 -0.4 208.2 3.0 1.7
16 206.2 -1.5 -1.9 206.2 3.0 3.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 291.0 - 291.0
M1 (kN.m) 4.7 5.8 5.8 225
M2 (kN.m) 3.5 5.8 5.8
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 235.6 mm Lambda1/Lim1 = 23.2 < 47.1 225
Alpha = 29.95 o Lambda2/Lim2 = 23.2 < 47.6
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 3.0 / 2.4 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.08 / 0.06 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

2C15 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 154.4 -4.7 -3.5 154.4 4.6 2.7
2 121.4 -3.6 -2.7 121.4 3.6 2.1
3 154.4 -4.7 -3.5 154.4 4.6 2.7
4 154.4 -4.7 -3.5 154.4 4.6 2.7
5 154.3 -4.3 -3.5 154.3 4.2 2.7
6 154.5 -5.1 -3.5 154.5 5.1 2.8
7 154.5 -4.7 -3.0 154.5 4.6 2.2
8 154.3 -4.7 -4.0 154.3 4.6 3.3
9 149.4 -4.0 -3.3 149.4 3.9 2.6
10 149.6 -4.8 -3.4 149.6 4.8 2.6
11 149.6 -4.4 -2.8 149.6 4.4 2.1
12 149.4 -4.4 -3.8 149.4 4.4 3.1
13 110.4 -2.7 -2.3 110.4 2.7 1.8
14 110.6 -3.4 -2.4 110.6 3.4 1.9
15 110.5 -3.0 -2.0 110.5 3.0 1.5
16 110.4 -3.0 -2.7 110.4 3.0 2.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 154.4 - 154.4
M1 (kN.m) -4.7 -3.1 -5.3 225
M2 (kN.m) -3.5 -3.1 -4.1
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 156.5 mm Lambda1/Lim1 = 23.2 < 75.9 225
Alpha = 26.94 o Lambda2/Lim2 = 23.2 < 70.9
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.6 / 2.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.07 / 0.05 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-23

3C15 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 13.0 -4.6 -2.7 13.0 0.1 0.3
2 10.4 -3.6 -2.1 10.4 0.1 0.3
3 13.0 -4.6 -2.7 13.0 0.1 0.3
4 13.0 -4.6 -2.7 13.0 0.1 0.3
5 13.0 -4.7 -2.7 13.0 0.1 0.3
6 13.0 -4.6 -2.8 13.0 0.1 0.4
7 12.9 -4.6 -2.7 12.9 0.1 0.3
8 13.1 -4.6 -2.7 13.1 0.1 0.3
9 13.0 -4.4 -2.6 13.0 0.1 0.3
10 13.0 -4.4 -2.6 13.0 0.1 0.3
11 12.9 -4.4 -2.6 12.9 0.1 0.3
12 13.1 -4.4 -2.6 13.1 0.1 0.3
13 10.4 -3.0 -1.8 10.4 0.1 0.3
14 10.4 -3.0 -1.9 10.4 0.1 0.3
15 10.3 -3.0 -1.9 10.3 0.1 0.3
16 10.5 -3.0 -1.9 10.5 0.1 0.3
Critical Combination:5 - (G+Q+Wx+Nx)
Min Design
N (kN) 13.0 - 13.0
M1 (kN.m) -4.7 -0.3 -4.7 225
M2 (kN.m) -2.7 -0.3 -2.8
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 225.7 mm Lambda1/Lim1 = 29.3 < 216.2 225
Alpha = 75.28 o Lambda2/Lim2 = 24.1 < 228.1
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.3 / 1.4 kN As (Required): %0.21 108.49 mm2 4Y16
v-Ed = 0.06 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.70 / 0.70 N/mm2
v-RdMax = 3.38 / 3.38 N/mm2
Links = R8-125

1C16 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 352.6 -0.4 1.3 352.6 0.8 -2.6
2 275.9 -0.3 1.0 275.9 0.6 -2.0
3 352.6 -0.4 1.3 352.6 0.8 -2.6
4 352.6 -0.4 1.3 352.6 0.8 -2.6
5 351.5 0.6 1.3 351.5 -0.1 -2.6
6 353.7 -1.3 1.3 353.7 1.6 -2.5
7 351.9 -0.4 2.3 351.9 0.7 -3.5
8 353.3 -0.4 0.2 353.3 0.8 -1.6
9 337.7 0.6 1.2 337.7 -0.2 -2.5
10 339.8 -1.3 1.2 339.8 1.6 -2.5
11 338.1 -0.3 2.2 338.1 0.7 -3.4
12 339.4 -0.3 0.2 339.4 0.7 -1.5
13 244.4 0.5 0.9 244.4 -0.2 -1.8
14 246.0 -0.9 0.9 246.0 1.1 -1.8
15 244.7 -0.2 1.6 244.7 0.4 -2.5
16 245.7 -0.2 0.2 245.7 0.5 -1.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 352.6 - 352.6
M1 (kN.m) 0.8 7.1 7.1 225
M2 (kN.m) -2.6 -7.1 -7.1
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Slender Column...
Y= 286.2 mm Lambda1/Lim1 = 23.2 > 13.1 !!! 225
Alpha = 35.25 o Lambda2/Lim2 = 23.2 < 44.2
M-add(1/2)= 2.0 / 0.0 kN.m
V-Ed (1/2)= 1.0 / 1.9 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.03 / 0.05 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-24

2C16 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 185.6 -0.8 2.6 185.6 1.0 -2.2
2 145.4 -0.6 2.0 145.4 0.8 -1.7
3 185.6 -0.8 2.6 185.6 1.0 -2.2
4 185.6 -0.8 2.6 185.6 1.0 -2.2
5 185.3 -0.3 2.5 185.3 0.5 -2.2
6 185.8 -1.2 2.6 185.8 1.4 -2.2
7 185.5 -0.7 3.1 185.5 1.0 -2.7
8 185.7 -0.8 2.0 185.7 1.0 -1.6
9 178.4 -0.3 2.5 178.4 0.5 -2.1
10 178.8 -1.1 2.5 178.8 1.4 -2.1
11 178.5 -0.7 3.0 178.5 0.9 -2.6
12 178.7 -0.7 1.9 178.7 0.9 -1.6
13 129.7 -0.2 1.8 129.7 0.3 -1.5
14 130.1 -0.7 1.8 130.1 0.9 -1.5
15 129.8 -0.4 2.2 129.8 0.6 -1.9
16 129.9 -0.5 1.4 129.9 0.6 -1.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 185.6 - 185.6
M1 (kN.m) 1.0 3.7 3.7 225
M2 (kN.m) 2.6 3.7 3.7
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 151.2 mm Lambda1/Lim1 = 23.2 < 66.1 225
Alpha = 19.57 o Lambda2/Lim2 = 23.2 < 66.4
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.8 / 1.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

3C16 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 16.1 -1.0 2.2 16.1 0.2 -0.2
2 12.9 -0.8 1.7 12.9 0.2 -0.2
3 16.1 -1.0 2.2 16.1 0.2 -0.2
4 16.1 -1.0 2.2 16.1 0.2 -0.2
5 16.1 -1.0 2.1 16.1 0.2 -0.2
6 16.1 -1.0 2.2 16.1 0.2 -0.2
7 16.2 -1.0 2.2 16.2 0.2 -0.2
8 16.1 -1.0 2.1 16.1 0.2 -0.2
9 16.1 -0.9 2.1 16.1 0.2 -0.2
10 16.1 -0.9 2.1 16.1 0.2 -0.2
11 16.2 -0.9 2.1 16.2 0.2 -0.2
12 16.1 -0.9 2.1 16.1 0.2 -0.2
13 12.9 -0.6 1.5 12.9 0.2 -0.1
14 12.9 -0.6 1.5 12.9 0.2 -0.2
15 12.9 -0.6 1.6 12.9 0.2 -0.2
16 12.9 -0.6 1.5 12.9 0.2 -0.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 16.1 - 16.1
M1 (kN.m) -1.0 -0.3 -1.0 225
M2 (kN.m) 2.2 0.3 2.2
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 54.7 mm Lambda1/Lim1 = 24.3 < 172.7 225
Alpha = 17.20 o Lambda2/Lim2 = 24.1 < 158.7
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.5 / 1.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.71 / 0.71 N/mm2
v-RdMax = 3.39 / 3.39 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-25

1C17 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 353.0 0.4 1.3 353.0 -0.8 -2.5
2 276.3 0.3 1.0 276.3 -0.6 -2.0
3 353.0 0.4 1.3 353.0 -0.8 -2.5
4 353.0 0.4 1.3 353.0 -0.8 -2.5
5 354.1 1.3 1.2 354.1 -1.6 -2.5
6 351.9 -0.6 1.3 351.9 0.1 -2.5
7 352.3 0.4 2.3 352.3 -0.7 -3.5
8 353.7 0.4 0.2 353.7 -0.8 -1.5
9 340.2 1.3 1.2 340.2 -1.6 -2.4
10 338.1 -0.6 1.2 338.1 0.2 -2.5
11 338.5 0.3 2.2 338.5 -0.7 -3.4
12 339.8 0.3 0.2 339.8 -0.7 -1.5
13 246.2 0.9 0.9 246.2 -1.1 -1.8
14 244.6 -0.5 0.9 244.6 0.2 -1.8
15 244.9 0.2 1.6 244.9 -0.4 -2.5
16 245.9 0.2 0.2 245.9 -0.5 -1.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 353.0 - 353.0
M1 (kN.m) -0.8 -7.1 -7.1 225
M2 (kN.m) -2.5 -7.1 -7.1
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Slender Column...
Y= 286.5 mm Lambda1/Lim1 = 23.2 > 13.1 !!! 225
Alpha = 35.29 o Lambda2/Lim2 = 23.2 < 44.2
M-add(1/2)= 2.0 / 0.0 kN.m
V-Ed (1/2)= 1.0 / 1.9 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.03 / 0.05 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

2C17 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 185.8 0.8 2.5 185.8 -1.0 -2.1
2 145.5 0.6 2.0 145.5 -0.8 -1.7
3 185.8 0.8 2.5 185.8 -1.0 -2.1
4 185.8 0.8 2.5 185.8 -1.0 -2.1
5 186.0 1.2 2.5 186.0 -1.4 -2.1
6 185.6 0.3 2.5 185.6 -0.5 -2.1
7 185.7 0.7 3.1 185.7 -1.0 -2.7
8 185.9 0.8 2.0 185.9 -1.0 -1.6
9 179.1 1.1 2.5 179.1 -1.4 -2.1
10 178.6 0.3 2.4 178.6 -0.5 -2.1
11 178.7 0.7 3.0 178.7 -0.9 -2.6
12 178.9 0.7 1.9 178.9 -0.9 -1.5
13 130.2 0.7 1.8 130.2 -0.9 -1.5
14 129.8 0.2 1.8 129.8 -0.3 -1.5
15 130.0 0.4 2.2 130.0 -0.6 -1.9
16 130.1 0.5 1.4 130.1 -0.6 -1.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 185.8 - 185.8
M1 (kN.m) -1.0 -3.7 -3.7 225
M2 (kN.m) 2.5 3.7 3.7
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 151.4 mm Lambda1/Lim1 = 23.2 < 66.0 225
Alpha = 19.59 o Lambda2/Lim2 = 23.2 < 66.4
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.8 / 1.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-26

3C17 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 16.1 1.0 2.1 16.1 -0.2 -0.2
2 12.9 0.8 1.7 12.9 -0.2 -0.2
3 16.1 1.0 2.1 16.1 -0.2 -0.2
4 16.1 1.0 2.1 16.1 -0.2 -0.2
5 16.1 1.0 2.2 16.1 -0.2 -0.2
6 16.1 1.0 2.1 16.1 -0.2 -0.2
7 16.2 1.0 2.2 16.2 -0.2 -0.2
8 16.1 1.0 2.1 16.1 -0.2 -0.2
9 16.1 0.9 2.1 16.1 -0.2 -0.2
10 16.1 0.9 2.1 16.1 -0.2 -0.2
11 16.2 0.9 2.1 16.2 -0.2 -0.2
12 16.1 0.9 2.0 16.1 -0.2 -0.2
13 12.9 0.6 1.5 12.9 -0.2 -0.2
14 12.9 0.6 1.5 12.9 -0.2 -0.1
15 12.9 0.6 1.6 12.9 -0.2 -0.2
16 12.9 0.6 1.5 12.9 -0.2 -0.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 16.1 - 16.1
M1 (kN.m) 1.0 0.3 1.0 225
M2 (kN.m) 2.1 0.3 2.2
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 33.8 mm Lambda1/Lim1 = 24.3 < 172.7 225
Alpha = 6.15 o Lambda2/Lim2 = 24.1 < 158.8
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.5 / 1.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.71 / 0.71 N/mm2
v-RdMax = 3.39 / 3.39 N/mm2
Links = R8-125

1C18 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 163.0 -0.2 1.0 163.0 0.4 -2.1
2 128.6 -0.2 0.8 128.6 0.3 -1.6
3 163.0 -0.2 1.0 163.0 0.4 -2.1
4 163.0 -0.2 1.0 163.0 0.4 -2.1
5 163.1 0.8 1.0 163.1 -0.5 -2.1
6 162.9 -1.2 1.0 162.9 1.4 -2.1
7 164.2 -0.2 2.0 164.2 0.4 -3.0
8 161.8 -0.2 0.0 161.8 0.4 -1.2
9 159.0 0.7 1.0 159.0 -0.5 -2.0
10 158.7 -1.2 1.0 158.7 1.3 -2.0
11 160.0 -0.2 1.9 160.0 0.4 -2.8
12 157.8 -0.2 0.0 157.8 0.4 -1.1
13 119.5 0.6 0.7 119.5 -0.4 -1.3
14 119.3 -0.8 0.7 119.3 1.0 -1.3
15 120.2 -0.1 1.4 120.2 0.3 -2.0
16 118.6 -0.1 0.0 118.6 0.3 -0.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 163.0 - 163.0
M1 (kN.m) 0.4 3.3 3.3 225
M2 (kN.m) -2.1 -3.3 -3.3
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Slender Column...
Y= 134.3 mm Lambda1/Lim1 = 23.2 > 19.2 !!! 225
Alpha = 17.49 o Lambda2/Lim2 = 23.2 < 63.4
M-add(1/2)= 1.5 / 0.0 kN.m
V-Ed (1/2)= 0.9 / 1.7 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-27

2C18 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 86.4 -0.4 2.1 86.4 0.4 -1.5
2 68.2 -0.3 1.6 68.2 0.3 -1.2
3 86.4 -0.4 2.1 86.4 0.4 -1.5
4 86.4 -0.4 2.1 86.4 0.4 -1.5
5 86.4 0.1 2.1 86.4 -0.2 -1.5
6 86.4 -0.9 2.1 86.4 0.9 -1.5
7 86.7 -0.4 2.5 86.7 0.4 -2.0
8 86.2 -0.4 1.6 86.2 0.4 -1.1
9 84.4 0.1 1.9 84.4 -0.2 -1.4
10 84.4 -0.9 2.0 84.4 0.9 -1.4
11 84.7 -0.4 2.4 84.7 0.4 -1.9
12 84.1 -0.4 1.5 84.1 0.3 -1.0
13 63.8 0.1 1.3 63.8 -0.1 -1.0
14 63.8 -0.7 1.3 63.8 0.6 -1.0
15 64.0 -0.3 1.6 64.0 0.3 -1.3
16 63.6 -0.3 1.0 63.6 0.3 -0.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 86.4 - 86.4
M1 (kN.m) -0.4 -1.7 -1.7 225
M2 (kN.m) 2.1 1.7 2.4
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 83.7 mm Lambda1/Lim1 = 23.2 < 98.7 225
Alpha = 12.97 o Lambda2/Lim2 = 23.2 < 93.2
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.6 / 1.3 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.91 / 0.91 N/mm2
v-RdMax = 3.74 / 3.74 N/mm2
Links = R8-125

3C18 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 12.0 -0.4 1.5 12.0 0.1 -0.1
2 9.6 -0.3 1.2 9.6 0.0 -0.1
3 12.0 -0.4 1.5 12.0 0.1 -0.1
4 12.0 -0.4 1.5 12.0 0.1 -0.1
5 12.0 -0.3 1.5 12.0 0.0 -0.1
6 12.0 -0.4 1.5 12.0 0.1 -0.1
7 12.0 -0.4 1.5 12.0 0.1 -0.1
8 12.0 -0.4 1.5 12.0 0.1 -0.1
9 12.0 -0.3 1.4 12.0 0.0 -0.1
10 12.0 -0.4 1.4 12.0 0.1 -0.1
11 12.0 -0.4 1.4 12.0 0.1 -0.1
12 12.0 -0.3 1.4 12.0 0.1 -0.1
13 9.6 -0.2 1.0 9.6 0.0 -0.1
14 9.6 -0.3 1.0 9.6 0.1 -0.1
15 9.6 -0.3 0.9 9.6 0.0 -0.1
16 9.6 -0.3 1.0 9.6 0.0 -0.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 12.0 - 12.0
M1 (kN.m) -0.4 -0.2 -0.4 225
M2 (kN.m) 1.5 0.2 1.6
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 40.5 mm Lambda1/Lim1 = 24.1 < 196.8 225
Alpha = 10.16 o Lambda2/Lim2 = 24.3 < 183.8
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.2 / 0.8 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.00 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.37 / 3.37 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-28

1C19 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 162.4 0.2 1.0 162.4 -0.4 -2.1
2 128.1 0.2 0.8 128.1 -0.3 -1.6
3 162.4 0.2 1.0 162.4 -0.4 -2.1
4 162.4 0.2 1.0 162.4 -0.4 -2.1
5 162.3 1.2 1.0 162.3 -1.4 -2.1
6 162.6 -0.8 1.0 162.6 0.5 -2.1
7 163.6 0.2 2.0 163.6 -0.4 -3.0
8 161.3 0.2 0.1 161.3 -0.4 -1.2
9 158.2 1.2 1.0 158.2 -1.3 -2.0
10 158.5 -0.7 1.0 158.5 0.5 -2.0
11 159.5 0.2 1.9 159.5 -0.4 -2.9
12 157.3 0.2 0.0 157.3 -0.4 -1.1
13 119.0 0.8 0.7 119.0 -1.0 -1.3
14 119.2 -0.6 0.7 119.2 0.4 -1.3
15 119.9 0.1 1.4 119.9 -0.3 -2.0
16 118.3 0.1 0.0 118.3 -0.3 -0.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 162.4 - 162.4
M1 (kN.m) -0.4 -3.2 -3.2 225
M2 (kN.m) -2.1 -3.2 -3.2
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Slender Column...
Y= 133.8 mm Lambda1/Lim1 = 23.2 > 19.3 !!! 225
Alpha = 17.44 o Lambda2/Lim2 = 23.2 < 63.5
M-add(1/2)= 1.5 / 0.0 kN.m
V-Ed (1/2)= 0.9 / 1.7 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

2C19 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 86.1 0.4 2.1 86.1 -0.4 -1.5
2 68.0 0.3 1.6 68.0 -0.3 -1.2
3 86.1 0.4 2.1 86.1 -0.4 -1.5
4 86.1 0.4 2.1 86.1 -0.4 -1.5
5 86.1 0.9 2.1 86.1 -0.9 -1.6
6 86.1 -0.1 2.1 86.1 0.2 -1.5
7 86.4 0.4 2.5 86.4 -0.4 -2.0
8 85.8 0.4 1.7 85.8 -0.4 -1.1
9 84.1 0.9 2.0 84.1 -0.9 -1.5
10 84.1 -0.1 2.0 84.1 0.2 -1.4
11 84.4 0.4 2.4 84.4 -0.4 -1.9
12 83.9 0.4 1.6 83.9 -0.4 -1.0
13 63.6 0.7 1.3 63.6 -0.6 -1.0
14 63.6 -0.1 1.3 63.6 0.1 -1.0
15 63.8 0.3 1.6 63.8 -0.3 -1.3
16 63.4 0.3 1.0 63.4 -0.3 -0.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 86.1 - 86.1
M1 (kN.m) 0.4 1.7 1.7 225
M2 (kN.m) 2.1 1.7 2.4
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 74.3 mm Lambda1/Lim1 = 23.2 < 99.0 225
Alpha = 9.28 o Lambda2/Lim2 = 23.2 < 93.4
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.6 / 1.3 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.91 / 0.91 N/mm2
v-RdMax = 3.73 / 3.74 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-29

3C19 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 12.0 0.4 1.5 12.0 -0.1 -0.1
2 9.6 0.3 1.2 9.6 0.0 -0.1
3 12.0 0.4 1.5 12.0 -0.1 -0.1
4 12.0 0.4 1.5 12.0 -0.1 -0.1
5 12.0 0.4 1.6 12.0 -0.1 -0.1
6 12.0 0.4 1.5 12.0 0.0 -0.1
7 12.0 0.4 1.5 12.0 -0.1 -0.1
8 12.0 0.4 1.6 12.0 -0.1 -0.1
9 12.0 0.4 1.5 12.0 -0.1 -0.1
10 12.0 0.3 1.4 12.0 0.0 -0.1
11 12.0 0.4 1.4 12.0 -0.1 -0.1
12 12.0 0.4 1.5 12.0 -0.1 -0.1
13 9.6 0.3 1.0 9.6 -0.1 -0.1
14 9.6 0.2 1.0 9.6 0.0 -0.1
15 9.6 0.3 1.0 9.6 0.0 -0.1
16 9.6 0.3 1.0 9.6 0.0 -0.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 12.0 - 12.0
M1 (kN.m) 0.4 0.2 0.4 225
M2 (kN.m) 1.5 0.2 1.6
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 22.4 mm Lambda1/Lim1 = 24.1 < 196.5 225
Alpha = 2.46 o Lambda2/Lim2 = 24.3 < 183.7
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.2 / 0.8 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.37 / 3.37 N/mm2
Links = R8-125

1C20 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 189.9 0.1 1.3 189.9 -0.1 -2.7
2 149.7 0.1 1.0 149.7 -0.1 -2.1
3 189.9 0.1 1.3 189.9 -0.1 -2.7
4 189.9 0.1 1.3 189.9 -0.1 -2.7
5 189.6 1.1 1.3 189.6 -1.1 -2.7
6 190.2 -0.9 1.3 190.2 0.8 -2.6
7 191.3 0.1 2.3 191.3 -0.1 -3.6
8 188.5 0.1 0.3 188.5 -0.1 -1.7
9 184.6 1.0 1.3 184.6 -1.1 -2.5
10 185.1 -0.9 1.2 185.1 0.8 -2.5
11 186.2 0.1 2.2 186.2 -0.1 -3.4
12 183.5 0.1 0.3 183.5 -0.1 -1.6
13 138.2 0.8 0.9 138.2 -0.8 -1.8
14 138.6 -0.7 0.8 138.6 0.6 -1.7
15 139.4 0.0 1.6 139.4 -0.1 -2.4
16 137.4 0.0 0.2 137.4 -0.1 -1.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 189.9 - 189.9
M1 (kN.m) -0.1 -3.8 -3.8 225
M2 (kN.m) -2.7 -3.8 -3.8
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Slender Column...
Y= 154.5 mm Lambda1/Lim1 = 23.2 > 17.8 !!! 225
Alpha = 19.97 o Lambda2/Lim2 = 23.2 < 58.6
M-add(1/2)= 1.7 / 0.0 kN.m
V-Ed (1/2)= 0.7 / 2.0 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.05 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-30

2C20 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 100.5 0.1 2.7 100.5 -0.1 -2.4
2 79.3 0.1 2.1 79.3 -0.1 -1.9
3 100.5 0.1 2.7 100.5 -0.1 -2.4
4 100.5 0.1 2.7 100.5 -0.1 -2.4
5 100.3 0.7 2.7 100.3 -0.7 -2.4
6 100.6 -0.4 2.6 100.6 0.4 -2.4
7 100.8 0.1 3.1 100.8 -0.1 -2.9
8 100.1 0.1 2.2 100.1 -0.1 -1.9
9 97.8 0.6 2.5 97.8 -0.7 -2.3
10 98.1 -0.4 2.5 98.1 0.4 -2.3
11 98.3 0.1 3.0 98.3 -0.1 -2.8
12 97.6 0.1 2.1 97.6 -0.1 -1.8
13 73.5 0.5 1.8 73.5 -0.5 -1.6
14 73.7 -0.3 1.7 73.7 0.3 -1.6
15 73.9 0.1 2.1 73.9 -0.1 -1.9
16 73.4 0.1 1.4 73.4 -0.1 -1.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 100.5 - 100.5
M1 (kN.m) -0.1 -2.0 -2.0 225
M2 (kN.m) 2.7 2.0 3.0
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 99.6 mm Lambda1/Lim1 = 23.2 < 24.5 225
Alpha = 16.38 o Lambda2/Lim2 = 23.2 < 91.6
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.4 / 1.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.96 / 0.96 N/mm2
v-RdMax = 3.81 / 3.81 N/mm2
Links = R8-125

3C20 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 10.5 0.1 2.4 10.5 0.0 -0.1
2 8.4 0.1 1.9 8.4 0.0 -0.1
3 10.5 0.1 2.4 10.5 0.0 -0.1
4 10.5 0.1 2.4 10.5 0.0 -0.1
5 10.5 0.2 2.4 10.5 -0.1 -0.1
6 10.6 0.1 2.4 10.6 0.0 -0.1
7 10.5 0.1 2.4 10.5 0.0 -0.1
8 10.5 0.1 2.4 10.5 0.0 -0.1
9 10.5 0.2 2.3 10.5 -0.1 -0.1
10 10.6 0.1 2.3 10.6 0.0 -0.1
11 10.5 0.1 2.3 10.5 0.0 -0.1
12 10.5 0.1 2.3 10.5 0.0 -0.1
13 8.4 0.1 1.6 8.4 -0.1 -0.1
14 8.4 0.1 1.6 8.4 0.0 -0.1
15 8.4 0.1 1.6 8.4 0.0 -0.1
16 8.4 0.1 1.6 8.4 0.0 -0.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 10.5 - 10.5
M1 (kN.m) 0.1 0.2 0.2 225
M2 (kN.m) 2.4 0.2 2.5
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 18.6 mm Lambda1/Lim1 = 24.1 < 230.0 225
Alpha = 1.24 o Lambda2/Lim2 = 29.3 < 189.7
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.1 / 1.2 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.00 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.36 / 3.36 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-31

1C21 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 268.5 0.5 -0.5 268.5 -1.0 1.0
2 209.9 0.4 -0.4 209.9 -0.8 0.8
3 268.5 0.5 -0.5 268.5 -1.0 1.0
4 268.5 0.5 -0.5 268.5 -1.0 1.0
5 268.6 1.5 -0.4 268.6 -2.0 0.9
6 268.5 -0.5 -0.5 268.5 0.0 1.0
7 267.5 0.5 0.5 267.5 -1.0 0.0
8 269.5 0.5 -1.5 269.5 -1.0 1.9
9 257.4 1.4 -0.4 257.4 -1.9 0.9
10 257.3 -0.5 -0.5 257.3 0.0 1.0
11 256.4 0.5 0.5 256.4 -0.9 0.1
12 258.3 0.5 -1.4 258.3 -0.9 1.9
13 185.0 1.0 -0.3 185.0 -1.3 0.7
14 184.9 -0.4 -0.4 184.9 0.1 0.8
15 184.3 0.3 0.3 184.3 -0.6 0.1
16 185.7 0.3 -1.1 185.7 -0.6 1.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 268.5 - 268.5
M1 (kN.m) -1.0 -5.4 -5.4 225
M2 (kN.m) 1.0 5.4 5.4
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Slender Column...
Y= 217.4 mm Lambda1/Lim1 = 23.2 > 15.0 !!! 225
Alpha = 27.89 o Lambda2/Lim2 = 23.2 > 15.0 !!!
M-add(1/2)= 2.1 / 2.1 kN.m
V-Ed (1/2)= 1.2 / 1.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.03 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

2C21 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 138.1 1.0 -1.0 138.1 -0.9 1.2
2 108.0 0.8 -0.8 108.0 -0.7 0.9
3 138.1 1.0 -1.0 138.1 -0.9 1.2
4 138.1 1.0 -1.0 138.1 -0.9 1.2
5 138.0 1.5 -0.9 138.0 -1.4 1.2
6 138.2 0.5 -1.0 138.2 -0.4 1.2
7 137.9 1.0 -0.5 137.9 -0.9 0.7
8 138.4 1.0 -1.4 138.4 -0.9 1.7
9 132.5 1.4 -0.9 132.5 -1.4 1.1
10 132.7 0.4 -1.0 132.7 -0.3 1.2
11 132.3 0.9 -0.5 132.3 -0.8 0.7
12 132.8 0.9 -1.4 132.8 -0.8 1.6
13 95.6 1.0 -0.7 95.6 -0.9 0.9
14 95.7 0.2 -0.8 95.7 -0.2 0.9
15 95.5 0.6 -0.4 95.5 -0.6 0.5
16 95.8 0.6 -1.1 95.8 -0.6 1.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 138.1 - 138.1
M1 (kN.m) 1.0 2.8 2.8 225
M2 (kN.m) 1.2 2.8 2.8
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 115.2 mm Lambda1/Lim1 = 23.2 < 78.8 225
Alpha = 15.06 o Lambda2/Lim2 = 23.2 < 76.5
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.9 / 0.9 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-32

3C21 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 10.9 0.9 -1.2 10.9 -0.1 0.0
2 8.7 0.7 -0.9 8.7 -0.1 0.0
3 10.9 0.9 -1.2 10.9 -0.1 0.0
4 10.9 0.9 -1.2 10.9 -0.1 0.0
5 10.8 0.9 -1.2 10.8 -0.1 0.0
6 11.0 0.9 -1.2 11.0 -0.1 0.0
7 10.9 0.9 -1.2 10.9 -0.1 0.0
8 10.9 0.9 -1.2 10.9 -0.1 0.0
9 10.8 0.9 -1.2 10.8 -0.1 0.0
10 11.0 0.8 -1.2 11.0 -0.1 0.0
11 10.9 0.8 -1.2 10.9 -0.1 0.0
12 10.9 0.8 -1.2 10.9 -0.1 0.0
13 8.7 0.6 -0.9 8.7 -0.1 0.0
14 8.8 0.5 -0.9 8.8 -0.1 0.0
15 8.7 0.6 -0.9 8.7 -0.1 0.0
16 8.7 0.6 -0.9 8.7 -0.1 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 10.9 - 10.9
M1 (kN.m) 0.9 0.2 0.9 225
M2 (kN.m) -1.2 -0.2 -1.2
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 34.1 mm Lambda1/Lim1 = 24.1 < 195.4 225
Alpha = 7.47 o Lambda2/Lim2 = 29.3 < 174.0
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.5 / 0.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.37 / 3.37 N/mm2
Links = R8-125

1C22 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 146.3 0.4 1.4 146.3 -0.9 -2.8
2 115.6 0.3 1.1 115.6 -0.7 -2.2
3 146.3 0.4 1.4 146.3 -0.9 -2.8
4 146.3 0.4 1.4 146.3 -0.9 -2.8
5 145.6 1.4 1.4 145.6 -1.8 -2.8
6 147.1 -0.6 1.3 147.1 0.1 -2.7
7 147.6 0.4 2.4 147.6 -0.9 -3.7
8 145.1 0.4 0.4 145.1 -0.8 -1.8
9 142.2 1.4 1.4 142.2 -1.7 -2.7
10 143.7 -0.5 1.3 143.7 0.1 -2.6
11 144.1 0.4 2.3 144.1 -0.8 -3.5
12 141.7 0.4 0.4 141.7 -0.8 -1.8
13 107.4 1.0 1.0 107.4 -1.3 -1.9
14 108.5 -0.4 0.9 108.5 0.1 -1.9
15 108.9 0.3 1.7 108.9 -0.6 -2.6
16 107.1 0.3 0.2 107.1 -0.6 -1.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 146.3 - 146.3
M1 (kN.m) -0.9 -2.9 -2.9 225
M2 (kN.m) -2.8 -2.9 -3.3
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 121.9 mm Lambda1/Lim1 = 23.2 < 69.4 225
Alpha = 15.96 o Lambda2/Lim2 = 23.2 < 66.1
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.1 / 2.0 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.03 / 0.05 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-33

2C22 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 78.5 0.9 2.8 78.5 -0.5 -2.5
2 62.0 0.7 2.2 62.0 -0.4 -1.9
3 78.5 0.9 2.8 78.5 -0.5 -2.5
4 78.5 0.9 2.8 78.5 -0.5 -2.5
5 78.6 1.3 2.8 78.6 -1.0 -2.5
6 78.3 0.4 2.7 78.3 0.0 -2.4
7 78.7 0.9 3.2 78.7 -0.5 -3.0
8 78.2 0.8 2.3 78.2 -0.5 -2.0
9 76.9 1.3 2.7 76.9 -1.0 -2.4
10 76.6 0.3 2.6 76.6 0.0 -2.3
11 77.0 0.8 3.1 77.0 -0.5 -2.8
12 76.5 0.8 2.2 76.5 -0.5 -1.9
13 58.2 0.9 1.9 58.2 -0.7 -1.7
14 58.0 0.2 1.9 58.0 0.0 -1.7
15 58.3 0.6 2.2 58.3 -0.4 -2.1
16 57.9 0.6 1.6 57.9 -0.4 -1.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 78.5 - 78.5
M1 (kN.m) 0.9 1.6 1.6 225
M2 (kN.m) 2.8 1.6 3.1
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 68.4 mm Lambda1/Lim1 = 23.2 < 95.5 225
Alpha = 8.41 o Lambda2/Lim2 = 23.2 < 103.2
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.8 / 1.7 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.89 / 0.89 N/mm2
v-RdMax = 3.70 / 3.70 N/mm2
Links = R8-125

3C22 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 8.9 0.5 2.5 8.9 0.0 -0.2
2 7.1 0.4 1.9 7.1 0.0 -0.2
3 8.9 0.5 2.5 8.9 0.0 -0.2
4 8.9 0.5 2.5 8.9 0.0 -0.2
5 9.1 0.5 2.5 9.1 0.0 -0.2
6 8.7 0.5 2.5 8.7 0.0 -0.2
7 8.9 0.5 2.5 8.9 0.0 -0.2
8 8.9 0.5 2.5 8.9 0.0 -0.2
9 9.1 0.5 2.4 9.1 0.0 -0.2
10 8.7 0.5 2.4 8.7 0.0 -0.2
11 8.9 0.5 2.4 8.9 0.0 -0.2
12 8.9 0.5 2.4 8.9 0.0 -0.2
13 7.3 0.4 1.7 7.3 0.0 -0.2
14 7.0 0.4 1.7 7.0 0.0 -0.2
15 7.1 0.4 1.7 7.1 0.0 -0.2
16 7.1 0.4 1.7 7.1 0.0 -0.2
Critical Combination:1 - (G+Q *F)
MinDesign
N (kN) 8.9 - 8.9
M1 (kN.m) 0.5 0.2 0.6 225
M2 (kN.m) 2.5 0.2 2.5
N-max (kN) 0.0
Concrete Cover 35.0
= mm
Neutral Axis: Short Column...
Y= 22.8 mm Lambda1/Lim1 = 24.1 < 215.4 225
Alpha = 3.29 o Lambda2/Lim2 = 29.3 < 212.2
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.3 / 1.2 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.68 / 0.68 N/mm2
v-RdMax = 3.35 / 3.36 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-34

1C23 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 87.6 0.5 1.4 87.6 -0.9 -2.8
2 69.6 0.4 1.1 69.6 -0.7 -2.2
3 87.6 0.5 1.4 87.6 -0.9 -2.8
4 87.6 0.5 1.4 87.6 -0.9 -2.8
5 89.6 1.4 1.4 89.6 -1.8 -2.8
6 85.6 -0.5 1.3 85.6 0.0 -2.7
7 88.3 0.5 2.3 88.3 -0.9 -3.6
8 86.8 0.5 0.4 86.8 -0.9 -1.9
9 88.5 1.4 1.4 88.5 -1.7 -2.7
10 84.6 -0.5 1.3 84.6 0.0 -2.7
11 87.3 0.4 2.3 87.3 -0.9 -3.5
12 85.8 0.4 0.4 85.8 -0.9 -1.9
13 68.7 1.0 1.0 68.7 -1.3 -2.0
14 65.8 -0.4 1.0 65.8 0.0 -2.0
15 67.8 0.3 1.7 67.8 -0.6 -2.6
16 66.7 0.3 0.3 66.7 -0.6 -1.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 87.6 - 87.6
M1 (kN.m) -0.9 -1.8 -1.8 225
M2 (kN.m) -2.8 -1.8 -3.1
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 75.4 mm Lambda1/Lim1 = 23.2 < 87.2 225
Alpha = 9.45 o Lambda2/Lim2 = 23.2 < 84.3
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.1 / 2.0 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.03 / 0.05 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.91 / 0.91 N/mm2
v-RdMax = 3.73 / 3.74 N/mm2
Links = R8-125

2C23 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 47.0 0.9 2.8 47.0 -0.5 -2.5
2 37.4 0.7 2.2 37.4 -0.4 -2.0
3 47.0 0.9 2.8 47.0 -0.5 -2.5
4 47.0 0.9 2.8 47.0 -0.5 -2.5
5 47.3 1.3 2.8 47.3 -1.0 -2.5
6 46.8 0.5 2.8 46.8 -0.1 -2.5
7 47.3 0.9 3.1 47.3 -0.5 -3.0
8 46.8 0.9 2.4 46.8 -0.5 -2.1
9 46.8 1.3 2.7 46.8 -0.9 -2.5
10 46.3 0.5 2.7 46.3 -0.1 -2.5
11 46.8 0.9 3.1 46.8 -0.5 -2.9
12 46.3 0.9 2.3 46.3 -0.5 -2.0
13 36.5 0.9 2.0 36.5 -0.7 -1.9
14 36.1 0.3 2.0 36.1 0.0 -1.8
15 36.5 0.6 2.3 36.5 -0.4 -2.2
16 36.1 0.6 1.7 36.1 -0.3 -1.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 47.0 - 47.0
M1 (kN.m) 0.9 0.9 1.1 225
M2 (kN.m) 2.8 0.9 2.9
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 47.4 mm Lambda1/Lim1 = 23.2 < 118.9 225
Alpha = 5.65 o Lambda2/Lim2 = 23.2 < 134.1
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.7 / 1.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.80 / 0.80 N/mm2
v-RdMax = 3.54 / 3.54 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-35

3C23 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 8.5 0.5 2.5 8.5 0.0 -0.5
2 6.8 0.4 2.0 6.8 0.0 -0.4
3 8.5 0.5 2.5 8.5 0.0 -0.5
4 8.5 0.5 2.5 8.5 0.0 -0.5
5 8.4 0.5 2.5 8.4 0.0 -0.5
6 8.6 0.6 2.5 8.6 0.0 -0.5
7 8.5 0.5 2.5 8.5 0.0 -0.5
8 8.5 0.5 2.6 8.5 0.0 -0.5
9 8.4 0.4 2.5 8.4 0.0 -0.5
10 8.6 0.5 2.5 8.6 0.0 -0.5
11 8.5 0.5 2.4 8.5 0.0 -0.5
12 8.5 0.5 2.5 8.5 0.0 -0.5
13 6.7 0.3 1.8 6.7 0.0 -0.4
14 6.9 0.4 1.9 6.9 0.0 -0.4
15 6.8 0.4 1.8 6.8 0.0 -0.4
16 6.8 0.3 1.9 6.8 0.0 -0.4
Critical Combination:1 - (G+Q *F)
MinDesign
N (kN) 8.5 - 8.5
M1 (kN.m) 0.5 0.2 0.5 225
M2 (kN.m) 2.5 0.2 2.6
N-max (kN) 0.0
Concrete Cover 35.0
= mm
Neutral Axis: Short Column...
Y= 22.3 mm Lambda1/Lim1 = 24.1 < 213.7 225
Alpha = 3.21 o Lambda2/Lim2 = 24.3 < 228.0
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.3 / 1.3 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.68 / 0.68 N/mm2
v-RdMax = 3.35 / 3.35 N/mm2
Links = R8-125

1C24 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 263.0 -0.2 -0.5 263.0 0.4 0.9
2 206.8 -0.2 -0.4 206.8 0.3 0.7
3 263.0 -0.2 -0.5 263.0 0.4 0.9
4 263.0 -0.2 -0.5 263.0 0.4 0.9
5 262.6 0.8 -0.4 262.6 -0.6 0.9
6 263.4 -1.2 -0.5 263.4 1.4 1.0
7 261.8 -0.2 0.5 261.8 0.4 0.0
8 264.1 -0.2 -1.4 264.1 0.4 1.8
9 254.5 0.8 -0.4 254.5 -0.5 0.8
10 255.3 -1.2 -0.5 255.3 1.4 0.9
11 253.8 -0.2 0.5 253.8 0.4 0.0
12 256.1 -0.2 -1.4 256.1 0.4 1.8
13 188.7 0.6 -0.3 188.7 -0.4 0.6
14 189.2 -0.9 -0.4 189.2 1.0 0.7
15 188.1 -0.2 0.4 188.1 0.3 0.0
16 189.8 -0.2 -1.0 189.8 0.3 1.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 263.0 - 263.0
M1 (kN.m) 0.4 5.3 5.3 225
M2 (kN.m) 0.9 5.3 5.3
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Slender Column...
Y= 212.9 mm Lambda1/Lim1 = 23.2 > 15.1 !!! 225
Alpha = 27.36 o Lambda2/Lim2 = 23.2 > 15.1 !!!
M-add(1/2)= 2.0 / 2.0 kN.m
V-Ed (1/2)= 0.9 / 1.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-36

2C24 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 140.7 -0.4 -0.9 140.7 0.7 1.2
2 110.8 -0.3 -0.7 110.8 0.5 1.0
3 140.7 -0.4 -0.9 140.7 0.7 1.2
4 140.7 -0.4 -0.9 140.7 0.7 1.2
5 140.7 0.1 -0.9 140.7 0.1 1.2
6 140.7 -0.9 -1.0 140.7 1.2 1.3
7 140.5 -0.4 -0.5 140.5 0.7 0.8
8 140.9 -0.4 -1.4 140.9 0.7 1.7
9 136.7 0.1 -0.9 136.7 0.1 1.2
10 136.7 -0.9 -0.9 136.7 1.2 1.2
11 136.5 -0.4 -0.5 136.5 0.7 0.7
12 136.8 -0.4 -1.3 136.8 0.7 1.7
13 101.8 0.0 -0.6 101.8 0.1 0.9
14 101.8 -0.7 -0.7 101.8 0.9 0.9
15 101.7 -0.3 -0.3 101.7 0.5 0.5
16 101.9 -0.3 -1.0 101.9 0.5 1.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 140.7 - 140.7
M1 (kN.m) 0.7 2.8 2.8 225
M2 (kN.m) 1.2 2.8 2.8
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 117.3 mm Lambda1/Lim1 = 23.2 < 73.2 225
Alpha = 15.35 o Lambda2/Lim2 = 23.2 < 74.5
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.7 / 0.9 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

3C24 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 12.9 -0.7 -1.2 12.9 0.2 0.1
2 10.3 -0.5 -1.0 10.3 0.2 0.1
3 12.9 -0.7 -1.2 12.9 0.2 0.1
4 12.9 -0.7 -1.2 12.9 0.2 0.1
5 12.9 -0.7 -1.2 12.9 0.2 0.1
6 12.8 -0.7 -1.2 12.8 0.2 0.1
7 13.0 -0.7 -1.3 13.0 0.2 0.1
8 12.8 -0.7 -1.2 12.8 0.2 0.1
9 12.9 -0.6 -1.2 12.9 0.2 0.1
10 12.8 -0.7 -1.2 12.8 0.2 0.1
11 12.9 -0.7 -1.2 12.9 0.2 0.1
12 12.8 -0.7 -1.2 12.8 0.2 0.1
13 10.3 -0.5 -0.9 10.3 0.2 0.1
14 10.3 -0.5 -0.9 10.3 0.2 0.1
15 10.4 -0.5 -0.9 10.4 0.2 0.1
16 10.3 -0.5 -0.9 10.3 0.2 0.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 12.9 - 12.9
M1 (kN.m) -0.7 -0.3 -0.7 225
M2 (kN.m) -1.2 -0.3 -1.3
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 27.4 mm Lambda1/Lim1 = 24.1 < 202.2 225
Alpha = 4.28 o Lambda2/Lim2 = 29.3 < 178.8
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.3 / 0.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.70 / 0.70 N/mm2
v-RdMax = 3.38 / 3.38 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-37

1C26 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 72.9 1.7 0.8 72.9 -3.5 -1.7
2 58.3 1.3 0.6 58.3 -2.7 -1.3
3 72.9 1.7 0.8 72.9 -3.5 -1.7
4 72.9 1.7 0.8 72.9 -3.5 -1.7
5 74.2 2.7 0.9 74.2 -4.4 -1.7
6 71.6 0.8 0.8 71.6 -2.6 -1.6
7 74.3 1.7 1.8 74.3 -3.4 -2.6
8 71.4 1.7 -0.2 71.4 -3.5 -0.7
9 74.1 2.6 0.9 74.1 -4.2 -1.7
10 71.6 0.7 0.7 71.6 -2.5 -1.5
11 74.2 1.6 1.8 74.2 -3.3 -2.5
12 71.5 1.7 -0.2 71.5 -3.4 -0.7
13 59.1 1.9 0.6 59.1 -3.1 -1.2
14 57.3 0.5 0.5 57.3 -1.8 -1.1
15 59.2 1.2 1.3 59.2 -2.4 -1.8
16 57.2 1.2 -0.1 57.2 -2.5 -0.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 72.9 - 72.9
M1 (kN.m) -3.5 -1.5 -3.8 225
M2 (kN.m) -1.7 -1.5 -2.0
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 95.8 mm Lambda1/Lim1 = 23.2 < 91.7 225
Alpha = 20.19 o Lambda2/Lim2 = 23.2 < 93.1
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.4 / 1.5 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.06 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.87 / 0.87 N/mm2
v-RdMax = 3.66 / 3.66 N/mm2
Links = R8-125

2C26 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 35.3 3.5 1.7 35.3 -2.9 -0.6
2 28.3 2.7 1.3 28.3 -2.2 -0.4
3 35.3 3.5 1.7 35.3 -2.9 -0.6
4 35.3 3.5 1.7 35.3 -2.9 -0.6
5 35.6 3.9 1.7 35.6 -3.3 -0.6
6 35.0 3.1 1.6 35.0 -2.4 -0.5
7 35.5 3.4 2.1 35.5 -2.8 -1.1
8 35.1 3.5 1.2 35.1 -2.9 -0.1
9 35.8 3.8 1.6 35.8 -3.2 -0.6
10 35.2 3.0 1.6 35.2 -2.3 -0.5
11 35.7 3.3 2.0 35.7 -2.7 -1.0
12 35.3 3.4 1.2 35.3 -2.8 -0.1
13 29.0 2.8 1.2 29.0 -2.4 -0.4
14 28.5 2.2 1.1 28.5 -1.7 -0.4
15 28.9 2.4 1.5 28.9 -2.0 -0.7
16 28.6 2.5 0.8 28.6 -2.1 -0.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 35.3 - 35.3
M1 (kN.m) 3.5 0.7 3.6 225
M2 (kN.m) 1.7 0.7 1.8
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 88.9 mm Lambda1/Lim1 = 23.2 < 149.4 225
Alpha = 28.29 o Lambda2/Lim2 = 23.2 < 123.4
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.0 / 1.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.05 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.76 / 0.76 N/mm2
v-RdMax = 3.49 / 3.49 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-38

3C26 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 7.5 2.9 0.6 7.5 -0.4 0.1
2 6.0 2.2 0.4 6.0 -0.3 0.1
3 7.5 2.9 0.6 7.5 -0.4 0.1
4 7.5 2.9 0.6 7.5 -0.4 0.1
5 7.5 2.8 0.6 7.5 -0.4 0.1
6 7.6 2.9 0.6 7.6 -0.4 0.1
7 7.5 2.8 0.5 7.5 -0.4 0.1
8 7.6 2.9 0.6 7.6 -0.4 0.1
9 7.5 2.7 0.5 7.5 -0.4 0.1
10 7.6 2.8 0.6 7.6 -0.4 0.1
11 7.5 2.7 0.5 7.5 -0.4 0.1
12 7.6 2.8 0.6 7.6 -0.4 0.1
13 6.0 2.0 0.4 6.0 -0.3 0.1
14 6.0 2.0 0.4 6.0 -0.3 0.1
15 6.0 2.0 0.4 6.0 -0.3 0.1
16 6.1 2.1 0.4 6.1 -0.3 0.0
Critical Combination:8 - (G+Q-Wy-Ny)
MinDesign
N (kN) 7.6 - 7.6
M1 (kN.m) 2.9 0.2 2.9 225
M2 (kN.m) 0.6 0.2 0.6
N-max (kN) 0.0
Concrete Cover 35.0
= mm
Neutral Axis: Short Column...
Y= 372.4 mm Lambda1/Lim1 = 24.2 < 302.5 225
Alpha = 86.28 o Lambda2/Lim2 = 24.1 < 254.3
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.4 / 0.3 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.04 / 0.01 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.68 / 0.68 N/mm2
v-RdMax = 3.35 / 3.35 N/mm2
Links = R8-125

1C27 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 174.0 1.8 -3.3 174.0 -3.7 6.7
2 137.1 1.4 -2.6 137.1 -2.9 5.3
3 174.0 1.8 -3.3 174.0 -3.7 6.7
4 174.0 1.8 -3.3 174.0 -3.7 6.7
5 174.8 2.8 -3.3 174.8 -4.6 6.7
6 173.2 0.8 -3.4 173.2 -2.8 6.8
7 173.2 1.8 -2.4 173.2 -3.7 5.9
8 174.7 1.8 -4.3 174.7 -3.7 7.6
9 170.0 2.7 -3.1 170.0 -4.4 6.4
10 168.5 0.8 -3.2 168.5 -2.6 6.5
11 168.6 1.7 -2.2 168.6 -3.5 5.6
12 170.0 1.7 -4.1 170.0 -3.5 7.3
13 127.2 1.9 -2.2 127.2 -3.1 4.5
14 126.1 0.5 -2.3 126.1 -1.8 4.6
15 126.1 1.2 -1.6 126.1 -2.5 3.9
16 127.2 1.2 -2.9 127.2 -2.5 5.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 174.0 - 174.0
M1 (kN.m) -3.7 -3.5 -4.3 225
M2 (kN.m) 6.7 3.5 7.4
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 195.8 mm Lambda1/Lim1 = 23.2 < 60.4 225
Alpha = 35.73 o Lambda2/Lim2 = 23.2 < 59.5
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.5 / 4.0 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.06 / 0.10 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-39

2C27 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 92.1 3.7 -6.7 92.1 -3.6 6.2
2 72.7 2.9 -5.3 72.7 -2.8 4.8
3 92.1 3.7 -6.7 92.1 -3.6 6.2
4 92.1 3.7 -6.7 92.1 -3.6 6.2
5 92.3 4.1 -6.7 92.3 -4.0 6.2
6 91.9 3.3 -6.8 91.9 -3.1 6.2
7 91.9 3.7 -6.4 91.9 -3.5 5.8
8 92.4 3.7 -7.1 92.4 -3.6 6.7
9 90.0 3.9 -6.4 90.0 -3.8 5.9
10 89.6 3.1 -6.5 89.6 -2.9 5.9
11 89.6 3.5 -6.1 89.6 -3.4 5.5
12 90.1 3.5 -6.8 90.1 -3.4 6.3
13 67.7 2.7 -4.5 67.7 -2.7 4.2
14 67.4 2.2 -4.6 67.4 -2.0 4.2
15 67.4 2.5 -4.3 67.4 -2.4 3.9
16 67.7 2.5 -4.8 67.7 -2.4 4.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 92.1 - 92.1
M1 (kN.m) 3.7 1.8 4.0 225
M2 (kN.m) -6.7 -1.8 -7.1
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 176.4 mm Lambda1/Lim1 = 23.2 < 97.4 225
Alpha = 45.93 o Lambda2/Lim2 = 23.2 < 95.9
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.1 / 3.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.05 / 0.09 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.93 / 0.93 N/mm2
v-RdMax = 3.77 / 3.77 N/mm2
Links = R8-125

3C27 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 12.2 3.6 -6.2 12.2 -0.6 0.9
2 9.8 2.8 -4.8 9.8 -0.5 0.8
3 12.2 3.6 -6.2 12.2 -0.6 0.9
4 12.2 3.6 -6.2 12.2 -0.6 0.9
5 12.2 3.5 -6.2 12.2 -0.6 0.9
6 12.2 3.6 -6.2 12.2 -0.6 0.9
7 12.2 3.5 -6.2 12.2 -0.6 0.9
8 12.2 3.6 -6.2 12.2 -0.6 1.0
9 12.2 3.3 -5.9 12.2 -0.6 0.9
10 12.2 3.4 -5.9 12.2 -0.6 0.9
11 12.2 3.4 -5.9 12.2 -0.6 0.9
12 12.2 3.4 -5.9 12.2 -0.6 1.0
13 9.8 2.3 -4.2 9.8 -0.5 0.7
14 9.8 2.4 -4.2 9.8 -0.5 0.8
15 9.8 2.4 -4.2 9.8 -0.5 0.7
16 9.8 2.4 -4.2 9.8 -0.5 0.8
Critical Combination:6 - (G+Q-Wx-Nx)
Min Design
N (kN) 12.2 - 12.2
M1 (kN.m) 3.6 0.2 3.6 225
M2 (kN.m) -6.2 -0.2 -6.3
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 236.9 mm Lambda1/Lim1 = 24.9 < 240.4 225
Alpha = 73.36 o Lambda2/Lim2 = 25.2 < 238.9
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.8 / 3.1 kN As (Required): %0.34 170.75 mm2 4Y16
v-Ed = 0.05 / 0.08 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.37 / 3.37 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-40

1C28 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 209.7 -0.2 -0.8 209.7 0.4 1.7
2 165.6 -0.2 -0.6 165.6 0.3 1.3
3 209.7 -0.2 -0.8 209.7 0.4 1.7
4 209.7 -0.2 -0.8 209.7 0.4 1.7
5 209.5 0.8 -0.8 209.5 -0.6 1.6
6 209.9 -1.3 -0.9 209.9 1.4 1.7
7 207.9 -0.2 0.2 207.9 0.4 0.7
8 211.5 -0.2 -1.8 211.5 0.4 2.6
9 204.7 0.8 -0.7 204.7 -0.6 1.5
10 205.1 -1.2 -0.8 205.1 1.4 1.5
11 203.1 -0.2 0.2 203.1 0.4 0.6
12 206.6 -0.2 -1.7 206.6 0.4 2.4
13 154.7 0.6 -0.4 154.7 -0.5 0.9
14 155.0 -0.9 -0.5 155.0 0.9 1.0
15 153.5 -0.1 0.2 153.5 0.2 0.3
16 156.1 -0.1 -1.2 156.1 0.2 1.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 209.7 - 209.7
M1 (kN.m) 0.4 4.2 4.2 225
M2 (kN.m) 1.7 4.2 4.2
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Slender Column...
Y= 170.1 mm Lambda1/Lim1 = 23.2 > 17.0 !!! 225
Alpha = 22.01 o Lambda2/Lim2 = 23.2 < 57.1
M-add(1/2)= 1.9 / 0.0 kN.m
V-Ed (1/2)= 0.9 / 1.5 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.02 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

2C28 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 110.6 -0.4 -1.7 110.6 0.3 1.0
2 87.5 -0.3 -1.3 87.5 0.3 0.7
3 110.6 -0.4 -1.7 110.6 0.3 1.0
4 110.6 -0.4 -1.7 110.6 0.3 1.0
5 110.7 0.1 -1.7 110.7 -0.2 1.0
6 110.6 -1.0 -1.7 110.6 0.9 1.0
7 110.3 -0.4 -1.2 110.3 0.3 0.5
8 111.0 -0.4 -2.1 111.0 0.3 1.5
9 108.4 0.2 -1.5 108.4 -0.2 0.9
10 108.3 -0.9 -1.5 108.3 0.8 0.9
11 108.1 -0.4 -1.1 108.1 0.3 0.4
12 108.7 -0.4 -2.0 108.7 0.3 1.4
13 82.5 0.2 -0.9 82.5 -0.2 0.6
14 82.5 -0.6 -1.0 82.5 0.6 0.6
15 82.3 -0.2 -0.6 82.3 0.2 0.2
16 82.7 -0.2 -1.3 82.7 0.2 0.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 110.6 - 110.6
M1 (kN.m) -0.4 -2.2 -2.2 225
M2 (kN.m) -1.7 -2.2 -2.2
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 93.3 mm Lambda1/Lim1 = 23.2 < 86.6 225
Alpha = 12.01 o Lambda2/Lim2 = 23.2 < 79.1
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.6 / 1.1 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.01 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.98 / 0.99 N/mm2
v-RdMax = 3.85 / 3.86 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-41

3C28 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 14.6 -0.3 -1.0 14.6 0.1 0.0
2 11.7 -0.3 -0.7 11.7 0.1 0.0
3 14.6 -0.3 -1.0 14.6 0.1 0.0
4 14.6 -0.3 -1.0 14.6 0.1 0.0
5 14.6 -0.3 -1.0 14.6 0.0 0.0
6 14.5 -0.3 -1.0 14.5 0.1 0.0
7 14.7 -0.3 -1.0 14.7 0.1 0.0
8 14.5 -0.3 -0.9 14.5 0.1 0.0
9 14.6 -0.3 -0.9 14.6 0.0 0.0
10 14.5 -0.3 -0.9 14.5 0.1 0.0
11 14.7 -0.3 -0.9 14.7 0.1 0.0
12 14.5 -0.3 -0.9 14.5 0.1 0.0
13 11.7 -0.1 -0.6 11.7 0.0 0.0
14 11.6 -0.2 -0.5 11.6 0.1 0.0
15 11.7 -0.2 -0.6 11.7 0.1 0.0
16 11.6 -0.2 -0.5 11.6 0.1 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 14.6 - 14.6
M1 (kN.m) -0.3 -0.3 -0.4 225
M2 (kN.m) -1.0 -0.3 -1.0
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 23.5 mm Lambda1/Lim1 = 24.1 < 185.9 225
Alpha = 2.33 o Lambda2/Lim2 = 24.1 < 162.2
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 0.2 / 0.5 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.00 / 0.01 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.70 / 0.70 N/mm2
v-RdMax = 3.38 / 3.38 N/mm2
Links = R8-125

1C29 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 322.9 1.4 -0.8 322.9 -2.9 1.6
2 251.5 1.1 -0.6 251.5 -2.3 1.3
3 322.9 1.4 -0.8 322.9 -2.9 1.6
4 322.9 1.4 -0.8 322.9 -2.9 1.6
5 323.6 2.4 -0.8 323.6 -3.8 1.6
6 322.3 0.4 -0.9 322.3 -2.0 1.7
7 323.9 1.4 0.2 323.9 -2.9 0.6
8 322.0 1.4 -1.8 322.0 -2.9 2.6
9 308.1 2.3 -0.7 308.1 -3.7 1.5
10 306.9 0.4 -0.8 306.9 -1.9 1.5
11 308.5 1.4 0.2 308.5 -2.8 0.5
12 306.6 1.4 -1.7 306.6 -2.8 2.5
13 217.7 1.7 -0.4 217.7 -2.7 0.9
14 216.7 0.3 -0.5 216.7 -1.4 1.0
15 217.9 1.0 0.3 217.9 -2.0 0.2
16 216.5 1.0 -1.2 216.5 -2.0 1.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 322.9 - 322.9
M1 (kN.m) -2.9 -6.5 -6.5 225
M2 (kN.m) 1.6 6.5 6.5
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 261.7 mm Lambda1/Lim1 = 23.2 < 45.8 225
Alpha = 32.76 o Lambda2/Lim2 = 23.2 < 47.0
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.1 / 1.5 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.05 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-42

2C29 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 169.8 2.9 -1.6 169.8 -2.9 1.2
2 132.3 2.3 -1.3 132.3 -2.3 1.0
3 169.8 2.9 -1.6 169.8 -2.9 1.2
4 169.8 2.9 -1.6 169.8 -2.9 1.2
5 169.9 3.3 -1.6 169.9 -3.4 1.2
6 169.8 2.4 -1.7 169.8 -2.5 1.3
7 169.9 2.9 -1.1 169.9 -2.9 0.7
8 169.8 2.9 -2.2 169.8 -2.9 1.8
9 161.9 3.2 -1.5 161.9 -3.3 1.1
10 161.8 2.4 -1.5 161.8 -2.4 1.2
11 161.9 2.8 -1.0 161.9 -2.8 0.6
12 161.8 2.8 -2.0 161.8 -2.8 1.7
13 114.6 2.3 -0.9 114.6 -2.4 0.7
14 114.6 1.7 -1.0 114.6 -1.7 0.8
15 114.6 2.0 -0.6 114.6 -2.1 0.4
16 114.6 2.0 -1.3 114.6 -2.1 1.1
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 169.8 - 169.8
M1 (kN.m) -2.9 -3.4 -3.6 225
M2 (kN.m) -1.6 -3.4 -3.4
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 141.8 mm Lambda1/Lim1 = 23.2 < 72.2 225
Alpha = 19.04 o Lambda2/Lim2 = 23.2 < 68.0
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.8 / 1.2 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.05 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

3C29 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 10.8 2.9 -1.2 10.8 0.0 0.1
2 8.6 2.3 -1.0 8.6 0.0 0.1
3 10.8 2.9 -1.2 10.8 0.0 0.1
4 10.8 2.9 -1.2 10.8 0.0 0.1
5 10.7 2.9 -1.2 10.7 0.0 0.1
6 10.8 3.0 -1.2 10.8 0.0 0.1
7 10.7 2.9 -1.2 10.7 0.0 0.1
8 10.9 2.9 -1.3 10.9 0.0 0.1
9 10.7 2.8 -1.1 10.7 0.0 0.1
10 10.8 2.9 -1.2 10.8 0.0 0.1
11 10.7 2.8 -1.1 10.7 0.0 0.1
12 10.9 2.8 -1.2 10.9 0.0 0.1
13 8.6 2.0 -0.7 8.6 0.0 0.0
14 8.7 2.1 -0.7 8.7 0.0 0.1
15 8.5 2.1 -0.7 8.5 0.0 0.0
16 8.7 2.1 -0.7 8.7 0.0 0.1
Critical Combination:6 - (G+Q-Wx-Nx)
Min Design
N (kN) 10.8 - 10.8
M1 (kN.m) 3.0 0.2 3.0 225
M2 (kN.m) -1.2 -0.2 -1.3
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 35.0 mm Lambda1/Lim1 = 29.3 < 228.2 225
Alpha = 7.77 o Lambda2/Lim2 = 24.1 < 243.3
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.5 / 0.6 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.04 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.37 / 3.37 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-43

1C30 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 284.7 2.3 2.0 284.7 -4.7 -4.0
2 223.4 1.8 1.5 223.4 -3.7 -3.1
3 284.7 2.3 2.0 284.7 -4.7 -4.0
4 284.7 2.3 2.0 284.7 -4.7 -4.0
5 285.6 3.3 2.0 285.6 -5.6 -4.1
6 283.7 1.4 1.9 283.7 -3.8 -3.9
7 283.5 2.3 3.0 283.5 -4.7 -5.0
8 285.8 2.3 0.9 285.8 -4.7 -3.0
9 275.8 3.2 1.9 275.8 -5.4 -3.9
10 274.0 1.3 1.8 274.0 -3.6 -3.7
11 273.8 2.2 2.9 273.8 -4.5 -4.8
12 276.0 2.2 0.9 276.0 -4.5 -2.8
13 202.4 2.2 1.4 202.4 -3.7 -2.7
14 201.0 0.8 1.3 201.0 -2.5 -2.6
15 200.9 1.5 2.1 200.9 -3.1 -3.4
16 202.5 1.5 0.6 202.5 -3.1 -2.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 284.7 - 284.7
M1 (kN.m) -4.7 -5.7 -5.8 225
M2 (kN.m) -4.0 -5.7 -5.7
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 232.2 mm Lambda1/Lim1 = 23.2 < 47.6 225
Alpha = 29.91 o Lambda2/Lim2 = 23.2 < 47.8
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 3.0 / 2.7 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.08 / 0.07 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

2C30 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 153.7 4.7 4.0 153.7 -4.6 -3.2
2 120.7 3.7 3.1 120.7 -3.6 -2.5
3 153.7 4.7 4.0 153.7 -4.6 -3.2
4 153.7 4.7 4.0 153.7 -4.6 -3.2
5 154.0 5.2 4.0 154.0 -5.1 -3.3
6 153.5 4.3 3.9 153.5 -4.1 -3.2
7 153.6 4.8 4.5 153.6 -4.6 -3.8
8 153.9 4.7 3.4 153.9 -4.6 -2.7
9 148.9 4.9 3.8 148.9 -4.8 -3.1
10 148.4 4.1 3.8 148.4 -3.9 -3.1
11 148.5 4.5 4.3 148.5 -4.4 -3.6
12 148.8 4.5 3.3 148.8 -4.3 -2.6
13 109.6 3.4 2.7 109.6 -3.3 -2.2
14 109.3 2.8 2.7 109.3 -2.7 -2.2
15 109.3 3.1 3.1 109.3 -3.0 -2.6
16 109.6 3.1 2.3 109.6 -3.0 -1.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 153.7 - 153.7
M1 (kN.m) 4.7 3.1 5.3 225
M2 (kN.m) 4.0 3.1 4.6
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 157.0 mm Lambda1/Lim1 = 23.2 < 75.6 225
Alpha = 27.20 o Lambda2/Lim2 = 23.2 < 71.8
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.7 / 2.3 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.07 / 0.06 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-44

3C30 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 13.9 4.6 3.2 13.9 -0.3 -0.4
2 11.1 3.6 2.5 11.1 -0.2 -0.4
3 13.9 4.6 3.2 13.9 -0.3 -0.4
4 13.9 4.6 3.2 13.9 -0.3 -0.4
5 13.9 4.6 3.2 13.9 -0.3 -0.5
6 13.9 4.6 3.2 13.9 -0.3 -0.4
7 14.0 4.6 3.3 14.0 -0.3 -0.5
8 13.9 4.6 3.2 13.9 -0.3 -0.4
9 13.9 4.3 3.1 13.9 -0.3 -0.5
10 13.9 4.4 3.1 13.9 -0.3 -0.4
11 14.0 4.4 3.1 14.0 -0.3 -0.5
12 13.9 4.3 3.1 13.9 -0.3 -0.4
13 11.2 3.0 2.2 11.2 -0.2 -0.4
14 11.1 3.0 2.2 11.1 -0.2 -0.4
15 11.2 3.0 2.2 11.2 -0.2 -0.4
16 11.1 3.0 2.2 11.1 -0.2 -0.3
Critical Combination:6 - (G+Q-Wx-Nx)
Min Design
N (kN) 13.9 - 13.9
M1 (kN.m) 4.6 0.3 4.7 225
M2 (kN.m) 3.2 0.3 3.3
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 190.1 mm Lambda1/Lim1 = 29.3 < 212.8 225
Alpha = 69.69 o Lambda2/Lim2 = 24.1 < 223.0
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.3 / 1.6 kN As (Required): %0.22 110.73 mm2 4Y16
v-Ed = 0.06 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.70 / 0.70 N/mm2
v-RdMax = 3.38 / 3.38 N/mm2
Links = R8-125

1C31 Storey: 1 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 300.9 -1.5 0.8 300.9 2.9 -1.6
2 234.4 -1.1 0.6 234.4 2.3 -1.2
3 300.9 -1.5 0.8 300.9 2.9 -1.6
4 300.9 -1.5 0.8 300.9 2.9 -1.6
5 300.3 -0.5 0.8 300.3 2.0 -1.7
6 301.6 -2.4 0.8 301.6 3.8 -1.6
7 301.0 -1.5 1.8 301.0 2.9 -2.6
8 300.9 -1.5 -0.2 300.9 3.0 -0.6
9 286.0 -0.5 0.8 286.0 2.0 -1.5
10 287.4 -2.3 0.7 287.4 3.7 -1.4
11 286.8 -1.4 1.7 286.8 2.8 -2.4
12 286.6 -1.4 -0.3 286.6 2.8 -0.5
13 202.3 -0.3 0.5 202.3 1.4 -1.0
14 203.3 -1.7 0.4 203.3 2.7 -0.9
15 202.8 -1.0 1.2 202.8 2.1 -1.7
16 202.7 -1.0 -0.3 202.7 2.1 -0.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 300.9 - 300.9
M1 (kN.m) 2.9 6.0 6.0 225
M2 (kN.m) -1.6 -6.0 -6.0
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 243.8 mm Lambda1/Lim1 = 23.2 < 47.2 225
Alpha = 30.85 o Lambda2/Lim2 = 23.2 < 48.6
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 2.1 / 1.5 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.05 / 0.04 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

Project: 1BEDROOM
EPH Enterprise WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-45

2C31 Storey: 2 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 154.3 -2.9 1.6 154.3 3.0 -1.4
2 120.3 -2.3 1.2 120.3 2.3 -1.1
3 154.3 -2.9 1.6 154.3 3.0 -1.4
4 154.3 -2.9 1.6 154.3 3.0 -1.4
5 154.3 -2.5 1.6 154.3 2.5 -1.4
6 154.4 -3.4 1.6 154.4 3.4 -1.4
7 154.4 -2.9 2.2 154.4 3.0 -2.0
8 154.3 -3.0 1.1 154.3 3.0 -0.8
9 147.2 -2.4 1.5 147.2 2.4 -1.3
10 147.3 -3.2 1.5 147.3 3.3 -1.3
11 147.3 -2.8 2.0 147.3 2.8 -1.8
12 147.2 -2.8 1.0 147.2 2.9 -0.7
13 104.5 -1.8 1.0 104.5 1.7 -0.9
14 104.6 -2.4 0.9 104.6 2.4 -0.8
15 104.6 -2.1 1.3 104.6 2.1 -1.2
16 104.5 -2.1 0.6 104.5 2.1 -0.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 154.3 - 154.3
M1 (kN.m) 3.0 3.1 3.5 225
M2 (kN.m) 1.6 3.1 3.1
N-max (kN) 0.0
Concrete Cover = 35.0 mm
Neutral Axis: Short Column...
Y= 133.9 mm Lambda1/Lim1 = 23.2 < 76.1 225
Alpha = 18.98 o Lambda2/Lim2 = 23.2 < 73.4
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.8 / 1.2 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.05 / 0.03 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 1.06 / 1.06 N/mm2
v-RdMax = 3.97 / 3.97 N/mm2
Links = R8-125

3C31 Storey: 3 (Con.:C20/25 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 10.2 -3.0 1.4 10.2 0.0 -0.1
2 8.2 -2.3 1.1 8.2 0.0 0.0
3 10.2 -3.0 1.4 10.2 0.0 -0.1
4 10.2 -3.0 1.4 10.2 0.0 -0.1
5 10.3 -3.0 1.4 10.3 0.0 -0.1
6 10.1 -2.9 1.4 10.1 0.0 0.0
7 10.2 -3.0 1.4 10.2 0.0 -0.1
8 10.2 -3.0 1.3 10.2 0.0 0.0
9 10.3 -2.9 1.3 10.3 0.0 -0.1
10 10.1 -2.8 1.3 10.1 0.0 0.0
11 10.2 -2.8 1.3 10.2 0.0 -0.1
12 10.2 -2.9 1.2 10.2 0.0 0.0
13 8.2 -2.1 0.8 8.2 0.0 0.0
14 8.1 -2.0 0.8 8.1 0.0 0.0
15 8.2 -2.1 0.9 8.2 0.0 -0.1
16 8.1 -2.1 0.8 8.1 0.0 0.0
Critical Combination:5 - (G+Q+Wx+Nx)
Min Design
N (kN) 10.3 - 10.3
M1 (kN.m) -3.0 -0.2 -3.0 225
M2 (kN.m) 1.4 0.2 1.4
N-max (kN) 0.0
Concrete Cover =35.0 mm
Neutral Axis: Short Column...
Y= 37.9 mm Lambda1/Lim1 = 29.3 < 241.6 225
Alpha = 9.00 o Lambda2/Lim2 = 24.1 < 248.1
M-add(1/2)= 0.0 / 0.0 kN.m
V-Ed (1/2)= 1.5 / 0.7 kN As (Required): %0.20 (min) 101.25 mm2 4Y16
v-Ed = 0.04 / 0.02 N/mm2 As (Provided): %1.59 804.25 mm2
v-Rdc = 0.69 / 0.69 N/mm2
v-RdMax = 3.36 / 3.36 N/mm2
Links = R8-125