REPORT
FOR PROPOSED
BY
Plot No.423/1, Opposite Kartvya Farm, Village Ravdapura, Taluka Samarkha, District
Anand, State Gujarat
CORPORATE OFFICE: Green Empire (Anupushpam), Beside Canara Bank, Nr. Yash Complex, Above Axis Bank, Gotri Main Road,
VADODARA – 390 021, (Gujarat), India
E-mail: info@greencircleinc.com:
EIA Report
For proposed manufacturing of Synthetic Organic Resin and Acrylic Base Emulsion
ACKNOWLEDGEMENT
DISCLAIMER
The consulting services conducted by Green Circle, Inc. (the “Company”) were performed using
generally accepted guidelines, standards, and/or practices, which the Company considers reliable.
Although the Company performed its consulting services pursuant to reliable and generally
accepted practices in the industry, the Company does not guarantee or provide any representations
or warranties with respect to Client’s use, interpretation or application of the findings, conclusions,
and/or suggestions of the consulting services provided by the Company. Moreover, the findings,
conclusions, and the suggestions resulting from the consulting service are based upon certain
assumptions, information, documents, and procedures provided by the Customer. AS SUCH, IN
NO EVENT AND UNDER NO CIRCUMSTANCE SHALL THE COMPANY BE LIABLE FOR
SPECIAL, INDIRECT, PUNITIVE OR CONSEQUENTIAL DAMAGES OF ANY NATURE
WHATSOEVER, INCLUDING WITHOUT LIMITATION, ANY LOST REVENUE OR PROFITS OF
THE CUSTOMER OR ITS CUSTOMERS, AGENTS AND DISTRIBUTORS, RESULTING FROM,
ARISING OUT OF OR IN CONNECTION WITH, THE SERVICES PROVIDED BY THE COMPANY.
The Customer agrees that the Company shall have no liability for damages, which may result from
Client’s use, interpretation or application of the consulting services provided by the Company.
Client’s logo has been used for report purpose only.
(An ISO: 9001, 14001, OHSAS: 18001 Certified Organization & GPCB approved Environment Auditor –
Schedule II)
EIA Certificate
This is to certify that M/s. Green Circle, Inc. Vadodara has
conducted EIA study for “Manufacturing Of Synthetic
Organic Resin and Acrylic Base Emuslsion” at Plot no.
423/1, Opposite Kartvya Farm, Village Ravdapura,
Taluka Samarkha, District Anand, State Gujarat the
period of March 2018 to May 2018.
Table of Contents
List of Tables
List of Figures
Figure 1.1 Methodology of EIA Study............................................................................................. 26
Figure 2.1 Project Location Map .................................................................................................... 37
Figure 2.2 Project Boundary of Proposed Project Site ................................................................... 38
Figure 2.3 Google Image of Project Site (200m & 500m) ............................................................... 39
Figure 2.4 Google Image of Project Site (5 & 10 km) ..................................................................... 39
Figure 2.5 Plant Layout .................................................................................................................. 41
Figure 2.6 Site Photographs .......................................................................................................... 42
Figure 3.1 Location Map of Study area .......................................................................................... 65
Figure 3.2 Land Use Map of the Study Area (10 km Radial Zone) ................................................. 68
Figure 3.3 Graph Showing Land Use of the Study Area (10 km Radius) ........................................ 69
Figure 3.4 Depth to water level map for the pre-monsoon period 2012 .......................................... 71
Figure 3.5 Depth to water level map for the post-monsoon period 2012 ........................................ 72
Figure 3.6 Ground Water Resources of Gujarat ............................................................................. 73
Figure 3.7 Wind Rose (March 2018 to May 2018) .......................................................................... 77
Figure 3.9 Graphical representation of PM10 concentration at different locations .......................... 84
Figure 3.10 Graphical representation of PM2.5 concentration at different locations ....................... 85
Figure 3.11 Graphical representation of SO2 concentration at different locations .......................... 85
Figure 3.12 Graphical representation of NOX concentration at different locations.......................... 86
Figure 3.13 Google Image showing Ambient Noise Monitoring Locations ...................................... 88
Figure 3.14 Graphical Representation of Day time Noise Level in the study area .......................... 89
Figure 3.15 Graphical Representation of Night time Noise Level in the study area ........................ 90
Figure 3.16 Google Image showing Ground Water Monitoring Locations ....................................... 92
Figure 3.17 Google Image showing Surface Water Monitoring Locations ...................................... 97
Figure 3.18 Google Image showing Soil Sampling Location ........................................................ 103
Figure 3.19 Villages within 10 km radius ...................................................................................... 110
Figure 3.20 Population of the study area ..................................................................................... 112
Figure 3.21 Social profile of the study area .................................................................................. 114
Figure 3.22 Population Literacy of the study area ........................................................................ 116
Figure 4.1 Isopleth for PM10 GLC due to Proposed Project ......................................................... 133
Figure 4.2 : Isopleth for SO2 GLC due to Proposed Project .......................................................... 134
Figure 4.3 : Isopleth for NOx GLC due to Proposed Project ......................................................... 135
Figure 7.1 Consequence analysis; Event tree analysis for release of flammable liquid ................ 152
List of Annexure
Annexure: 6 Toposheet
Annexure: 7 MSDS
EXECUTIVE SUMMARY
Introduction
M/s. Maruti Polymers is situated at plot no. 423/1, opposite Kartvya Farm, village Ravdapura,
District Anand and State Gujarat. In proposed project they have decided to manufacture synthetic
organic resin and acrylic based emulsions. Alkyd resin and Acrylic emulsion are used in
manufacturing of paints for commercial and decorative purpose.
Project Proponent
M/s. Maruti Polymers is promoted by Mr. Soham Patel & Mr. Mayur Patel are young, dynamic,
energetic and believer in Digitalization work and world, who have two years of experience in
chemical industry.
Type of Project
The project is neither an interlinked project nor an interdependent project. It is the proposed
manufacturing unit of Synthetic Organic Resin & Acrylic Base Emulsion. The project falls under
category ‘A’, section 5(f) “Synthetic organic chemical industry” of EIA notification 2006 and
subsequent amendments.
M/s. Maruti Polymers is situated at plot no. 423/1, Opposite Kartvya Farm, Village Ravdapura,
District Anand, and State Gujarat. The proposed project at inter section of latitude 22°35'41.21"N
and longitude 72°57'37.34"E.
The site is well connected with road and railway, nearest city Ravdapura located at distance of
301.5 m (0.3 Km), North and the nearest water body is Mahi River at distance of 1.05 Km. Nearest
Railway station Anand Junction is located at 3.70 Km, South. There is no reserved forest, national
park, eco sensitive areas in surrounding 10 km radius. The detail related to the proposed project is
discussed in the upcoming section.
Presently total 9 products are proposed with production capacity of 480 MT/M. The unit propose to
manufacture Acrylic Based Emulsion (Styrene acrylic emulsion, Pure acrylic emulsion and Vinyl
acrylic emulsion) of 250 MT/M, Alkyd Resin (Soya long oil, D.C.O long oil, D.C.O rosinated and
Linseed long oil) of 200 MT/M and Amino Resin (Melamine formaldehyde) of 30 MT/M. Also, the
company have applied for PESO Certificate for the storage of chemicals.
Water Requirement
The source of water for the proposed project will meet through Ravdapura gram panchayat. The
total water requirement for the proposed project will be 11.03 KLD. The total wastewater
generation from industrial process will be 1.31 KLD, while 0.324 KLD domestic effluents will be
generated.
Total waste water generation from the industry will be 1.31 KLD, which will be treated in the
proposed ETP and the treated waste water will be reused in the cooling tower. 0.324 KLD of
domestic waste water will be generated and disposed off in the septic tank.
Electricity
Electricity shall be obtained from MGVCL. The power demand for the proposed project will be
60 HP. DG set of 40 HP will be used as power back-up only.
Coal Pellets (60kg/hr) will be used as fuel for Boiler (200 kg/hr) & Diesel (8 L /hr) will be used as
fuel for D.G. Set. Stack of adequate height will be provided to Boiler & D.G set.
Manpower Requirement
The project will require 10 workers during the construction phase and 9 employees during
operation phase.
Domestic waste generated will be disposed off through Municipal Corporation. Hazardous waste
like Evaporator residue, Used oil/ Spent Oil, Discarded Container/ drums/Bags etc. will be
generated and sell to the registered recycler/ re-processor or send to TSDF site.
Total 404.2 m2 area (33%) will be taken for green cover / lawn development in the proposed
facility. Suitable plant species of local varieties will be planted with adequate spacing and
density for their fast growth and survival.
Study Area
The baseline quality of various components of the environment, viz. air, noise, water, and land,
biology, meteorological and socio-economic is assessed within the impact zone of about 10 km
around the proposed site. The present report presents the data collected during the sampling
period of three months during pre monsoon season from March’18 to May’18.
The climate of the study area varies with hot summer, cold winter and rainfall. Annual maximum
temperature is 44 ºC in the month of May and minimum temperature is 19 ºC in the month of
March. Relative humidity of this region is 82% maximum and 17.5 % minimum.
Seismicity
Study area falls in Zone III in seismic zoning map of India, which is classified as moderate
damage risk zone (Institute of Seismology Research (ISR), Govt. of Gujarat).
Air Environment
AAQM was carried out in 8 locations on 24 hourly average basis as per guidelines of CPCB and
NAAQS within 10 km radius of the study area. PM10 and PM2.5 was found in the range of 57.3
to 79.5 μg/m3 and 26.4 to 36.5 μg/m3 respectively. SO2 found in the range of 6.3 to 8.7 μg/m3
and NOx 12.0 to 16.7 μg/m3. The PM10 & PM2.5 parameters are found within the NAAQS level.
Other parameters like VOCs, Heavy metals, Benzene etc. were found within permissible limit.
Noise Environment
Noise can be defined as an unwanted sound. A total of 8 locations were identified for ambient
noise monitoring in the study area. The daytime varied from 47.1 dB (A) Leq to 64.8 dB (A) Leq
and night time noise varied of 38.0 dB (A) Leq to 54.3 dB (A) Leq. Both daytime noise and night
time noise were found within the limit.
Water Environment
In order to establish the baseline water quality, 8 ground water and 8 surface water
samples were collected and analyzed in the study area. The analysis result of ground
water samples were within drinking water limit as per IS 10500:2012. The surface water
quality is within class D as per classification of water quality criteria.
Soil Quality
Soil samples were collected from 8 locations in the study area and analyzed for physico-
chemical characteristics. Soil quality was found to be normal.
Land use pattern of the study area covering 10 km radius includes Crop Land , Urban Built up,
Settlement, Industry, Mixed Built up, Residential Built up, Waste Land, Plantation, Pond/ Lake,
Fallow Land, Wet Land.
Biological Environment
Biological environment includes flora and fauna including aquatic species found in the study
area of 10 km radius. The various animal species in the study area are found, detailed study is
given in Baseline Chapter-3.
Socio-economic Environment
Socio-economic data were collected from within 10 km radius of the Project site. These include
22 villages as per census of India 2011. Total population was 409337, out of which male
population is 212371 and female population is 196966 with Sex ratio is 928.7. The total number
of household was 84186. The total literate population was 306891, male literacy was 173550
and female literacy was 133341 and literacy rate was 75%.
Air Environment
• In order to estimate the ground level concentrations due to the emission from the
proposed project, AERMOD Cloud 5 software has been employed.
• These predicted ground level concentrations when added to baseline scenario, the
overall scenario levels of PM10, PM2.5, SO2, NOx, are observed well within the
permissible limits specified by CPCB.
• VOCs and other parameters are observed with below detectable limit, the detail
explanation is mentioned in Baseline chapter-3.
The major noise source includes various machines, pumps, motors, DG sets and vehicular
traffic. The noise levels were below the stipulated standards of CPCB for residential and
industrial areas. Periodic maintenance of machinery and vehicles should be undertaken to
reduce the noise impact. Noise suppression measures such as enclosures, buffers and/or
protective measures should be provided (wherever noise level is more than 75 dB
(A)).Employees should be provided with Personal Protective Equipments like earplugs or
earmuffs, wherever required.
Water Environment
The source of water for the project shall be met through Ravdapura Gram Panchayat water
supply. Total water requirement for the proposed project will be 11.03 KLD. 0.41 KLD will be
used for domestic purpose, 2.02 KLD for gardening purpose and 8.6 KLD for industrial
purpose. The industrial waste water generated will be sent to ETP for treatment and after that
the treated water will be used in cooling towers. Domestic waste water (0.324 KLD) will be
disposed off into the septic tank.
Land Environment
Total area of the project site is 1225 m2. Large part of plant will be open area and will be utilized
for road, parking, and green belt. A total of 404.2 m2 area has been earmarked for the green
area development. Once the construction activities will be completed, there will be little impact
envisaged due to the operation of the plant. Development of green belt and other landscape on
the project site would enhance the visual aesthetics of the area.
Biological Environment
The project activity does not require tree cutting during land clearing also, the study zone does
not have any ecologically sensitive location and hence, the plant activities are not expected to
have any impact on the ecology and biodiversity. A total of 404.2 m2 area has been earmarked
for greenbelt development, which will help in development of biodiversity. The indigenous plants
shall be planted along with ornamental trees/shrubs to provide an aesthetic environment within
and around the plant. The maintenance of the greenbelt developed shall be ensured and
survival rate of the plants shall also be studied every half yearly.
Socio-economic Environment
The proposed project will have some positive impact on the industrial growth in the region. It is
anticipated that during the operation phase, the proposed project will also generate some
indirect employment due to sales / transportation etc. The overall project will have a long term
benefit and hence no mitigation measure is required. However, as per the skills, preference to
local people shall be given in employment. Hence, the proposed project will have positive
impact on the socioeconomic environment.
Environmental Monitoring Network is designed for operation phase of the project for monitoring
of various environmental parameters like air, water, noise, soil and ecology etc.
The Risk assessment study has been conducted for all the operations involved in the project.
The study considers all the hazards associated with all the activities which will be involved. The
hazards leading to possible consequences are summarized in the chapter-7 and the risk
mitigation measures and intended safeguards are specifically mentioned in the chapter-7 in the
EIA report. The risk to personnel, process/operation is considered in the study.
Project Benefits
Growth in the industrial sector creates new opportunities for employment and can also help
diversify the economy.
CSR Activities
Conclusion
• The project proponent will follow all the statutory norms and guidelines as per EPA,
1986 to safe guard environment.
• Waste water generated from the proposed project will be sent to proposed ETP and the
after treatment the waste water will be used for cooling towers. Sewage will be
disposed off into Septic tank.
• Ambient Air Quality of the project site are concerned viz. SPM (PM10 & PM2.5), SO2
and NOx, their concentrations in the ambient air at the proposed site were found within
prescribed limits.
• The operational phase noise shall be within industrial premises which will not exceed 75
dB (A).
• The project will generate employment opportunities during construction stage and also
at operational stage. The standard of living of local people due to employment is likely
to be better, so we may say that it is positive socio economic impact. The region will get
economic boost.
• Overall, the project will have positive impact for socio economic and cultural
development.
સંિક્ષ સારાંશ
પ�રચય
મેસેસર મા�િત પોિલમેસર પ્લો નો. 423/1, કતર્વ ફામર ની સામે, ગામ રાવડાપુરા, િજલ્લ આનંદ, ગુજરાત ખાતે આવેલ છે . સૂિચત
�ોજે કટમાં તેઓએ કૃિ�મ ઓગર્િન રેિઝન અને એક�રિલક આધા�રત ઇમલ્ઝ બનાવવાનું નક્ક કયુ� છે . અલ્કાઇ રેિઝન અને એક�રિલક
ઇમલ્ઝનન ઉપયોગ પેઈન્ ના ઉત્પાદનમા થાય છે જે વ્યાવસાિય અને સુશોભન હેતુ ઉપયોગ કરવામાં આવે છે .
�ોજે કટ �ોપોન�ટ
મેસેસર મા�િત પોિલમેસર્ન �ી સોહમ પટેલ અને �ી મયુર પટેલ દ્વાર �ોમોટ કરવામાં આવે છે . તેઓ યુવાન, ગિતશીલ અને ઉ�ર્સભ છે
જે �ડિજટલ િવ�વ અને કાયર માં િવ�વાસ રાખે છે . તેઓ ને કેિમકલ �ડસ્� માં બે વષર નો અનુભવ છે .
આ �ોજે કટ એકબી� સાથે સંકળાયેલ �ોજે કટ નથી, અને એક પરસ્પરાવલંબ �ોજે કટ છે . તે િસન્થેટી ઓગર્િન કેિમકલ્ ઉત્પાદનન
એકમ છે . આ �ોજે કટ ઇઆઈએ સૂચના 2006 અને પછીના સુધારા હેઠળ ‘એ’ કેટેગરી કલમ 5(એફ) ના “િસન્થેટી ઓગર્િન કેિમકલ”
આવે છે .
�ોજે કટ ની �કમત
સૂિચત �ોજે કટ �વૃિત માટે કુલ �ોજે કટ ખચર અંદાજે �િપયા 1.5-2 કરોડ છે .
સૂિચત �ોજે કટ સાઇટ પ્લો નો. 423/1, કતર્વ ફામર ની સામે, ગામ રાવડાપુરા, િજલ્લ આનંદ, ગુજરાત પર િસ્થ થયેલ છે . સાઇટ
કોઓ�ડનટેસ 22°35'41.21"N, 72°57'37.34"E છે . આ સાઇટ રોડ અને રેલ નેટવકર દ્વાર સારી રીતે જોડાયેલ છે . ન�કનું રેલ્વ
સ્ટેશ આનંદ જં ક્શ (3.70 �કલોમીટર S), અને ન�કનું એરપોટર વડોદરા એરપોટર (46.9 �કમી) છે .
મેસેસર મા�િત પોિલમેસર દ્વાર િસન્થેટી ઓગર્િન રેિઝન અને એક�રિલક ઇમલ્ઝ ઉત્પાદ માટે નો �સ્તા મૂક્ય છે . હાલ માં
�સ્તાિવ 9 ઉત્પાદન છે જે ની ઉત્પાદ ક્ષમ 480 મે��ક ટન �િત માસ છે . �સ્તાિવ યુિનટ માં એક�રિલક બેઝ્ ઇમલશન ની
ઉત્પાદ ક્ષમ 250 મે��ક ટન �િત માસ,અલ્કાઇ રેિઝન ની ઉત્પાદ ક્ષમ 200 મે��ક ટન �િત માસ અને એમીનો રેિઝન ની
ઉત્પાદ ક્ષમ 30 મે��ક ટન �િત માસ રેહશે. કંપની એ PESO સ�ટ�ફકેટ (રસાયણોનો સં�હ) માટે પણ અર� કરી છે .
પાણીની જ��રયાત
�સ્તાિવ �ોજે કટ માટે પાણીની જ��રયાત રાવડાપુરા �ામ પંચાયત દ્વાર પૂરી પાડવામાં આવશે. �સ્તાિવ �ોજે કટ માટે કુલ પાણીની
જ��રયાત 11.03 KLD રેહશે. તેમાં થી કુલ ઔધ્યોિગ ગંદા પાણીનું ઉત્પન 1.31 KLD થશે અને કુલ ઘરેલુ દૂિષત પાણીનું ઉત્પન
0.324 KLD થશે.
લગભગ 1.31 KLD ઔધ્યોિગ ગંદુ પાણી ઉત્પન થશે, જે નો �સ્તાિવ ETP માં સંચાલન થશે. જ્યાર 0.324 KLD ઘરેલુ ગંદુ પાણી
ને સેિપ્ટ ટેન્ માં છોડવામાં આવશે.
વીજળી ની જ��રયાત
વીજળીનો સ્�ો MGVCL રેહશે. સૂિચત �ોજે કટ માટે ની વીજળીની માંગ 60 HP હશે. પાવર બેક- અપ માટે 40 HP નો DG સેટ નો
ઉપયોગ કરવામાં આવશે.
બોયલર ના �ધણ તરીકે કોલસા ની ગોળીઓ ( 60 kg/hr) વાપરવામાં આવશે અને DG સેટ માટે ડીજલ (8 L/hr) નો ઉપયોગ
કરવામાં આવશે. બોયલર અને DG સેટ માટે પયાર્પ �ચાઈના સ્ટે આપવામાં આવશે.
માનવશિક્ ની જ��રયાત
બાંધકામ દરિમયાન 10 કામદારો ની જ��રયાત હશે અને કાયર્કા દરિમયાન લાયકાત અને જ��રયાત ના આધારે આશરે 9 લોકો કાયર્ર
થશે.
મ્યુિનિસપ કોપ�રેશન દ્વાર સ્થાિન કચરાનો િનકાલ કરવામાં આવશે. ઇવેપોરેટોર ના અવશેષો, ઉપયોગમાં લેવાયેલા તેલ/ સ્પ�
ઓઇલ, વપરાયેલા કંટેનર /�મ્/ બેગ્ વગેરે જે વા જોખમી કચરો રેિજસ્ટેડ �રસાઇક્લ/રી �ોસેસરને વેચી દેવાશે અથવા TSDF સાઇટ
પીઆર મોકલવામાં આવશે.
�ીનબેલ્ટન િવકાસ
સૂિચત સુિવધા કુલ 404.2 ચો મી િવસ્તા (33%) �ીન કવર/ લૉન િવકાસ માટે ફાળવવામાં આવશે. સ્થાિન �તોની યોગ્ છોડની
��િતયો ઝડપી િવકાસ અને �વન ટકાવી રાખવા માટે પયાર્પ અંતર અને ઘનતા સાથે વાવેતર કરવામાં આવશે.
અભ્યા િવસ્તા
પયાર્વરણન િવિવધ ઘટકોની પાયાની ગુણવ�ા, એટ્લ કે હવા, પાણી અને જમીન, �વિવજ્ઞ, હવામાન શાસ્ અને સામાિજક-આ�થક
સૂિચત સાઇટની આસપાસ આશરે 10 �કમી ના અસર ઝોનમાં મૂલ્યાંક કરવામાં આવ્યુ છે . હાલનો �રપોટર ચોમાસાની મોસમ પૂવ�ના �ણ
મિહના માચર- 2018 થી મે- 2018 ના સમય દરિમયાન એકિ�ત કરેલી માિહતી રજૂ કરે છે .
અભ્યાસન િવસ્તારનુ વાતાવરણ ગરમ ઉનાળા, ઠંડા િશયાળા અને વરસાદ સાથે બદલાય છે . વા�ષક મહ�મ તાપમાન મે મિહનામાં 44
�ડ�ી સેિલ્સય હોય છે અને ન્યુન� તાપમાન માચર મિહના માં 19 �ડ�ી સેિલ્સય હોય છે . આ િવસ્તારમા મહ�મ સાપેક ભેજ 82%
અને લઘુ�મ સાપેક ભેજ 17.5% છે .
િસસ્મીિસટ (ધરતીકંપની)
ભારત ભૂકંપ ઝો�નગ નકશા અનુસાર અભ્યા િવસ્તારન ઝોન-III (મધ્ય જોખમ ઝોન) તરીકે વગ�કૃત કરવામાં આવે છે .
હવાઈ પયાર્વર
આસપાસ ની હવાની ગુણવ�ા નું મોિન��ગ અભ્યા િવસ્તારન 10 �કમી િ�જયાના 8 સ્થળો CPCB અને NAAQS માગર્દિશક
મુજબ સરેરાશ 24 કલાક દીઠ હાથ ધરવામાં આવ્યુ હતુ.ં PM10 અને PM2.5 અનુ�મે 57.3 થી 79.5 µg/m3 અને 26.4 થી 36.5
µg/m3 ની રેન્જમા હોવાનું અવલોકન કરાયું હતું. SO2 6.3 થી 8.7 µg/m3 ની રેન્જમા, NOx 12.0 થી 16.7 µg/m3 ની રેન્જમા
હોવાનું અવલોકન કરાયું હતુ.ં VOC, ભારે ધાતુઓ, બ�ઝીન વગેરે જે વા અન્ પ�રમાણો મયાર્દાન નીચે મળી આવ્ય હતા.
ઘ�ઘાટ એટ્લ અિનચ્છની અવાજ. અભ્યાસન િવસ્તારમા કુલ 8 સ્થળ પીઆર અવાજનું િનરીક્ કરવામાં આવ્યુ છે . �દવસ દરિમયાન
47.1 dB (A) Leq થી 64.8 dB (A) Leq અને રાતના સમયે અવાજ 38.0 dB (A) Leq અને 54.3 dB (A) Leq સુધી ન�ધાયો
હતો. �દવસના અવાજ અને રાિ�ના સમય ના અવાજ સ્વીકાય મયાર્દામા મળી આવ્ય હતા.
પાણીનું પયાર્વર
અભ્યા ક્ષે 8 ભૂગભર જળ અને 8 સપાટી ના જલના નમુનાઓ એક� કરવામાં આવ્ય અને તેનું િવ�લેષણ કરવામાં આવ્યુ હતું. ભૂગભર
ના પાણી ના નમુનાઓનું િવ�લેષણ પ�રણામ IS 10500:2012 મુજબ પીવાના પાણી ની મયાર્દામા હતું. જળ ગુણવ�ા માપદંડના
વગ�કરણ મુજબ D માં છે
જમીન ની ગુણવ�ા
અભ્યા ના ક્ષે�મ 8 સ્થાનોમાથ માટીના નમુનાઓ એક� કરવામાં આવ્ય હતા અને ભૌિતક- રસાઈિણક લાક્ષિણકત માટે
િવ�લેષણ કયુ� હતુ.ં માટીની ગુણવ�ા સામાન્ હોવાનું �ણવા મળ્યુ હતુ.ં
10 �કમી િ�જયા આવરી લેતા અભ્યા ના િવસ્તારન જમીનમાં તળાવ/ સરોવર, ખેતીની જમીન, પડતર જમીન, ઝાડીની જમીન,
ઉધ્યો, શેહરી બાંધકામ અને વસાહતો નો સમાવેશ થાય છે .
જૈ િવક પયાર્વર
10 �કમી િ�જયા અભ્યા િવસ્તારન જૈ િવક પયાર્વર વનસ્પિ અને �ાણીઓ ઉપરાંત જળચર �ાણીનો પણ સમાવેશ થાય છે .
અભ્યા િવસ્તારમા િવિવધ �ાણીની ��િતયો મળી આવે છે , િવગતવાર અભ્યા �કરણ-3 માં આપવામાં આવ્ય છે .
�ોજે કટ સાઇટના 10 �કમી િ�જયા અંદરના િવસ્તારમા સામાિજક-આ�થક માિહતી એકિ�ત કરવામાં આવી હતી. ભારતના 2011 ની
વસ્ત ગણતરી મુજબ 22 ગામોનો સમાવેશ થાય છે . કુલ વસ્ત 409337 છે , જે માં પુ�ષોની વસ્ત 212371 છે અને મિહલાઓ ની વસ્ત
196966 છે અને �િત અનુસાર ગુણો�ર 928.7 છે . ઘરની કુલ સંખ્ય 84186 છે . કુલ િસિક્ વસ્ત 306891 છે . સાક્ પુ�ષ
173550 છે અને સાક્ સ્�ી 133341 છે અને સાક્ષર દર 75% છે .
• સૂિચત યોજનામાથી થતાં ઉત્સજર્ન નીચલા સ્ત ની સાં�તાના અંદાજ માટે, એરમોડ – ક્લાઉ 5 સોફ્ટવેરન ઉપયોગ
કરવામાં આવ્ય છે .
• આ અનુમાિનત જમીનના સ્તરન સાં�તા આધાર રેખા (બેઝલાઈન) �શ્યમા ઉમેરવામાં આવી ત્યાર, PM10, PM2.5, SO2,
NOx ના એકંદર �શ્ સ્ત, CPCB દ્વાર િનદ�િશત કરાયેલી મયાર્�દ સીમાની અંદર જોવા માં આવ્યુ છે .
• VOC અને અન્ પ�રમાણો �ડટેક્ટબ િલિમટની નીચે જોવામાં આવ્ય છે , િવગતવાર વણર્ �કરણ-3 માં દશાર્વવામા આવ્યુ છે .
• વાયુ �દૂષણને અંકુશમાં લેવા માટે પયાર્પ ઉપચારના પગલાં લેવામાં આવશે.
અવાજના મુખ્ સ્�ો તરીકે િવિવધ કામગીરીના મશીનો, પમ્, મોટરો, ડી� સેટ અને વાહન વ્યહવારન �ા�ફક નો સમાવેશ થાય.
રેહણાક અને ઔધ્યોિગ િવસ્તારોમા અવાજના સ્ત CPCB ના િનયત ધોરણોની નીચે હતા. અવાજ ની અસર ઘટાડવા માટે
મશીનરી અને વાહનોની સમયાંતર �ળવણી કરવામાં આવશે. ઘ�ઘાટ દમન ઉપાયો, જે મકે �ક્લોઝસ, �િતરોધક(બફેસર) અને/
અથવા રક્ષણાત પગલાં લેવામાં આવશે. (જ્યા અવાજનો સ્ત 75 dB (A) કરતાં વધુ હોય). કમર્ચા�ર ને ઈયરપ્લગ અથવા
ઈયર મફ્ જે વા રક્ષણાત સાધનો પૂરા પાડવામાં આવશે.
�સ્તાિવ �ોજે કટ માટે પાણીની જ��રયાત રાવડાપુરા �ામ પંચાયત દ્વાર પૂરી પાડવામાં આવશે. �સ્તાિવ �ોજે કટ માટે કુલ
પાણીની જ��રયાત 11.03 KLD રેહશે. તેમાં થી કુલ ઔધ્યોિગ ગંદા પાણીનું ઉત્પન 1.31 KLD થશે અને કુલ ઘરેલુ દૂિષત પાણીનું
ઉત્પન 0.324 KLD થશે. લગભગ 1.31 KLD ઔધ્યોિગ ગંદુ પાણી ઉત્પન થશે, જે નો �સ્તાિવ ETP માં સંચાલન થશે. જ્યાર
0.324 KLD ઘરેલુ ગંદુ પાણી ને સેિપ્ટ ટેન્ માં છોડવામાં આવશે.
�ોજે કટ સાઇટ નો કુલ િવસ્તા 1225 ચો મી છે . પ્લાંટન મોટો ભાગ ખુલ્લ િવસ્તા રેહશે અને તેનો ઉપયોગ રોડ, પા�કગ અને �ીન
બેલ્ માટે કરવામાં આવશે. �ીન િવસ્તારન િવકાસ માટે કુલ 404.2 ચો મી િવસ્તા ફાળવવામાં આવશે. એક વખત બાંધકામ �વૃિત
પૂણર થઈ �ય તે પછી, પ્લાંટન કામગીરીને કારણે ત્યા થોડી અસર થશે. �ોજે કટ સાઇટ પર �ીન બેલ્ અને અન્ લેન્ડસ્કેપ િવકાસ,
િવસ્તા �શ્ સ�દયર્ત વધારશે.
�ોજે કટ �વૃિત માં જમીન ક્લીયે�રગદરિમયા વૃક કાપવાની જ�ર નથી, ઉપરાંત અભ્યા િવસ્તારમા કોઈ પણ ઇકોલોિજકલ
સંવ�દનશીલ સ્થળ નથી અને તેથી, પ્લાન્ટ �વૃિતઓથી ઇકોલોિજ અંદ જૈ વ િવિવધતા પર કોઈ અસર થવાની સંભાવના નથી. કુલ
404.2 ચો મી િવસ્તારમા �ીન બેલ્ હશે, જે જૈ વ િવિવધતાના િવકાસમાં મદદ કરશે. પ્લાન ની અંદર અને તેના આસપાસ સ�દયર
લક્ વાતાવરણ પૂ�ં પાડવા સ્વદેશ છોડ સુશોભન વૃક્/ ઝાડીઓ સાથે વાવેતર કરવામાં આવશે. િવકિસત �ીન બેલ્ટન �ળવણી
ખાતરી કરવામાં આવશે અને છોડના અિસ્તત્વ દર પર પણ અડધા વષ� અભ્યા કરવામાં આવશે.
સામાિજક-આ�થકનો પયાર્વર
આ �સ્તાિવ �ોજે કટ થી ક્ષે� ઔધ્યોિગ િવકાસ પર કેટ્લી હકારાત્મ અસર પડશે. અપેિક્ છે કે ઓપરેશન તબક્ક દરિમયાન,
સૂિચત �ોજે કટ વેચાણ/ પ�રવહન વગેરેને લીધે કેટલીક પરોક રોજગારી ઊભી કરશે. એકંદરે �ોજે કટમાં લાંબા ગાળાના ફાયદા થશે.
જોકે,કુશળતા મુજબ, રોજગાર માટે સ્થાિન લોકોની પસંદગી કરવામાં આવશે. આથી સૂિચત �ોજે કટ સામાિજક-આ�થક
વાતાવરણ પર સકારાત્મ અસર કરશે.
આ �ોજે કટમાં સામેલ તમામ કામગીરી માટે જોખમ આકારણી હાથ ધરવામાં આવી છે . આ અભ્યા તમામ �વૃિતઓ સાથે સંકળાયેલા
તમામ જોખમોનો ધ્યાનમા લે છે . સંભિવત પ�રણામો તરફ દોરી રહેલા જોખમોનો �કરણ-7 માં સારાંશ આપેલ છે , અને જોખમ
ઘટાડવાના પગલાં �કરણ-7 માં EIA રેપોટર્મા દશાર્વવામા આવેલા છે . અભ્યાસમા કમર્ચારી, ���યા/ કામગીરી માટે જોખમ ગણવામાં
આવ્ય છે .
ગુણાત્મ રીતે સંભોધાયેલા િવિવધ જોખમોની ઓળખ માટે આપિ� વ્યવસ્થા યોજના તૈયાર કરવામાં આવી છે , જે માં ઓન સાઇટ
અને ઓફ સાઇટ કટોકટી યોજના નો સમાવેશ થાય છે . કુદરતી આપિ�ઑ જે વી કે પૂર, ભૂકંપ, અથવા માનવસ�જત આપિ� જે વા કે યુદ્
અને આગ, પાવર િનષ્ફળતાન કારણે થઈ શકે તેવી કોઈ ગંભીર કટોકટીને પહોચી વળવા માટે આપિ� વ્યવસ્થા યોજના તૈયાર કરેલ છે .
જોખમ આકારણી અને આપિ� વ્યવસ્થા યોજનાની િવગતો EIA �રપોટર્ન �કરણ 7 માં આપવામાં આવી છે .
ઔધ્યોિગ ક્ષે� િવકાસ રોજગાર માટે નવી તક ઊભી કરશે અને અથર્તં�મા િવિવધતા લાવવા માટે પણ મદદ કરી શકે છે .
CSR �વૃિતઓ
• ન�કના સ્કૂલોમા વધારાની �વૃિતઓની વ્યવસ્ કરવા માટે ભંડોદ પૂ�ં પાડવામાં આવશે.
• ગરીબ િવધ્યાથ�ઓન શાળાનો ગણવેશ, નોટબૂક્ અને િશષ્યવૃિ આપવામાં આવશે.
િનષ્કષ
• �ોજે કટ �ોપોન�ટ EPA, 1986 માગર્દ�શક મુજબ પયાર્વર રક્ માટે બધા કાનૂની િનયમોનું પાલન કરશે.
• સૂિચત �ોજે ક્ટમાથ ઉત્પન થયેલ ગંદુ પાણી ETP માં સંચાલન થશે. િસવેજનો સેિપ્ટ ટાંકી માં િનકાલ કરવામાં આવશે.
• �ોજે કટ સાઇટની આસપાસની હવાની ગુણવ�ા જે મ કે, SPM (PM 10 & PM 2.5), SO 2 અને NOx ની સાં�તા િનયત
મયાર્દાન અંદર નોધવામાં આવી હતી.
1.1. Introduction
M/s. Maruti Polymers is situated at plot no. 423/1, opposite Kartvya Farm, village Ravdapura,
District Anand, and State Gujarat. In proposed project they have decided to manufacture
synthetic organic resin and acrylic based emulsions. Alkyd resin and Acrylic emulsion are used
in manufacturing of paints for commercial and decorative purpose.
Company’s purpose is to start production activity for range of products to meet the growing
demands of specific market segment with the objective to be the most reliable manufacturer in
the market.
In order to obtain the Environmental Clearance from the EAC, MoEF&CC New Delhi, Form 1,
Pre- feasibility Report and proposed ToR submitted on dated 7th March 2018 and ToR issued on
dated 8th April 2018. M/s. Maruti Polymers has retained the services of Green Circle, Inc.,
Vadodara to undertake Environmental Impact Assessment (EIA) studies for assessing the
impact of the proposed project, industrial development project, on various environmental
parameters in the study area and prepare an Environment Management Plan to mitigate the
adverse impacts of the proposed project.
As per the ToR prescribed by MoEF&CC, baseline data has been prepared for one season i.e.
pre monsoon season (March 2018 to June 2018). The study area comprises of the core zone
(project area) and the buffer zone (10 km around the core zone from the periphery).
M/s. Maruti Polymers is situated at Plot no. 423/1, Opposite Kartvya Farm, Village Ravdapura,
Taluka Samarkha, District Anand and State Gujarat. Presently total 9 products are proposed
with production capacity of 480 MT/M. The total area covered by the proposed project is 1225
sq.m.
Project Proponent
M/s. Maruti Polymers is promoted by Mr. Soham Patel & Mr. Mayur Patel, are young, dynamic,
energetic and believer in digitalization work and world, who have two years of experience in
chemical industry.
The site is well connected with road and railway, nearest city Ravdapura located at distance of
301.5 m (0.3 Km), North and the nearest water body is Mahi River at distance of 23 Km.
Nearest Railway station Anand Junction is located at 3.70 Km, South. There is no reserved
forest, national park, eco sensitive areas in surrounding 10 km radius. The detail related to the
proposed project is discussed in the upcoming section.
The scope of the study includes a detailed characteristic of environment in the study area
associated with the proposed development on various environmental components. The
proposed project is currently in the design preparation stage. For the purpose of environmental
assessment, areas within 10 km radius of the project have been studied and the following
methodology will be adopted:
• Generation and collection of baseline data for valued environmental components as per
the EIA guidelines.
• Identification and quantification of significant environmental impacts due to the project
and associated activities.
• Evaluation of impacts due to the proposed activities and preparation of an environmental
impact statement.
• Preparation of Environmental Management Plan (EMP) encompassing the strategies for
minimizing identified adverse impacts along with the budgetary provisions to be made by
the project authorities for implementation of mitigation measures.
• Delineation of Post Environmental Quality Monitoring Programme (PEQMP) along with
organizational set up required for monitoring the effectiveness of mitigation measures.
Chapter-1, section
ii Information about the project proponent
1.3
Chapter-1, section
iii Importance and benefits of the project 1.4, subsection 1.4.3
and chapter 8
3 Project description
Chapter 2, section
i Cost of project and time of completion.
2.5
Chapter 2, section
ii Products with capacities for the proposed project.
2.8, subsection 2.8.1
If expansion project, details of existing products with capacities
iii and whether adequate land is available for expansion, reference Not Applicable
of earlier EC if any.
Chapter 2, section
List of raw materials required and their source along with mode of
iv 2.10, subsection
transportation.
2.10.1
Other chemicals and materials required with quantities and
v Not Applicable
storage capacities
Details of Emission, effluents, hazardous waste generation and Chapter 2, section
vi
their management. 2.12
Requirement of water, power, with source of supply, status of
Chapter 2, section
vii approval, water balance diagram, man-power requirement
2.11
(regular and contract)
Process description along with major equipments and Chapter 2, section
viii machineries, process flow sheet (quantative) from raw material to 2.8, subsection 2.8.1
products to be provided & section 2.9
ix Hazard identification and details of proposed safety systems.
Hazard identification and details of proposed safety systems.
c. Copy of all the Environmental Clearance(s) including
Amendments thereto obtained for the project from MOEF/SEIAA
shall be attached as an Annexure. A certified copy of the latest
Monitoring Report of the Regional Office of the Ministry of
Environment and Forests as per circular dated 30th May, 2012 on
the status of compliance of conditions stipulated in all the existing
environmental clearances including Amendments shall be
provided. In addition, status of compliance of Consent to Operate
for the ongoing Iexisting operation of the project from SPCB shall
x Not Applicable
be attached with the EIA-EMP report.
d. In case the existing project has not obtained environmental
clearance, reasons for not
taking EC under the provisions of the EIA Notification 1994 and/or
EIA Notification 2006 shall be provided. Copies of Consent to
Establish/No Objection Certificate and Consent to Operate (in
case of units operating prior to EIA Notification 2006, CTE and
CTO of FY 2005-2006) obtained from the SPCB shall be
submitted. Further, compliance report to the conditions of
consents from the SPCB shall be submitted.
4 Site Details
Location of the project site covering village, Taluka/Tehsil, District
Chapter 2, section
i and State, Justification for selecting the site, whether other sites
2.6 & 2.7 & Chapter 5
were considered
Executive Summary
Chapter: 1 Introduction
This chapter gives the brief description of the location, approachability, amenities, layout and
utilities of the proposed project.
This chapter presents details of the baseline environmental status for microclimate, air quality,
noise, traffic, water quality, soil quality, flora, fauna, socio-economic status etc.
This chapter discusses the possible sources of pollution and environmental impacts due to the
project during construction and operation phases and suggests the mitigation measures.
This chapter covers the analysis of technology alternatives and site alternatives.
This chapter discusses the details about the environmental monitoring program during
construction and operation phases.
This chapter covers about the Public Hearing, Risk Assessment Studies for the construction and
operation phase, the safety precautions that are taken during construction phase and Disaster
Management Plan and Emergency Preparedness Plan onsite and offsite.
This chapter deals with the Environmental Management Plan (EMP) for the proposed project
and indicates measures proposed to minimize the likely impacts on the environment during
construction and operation phases and budgetary allocation for the same.
Chapter: 10 Conclusions
This chapter presents the conclusion made by the project proponent and developer.
2.1. Introduction
This section of the report describes the features of the proposed project in detail to allow an
assessment of its environmental impact. A complete description is important to understand the
potential environmental implications of the initiative and accordingly addressing issues in an
appropriate manner. Description of the proposed project components and activities are
presented together with the aspects during the construction and operation phase of the project
which are also important from the environmental perspective.
Due to increase in the threshold limit (storage of chemicals) as well as the propose project is
situated outside the notified industrial area & have applied for PESO Certificate for the storage
of chemicals. Hence, the category of the proposed project will come under category ‘A’.
Corners Coordinates
The project is in the proximity of Anand district of Gujarat State. Proponent is very well familiar
with the surrounding environment.
Plant Layout:
NH - 8 0.48 SW
5 Nearest Highway
SH - 60 1.56 ESE
Vadodara International
6 Nearest Airport 39.29 SE
Airport
Site Photographs:
The proposed project is small scale industry and plan to establish manufacturing of Synthetic
Organic Resin & Acrylic Base Emulsion at 480 MT/M.
Proposed products for the new plant with capacity are shown in below table:
Styrene acrylic
25085-34-1 Paint manufacturing
emulsion
Vinyl acrylic
25067-01-0 Paint manufacturing
emulsion
Melamine
C. Amino Resin 9003-08-1 30 Paint manufacturing
formaldehyde
Total 480
Firstly, water and surfactant is charged into reactor and into pre-mix tank at the same time.
Then stir it continuously for half an hour. Once it mixed properly start to add monomers (i.e.
styrene or vinyl acrylic and Butyl acrylate) slowly with fixed flow rate. Simultaneously start
heating in the reactor with the set point of 80 OC. Add S.B.C in the reactor and add Acrylic acid
and P.P.S in pre-mix tank. After 20 mins of charge, start feeding of pre-mixed emulsion in the
reactor. Once feeding is completed in the process, the solution will start to exotherm in the
reactor. After finishing exothermic reaction, start continuous feeding for 4 hours with fixed flow
rate. Add T.B.H.P to complete the reaction and hold the batch for half an hour at 45-50 OC
discharge it.
Input Kg Output Kg
Water 48.4 Styrene/Vinyl Acrylic 98
Styrene/Vinyl Acrylate 24.5 Emulsion
Butyl acrylate 24.5
PPS 0.1 Reflux water 02
Ammonia 0.5
Formaldehyde 0.5 Total 100
Surfactant 1
Acrylic acid 0.5
Total 100
Firstly, water and surfactant is charged in reactor and into pre mix tank at the same time. Then
stir it continuously for half an hour. Once it is mixed properly, start adding monomers (i.e. Methyl
methacrylate and Butyl acrylate) slowly with fixed flow rate. Simultaneously start heating in the
reactor with the set point of 80̊C. Add S.B.C in the reactor and add Acrylic acid and P.P.S in
pre -mix tank. After 20 mins of charge, start feeding of pre-mixed emulsion in the reactor. Once
feeding is completed in the process, the solution will start to exotherm in the reactor. After
finishing exothermic reaction, start continuous feeding for 4 hours with fixed flow rate. Add
T.B.H.P to the complete reaction and hold the batch for half an hour at 45-50˚C and then
discharge it.
Input Kg
Water 48.4
Methyl methacrylate 23.5 Output Kg
Butyl acrylate 25.5 Pure Acrylic 98
PPS 0.1 Emulsion
Ammonia 0.5
Formaldehyde 0.5 Reflux water 02
Surfactant 1
Acrylic acid 0.5 Total 100
Total 100
The chemistry principles of resin synthesis are simple. First an acid/anhydride reacts with glycol
to form an ester with release of a water molecule i.e. the acid/anhydride group (COOH or CO-O-
CO) reacts with the OH group to form an ester and a water molecule.
Firstly, Soya Oil is heated in a vessel at a temperature of 180˚C then charge penta erithrytol and
glycerine in a vessel, during continuous heating let it get heated up to 255˚C and then cool it up
to 200˚C. Start addition of Phthalic anhydride. Start thinning after it gets certain fixed viscosity.
Firstly, Caster oil is heated in a vessel at a temperature 180˚C then charge Phthalic anhydride in
vessel, after that add Penta erythritol and glycerine. During continuous stirring let it gets heated
up to 265˚C and then let it cool up to 190˚C. Start thinning after it gets certain fixed viscosity.
Firstly Caster Oil is heated in a vessel at a temperature 180̊C. Then charge Phthalic anhydride
in vessel, start adding penta erythritol or glycerine. Then charge the Gum Rosin, during
˚C and then let it cool u pto 190˚C. Start thinning
continuous stirring let it get heated upto 265
after it gets certain fixed viscosity.
First of all charge water and Butanol in reactor. Start heating with set point of 65̊C and th en
start addition of para formaldehyde in the reactor. Check pH after the addition of caustic
solution. Stir it for 1 hour and then add melamine powder into reactor. Start heating for set point
of 120̊C and start to recover water from the process. After the r ecovery of water start
recovering of butanol from the process and check viscosity. Cool the reactor after the desired
viscosity is achieved and discharges the material.
Chemical reaction:
Paraformaldehyde
o
(65 C)
Addition of Caustic
solution
(pH 9-10)
Melamine powder
addition
(After 2 hrs)
Melamine
formaldehyde
resin
Sr. Product Name Raw Materials CAS no. Qty. Storage Mode of Capacity of Source
No. condition transport storage of Raw
required (MT/M)
condition material
68585-
34-2
79-10-7
6. Formaldehyde 7727-21-
0.05 Drums -
7. Surfactant 1
Sr. Product Name Raw Materials CAS no. Qty. Storage Mode of Capacity of Source
No. condition transport storage of Raw
required (MT/M)
condition material
7 0.15 Drums -
50-00-0 -
68585-
34-2
79-10-7
50-00-0
68585-
34-2
79-10-7
Sr. Product Name Raw Materials CAS no. Qty. Storage Mode of Capacity of Source
No. condition transport storage of Raw
required (MT/M)
condition material
8 2 Bags 50 KG
1330-20- 1
7
1310-65-
2
St. Tank
1330-20-
7
Sr. Product Name Raw Materials CAS no. Qty. Storage Mode of Capacity of Source
No. condition transport storage of Raw
required (MT/M)
condition material
1310-65-
2
2.11. Utilities
2.11.1. Electricity
Electricity shall be obtained from MGVCL. Coal pellet will be used for boiler and diesel will be
used as fuel for D.G. set. The total power and fuel requirement for the proposed project is given
below:
1. MGVCL 60 Hp
2.11.2. Fuel
2.11.3. Water
The source of water for the proposed project will meet through Ravdapura gram panchayat. The
total water requirement for the proposed project will be 11.03 KLD. The total wastewater
generation from industrial process will be 1.31 KLD, while 0.324 KLD domestic effluent will be
generated.
Domestic (Including
1 0.41 0.324
Flushing)
3 Industrial
Washing (Equipment
d. 0.5 0.5
+Floor Washing)
2.11.4. Manpower
The project will require 10 workers during the construction phase and 9 employees during
operation phase.
2.12. Emission, Effluent Generation & Waste Generation with Control System
2.12.1. Air Emission
2.12.1.1 Flue Gas Stacks and Process Vents Details
40 Hp or
DG set
3 29.827 Diesel 4m 0.5 90
(standby)
KVA
Sold to authorized
Used/spent 20 Litres/Year
2. 5.1 D.G set Liquid reprocessor
oil
Return back to raw
material supplier/
Discarded Production 25 Nos./ Month
3. 33.3 - Hanover to authorized
containers processes
reprocessor
4 2010 697.33
5 2011 813.5
6 2012 618
7 2013 1138
8 2014 769
9 2015 479.5
10 2016 494.5
11 2017 715
Average 727.7
Run off from the proposed project site is calculated using rational formula:
Q= C x I x A
Q = Run-off in m3/hr
A = Catchment Area (sq.mt)
C = Coefficient of Run-off
I = intensity of Rainfall in m/hr
3.1. Introduction
The baseline environmental qualities of various environmental components like air, noise, water,
land, flora and fauna and socio-economic form an important and integral part of an EIA study.
The baseline data forms the basis for predicting/assessing the environmental impacts of the
proposed project. The baseline environmental quality is assessed through field surveys within
the impact zone as well as the secondary data for various components of the environment, viz.,
air, noise, water, land and socio-economic.
The proposed project is located at Plot no. 423/1, opposite Kartvya Farm, village Ravdapura,
district Anand, state Gujarat. The proposed project is at the intersection of latitude
22°35'41.21"N and 72°57'37.34"E longitude.
The report presents the data collected during the sampling period of three months during pre
monsoon season from March 2018 to May 2018. Various environmental components were
monitored and samples were analyzed.
The baseline quality of various components of the environment viz., air, noise, water, land,
biology, meteorological and socio- economic was assessed within the impact zone of about 10
km around the proposed site. Secondary data has also been incorporated from authentic
sources viz.
3.2. Methodology
The methodology for conducting the baseline environmental survey has been obtained from the
guidelines provided in the “EIA Guidance Manual for Synthetic Organic Chemicals Industry”
issued by the Ministry of Environment Forest and Climate Change (MoEF&CC). Environmental
attributes and frequency of monitoring is given below in table:
Table 3.1 Location Details, Period and Methodology of Baseline Data Generation
Sr No. Attribute Parameters No. of Frequency of
Sampling monitoring/ Data
locations collection
1 Meteorology Wind speed & direction, Project Site Data collected from
temperature, relative humidity, IMD
rainfall
2 Ambient Air Quality PM10 , PM2.5, SO2, NOX, CO, 8 24 hourly samples
H2S, NH3,HC,Pb, Ozone, twice a week. CO and
Benzene, Benzo pyrene, O3
Arsenic, Nickel 8 hourly samples
twice a week
3 Noise levels Noise levels in dB(A) leq 8 At least one day in a
season for day time
and night time on a
working & nonworking
day.
4 Surface water Physical, Chemical and 8 Once in a year.
quality bacteriological parameters
including pH, temperature,
turbidity, magnesium,
hardness, total alkalinity,
chloride, sulphate, fluoride,
salinity, DO, BOD, COD,
Heavy metals, Total coliforms,
faecal coliforms
5 Ground water Physical, Chemical and 8 Once in a year.
quality bacteriological parameters
including pH, temperature,
turbidity, magnesium
hardness, total alkalinity,
chloride, sulphate, fluoride,
salinity, DO, BOD, COD,
Heavy metals, Total coliforms,
faecal coliforms
6 Biological Existing flora and fauna Study area Through field visits
environment and substantiated
through secondary
data sources
7 Soil characteristics Physical, Chemical and 8 Once in year.
Biological parameters to
assess agricultural and
afforestation potential
including pH, Permeability,
Electrical conductivity,
Nitrites, Phosphates, TPH,
Fluorides, Heavy metals,
SAR, Total Hydrocarbons and
Cation exchange capacity.
8 Land use/ Land Land use for different land Study area Land use / Land
cover use classifications Cover Analysis using
satellite imaging and
GIS Technique
9 Socio- economic Socio-economic Study area Based on field survey
Environment characteristics, labour force and data collected
characteristics, population from Census of India
statistics, existing amenities in
the study area and quality of
life.
3.3. Geology
3.3.1. Introduction
Anand district covers an area of 2941 sq km, lies in the central part of the state. Anand district
is situated between North latitudes 22°06' & 22°43' and East longitudes 72°20' & 73°12' and
falls in the Survey of India degree sheet No. 46B and 46F. The district is bounded on the north
by the Kheda District, on the west by Ahmadabad District and on the east by Vadodara District.
The southern boundary of the district is marked by the Gulf of Khambat. Anand District is
famous for the Agriculture Co-operative “The Amul” Milk Co-operative which is located at
Anand the District Headquarter. The district falls under the canal command of Mahi Right Bank
Canal Command Area (MRBC) and has an intensive network of canal. The Canal is fed by weir
constructed on Mahi River at Waynesboro in Balasinor Taluka of Kheda District. The flow in the
river is regulated by Kadana Dam situated upstream in the Panchmahals district.
gradually increases from piedmont zone in the northeast towards west and southwest.
Maximum thickness of alluvium in the district is estimated to be about 250-300 m in the south,
central part.
Quaternary, Post Miocene and Tertiary sediments in the area were deposited over a sinking
basement. The main formation is of quaternary age, formed by alluvium deposited by Mahi,
Sabarmati and Watrak rivers. They comprise multilayered formations of gravel, sand, clay and
kankars intermixed at places. The clay and sand horizons form alternate layers having pinching
and swelling nature. The kankars, pebbles and the gravels form lenses. Thickness of alluvium
increases from North and North West towards South and South West direction. Alluvium is
underlain by Deccan traps in general with intervening blue clays at some places.
3.3.3. Geomorphology
The present physiographic set up is a combined result of diversified lithology, structure and
denudational as well as depositional processes active in the area. Geomorphologically, the
district can be broadly classified into following major zones:
1. Piedmont plain
2. Alluvial Plain
3. The Coastal Plains (Bhal)
Piedmont plain: A belt of about 15-20 km width fringing the hilly terrain in the north east
extending approximately 70-80 m above MSL elevation constitute piedmont plain. This belt is
characterised by moderate relief, shallow alluvium with at places boulder/gravel beds.
Alluvial Plain: It is the single most prominent geomorphic unit and covers the major part of the
district. It forms part of the inter cratonic Cambay graben, where sediments have been
deposited in a slow sinking basin. Wind as carrier has dumped or deposited sand and silt
covering paleo-topography and older formations. It is a vast sandy tract characterised by gently
sloping, slightly rolling to undulating topography owing to presence of blown sands at surface.
Over all drainage density is low and most of the area, particularly the mid-stream part of Mahi
and Sabarmati River, is devoid of well-developed drainage network. River alluvium is observed
along the rivers Mahi, Sabarmati, Vatrak in the form of channel or flood deposits. Terrain slope
are moderate to low. Charotar plain lying between the rivers Shedi and Mahi in the central part
is one of the richest agriculture belt of Gujarat. Bad land topography is observed all along the
bank, with bank height 15-20 m, of river Mahi indicating active erosion.
Coastal Plains (Bhal Region): In the south-western part, mainly in Tarapur and Khambat
talukas, alluvial plain merges with the coastal Bhal area. BHAL in the local language means
forehead where nothing grows. Such areas have saline soil and are monotonously 6 flat with
few isolated and continuous patches of marshy lands with salt encrustation, which are at
places contiguous to the marshy lands of the gulf. In this conspicuous landform, terrain is
monotonously flat & low lying with general elevations less than 30- 40 m above MSL. Such
areas are mostly wasteland and are devoid of vegetation. During monsoon period, such tract is
covered by a large sheet of water.
A systematic digital image interpretation approach was used to delineate the land use classes.
The present study was focused on demarcating boundaries of different land use and land cover
unit from an analysis of different types of colour registrations of land use and land cover unit s
from satellite imagery. Data used in the land use map preparation is the satellite imagery of
Indian Remote Sensing Satellite (IRS-ID, sensor P6, LISS III) of 24 m resolution.
Figure 3.2 Land Use Map of the Study Area (10 km Radial Zone)
Table 3.2 Land Use Distribution of the Study Area (10 km Radius)
Crop Land
Urban Built Up
Settlement
Industry
Mixed Built Up
Residential Built Up
Waste Land
Plantation
Pond/Lake
Fallow Land
Wet Land
Figure 3.3 Graph Showing Land Use of the Study Area (10 km Radius)
3.5. Hydrogeology
The Anand district lies in the Cambay basin situated between Saurashtra Crater and Aravali
Swell and Deccan Shield in the east. The basin comprises both marine and non marine
formations. Major part of the district is underlain by alluvium which in turn is underlain by
Tertiary sedimentary formations within the Cambay Sedimentary Basin. The alluvium mainly
consists of fine to coarse grained sand, gravel, silt, clay and Kankar. The thickness of alluvium
gradually increases from piedmont zone in the northeast towards west and south west.
Maximum thickness of alluvium in the district is estimated to be about 250-300 m in the south,
central part. Ground water occurs both under phreatic and confined conditions in arenaceous
horizons that form a multilayered aquifer system. The occurrence and movement of ground
water is mainly controlled by inter- granular pore spaces. Two major aquifers can be identified
within the explored depth. Ground water in the upper unit occurs under phreatic conditions,
which at places becomes semi- confined to confine. The lower unit, comprising a few hundred
metres of alternating sandy and clayey horizons, forms a multiple confined aquifer system. The
general disposition of these aquifers in the study area is as follows.
Towards east and northeast, in the piedmont plain, the nature of sediments is more uniform
and only phreatic aquifer is present. This belt forms the principal recharge zone for the deeper
aquifers. The argillaceous in the central and western parts, mainly act as confining layers.
Ground water is extensively developed by dug, dug-cum-bored and tube wells in areas
underlain by alluvium. Depth of dug and dug-cum-bored wells varies from 5 m to 38 m bgl
whereas depth of water level, in general, varies from 5 m to 15 m bgl. The depth of ground
water in the vicinity of the Mahi River in the east is deepest and gradually become shallower
towards west. The general depth to ground water is between 5 m and 10 m bgl. The average
fluctuation, between pre monsoon and post monsoon seasons, recorded during the studies is
of the order of 3m. It varies from 0.60 m to 10.269 m. The quality of ground water is generally
suitable for irrigation, and the hydro geological conditions are conducive to ground water
development through dug wells, dug cum bored and tube wells.
Figure 3.4 Depth to water level map for the pre-monsoon period 2012
Figure 3.5 Depth to water level map for the post-monsoon period 2012
The level of ground water development varies from 17.09 % (Tarapur Taluka) to 63.27 %
(Anklav Taluka). Overall level of ground water development in the district is 52.48%. Prime
source of ground water irrigation in the district are dug wells, shallow and deep tube wells and
canals.Net irrigated area is about 181500 ha. Irrigation intensity is 133.11 %. Net irrigated area
through canals is 95700 ha.
3.8. Meteorology
Observation on Meteorology: The meteorological parameters play a vital role in transport and
dispersion of pollutants in the atmosphere.
Micro meteorological data within the study area, during air quality survey period. Meteorological
data recorded during the monitoring period is very useful for proper interpretation of the
baseline information as well as for the input to the predictive air pollutants dispersion models.
Historical data on meteorological parameters will also pay an important role in identifying the
general meteorological status of the region. Site specific data can be compared with the
historical data in order to identify changes, which may have taken place due to the rapid
industrialization in the area.
The micro-meteorological parameters regulate the transport and diffusion of pollutants released
into the atmosphere. The principle variables which affect the micrometeorology are horizontal
connective transport (average wind speed and direction), vertical connective transport
(atmospheric stability and inversion conditions) and topography of the area.
Total - - - - 799.6
Observations on meteorology: the meteorological parameters play a vital role in transport and
dispersion of pollutants in the atmosphere.
Site specific climatic condition refers to average weather comprising of temperature, relative
humidity, wind speed, rainfall, cloud cover etc. This determines the baseline conditions and
probable impacts on environmental parameters with respect to the project. The site specific
climatic conditions are given below table:
Ambient Temperature
Monthly variations of monthly highest and monthly lowest temperature recorded are as follows:
o
Temperature ( C)
-
March, 2018 April, 2018 May,2018
Maximum
43 45 47
Minimum
16 19 23
Average Max.
37 41 44
Average Min.
19 24 27
Precipitation:
Precipitation (mm)
Month
Maximum Minimum Average
March, 2018
April, 2018 0.0 0.0 0.0
May,2018
Humidity:
Humidity (%)
Month
Maximum Minimum Average
March, 2018 53 11 32
April, 2018 51 12 32
May,2018 60 12 36
Wind speed
The baseline studies on air environment include identification of specific air pollution parameters
expected to have significant impacts and assessing their existing levels in the ambient air within
the impact zone. To assess the baseline status of ambient air quality in the study area,
monitoring is undertaken to ascertain the baseline pollutant concentrations in ambient air.
Methodology for Air Monitoring: AAQM was carried out and AAQM locations were monitored
on 24 hourly average basis twice as per guidelines of CPCB and NAAQS. The conventional and
project specific parameters such as particulate matter PM10 (size less than 10 μm), particulate
matter PM2.5 (size less than 2.5 μm), sulphur Dioxide (SO2) & Oxides of Nitrogen (NOx) were
monitored.
Selection of Stations for Sampling: Depending upon the purpose of the study IS: 5184 (part XIV)
lays down various criteria for selection of sampling stations. For EIA/EMP, the purpose is to
ascertain the baseline pollutant concentrations in ambient air. Accordingly, the criterion can be
selected to ascertain quality of air on human settlements or environmentally sensitive areas if
any located in the 10 km radius study area.
The locations for AAQM study were selected within the 10 km radius of the proposed plant
installation. Ambient air quality was monitored on 8 locations to generate representative ambient
air quality data. The sampling locations are shown in figure and listed in Table 3.4
Maximum 71.3 32.8 7.8 15.0 0.250 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
AAQ1- Minimum 48.0 22.1 5.3 10.1 0.168 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Project
Site Average 59.7 27.5 6.6 12.5 0.209 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
98percentile 70.2 32.3 7.7 14.7 0.246 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Maximum 94.8 43.6 10.4 19.9 0.332 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Minimum 63.9 29.4 7.0 13.4 0.224 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
AAQ2-
Average 79.5 36.5 8.7 16.7 0.278 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
98percentile 93.3 42.9 10.3 19.6 0.326 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Maximum 84.5 38.9 9.3 17.7 0.296 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Minimum 56.9 26.2 6.3 11.9 0.199 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
AAQ3-
Average 70.8 32.6 7.8 14.9 0.248 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
98percentile 83.2 38.3 9.1 17.5 0.291 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
AAQ4- Maximum 89.8 41.3 9.9 18.9 0.314 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Benzo
SO2 CO As
PM 10 PM 2.5 NOx NH3 Pb O3 C6H6 Ni (a) VOC
Locations (µg/m (mg/m (ng/
(µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) (ng/m3) Pyrene (ppm)
3) 3) m3)
(ng/m3)
Minimum 60.5 27.8 6.7 12.7 0.212 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Average 75.3 34.6 8.3 15.8 0.263 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
98percentile 88.4 40.7 9.7 18.6 0.309 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Maximum 81.3 37.4 8.9 17.1 0.285 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Minimum 54.7 25.2 6.0 11.5 0.191 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
AAQ5-
Average 68.1 31.3 7.5 14.3 0.238 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
98percentile 80.0 36.8 8.8 16.8 0.280 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Maximum 76.3 35.1 8.4 16.0 0.267 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Minimum 51.4 23.6 5.7 10.8 0.180 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
AAQ6-
Average 63.9 29.4 7.0 13.4 0.224 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
98percentile 75.1 34.5 8.3 15.8 0.263 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Maximum 68.4 31.5 7.5 14.4 0.239 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Minimum 46.1 21.2 5.1 9.7 0.161 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
AAQ7-
Average 57.3 26.4 6.3 12.0 0.201 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
98percentile 67.3 31.0 7.4 14.1 0.236 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
AAQ8- Maximum 78.4 36.1 8.6 16.5 0.274 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Benzo
SO2 CO As
PM 10 PM 2.5 NOx NH3 Pb O3 C6H6 Ni (a) VOC
Locations (µg/m (mg/m (ng/
(µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) (ng/m3) Pyrene (ppm)
3) 3) m3)
(ng/m3)
Minimum 52.8 24.3 5.8 11.1 0.185 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Average 65.7 30.2 7.2 13.8 0.230 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
98percentile 77.2 35.5 8.5 16.2 0.270 <20 <0.01 <20 <3.0 <5 <1.0 <0.01 <1
Source: Primary Data Collection and analysis during study period by Laboratory
Table 3.6 National Ambient Air Quality Standards and Methods of Measurement
National Ambient Air Quality Standards (NAAQS)
Time
S. Industrial,
Pollutants Weighted Ecologically
No. Residential, Methods of
Average Sensitive
Rural and measurement
Area
other area
Ammonia
6 24 hours 400 400 Indophenol Blue Method
(µg/m3)
UV Photometric
7 Ozone (µg/m3) 8 hours 100 100
Chemical Method
Arsenic
9 Annual 6.0 6.0 AAS
(mg/m3)
Benzene
11 Annual 5.0 5.0 Gas Chromatography
(µg/m3)
Benzopyrene
12 Annual 1.0 1.0 Gas Chromatography
(mg/m3)
(Source: http://cpcb.nic.in/National_Ambient_Air_Quality_Standards.php)
PM10 levels were ranging from 57.3 to 79.5 µg/m3. The highest PM10 level was found at Anand
and lowest PM10 level were observed at Jol. PM10 concentration was within the NAAQS level
(i.e.100 µg/m3) at all locations.
PM 10
100
Concentration in µg/m3
90
80
70
60 Maximum
50 Minimum
40
30 Average
20 98%tile
10
CPCB Limit
0
AA01 AA02 AA03 AA04 AA05 AA06 AA07 AA08
Sampling Locations
PM2.5 levels were ranging from 26.4 to 36.5µg/m3. The highest PM2.5 level was found at
Anand and lowest PM2.5 level was observed at Jol. PM2.5 concentration was found within the
NAAQS level (i.e.60 µg/m3) at all the locations.
PM 2.5
90
Concentration in µg/m3
80
70
60
Maximum
50
40 Minimum
30 Average
20 98%tile
10
CPCB Limit
0
AA01 AA02 AA03 AA04 AA05 AA06 AA07 AA08
Sampling Locations
SO2 levels were ranging from 6.3 to 8.7µg/m3. The highest SO2 level was found at Anand and
lowest SO2 level was observed at Jol. The SO2 level in all the monitoring locations is within
permissible limit i.e. NAAQS level 80µg/m3.
SO2
80
Concentration in µg/m3
70
60
50 Maximum
40
Minimum
30
20 Average
10 98%tile
0
CPCB Limit
AA01 AA02 AA03 AA04 AA05 AA06 AA07 AA08
Sampling Locations
NOx levels were found ranging from 12.0 to 16.7 µg/m3. The highest NOx level were found at
Anand and lowest NOx level were observed at Jol. The NOx level in all monitoring locations
was under permissible limit i.e. NAAQS level 80 µg/m3.
NOx
80
Concentration in µg/m3
70
60
50 Maximum
40
30 Minimum
20 Average
10
0 98%tile
AA01 AA02 AA03 AA04 AA05 AA06 AA07 AA08 CPCB Limit
Sampling Locations
Noise can be defined as an unwanted sound. It interferes with speech and hearing. If intense
enough, it can damage hearing, or is otherwise irritating. The definition of noise as unwanted
sound implies that it has an adverse effect on human beings and their environment. Noise can
also disturb natural wildlife and ecological system.
The objective of the noise pollution survey in the study area was to identify existing noise
sources and to measure background noise levels. The collection of baseline noise environment
data included following steps:
Reconnaissance: In order to measure the existing noise sources and to identify the
background noise levels, the noise pollution survey around the proposed site was carried out.
The collection of baseline noise environment data included identification of noise sources and to
measure background noise levels due to transportation and other local activity.
Methodology for Noise Monitoring: Noise standards have been designated as per the Noise
pollution (Regulation & Control) Rules, 2000 Notified by Ministry of Environment and Forests,
New Delhi, February 14, 2000. The measurements were carried out at each monitoring location
during day time and night time.
A total of 8 locations were identified for ambient noise monitoring in the study area. The noise
monitoring locations are given in Table 3.7
70
60
50
dB(A) Leq
40
30 Series1
20 Series2
10
0
1 2 3 4 5 6 7 8
Sampling Locations
Figure 3.14 Graphical Representation of Day time Noise Level in the study area
Night Time:
The night time noise level in the study area is in the range of 38.0 dB (A) Leq at Spandan
Hospital to 54.3 Leq dB (A) at Near Railway Station. The night time noise was also within
stipulated standards of CPCB.
40
30 Result
20 CPCB Permissible Limit
10
0
1 2 3 4 5 6 7 8
Sampling Locations
Figure 3.15 Graphical Representation of Night time Noise Level in the study area
A Industrial area 75 70
B Commercial area 65 55
C Residential area 55 45
D Silence zone 50 40
Note:
Reconnaissance Survey: Reconnaissance survey has been done for water quality monitoring
in the study area. The baseline water quality of ground water/surface water in the region is
obtained by collecting sample from villages in the area considering the 10 km radius for the
baseline study.
Methodology of Monitoring: In order to establish the baseline water quality, ground water and
surface water sampling locations were selected based on availability, following standard norms
and requirement. Ground water samples were collected from the identified hand pumps and
bore wells for the characterization of water quality. Selection of surface water sampling locations
has been considered as per the utilization pattern of the villagers for domestic/ drinking
purposes.
The samples collected were preserved, stored and analyzed as per standard methods of
Analysis of Water and Waste water (APHA, 1995).
Ground water samples were collected from 8 locations during the study period and analyzed for
a number of physico-chemical parameters.
Permissible
S.
Parameter Units Result Limit as
No. Reference
Per
Method
IS
Sample Identification GW1 GW2 GW3 GW4 GW5 GW6 GW7 GW8
10500:2012
1. pH --- 7.78 7.45 7.65 7.82 7.36 7.41 7.20 7.13 6.5-8.5 APHA 4500 H+
2. Conductivity mS/cm 2800 1712 2584 2180 2200 2426 2164 2324 - APHA 2510
3. Turbidity NTU <2 <2 <2 <2 <2 <2 <2 <2 5 APHA 2130
4. Color Hazen <5 <5 <5 <5 <5 <5 <5 <5 15 APHA 2120
5. Odor - Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable APHA 2150
Total
6. Dissolved mg/L 1836 1237 1685 1437 1438 1590 1432 1526 2000 APHA 2540 C
Solid
Total
7. Suspended mg/L 2 1 3 2 2 3 1 2 - APHA 2540 B
Solid
APHA 4500-
8. Sulphate mg/L 98.6 55.1 72.2 45.7 61.3 87.6 54.8 68.8 400
SO42-
APHA 4500 -
9. Chloride mg/L 215 245 226 370 356 394 243 200 1000
Cl-
Total
10. mg/L 580 385 438 505 468 435 501 390 600 APHA 2340
Hardness
Calcium as
11. mg/L 142.4 86.4 130 147.2 140.8 103.6 131.2 101.6 200 APHA -3500 Ca
Ca
Magnesium
12. mg/L 54.4 41.07 27.46 33.29 28.19 42.77 43.01 33.05 100 APHA 3500-Mg
Mg
13. Alkalinity mg/L 325 315 294 405 389 321 375 306 600 APHA 2320
14. Copper mg/L <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 1.5 APHA 3500-Cu
15. Zinc mg/L <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 15 APHA 3500-Zn
16. Iron mg/L 0.26 0.22 0.19 0.20 0.19 0.34 0.29 0.21 0.3 APHA 3500-Fe
17. Lead mg/L <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.01 APHA 3500-Pb
18. Nickel mg/L <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.02 APHA 3500-Ni
19. Cadmium mg/L <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 0.003 APHA 3500-C
Calcium
20. Hardness mg/L 356 216 325 368 352 259 328 254 - APHA 3500-Ca
as CaCO3
21. Magnesium mg/L 224 169 113 137 116 176 177 136 - APHA 3500-Mg
Hardness
as CaCO3
Phenolic
22. mg/L <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.002 APHA 5530
compound
23. Fluoride mg/L 0.28 0.45 0.39 0.40 0.32 0.45 0.37 0.30 1.5 APHA 5400-F-
24. Salinity mg/L 387 441 406.8 666 640.8 709.2 437.4 360 - 27.
25. Pesticides P/A Absent Absent Absent Absent Absent Absent Absent Absent Absent 29.
All the samples were colorless meeting desirable norms (<5 Hazen).
All the samples meet the desirable standards (pH ranges from 7.13 to 7.82).
TDS in samples ranges from 1237 mg/L (Anand) to 1836 mg/L (Project Site). All the
samples meet the permissible limit of 2000 mg/L.
Total Hardness in the water ranges from 385 mg/L (Anand) to 580 mg/L (Project Site). All
the samples meet the permissible limit of 600 mg/L.
Calcium content in the water ranges from 86.4 mg/L (Anand) to 147.2 mg/L (Bhalej), all
the samples meet the permissible limit of 200 mg/L.
Magnesium content in the water ranges from 27.46 mg/L (Ajarpura) to 54.4 mg/L (Project
Site). All the samples meet the permissible limit of 100 mg/L.
Sulphate content in the water ranges from 45.7 mg/L (Bhalej) to 98.6 mg/L (Project Site).
All the samples meet the permissible limit of 400 mg/L for drinking water.
Fluoride content in the water ranges from 0.30 mg/L (Samarkha) to 0.45 mg/L (Anand).
All the samples meet the permissible limit of 1.5 mg/L for drinking water.
Total alkalinity in the water samples ranges from 294 mg/L (Ajarpura) to 405 mg/L
(Bhalej). All the samples are within the permissible limit of drinking water (600 mg/L).
Chlorides range from 215 mg/L (Project Site) to 394 mg/L (Chikhodra), which are below
permissible limits (1000 mg/L).
Heavy metals like Copper, Nickel, Cadmium and Zinc are well below the limit in all
samples except Lead which was slight above the permissible limit.
Hence, it can be observed that ground water qualities in terms of various essential and
desirable characteristics are found within the limits specified by IS 10500:2012.
Total
APHA 2540
7. Suspended mg/l 14 16 13 15 17 16 15 20
B
Solid
APHA
8. Sulphate mg/l 45.6 58.3 42.6 53.6 59.4 71.2 63.2 75.4
4500- SO42-
APHA 4500
9. Chloride mg/l 116 98 153 138 105 126 158 162
- Cl-
10. Total Hardness mg/l 228 213 236 250 239 196 201 226 APHA 2340
APHA -
11. Calcium as Ca mg/l 37.2 51.6 41.5 35.2 48.6 34.8 41.3 31.7
3500 Ca
APHA
12. Magnesium Mg mg/l 23.3 23.1 21.5 18.8 25.4 20.5 21.6 19.2
3500-Mg
13. Alkalinity mg/l 342 329 289 332 244 357 315 240 APHA 2320
APHA
14. Copper mg/l <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1
3500-Cu
15. Zinc mg/l <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 APHA
APHA
16. Iron mg/l 0.14 0.17 0.11 0.15 0.13 0.10 0.13 0.17
3500-Fe
APHA
17. Lead mg/l <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01
3500-Pb
APHA
18. Nickel mg/l <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02
3500-Ni
APHA
19. Cadmium mg/l <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003
3500-C
MPN/
APHA 9221
20. Total Coliform 100 140 120 110 130 84 63 240 170
B
ml
MPN/
Faecal APHA 9221
21. 100 34 23 27 21 17 9.8 47 40
Coliform E
ml
MPN/
APHA 9221
22. E. Coli 100 Absent Absent Absent Absent Absent Absent Absent Absent
F
ml
Calcium
APHA
23. Hardness as mg/l 163 175 189 174 186 156 156 186
3500-Ca
CaCO3
Magnesium
APHA
24. Hardness as mg/l 65 38 47 76 53 40 33 40
3500-Mg
CaCO3
25. Phenol mg/l <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 APHA 5530
APHA
26. Fluoride mg/l 0.16 0.28 0.17 0.21 0.17 0.25 0.31 0.18
5400-F-
APHA 2520
27. Salinity mg/l 208.8 176.4 275.4 248.4 189 226.8 284.4 291.6
B
Gas
28. Pesticides P/A Absent Absent Absent Absent Absent Absent Absent Absent Chromatog
raphy
Biochemical mg/l
30. Oxygen 8 4 6 4 8 4 6 6 APHA 5210
Demand
The baseline quality of water based on the results of the surface water quality monitoring within
the study area, it is observed that,
• The TDS and Chloride is high at Reservoir Chikhodra water body due to some
anthropogenic sources such as washing, bathing etc. and it may be due some
percolation of groundwater where TDS is high from nearby area.
• Total coliform and faecal coliform are observed high at all locations due to domestic
activities in ponds like washing, bathing etc.
3.12. Soil
Soil is the most important natural resource and a natural resource is anything that comes from
the earth and is used by us. We depend on the soil for food, clothing, shelter, minerals, clay and
water. Soil is the seat of many macro and micro flora like algae, fungi, earthworms, bacteria etc.
These are very beneficial in promoting soil reactions and decomposing the organic matter by
which essential nutrients for plants are liberated. Most of the soil is made up of two main parts:
Tiny bits of mineral particles which come from larger rocks, and humus, which is dark brown in
color and consists of decaying remains of plants and animals.
Soil also contains water, air and living organisms, such as fungi, bacteria, earthworms, round
worms, insects, etc. Actually more organisms live in the soil than above it.
3.12.1. Methodology
The soil samples were collected from 8 selected locations during pre monsoon season. The
samples collected were homogeneous representative of each sampling location. At random sub
locations were identified at each location and soil samples were collected from 5 to 15 cm below
the surface. It was uniformly mixed before homogenizing the soil samples. The samples about
500 gm were packed in polythene bags labelled in the field with location number and sent to the
laboratory for the analysis of physicochemical parameters.
Soil Sampling was conducted once during the study period of Pre Mon soon season. 8 soil
samples were collected from selected locations in the vicinity of the proposed project. For
studying soil quality environment in the study area, sampling locations were selected to assess
the existing soil conditions in and around the existing plant area representing various land use
conditions. The homogenized samples were analyzed for physicochemical characteristics.
IS 2720 : Part 26
1 pH - 7.55 7.66 7.81 7.34 7.41 7.62 7.83 7.25
: 1987
Mechanical soil
analysis Clay Clay Clay Clay Clay Clay
2 - Clay Loam Clay Loam -
Loam Loam Loam Loam Loam Loam
(soil texture)
Electrical ms/c
3 2114 1720 1850 1630 1562 147 1522 1681 IS 14767: 2000
Conductivity m
Water Holding
5 % 53.7 44.9 53.7 51.8 56.3 40.7 46.0 44.0 APHA 3111-B
Capacity
gm/c
6 Bulk Density 1.39 1.47 1.33 1.49 1.38 1.47 1.42 1.40 -
m3
IS 2720 : Part 22
5 Organic Carbon % 0.58 0.56 0.38 0.78 0.44 0.63 0.52 0.48
: 1972
IS 2720 : Part 22
6 Organic Matter % 1.0 0.97 0.65 1.35 0.76 1.1 0.90 0.83
: 1972
7 Phosphorus % 0.0011 0.0016 0.0013 0.0018 0.0013 0.0017 0.0014 0.0019 APHA 4500 – P
APHA 4500-
8 Total Nitrogen % 0.15 0.10 0.14 0.32 0.44 0.17 0.19 0.29
NORG
APHA 3500 – K -
9 Potassium as K mg/kg 0.013 0.012 0.018 0.011 0.017 0.015 0.021 0.010
B
12 Chloride mg/kg 148 202 185 138 187 162 154 171 IS 6925: 1973
13 Copper as Cu mg/kg 12.6 13.7 11.9 13.1 12.6 14.0 13.5 12.4 APHA 3111 B
14 Zinc as Zn mg/kg 212 198 165 132 217 105 197 201 APHA 3111 B
15 Iron as Fe mg/kg 15.4 11.2 12.2 16.3 14.1 11.1 13.5 16.2 APHA 3111 B
16 Lead as Pb mg/kg <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 APHA 3500-Pb
17 Nickel as Ni mg/kg 13.2 12.7 12.2 14.5 13.6 11.8 12.4 13.0 APHA 3500-Ni
Environment consists of all living and non living factors which balance the weather conditions
and may be disturbed by some mechanical activities. Due to introduction of such activities, the
surrounding water, air and habitats may disappear or some new species may appear.
The future industrial activities may be so planned in such a way that the existing ecosystem may
not get disturbed beyond sustainable limits. Hence, ecological studies form a part of
environmental monitoring studies required for Environmental Management Plan.
The ecological study was undertaken to understand the present status of ecosystem of the
area, to predict changes as a result of proposed activities and to suggest measures for
maintaining the conditions. This carried through primary survey and secondary data collected
from various Government agencies like Forest Department, Agriculture Department, Scientific
literatures etc. Ecological survey is aimed to assess the existing flora and fauna components in
the study area. Considering the rich bio diversity of organisms and their role in productivity and
their importance in human livelihood, it is vital to project and safeguard this dynamic ecosystem.
The floristic survey was carried out in and around the project site. Overall structure of the
vegetation in this area was scattered forest patches intercepted with scrubland and grassland.
Most of the study area is under human settlement and agriculture practice. The grasses were
found growing on open places, agricultural area and near human settlements. The agricultural
practice is mainly depending on monsoon water. The main crops cultivated in the region are
Rice, lab lab bean, cow pea, black gram, horse gram, finger millet, pros millet and groundnut.
Some irrigated part of the area has vegetables like okra, brinjal and leafy vegetables.
The floral composition of the study area is mostly tropical deciduous type. The various terrestrial
plants available in the study area are reported in below table. Heavy rainfall, moderate and
humid climate condition favours the richness of flora in study area.
Fauna
The various animal species in the study area are reported in Table 3.18. The richness of plant
species of the region is the prime cause for animal richness.
Reptiles
Indian Monitor Varanus bengalensis
Garden Lizard Calotes versicolor
Common Rat Snake Ptyas mucosus
Common Vine Snake Ahaetulla nasuta
Common tree Snake Dendrelaphis tristis
Indian Cobra Naja naja
Mammals
Bander Presbytis entellus
Chachunder Suncus murinus
Sasalu Lepus nigricollis
Chamarchidiyu Pteropus giganteus
Nolio, nyula Herpetes auropunctatus
Nilgai Baselaphus tragocamelus
Lamba Kanwado Sedo Hemiechinus auritus
Jarakh Hyaena hyaena
Aquatic Animals
Common name Habitat
Karchala Salty Water
Bhangra Salty Water
Lapta Salty Water
Bakara Salty Water
Jinga Salty Water
Reconnaissance: Reconnaissance has been done to assess socio economic status in the
study area. The study area is rural however basic amenities were observed to be available.
Methodology: Detailed socio economic data were collected within 10 km radius of the existing
Project site. Preliminary information was collected during field investigation followed by
secondary data from the census of India 2011.
Socio economic status of the population is the indicator of the change in the life style due to the
developmental activities taking place in the region. The villages which appears within the 10 km
radius from the centre of the proposed Project site are considered for socio economic study.
Demography
The study there is 22 villages in the study area. The demographic pattern of all the settlements
as per 2011 census is given in below table:
Sex Ratio
Sex ratio is number of females per 1000 males. In the study area the sex ratio is 929. As per
the Census 2011 the male population is 52% while female population is 48% of the total
population.
Social Structure:
4%
95%
Literacy
The overall percentage of literate in the area is 75 %. Total literate population is 306891. The
literacy rate of male is 42 % while literacy rate in female is 33%.
25%
33%
Occupational Pattern
Main
Main Non
House Main Non
Main Main Agricult Margin Wor Non
Total Total Total hold Other Worki
Total Workin Cultivat ural al king Worki
Worker Worker Worker Indust Worker ng
Popula g or Laboure Worker Pop ng
Sr. No. Name Popula Popula Populati ries s Popula
tion Popula Populati rs Popula ulati Popul
tion tion on Popul Popula tion
Person tion on Populati tion on ation
Person Male Female ation tion Femal
Person Person on Person Pers Male
Perso Person e
Person on
n
4693 1651 1428 223 1369 401 519 36 413 282 3042 1015 2027
1 Ajarpura
3386 1655 1039 616 1567 449 938 3 177 88 1731 744 987
2 Saiyadpura
2012 877 517 360 456 304 81 0 71 421 1135 509 626
3 Badapura
1386 610 441 169 609 249 253 1 106 1 776 281 495
4 Tarpura
1119
16266 5070 4556 514 4274 736 1598 61 1879 796 3854 7342
5 Bhalej 6
13057 6370 4066 2304 4398 1043 2923 63 369 1972 6687 2723 3964
6 Kasor
2178 1027 656 371 775 170 572 0 33 252 1151 482 669
8 Sardarpura
7677 2980 2375 605 2812 307 2142 15 348 168 4697 1594 3103
9 Tarnol
6917 2766 2204 562 2624 387 1767 10 460 142 4151 1421 2730
10 Kunjrao
9390 4100 2894 1206 3167 754 2052 21 340 933 5290 2033 3257
11 Rasnol
5444 2053 1744 309 1892 440 864 11 577 161 3391 1099 2292
12 Bedva
1016
15957 5793 4677 1116 5207 585 2049 85 2488 586 3592 6572
13 Chikhodra 4
2159 882 656 226 882 318 224 21 319 0 1277 479 798
14 Bhuvel
1286
22712 9843 6650 3193 7470 1381 3776 127 2186 2373 4992 7877
15 Samarkha 9
6305 2280 1880 400 2092 400 1211 48 433 188 4025 1317 2708
16 Bamroli
1460 548 384 164 522 180 284 1 57 26 912 362 550
17 Ravipura
5952 2299 1829 470 1995 550 886 65 494 304 3653 1264 2389
18 Jol
2660 1002 781 221 921 139 597 17 168 81 1658 595 1063
19 Gopalpura
8050 3273 2340 933 2262 393 868 26 975 1011 4777 1778 2999
20 Valasan
5578 1791 1524 267 1409 239 287 26 857 382 3787 1418 2369
21 Lambhvel
1600 10267
263835 103760 79613 24147 89463 16911 44790 1385 26377 14297 57405
22 Anand 75 0
2479 15851
Total 409337 161383 122934 38449 136903 26431 69129 2027 39316 24480 54 89437 7
37%
Main Workers
Marginal Workers
57% Non Workers
6%
Reconnaisance
The traffic survey , to ascertain the traffic density in the study area was conducted on the road
near the project site. The composition of Traffic includes Two Wheelers, Three Wheelers
(Goods & Passenger Autos), Four Wheeler (Passenger cars) and Four Wheeler Heavy Vehicles
like Trucks, Lorries, Buses etc.
The traffic survey, to ascertain the traffic density in the study area was conducted on the road
near to the project site and also to evaluate the impacts of the increased traffic due to the
proposed activity. The methodology adopted for carrying out the traffic study was to select the
major road around the project site and count the various categories of vehicles moving on these
roads given in the below table
No. Of
No. Of vehicles
vehicles in
in PCU During
PCU During
During peak During lean lean hrs
Equivalent peak Hrs
Sr No. Vehicle Type Hrs (No. Of Hrs (No. Of (Equivalent PUC
PUC factor (Equivalent
vehicles/ hr) vehicles/hr) factor* No. Of
PUC factor*
vehicle in lean
No. Of
hrs)
vehicles)
Two
1 0.75 470 352.5 335 251.2
Wheelers
Three
2 1.2 168 201.6 98 117.6
Wheelers
3 Cars 1 637 637 363 363
700
600
During peak Hrs (No. Of vehicles/
No. of Vehicle/hr
500 hr)
400
300
No. Of vehicles in PCU During peak
200 Hrs (Equivalent PUC factor* No. Of
100 vehicles)
0
During lean Hrs (No. Of
vehicles/hr)
Existing Volume/Capacity
Level of Services
Sr No. Ratio
1 0.0 to 0.2 “A” (Excellent)
2 0.2 to 0.4 “B” (Very Good)
3 0.4 to 0.6 “C” (Good)
4 0.6 to 0.8 “D” (Fair)
5 0.8 to 1.0 “E” (Poor)
The following sections identify the potential impacts on the environment from the proposed
project based on the nature and extent of the various activities associated with the project
implementation and operation, as well as the current status of the environmental quality at the
project site. Both beneficial (positive) and adverse (negative) impacts are considered.
The project activities will interact with various valued Environmental Components viz., air,
water, soil, land, flora & fauna, etc. The components that may be affected due to the proposed
manufacturing and require focused evaluation are summarized in the following sub sections,
considering both construction phase as well as operation phase of the project.
Machinery installation and commissioning involve activities like fabrication work, cutting,
welding and construction of buildings and other facilities, lying of cables and pipelines etc. It
involves testing of plant for any type of leakages and designed capacity. The environmental
impacts along with suggested mitigation measures have been presented in the following sub
sectors. The construction activities for the proposed project are limited only and for shorter
period.
Impact: The sources of air emission during construction phase will include site clearing,
vehicles movement, material storages and handling and operation of construction equipment.
Emissions from them are expected to result in temporary degradation of air quality, primarily in
the working environment affecting construction employees. However, dust generation and SPM
rise in the ambient air will be coarse and will settle within a short distance close to the
construction sites. Hence, dust and other emissions are unlikely to spread sufficiently to affect
the surroundings of the construction site.
Traffic to the site during construction will be slightly more intensive than at present. The present
road conditions are good for the proposed additional movement of vehicular traffic. Hence, the
impacts on the ambient air quality during construction phase will be temporarily for short
duration and reversible in nature and restricted to small area.
Fugitive dust sources associated with construction phase include vehicular traffic generating
fugitive dust on paved and unpaved roads, aggregate material handling, and other aggregate
processing operations.
The emission of particulate matter during the construction phase will be generated from the
activities like receipt, transfer and screening of aggregate, road dust emissions, etc.
Mitigation Measures:
Dust Control
• Paving is an appropriate solution for access road to the project. Another appropriate use
of paving is for parking lots and for material storage areas, where gravel cover is not
adequate for dust control or erosion.
• Locally found gravels can also be applied to access roads and lots to add a protective
layer over the exposed soil and helps to control dust generation. However, gravels shall
contain a minimal percentage of fines and clean gravel shall be added periodically, as
the fines migrate to the surface and create dust.
• Water spray, through water trucks is an effective way to keep dust under control.
Sprinklers can also be employed to deliver continuous moisture in dust prone areas.
• High vehicle speeds increase the amount of fugitive dust created from unpaved areas.
Reducing the speed of a vehicle to 20 km/hr can reduce emissions by a large extent.
• Care shall be taken to keep all material storages adequately covered and contained so
that they are not exposed to situations, where winds on site could lead to dust
particulate emissions.
• Fabrics and plastics for covering piles of soils and debris is an effective means to reduce
fugitive dust from the material stores/warehouses.
• Spills of dirt or dusty materials shallll be cleaned up promptly so that the spilled materials
do not become a source of fugitive emission.
• Spilled concrete slurries or liquid wastes shall be contained/cleaned up immediately
before they can infiltrate into the soil/ground or run off in nearby areas.
Impact: The general noise levels during construction phase viz. due to working of heavy earth
moving equipment and machinery installation may sometimes go up to 90 db (A) at the work
sites in day time. The workers in general are likely to be exposed to an equivalent noise level of
80-90 db (A) in 8 hours shift for which all statutory precautions will be implemented.
The noise generation will be considered during such type of large scale construction activities.
The impacts during construction phase are temporary and will be marginal. Necessary
mitigation measures are required to be implemented during construction period.
Mitigation Measures
There will be increase in ambient noise levels during the construction phase due to all the
project activities during construction phase, which will be temporary in nature and for a shorter
duration ( i.e. construction phase). The measures described below wil be able to mitigate the
noise levels generated at site:
During the construction phase of the project, total water requirement will be fulfilled from Ravda
Pura Gram Panchayat water supply. Waste water generated during construction phase will be
mainly from construction workers & domestic activities. Therefore, no long term adverse impact
on water quality (surface as well as ground) is anticipated during construction phase.
Mitigation Measures:
Minimal quantity waste water will be generated during the construction phase of the project.
Water will be used only for curing of concrete, which will be absorbed by land or get
evaporated. Vitrified/ polished tiles will be used for flooring and hence no wash water will be
needed.
The potential negative impact is considered minor and has no long term impact. Alkaline wash
water containing excessive amounts of cement will be made to settle down and neutralized
before discharge. The overall impact on water environment during construction phase due to
the proposed project would be short term duration and insignificant. The potential negative
impact is considered minor and has no long term impact.
Sanitation
The construction work force will use the sanitation facility (Septic tank) in order to maintain
adequate hygienic conditions.
• Soil around construction site, haulage road, and workshop areas, will get compacted due
to transportation of man, machine and materials.
• Soil may also get contaminated around construction site, machine maintenance area,
fuelling station and internal road construction material storage (not much involved) &
preparation site and haulage road.
• No soil erosion is anticipated due to the construction activities during the rainy season,
as the project site is a flat land.
• Road traffic will be increased during construction phase. There will not be increase in rail
and sea traffic during construction phase.
• However, as such, the operations do not require any major combustion source; hence
the impact on soil due to deposition of air pollutants shall be negligible.
• Soil quality will not be affected, as there will not be any disposal of untreated effluent on
land.
Mitigation Measures:
• To keep the damage to topsoil, minimum excavators shall be used for construction. The
excavated material such as topsoil shall be stacked at safe places for reuse at a later
stage of construction.
• Top soil conserved during the construction phase shall be utilized for landscaping and
green belt development.
• Once the construction activities will be completed, there is no adverse impact envisaged
due to the operation of the plant. The greenbelt development and tree plantation will help
in enhancing the aesthetic value of the plant.
• During dry weather, control of the dust nuisance created by excavation, levelling and
transportation activities shall be carried out by water sprinkling.
• Occasional & minor fuel/ chemicals spills may occur. These will not affect water or land
because of appropriate flooring & presence of spill control procedures.
• Spill prevention and control plans shall be made , clearly stating measures to stop the
source of the spill, to contain the spill, to dispose the contaminated material and
hazardous wastes.
• The discharge of sewage/ other effluents will be taken upon need basis, the quality of
effluent shall be maintained confirming to be stipulated CPCB standards.
All efforts shall be made to prevent soil contaminations and following measures shall be
taken to prevent the same:
• No fuelling/ repairing the vehicles at the project site is proposed, as the volume of
construction activities is very limited and will be limited to the proposed project site.
• To avoid the soil contamination at the wash down areas, “oil interceptors” shall be
provided.
• The sewage stream will be sent to septic tank.
Impact:
During construction phase, solid waste such as excavated soil, debris, metal waste and oil &
grease from construction machines will be generated. This waste may contaminate soil at plant
site temporarily and will be restricted to a small area.
During the construction phase, hydraulic oil, fuels and lubricating oils will be used. There is
potential for accidental spills while re -fuelling or servicing vehicles and through the breakage
due to wear and tear. Procedures for maintenance of equipment will ensure that this risk is
minimized and cleanup response is rapid, if any spill occurs.
During construction phase, waste oil will be generated as and when lubricating oil is changed.
Waste oil will be collected through the drain pots and stored in leak proof steel drums.
Hence, impacts will be insignificant, reversible and for short duration only. The impacts will be
confined to the construction site only.
Mitigation measures:
The best option of its management is to reduce its generation at source with the help of
following good practices in construction management:
• Hazardous materials shall not be stored near surface waters and shall be stored in the
storage area designed as per CPCB guidelines for storage of hazardous waste with
leachate collection system.
• Delivery of material on site shall be done over impervious and level surface, so that first
batch of material does not mix with the site surface. Availability of covered storage would
be assured.
• The recyclable items like metal, plastic shall be sent to recyclable industry, and rest of
this scrap shall be stored in a covered area.
• Wherever materials (aggregated, sand, etc.) are more likely to generate fine air borne
particles during operations, nominal wetting by water shall be practiced. Workers/ labour
shall be given proper air masks and helmets.
• Skilled labour and good workmanship is must for judicial utilization of materials and
minimizing the waste. The waste oil drums will be properly identified with label of what is
contained both in local language (Gujarati) and English. It will be mainly disposed-off by
selling to authorized recycler as per Hazardous and Other wastes (Management and
Transboundary Movement) Rules, 2016.
• Municipal waste will be minimal as most of workforce will be from nearby areas. The
waste so generated will be collected and segregated and will be sent to municipal waste
disposal site allocated by the local administrative authorities.
• Rubbish, debris and bitumen wastes remaining after blacktop works shall be cleaned
and disposed off in a safe place.
Impact:
No hazardous chemicals storage at project site is proposed during the construction phase. Also
a lot of material may be generated for disposal during construction activity. These, is disposed
off haphazardly can pollute the nearby water bodies adversely. They would increase the
accident incidences also.
Mitigation Measures:
Utmost care shall be taken to store these materials at a suitable place and then disposed off at
a place in consultation with and as per the guidelines of GPCB/CPCB.
Impact:
All the activities to be carried out during the planning, and construction phases will require
skilled, semi-skilled and un-skilled labours, hence creating temporary employment for local
people. The workforce required during construction phase will be depending upon construction
activities. Thus, impact on the physical and aesthetic resources will be minimal. Further, local
skilled, semi-skilled and unskilled labourers will get direct and indirect employment during the
construction phase. This might also result in a steep rise in agricultural wages in the
surrounding villages, especially at the time of harvesting for short duration. Hence, the short
term positive impacts on socio- economic conditions of the area are anticipated during
construction phase.
Mitigation Measures:
Short term positive impacts will result in better quality of life. The project proponent/contractors
shall ensure that most of the workplace shall be engaged from the nearby villages/ town.
Impact:
A construction site forms a potentially hazardous environment due to the various construction
activities, involvement of heavy construction machinery, vehicular movement etc. Any accident
happens in the project site can affect the construction workers. No hazardous chemicals storage
at project site is proposed during the construction phase.
Mitigation Measures:
• To ensure that the surrounding population is not exposed to these hazards, the site shall
be properly secured by fencing and also guards shall be posted at entry points.
• First aid facilities shall be provided at different locations for immediate assistance in case
of emergencies and accidents.
• Important information about nearby hospitals, fire stations, police stations etc. should be
kept available in the first aid centres for speedy actions at the time of emergency.
• In case inflammable materials to be kept at the site, they shall be stored and handled in
accordance with guidelines of inspectorate of Safety and Health of the State and Central
Governments.
• Fire extinguishers shall be located at all vulnerable sites.
Mitigation Measures:
The objective is to ensure health and safety of the workers during construction, with effective
provisions for the basic facilities of sanitation, drinking water, safety of equipment or machinery
etc. following are the measures, which needs to be followed for better working environment:
• Comply with the safety procedures, norms and guidelines (as applicable) as outlines in
the Constructional Practices and Safety, 2005, National Building Code of India, Bureau
of Indian Standards.
• Clean drinking water shall be provided to all the workers.
• Proper sanitation facility will be provided for the workers working during the Construction
phase.
• All parts of the dangerous machinery shall be guarded.
• Protective equipment, helmets etc. shall be provided to the construction workers.
• Sufficient and suitable light for working during night time shall be provided.
• Dangers, health hazards and measures to protect workers and also information about
these shall be displayed in the areas.
• Training module on construction safety shall be prepared and impart training to the
construction workers.
Some of the potentially significant environmental impacts from the proposed project will be in
water environment, land environment, air environment and socio economics.
Air environment is likely to be affected due to emissions from combustion of fuels used in
machineries, vehicles, DG set and Boilers. Point and Non point source of pollutants will be there
which may cause serious threat to the air quality and it can result in many secondary impacts
like occupation & social health, corrosion of metallic structures of area etc.
Mitigation measures:
• To control the fugitive emission proponent will practice regular maintenance for the
proposed project.
The air quality impacts have been predicted for the proposed plant assuming baseline air
quality. Site specific meteorological parameters have been recorded by continuous monitoring.
Short term 8 hourly GLC’s incremental values were estimated using the site specific
meteorological conditions.
The hourly meteorological data along with emission rate for individual pollutants used for
prediction of air quality impacts as given in chapter 2 has been taken into consideration.
The predicted concentrations of PM10 for the study period are shown below:
Table 4.1 Summary of Maximum 8-hour GLC due to the Proposed Project
Incremental
Distance&
Location Name of Predicted GLC Baseline result result after
Direction
Code Location µg/m3 (Avg.) µg/m3 development
from site
of Project
Project 59.9
AAQ-1 - 0.2 59.7
Site
AAQ-2 Anand 4.40 km, SSW 0.002 79.5 79.50
AAQ-3 Ajarpura 5.43 km, NNE 0.018 70.8 70.81
AAQ-4 Bhalej 8.50 km, ENE 0.006 75.3 75.30
AAQ-5 Bakrol 6.10 km, SW 0.004 68.1 68.10
AAQ-6 Chikhodra 5.28 km, SE 0.001 63.9 63.90
AAQ-7 Vadtal 8.92 km, W 0.015 57.3 57.31
AAQ-8 Samarkha 2.67 km, ENE 0.064 65.7 65.76
Table 4.2 Summary of Maximum 8-hour GLC due to the Proposed Project
Incremental
Distance&
Location Name of Predicted GLC Baseline result result after
Direction from 3 3
Code Location µg/m (Avg.) µg/m development of
site
Project
Project 6.7
AAQ-1 - 0.1 6.6
Site
AAQ-2 Anand 4.40 km, SSW 0.0 7 7
AAQ-3 Ajarpura 5.43 km, NNE 0.004 7.8 7.804
AAQ-4 Bhalej 8.50 km, ENE 0.002 8.3 8.302
AAQ-5 Bakrol 6.10 km, SW 0.001 7.5 7.501
AAQ-6 Chikhodra 5.28 km, SE 0.0 7 7
AAQ-7 Vadtal 8.92 km, W 0.004 6.3 6.304
AAQ-8 Samarkha 2.67 km, ENE 0.016 7.2 7.216
Table 4.3 Summary of Maximum 8-hour GLC due to the Proposed Project
Incremental
Distance& Baseline
Location Name of Predicted result after
Direction result (Avg.)
Code Location GLC µg/m3 development
from site µg/m3
of Project
Project 12.548
AAQ-1 - 0.048 12.5
Site
AAQ-2 Anand 4.40 km, SSW 0.0 16.7 16.7
AAQ-3 Ajarpura 5.43 km, NNE 0.002 14.9 14.902
AAQ-4 Bhalej 8.50 km, ENE 0.001 15.8 15.801
AAQ-5 Bakrol 6.10 km, SW 0.001 14.3 14.301
AAQ-6 Chikhodra 5.28 km, SE 0.0 13.4 13.4
AAQ-7 Vadtal 8.92 km, W 0.004 12.0 12.004
AAQ-8 Samarkha 2.67 km, ENE 0.014 13.8 13.814
The source of water for the project shall be met through Ravdapura Gram Panchayat water
supply. Total water requirement for the proposed project will be 11.03 KLD. 0.41 KLD will be
used for domestic purpose, 2.02 KLD for gardening purpose and 8.6 KLD for industrial
purpose. The industrial waste water generated will be sent to ETP for treatment and after that
the treated water will be used in cooling towers. Domestic waste water (0.324 KLD) will be
disposed off into the septic tank.
Generated industrial waste water will be sent to ETP for treatment and then the treated water
will be used in cooling towers. The Domestic waste water generated will be disposed off into
septic tank.
Total area of the project site is 1225 m2. Large part of plant will be open area and will be
utilized for road, parking and green belt. A total of 404 m2 area has been earmarked for the
green area development. Once the construction activities will be completed, there will be little
impact envisaged due to the operation of the plant. The green area development and tree
plantation will help in enhancing the aesthetics of the plant.
Mitigation Measures
Green belt development is slow. It should be expedited in consultation with forest department.
Topsoil conserved during the construction phase shall be utilized for landscaping and greenbelt
development.
Solid wastes like process waste and organic waste are to be separately collected and sent to
safe disposal or sold to the authorized vendor. The final hazardous wastes such as discarded
containers and drums from the plant as classified under Hazardous and Other Wastes
(Management and Transboundary Movement) Rules, 2016 are to be collected, stored &
disposed off to the TSDF site or to the registered recycler/processor.
Mitigation Measures:
Hazardous waste generated from the facility shall be disposed off in suitable manner as per the
Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016. The
used oil generated from the proposed project shall also be collected in barrels and shall be sold
to the authorized recyclers identified by the GPCB/CPCB. Authorization from GPCB shall be
taken for Hazardous Waste disposal.
The hazardous solid wastes generated from the proposed plant shall be sent for landfill as per
CPCB/GPCB guidelines. The waste management plan includes:
• Waste inventory
• Classification of waste
• Contingency plan
• Personnel training
• Waste minimization
The requirements, which will be specified in the Authorization from GPCB, shall be followed.
The manifest system shall also be implemented for control and record keeping.
Proper housekeeping practices make the system easier and less costly. Some of these are as
follows:
• Solid wastes generated from the process and packaging are to be separately collected
and disposed off instead of allowing these to join effluent streams.
• Liquid wastes from various sections shall be collected and stored separately and
released at a regulated rate.
• To investigated the large scale regionalized treatment centres for centralized disposal
and reuse of solid wastes.
• Search for future recycling schemes and evaluate their worth and implement such
schemes wherever a promise of economic feasibility exists.
• Discarded Containers/ barrels/ liners will be kept at a designated place with paved
surface. These will be decontaminated (washed/cleaned) and after that will be stored in
the designated area in scrap yard. Later on these will be sold to the actual users/
recyclers as per the Hazardous and Other Wastes (Management and Transboundary
Movement) Rules, 2016.
Soil Quality
Impact:
There are no major sources of land contamination from waste spillage. The used oil shall be
collected in barrels and shall be sold to authorized recyclers identified by the GPCB/CPCB. All
other hazardous wastes shall also be stored safely within the site before its final disposal to
landfill site.
Mitigation Measures:
Impact:
The proposed project will have some positive impact on the industrial growth in the region. It is
anticipated that during the operation phase, the proposed project will also generate some
indirect employment due to sales/transportation.
Mitigation Measures:
The overall project will have a long term benefit and hence no mitigation measure is required.
However, as per the skills, preference to local people shall be given in employment.
Impact:
The project activity does not require tree cutting during land clearing also, the study zone does
not have any ecologically sensitive location and hence, the plant activities are not expected to
have any impact on the ecology and biodiversity.
Mitigation Measures:
A total of 404 m2 area has been earmarked for greenbelt development, which will help in
development of biodiversity. The indigenous plants shall be planted along with ornamental
trees/shrubs to provide an aesthetic environment within and around the plant. The
maintenance of the greenbelt developed shall be ensured and survival rate of plants shall also
be studied every half yearly.
Impact:
Some of the processes and wastes generated from the plant may release high odour.
Undesirable odour contributes to air quality concerns and affect human lifestyles. On the
economic front, loss of property value near odour –causing operations/industries and odorous
environment is partly a consequence of offensive odour. Odour is undoubtedly the most
complex of all the air pollution problems. Mainly odour generated by the industries varies
enormously since they can be generated during the production, processing, or even in the
waste water treatment areas of the plants.
Mitigation Measures:
• Sampling points will be provided with double valve followed by suction hoods which will
be connected to ducting system leading to charcoal bed.
• Odour causing raw materials will be charged in closed chambers with exhaust of
chambers connected to ducting system.
Additional Measures:
• Odour rounds by non plant personnel will hold regular meetings and odour rounds in
the factory premises for ensuring effective implementation of odour control measures.
• As a long term measure to improve the environment, plantation of trees within factory
premises as well as along the nearby roads is proposed.
• All critical vessels, pumps, reactors which have potential to generate odour will be fitted
with mechanical seals to prevent leakage and therefore odour.
• De-odorizer solution will be sprayed through special network, which will be laid around
the plant. It will help in neutralizing the fugitive emissions.
• Beneath all sample points/ drain points, spill control powder containing trays will be kept
so as to adsorb even slightest of leakage, if at all arises from these points. The spill
control powder will then be sent for incinerator as a solid waste.
During the operation phase of the project, energy resources will be required for operating
various pumping machineries for water & waste water, internal road lighting, common utilities
etc. The following options can be used for energy conservation.
• Energy efficient machineries shall be used during operation phase as per Energy
Conservation Building Code 2007.
• Sufficient care shall be taken to prevent/ minimize energy losses at each stage of
development.
• Every year energy audit shall be conducted through competent authority nominated by
Govt. Of India.
• All the provisions as per the Factories Act, 1948, Manufacture, Storage and import of
Hazardous Chemicals (MSIHC) Rules, 1989 and amendments thereafter and also, the
Hazardous and Other Wastes(Management and Tranboundary Movement) Rules, 2016
to be followed.
• A professional doctor has also been contracted for regular health checkups of the
employees.
5.1 Introduction
It is the best practice that the EIA should consider project alternatives and their relative
potential impact on the environment. Alternatives must, however be both practical and
reasonable, within the overall constraints of the proposed project development. The project
alternative is the way of action in pace of another, that would meet the same purpose and
need, but which would avoid or minimize negative impacts and enhance project benefits.
Project activities may consume natural resources and discharge wastes, which are likely to
have serious consequence to the environment. A number of alternative options may be
available to carry out many of these activities. An option with least or nil adverse environment
impacts is to be selected. Critical analysis is therefore required for selection of the right
alternative. Alternative analysis (AA) has been done for critical aspects of the project.
M/s Maruti Polymers has proposed for manufacturing of Synthetic Organic Resin & Acrylic
Base Emulsion. While selecting the site Maruti Polymers has considered following factors on
the basis of which the site was finalized.
The project is in proximity of Anand district of Gujarat State. Project site is located at Plot no.
423/1, Opposite Kartvya Farm, Village Ravdapura, District Anand, and State Gujarat.
Proponent is very well familiar with the surrounding environment; therefore, it becomes easy for
the unit to set up the project on above said location.
• To comply with the statutory requirements of monitoring for compliance with conditions
of EC, NOC and CC&A
• To comply with the provisions of factory Act.
• To verify the result of the impact assessment study in particular with regards to new
development.
• Identification of any significant adverse transformation in environmental condition to plan
additional mitigation measures, if & as required.
• To check or assess the efficiency of the controlling measures
• To ensure that new parameters, other than those identified in the impact assessment
study, do not become critical through the commissioning of new project.
• To establish a data base for future impact assessment studies for new project.
Environmental Monitoring should be carried out during construction and operation phase of the
project.
With the knowledge of baseline condition, the monitoring program can serve as an indicator for
any deterioration in environmental conditions due to operational phase and suitable mitigation
steps could be taken in time to safeguard the environment. Monitoring is as important as that of
control of pollution since the efficiency of control measures can only be determined by
monitoring.
Both ambient air quality and stack emission will be monitored. The ambient air quality with
respect to NOx, SO2 , suspended particulate matter (PM10 and PM2.5) will be monitored in at
least 3-4 locations in and around the project site through a reputed environmental laboratory
recognized by MoEF/NABL. Monitoring will be carried out for a period of 24 hours, every month
during construction phase and quarterly in operation phase. Similarly, all the stacks in the
proposed unit will be monitored once in three months with respect to NOx, SO2, Suspended
Particulate matter (SPM) and Carbon Monoxide (CO) level.
Water Monitoring
Ground water monitoring locations will be identified and periodical checking of physical,
chemical as well as biological parameters as per drinking water standard IS 10500:2012.
A well equipped laboratory with consumable items will be provided for monitoring of important
environmental parameters. Alternatively, monitoring can be outsourced from MoEF recognized
laboratory.
For environment protection and management and pollution control and treatment and
monitoring systems, appropriate budgetary provision would be made and provision for recurring
expenditure for environment management of the project would be made. The details of budget
allocation during construction phase and operation phase are given in below table:
checkup, PPE & first aid kit and PPE, first aid
facility, safe drinking water plant & sanitation
Total 1.5
Operation Phase
Recurring Cost per Capital Cost Per
Sr no. Pollution Control Measures
annum Rs. (Lakhs) Annum (Lakhs)
1 Rain Water Harvesting 0.5 4.0
2 Air Pollution Control
3 Water Pollution 4.0 35.0
4 Noise Pollution Control
Environment Monitoring and
5 1.5 -
Management
6 Occupational health 1.0 3
7 Green Belt 1.0 1.5
8 Solid waste management 1.5 2.5
9 CSR activity - 4.0
Total 9.5 50
7.1. Introduction
This chapter deals with the study of prevention and mitigation of incidents/ accidents which can
lead to personal injuries, damage or loss of property, material plant, equipment and the
environment.
The study is mainly concerned with conducting a risk assessment to identify the hazards and
risks associated with the various activities and to identify and evaluate the control measures to
eliminate/ prevent accidents and loses, and/ or mitigate the risk to minimum acceptable level.
The other aspect considered for the study includes the disaster management plan. Even after
providing all necessary control measures, things may go wrong. The study includes the
conditions, activities, material, manmade or natural, will be considered, which can lead to an
emergency situation. A well defined, disaster management plan will provide awareness and
prompt action by employees to control emergency situation promptly and effectively and will
minimize the losses.
Evaluate the process hazards emanating from the identified potential accident
scenarios.
Analyse the damage effects to the surroundings due to such accidents.
Conclusion and recommendation to mitigate measures to reduce the hazard/ risks.
To provide guidelines for the preparation of On-site response plan.
The project will undertake Quantitative Risk Assessment (QRAA) study for the storage tank
area.
Table 7.1 Following listed material below are stored, used and handled in the
premises
Storage / Packing
Storage Facility /
Name of Raw Material Capacity Storage condition
Packing
(MT)
The study has been carried out in accordance with the National and International codes of
practices using Process Hazard Analysis Software Tool (PHAST) software. The latest version
of the renowned PHAST software package of DNV is used for carrying out the risk analysis.
The full terms of potential hazardous scenarios and consequence events associated with the
installation and operation was considered in the analysis.
Based on the operations to be carried at the plant, the Risk Analysis conducted to identify the
affected distances and the damage of property and population from the identified scenarios
considering the Maximum Credible Loss Scenario (MCLS) & worst case scenario.
Maximum credible loss scenarios have been worked based on the inbuilt safety systems and
protection measures to be provided for the operation of the facility & the worst case scenario
i.e. 100% catastrophic rupture have been worked out based on failure of the inbuilt safety
system.
The worst case scenario assumed as catastrophic rupture, as per the guidelines suggested by
DNV-UK and maximum inventory at the time of failure.
Consequence analysis and calculation are effectively performed by computer software using
models validated over a number of applications. Consequence modelling is carried out by
PHAST (version 6.53) of DNV Software, UK.
PHAST uses the Unified Dispersion Model (UDM) capable of describing a wide range of types
of accidental releases. The Model uses a particularly flexible form, allowing for sharp edged
profiles, which become more diffuse downwind.
PHAST contains data for a large number of chemicals and allows definition of mixtures of any
of these chemicals in the required proportion. The calculations by PHAST involve following
steps for each modelled failure case:
Figure 7.1 Consequence analysis; Event tree analysis for release of flammable liquid
Software used
PHAST has been used for consequence analysis include discharge and dispersion calculations.
The consequences of released toxic or flammable material are largely dependent on the
prevailing weather conditions. For the assessment of major scenarios involving release of toxic
or flammable materials, the most important meteorological parameters which affect the
atmospheric dispersion of the escaping material include crucial variables such as wind direction,
wind speed, atmospheric stability and temperature. Rainfall does not have any direct bearing
on the results of the risk analysis; however, it can have beneficial effects by absorption/washout
of released materials. Actual behaviour of any release would largely depend on prevailing
weather condition at the time of release.
For the present study we used the meteorological data of the Anand
Atmospheric parameters
The wind speed and wind direction data which have been used for the study is summarized
below:
Weather category
One of the most important characteristics of atmosphere is its stability. Stability of atmosphere
is its tendency to resist vertical motion or to suppress existing turbulence. This tendency directly
influences the ability of atmosphere to disperse pollutants emitted into it from the facilities. In
most dispersion scenarios, the relevant atmospheric layer is that nearest to the ground, varying
in thickness from a few meters to a few thousand meters. Turbulence induced by buoyancy
forces in the atmosphere is closely related to the vertical temperature gradient.
Temperature normally decreases with increasing height in the atmosphere. The rate at which
the temperature of air decreases with height is called Environmental Lapse Rate ((ELR). It will
vary from time to time and from place to place. The atmosphere is said to be stable, neutral or
unstable according to ELR is less than, equal to or greater than Dry Adiabatic Lapse Rate
(DALR), which is a constant value of 0.98 ˚C/100 meters.
Pasquill has defined six stability classes ranging from ‘A’ (extremely unstable) to ‘F’ (moderately
stable). Wind speeds, intensity of solar radiation (daytime unstable) and night time sky cover
have been identified as prime factors defining these stability categories.
When the atamosphere is unstable and wind speeds are moderate or high or gusty, rapid
dispersion of pollutants will occur. Under these conditions, pollutant concentrations in air will be
moderate or low and the material will be dispersed rapidly.
When the atmosphere is stable and wind speed is low, dispersion of material will be limited and
pollutant concentration in air will be high. In general, worst dispersion conditions (i.e.
contributing to greater hazard distance) occur during low wind speed and very stable weather
conditions.
Definitions
The release of flammable gas or liquid can lead to different types of fire or explosion scenarios
and will depend on the material released, mechanism of release, temperature and pressure of
the material and the point of ignition. Types of flammable effects are as follows:
Pool Fire
The released flammable material, a liquid stored below its normal boiling point, will collect in a
pooll. The geometry of the pool will be dictated by the surroundings. If the liquid is stored under
pressure above its normal boiling point , then a fraction of the liquid will flash into vapour and
the remaining portion will form a pool in the vicinity of the release point. Once sustained
combustion is achieved , liquid fires quickly reach steady state burning. The hear release rate is
a function of the liquid surface area exposed to air. An confined spill will tend to have thin fuel
depth (typically less than 5 mm) which will result in slower burning rates. A confined spill is
limited by the boundaries ( e.g. a dyked area) and the depth of the resulting pool is greater than
that for an unconfined spill.
Flash Fire:
It occurs when a vapour cloud of flammable material burns. The cloud is typically ignited on the
edge and burns towards the release point. The duration of flash fire is very short (seconds), but
it may continue as jet fire if the release continues. The overpressures generated by the
combustion are not considered significant in terms of damage potential to persons, equipment
or structures. The major hazard from flash fire is direct flame impingement. Typically, the burn
zone is defined as the area the vapour cloud covers out to half of the LFL. This definition
provides a conservative estimate, allowing for fluctuations in modelling. Even where the
concentration may be above the UFL, turbulent induced combustion mixes the material with air
and results in flash fire.
Jet Fire:
Jet flames are characterized as high-pressure release of gas from llimited openings (e.g. due to
small leak in a vessel or broken drain valve). Boiling liquid expanding vapour explosion (BLEVE)
or fireball: A fireball is an intense spherical fire resulting from a sudden release of pressurized
liquid or gas that is immediately ignited. The best known cause of a fireball is a boiling liquid
expanding vapour explosion (BLEVE). Fireball duration is typically 5-20 seconds.
When a large quantity of flammable vapour or gas is released, mixes with air to produce
sufficient mass in the flammable range and is ignited, results a vapour cloud explosion ((VCE).
Without sufficient air mixing, a diffusion- controlled fireball may result without significant
overpressures developing. The speed of flame propagation must accelerate as the vapour cloud
burns. Without this acceleration, only a flash fire will result.
Damage Criteria
Damage due to thermal radiations and overpressure have been arrived at by taking in to
consideration the published literature on the subject. The consequences are then visualized by
superimposing the damage effects zones on the proposed plan site and identifying the elements
within the project site as well as in the neighbouring environment, which might be a adversely
affected, should one or more hazards materialize.
Thermal damage
The effect of thermal radiation on people is mainly a function of intensity of radiation and
exposure time. The effect is expressed in terms of the probability of death and different degrees
of burn. The following tables give the effect of various levels of heat flux.
FATALITY
RADIATION LEVEL
1% 50% 99%
kW/m2
EXPOSURE IN SECONDS
4.0 150 370 930
12.5 30 80 200
37.5 8 20 50
OVER
MECHANICAL DAMAGE TO
PRESSURE DAMAGE TO PEOPLE
EQUIPMENTS
(mbar)
1% death from lung damage
It is necessary to specify suitable concentration of the toxic substance under study to form
the end point for consequence calculations. American Industrial Hygiene association
(AIHA) has issued Emergency Response Panning Guidelines (EPRG) for many chemicals,
describes the various scenarios:
EPRG-1 is the maximum air borne concentration below which it is believed that nearly all
individuals could be exposed for up to 1 hour without experiencing other than mild
transient adverse health effects or perceiving a clearly defined, objectionable odour.
EPRG-2 is the maximum airborne concentration below which it is believed that nearly all
individuals could be exposed for up to 1 hour without experiencing or developing
irreversible or other serious health effects or symptoms, which could impair an individual’s
ability to take protective action.
EPRG-3is the maximum airborne concentration below which it is believed that nearly all
individuals could be exposed for up to 1 hour without experiencing or developing life-
threatening health effects.
Toxic limit values as TLV (Threshold Limit Value). STEL (Short Term Exposure Limit),
Immediately Dangerous to Life or Health (IDLH) concentrations are issued by US National
Institute for Occupational Safety and Health (NIOSH).
TLV: Threshold Limit Value- is the permitted level of exposure for a given period on a
weighted average basis (usually 8 hours for 5 days in a week)
STEL: A Short Term Exposure Limit (STEL) is defined by ACGIH as the concentration to
which workers can be exposed continuously for a short period of time without suffering
from: Irritation
Chronic or irreversible tissue damage
Narcosis of sufficient degree to increase the likelihood of accidental injury, impair self-
rescue or materially reduce work efficiency.
The permitted Short Term Exposure Limit usually have maximum exposure for 15 minute.
IDLH: IDLH is an acronym for Immediately Dangerous to Life or Health. This refers to a
concentration, formally specified by a regulatory value, and defined as the maximum
exposure concentration of a given chemical in the workplace from which one could escape
within 30 minutes without any escape- impairing symptoms or any irreversible health
effects. This value is normally referred to in respirator selection.
Butyl acrylate
LEL-1.3-1.7
Monomer Drums 10 37 NTP
UEL-9.4-9.9
Storage LEL-1
Mix Xylene 26 24 NTP
tank UEL-7
Storage
MTO 26 35 N/A NTP
Tank
7.5.1. Introduction
The consequence analysis is carried out to determine the extent of spread (dispersion) by
accidental release which may lead to jet fire, pool fire, tank fire resulting into generating heat
radiation, over pressures, explosions etc.
In order to form an opinion on potentially serious hazardous situations and their consequences,
consequence analysis of potential failure scenarios is conducted. It is qualitative analysis of
hazards due to various failure scenarios. In consequence analysis, each failure case is
considered in isolation and damage effects predicted, without taking into the account of the
secondary events or failures it may cause, leading to a major disastrous situation. The results of
consequence analysis are useful in developing disaster management plan and in developing a
sense of awareness among operating and maintenance personnel. It also gives the operating
personnel and population living in its vicinity, an understanding of the hazard they are posed to.
Earlier, it was the practice to select a particular item in a unit as failure scenario, e.g. rupture of
reactor outlet pipe. Such selection is normally subjective on following parameters:
Taking this factor into consideration, a list of selected failure cases was prepared based on
process knowledge, inventory, engineering judgement and experience past incidents associated
with such facilities and considering the general mechanisms for loss of containment. Cases
have been identified for the consequence analysis.
Dispersion of hydrocarbon on vapour with wind till it reaches its lower flammability limit
(LFL) or finds a source of ignition before reaching LFL, which will result in a flash fire or
explosion.
Spillage of liquid hydrocarbons will result in a pool of liquid, which will evaporate taking
heat from the surface, forming a flammable atmosphere above it. Ignition of this pool will
result in pool fire causing thermal radiation hazards.
A fireball or BLEVE (Boiling Liquid Expanding Vapour Explosion) occurs when a vessel
containing a highly volatile liquid ( e.g. LPG, Propylene etc.) fails and the released large
mass of vapour cloud gets ignited immediately. It has damage potential due to high
intensity of radiation and generation of the overpressure waves, causing large scale
damage to nearby equipment and structures.
Catastrophic failure of tanks/ pressurized vessels, rotary equipment and valves etc. Can
result in equipment fragments flying and hitting other equipment of the plant.
Release of toxic compounds results in the toxic vapour cloud travelling over long
distances, affecting a large area, before its gets sufficiently diluted to harmless
concentration in the atmosphere.
The material is in two phases inside the containment- liquid & vapour. Depending on the
location of the leak liquid or vapour will be released from the containment. If vapour is
released a vapour cloud will form by the mixing of the vapour and air. The size of the
vapour cloud will depend on the rate of release, wind speed; wind direction &
atmospheric stability will determine the dispersion and movement of the vapour cloud.
If liquid is released there will be some flashing as the boiling point of liquid is below the
ambient temperature. The vapour formed by immediate flashing will behave as vapour
release. The liquid will fall on the ground forming a pool. There will be vaporization from
the pool due to the heat gained from the atmosphere & ground.
There will be dispersion and movement of vapour cloud formed by evaporation of liquid.
The behaviour of material released by loss of containment depends on the following factors:
• Physical properties of the material
• Conditions of material in containment (pressure and temperature)
• Phase of material released (liquid or gas)
• Inventory of material released
• Weather parameters (temperature, humidity, wind speed, atmospheric stability)
• Material with boiling point below ambient condition
Scenario Catastrophic
5 mm leak 25 mm leak 100 mm leak
details Rupture
Weather 1.5 1.5 1.5 1.5 1.5 1.5
5D 5D 1.5 F 5D 1.5 F 5D
Category F D F D D D
Flash Fire Envelope (m)
7500 1 2 2 2 2 2 23 10 13 66 22 53
Conc.
(ppm) 1500
1 2 1 2 2 2 8 5 8 6 6 6
0
Thermal Damage Distance by Pool Fire (m)
Radiatio 4 23 25 23 47 55 47 97 116 97 97 116 97
n 12.5 14 17 14 19 23 19 44 46 44 43 46 43
Scenario Catastrophic
5 mm leak 25 mm leak 100 mm leak
details Rupture
Weather 1.5 1.5 1.5 1.5 1.5 1.5
5D 5D 1.5 F 5D 1.5 F 5D
Category F D F D D D
Intensity
37.5 6 8 6 47 55 47 NR NR NR NR NR NR
(KW/m2)
Thermal Damage Distance by Jet Fire (m)
Radiatio 4 NR NR NR NR NR NR 7 6 7 NH NH NH
n
Intensity 12.5 NR NR NR NR NR NR 5 4 5 NH NH NH
(
KW/m2) 37.5 NR NR NR NR NR NR NR NR NR NH NH NH
Maximum Distance at Overpressure Level (m)
0.02
NH NH NH NH NH NH 47 NH 32 NH NH NH
068
Overpre
0.13
ssure NH NH NH NH NH NH 27 NH 16 NH NH NH
79
( bar)
0.20
NH NH NH NH NH NH 25 NH 14 NH NH NH
68
The results for 100 mm leak and catastrophic case are superimposed on plot plan and
presented in below figures. The result for only credible scenarios are presented.
Legend:
Late pool Fire intensity radii in case of 100 mm leak of Styrene Monomer
s
Legend:
Legend:
Legend:
Late pool fire Intensity radii in case of catastrophic rupture of Styrene Monomer
Legend:
Scenario Catastrophic
5 mm leak 25 mm leak 100 mm leak
details Rupture
Weather 1.5 1.5 1.5 1.5 1.5 1.5
5D 5D 1.5 F 5D 1.5 F 5D
Category F D F D D D
Flash Fire Envelope (m)
7500 0 1 0 1 1 1 3 1 2 100 117 108
Conc.
(ppm) 1500
0 0 0 0 1 1 1 1 1 82 77 87
0
Thermal Damage Distance by Pool Fire (m)
Radiatio 4 8 9 8 21 23 21 39 46 39 61 72 61
n 12.5 5 6 5 13 16 13 17 21 17 26 29 26
Intensity
(KW/m2) 37.5 3 4 3 5 7 5 NR NR NR NR NR NR
Thermal Damage Distance by Jet Fire (m)
Radiatio 4 NR NR NR NR NR NR NR NR NR NH NH NH
n
Intensity 12.5 NR NR NR NR NR NR NR NR NR NH NH NH
(
KW/m2) 37.5 NR NR NR NR NR NR NR NR NR NH NH NH
Maximum Distance at Overpressure Level (m)
0.02
NH NH NH NH NH NH NH NH NH 373 343 370
068
Overpre
0.13
ssure NH NH NH NH NH NH NH NH NH 163 140 168
79
( bar)
0.20
NH NH NH NH NH NH NH NH NH 147 127 152
68
NR- NOT REACHABLE NH-NO HAZARD
The results for 100mm leak and catastrophic case are superimposed on plot plan and
presented in below figures. The results for only credible scenarios are presented.
Legend:
Late pool Fire Intensity radii in case of 100 mm leak of Butyl Acrylate Monomer
Late pool Fire envelope in case of 100 mm leak of Butyl Acrylate Monomer
Legend:
Legend:
Late pool fire Intensity radii in case of catastrophic rupture of Butyl Acrylate Monomer
Late pool fire envelope in case of catastrophic rupture of Butyl Acrylate Monomer
Legend:
Scenario Catastrophic
5 mm leak 25 mm leak 100 mm leak
details Rupture
Weather 1.5 1.5 1.5 1.5 1.5 1.5
5D 5D 1.5 F 5D 1.5 F 5D
Category F D F D D D
Flash Fire Envelope (m)
7500 0 1 0 1 1 1 15 1 7 162 101 81
Conc.
(ppm) 1500
0 0 0 0 1 1 6 1 3 81 67 52
0
Thermal Damage Distance by Pool Fire (m)
Radiatio 4 4 5 4 13 14 13 45 45 44 95 97 95
n 12.5 2 3 3 8 10 8 28 30 27 60 65 60
Intensity
(KW/m2) 37.5 NR NR NR 4 5 4 12 14 12 31 38 31
Thermal Damage Distance by Jet Fire (m)
Radiatio 4 NR NR NR NR NR NR NR 2 NR NR NR NR
n
Intensity 12.5 NR NR NR NR NR NR NR NR NR NR NR NR
(
KW/m2) 37.5 NR NR NR NR NR NR NR NR NR NR NR NR
Maximum Distance at Overpressure Level (m)
0.02
NH NH NH NH NH NH 28 NH NH 223 210 221
068
Overpre
0.13
ssure NH NH NH NH NH NH 15 NH NH 119 99 94
79
( bar)
0.20
NH NH NH NH NH NH 14 NH NH 117 93 84
68
NR- NOT REACHABLE NH-NO HAZARD
The results for 100mm leak and catastrophic case are superimposed on plot plan and presented
in below figures. The results for only credible scenarios are presented.
Late pool Fire Intensity radii in case of 100 mm leak of Methyl Metha acrylate
Late pool Fire envelope in case of 100 mm leak of Methyl Metha acrylate
Legend:
Jet Fire Intensity radii in case of 100 mm leak Methyl Metha acrylate
Legend:
Late pool fire Intensity radii in case of catastrophic rupture of Methyl Metha acrylate
Late pool fire envelope in case of catastrophic rupture of Methyl Metha acrylate
Legend:
Scenario Catastrophic
5 mm leak 25 mm leak 100 mm leak
details Rupture
Weather 1.5 1.5 1.5 1.5 1.5 1.5
5D 5D 1.5 F 5D 1.5 F 5D
Category F D F D D D
Flash Fire Envelope (m)
7500 0 1 0 3 1 1 11 5 12 14 19 18
Conc.
1500 0 0 0 1 1 1 7 2 8 10 12 13
(ppm)
0
Thermal Damage Distance by Pool Fire (m)
Radiatio 4 4 5 4 14 15 14 40 41 39 46 48 46
n 12.5 2 3 2 8 10 8 24 27 23 27 32 27
Intensity
NR NR NR 3 4 4 9 11 9 12 13 11
(KW/m2) 37.5
Thermal Damage Distance by Jet Fire (m)
Radiatio 4 NR NR NR NR NR NR 5 4 5 NR NR NR
n
Intensity 12.5 NR NR NR NR NR NR NR 3 NR NR NR NR
(
37.5 NR NR NR NR NR NR NR NR NR NR NR NR
KW/m2)
Maximum Distance at Overpressure Level (m)
0.02 NH NH NH NH NH NH 40 31 33 41 35
NH
068
Overpre
0.13 NH NH NH NH NH NH 18 15 16 18 16
ssure NH
79
( bar)
0.20 NH NH NH NH NH NH 16 14 15 16 15
NH
68
NR- NOT REACHABLENH-NO HAZARD
The results for 100mm leakand catastrophic case are superimposed on plot plan and presented
in below figures. The results for only credible scenarios are presented.
Legend:
Late pool Fire Intensity radiiin case of 100 mm leak of Vinyl Acrylate Monomer
Late pool Fire envelope in case of 100 mm leak of Vinyl Acrylate Monomer
Legend:
Jet Fire Intensity radii in case of 100 mm leak Vinyl Acrylate Monomer
Legend:
Legend:
Late pool fire Intensity radii in case of catastrophic rupture of Vinyl Acrylate Monomer
Late pool fire envelope in case of catastrophic rupture of Vinyl Acrylate Monomer
Legend:
Scenario Catastrophic
5 mm leak 25 mm leak 100 mm leak
details Rupture
Weather 1.5 1.5 1.5 1.5 1.5 1.5
5D 5D 1.5 F 5D 1.5 F 5D
Category F D F D D D
Flash Fire Envelope (m)
7500 1 2 2 2 2 9 18 10 16 117 26 42
Conc.
(ppm) 1500
1 2 1 2 2 4 10 6 8 69 6 18
0
Thermal Damage Distance by Pool Fire (m)
Radiatio 4 24 25 24 47 56 47 99 120 99 100 120 100
n 12.5 14 18 14 19 22 19 45 47 45 45 47 45
Intensity
(KW/m2) 37.5 6 8 6 NR NR NR NR NR NR NR NR NR
Scenario Catastrophic
5 mm leak 25 mm leak 100 mm leak
details Rupture
Weather 1.5 1.5 1.5 1.5 1.5 1.5
5D 5D 1.5 F 5 D 1.5 F 5D
Category F D F D D D
Thermal Damage Distance by Jet Fire (m)
Radiatio 4 NR NR NR 1 1 1 8 7 8 NR NR NR
n
Intensity 12.5 NR NR NR NR NR NR 6 5 6 NR NR NR
(
KW/m2) 37.5 NR NR NR NR NR NR NR 4 NR NR NR NR
Maximum Distance at Overpressure Level (m)
0.02
NH NH NH NH NH NH 45 26 37 125 NR 47
068
Overpre
0.13
ssure NH NH NH NH NH NH 19 14 17 90 NR 27
79
( bar)
0.20
NH NH NH NH NH NH 17 13 15 87 NR 25
68
NR- NOT REACHABLE NH-NO HAZARD
The results for 100mm leakand catastrophic case are superimposed on plot plan and
presented in below figures. The results for only credible scenarios are presented.
Legend:
Late pool Fire Intensity radiiin case of 100 mm leak of Mix Xylene
Legend:
Legend:
Late pool fire Intensity radii in case of catastrophic rupture of Mix Xylene
Legend:
Scenario Catastrophic
5 mm leak 25 mm leak 100 mm leak
details Rupture
Weather 1.5 1.5 1.5 1.5 1.5 1.5
5D 5D 1.5 F 5D 1.5 F 5D
Category F D F D D D
Flash Fire Envelope (m)
Conc. 3500 0 0 0 0 0 0 0 0 0 48 11 19
(ppm) 7000 0 0 0 0 0 0 0 0 0 43 8 15
Thermal Damage Distance by Pool Fire (m)
Radiatio 4 10 11 10 28 30 28 52 62 52 108 129 108
n 12.5 6 7 6 16 20 16 20 23 20 49 51 49
Intensity
(KW/m2) 37.5 3 4 3 6 6 6 NR NR NR NR NR NR
Scenario Catastrophic
5 mm leak 25 mm leak 100 mm leak
details Rupture
Weather 1.5 1.5 1.5 1.5 1.5 1.5
5D 5D 1.5 F 5 D 1.5 F 5D
Category F D F D D D
Thermal Damage Distance by Jet Fire (m)
Radiatio 4 NH NH NH NH NH NH NH NH NH NH NH NH
n
Intensity 12.5 NH NH NH NH NH NH NH NH NH NH NH NH
(
KW/m2) 37.5 NH NH NH NH NH NH NH NH NH NH NH NH
Maximum Distance at Overpressure Level (m)
0.02
NH NH NH NH NH NH NH NH NH 49 17 16
068
Overpre
0.13
ssure NH NH NH NH NH NH NH NH NH 42 12 12
79
( bar)
0.20
NH NH NH NH NH NH NH NH NH 42 11 11
68
NR- NOT REACHABLE NH-NO HAZARD
The results for 100mm leakand catastrophic case are superimposed on plot plan and presented
in below figures. The results for only credible scenarios are presented.
Legend:
Legend:
Conclusion
In above QRA study we found that this industry stored hazardous material like corrosive and
toxic acids and flammable chemicals etc. In case of any leakage or fire the damage distance
and affected area around 373 m from the object during worst case. In case of any toxic material
release or spill around 5 m, the concentration is very high. Follow disaster management plan/
procedure in case of any spillage, release and fire of hazardous material. Provide specific active
and passive fire fighting system.
1. To prevent fatalities, injuries and to reduce damage to buildings and contents follow
Workplace Emergency Planning & Preparedness procedure:
2. Onsite emergency response plan will be prepared and implement.
3. Trained employees will be deployed for operation.
4. Adequate personal protective equipment will be provided to all working personnel.
5. Fire hydrant system and fire extinguishers will be installed.
6. Regular training programs will be conducted for enhancement of employees’
competence.
7. Earthing and bonding will be provided to all the storage tanks and pipeline to prevent
accumulation of static charge.
8. Safe operating procedures will be developed and implemented.
9. National / International engineering standards in the Design, Construction and testing of
the storage tanks, equipment and other hardware will be adhered.
10. Visual display signage will be provided.
11. Material safety sheet and SOP will be displayed.
12. Safety appliances and equipment (Self-contained breathing apparatus, safety shower
etc.) will be provided.
MITIGATION MEASURES
General
The disaster/emergency may arise as a natural calamity such as floods, earthquakes, etc. or
may be a Man-made Disaster such as a leakage/ Spillage of Hazardous chemicals/ Gases or
Fire and Explosion.
A Disaster Management Plan is an action plan drawn to fix responsibility and actions to be
taken by various groups to contain the disaster/emergency incident within shortest possible time
and with minimum losses to people, material, property and environment.
7.6.2. Objective
The main objectives of preparing the On Site / Off Site Emergency Plan are:
1. To define and assess emergencies, including risk and environmental impact assessment.
2. To establish the procedures to handle emergency situation that may arise due to spillage
and fire while handling plant & equipment.
3. To control and contain incidents within shortest possible time and to restore normalcy.
5. To inform employees, the general public and the authority about the hazards/risks
assessed, safeguards provided, residual risk if any and the role to be played by them in
the event of emergency.
6. To be ready for 'mutual aid' if need is arise to help neighbouring unit. Normal jurisdiction
of an OEP is the own premises only, but looking to the time factor in arriving the external
help or off-site plan agency; the jurisdiction must be extended outside to the extent
possible in case of emergency occurring outside.
10. To preserve records, equipments etc., and to organize investigation into the cause of the
emergency and preventive measures to stop its recurrence.
11. To ensure safety of the works before personnel re-enter and resume work.
12. To work out a plan with all provisions to handle emergencies and to provide for emergency
preparedness and the periodical rehearsal of the plan.
7.6.3. Definition
An emergency could be defined as any situation which presents a threat to safety of persons
or/and property. It may require outside help also.
A major emergency occurring at a work is one which may affect one or several sections of the
plant and possibly extend beyond the factory boundaries that may cause serious injuries, loss
of life, and extensive damage to property or serious disruption outside the works. It will require
the use of outside resources to handle it effectively.
Disaster is a catastrophic situation in which the day-to-day patterns of life are, in many
instances, suddenly disrupted and people are plunged into helplessness and suffering and as a
result need protection, clothing, shelter, medical and social care and other necessities of life,
such as -
(1) Disasters resulting from natural phenomena like earthquakes volcanic eruptions, storm,
surges, cyclones, tropical storms, floods, landslides, forest fires and massive insect
infestation. Also in this group, violent drought which will cause a creeping disaster landing
to famine, disease and death must be included.
(2) Second group includes disastrous events occasioned by man, or by man's impact upon
the environment, such as armed conflict, industrial accidents, factory fires, explosions and
escape of toxic gases or chemical substances, river pollution, mining or other structural
collapses; air, sea, rail and road transport accidents, aircraft crashes, collisions of vehicles
carrying inflammable liquids, oil spills at sea, and dam failures.
The on-site emergency plan deals with measures to prevent and control emergencies within
the factory and not affecting outside public or environment.
The off-site emergency plan will deal with measures to prevent and control emergencies
affecting public and the environment outside the premises. The manufacturer should provide
the necessary information on the nature, extent and likely effects of such incidents.
The NDMA Guidelines categorize the levels of disasters, based on the ability of various
authorities to deal with them. In order to facilitate the responses and assistances to States and
Districts, the levels of disasters have been defined as follows.
1. L0 level denotes normal times which will be utilized for close monitoring, documentation,
prevention and preparatory activities. Training on search and rescue, rehearsals,
evaluation and inventory updation for response activities will be carried out during this
time.
2. L1 level specifies disaster that can be managed at the District level, however, the State
and Centre will remain in readiness to provide assistance if needed.
3. L2 level disaster situations are those which require assistance and participation of State,
mobilization of its resources for management of resources.
4. L3 level disaster situation is in case of large scale disaster where the State and District
authorities have been overwhelmed and require assistance from the Central Government
for reinstating the State and District machinery as well as for rescue, relief, other
response and recovery measures. In most cases, the scale and intensity of the disaster
as determined by the concerned technical agencies like Indian meteorological department
(IMD)/ Indian National Centre for Ocean Information Services (INCOIS) are sufficient for
the declaration of L3 disaster.
7.7. Scope
The M/s Maruti Polymers Incorporation has prepared Disaster Management Plan in order to
provide proper guidance to plant operating personnel to confidently handle any accidental
spillage or fire / explosion / bursting of vessel/tank or any natural calamity or sabotage.
With this objective comprehensive information has been gathered and analyzed on the resins
handling plant and equipment which includes the hazardous properties of materials/chemicals,
fire hazards, safety appliances, safety measures incorporated in the plant, emergency
procedures and finally regarding the constitution & responsibility of Emergency Rescue Team
(Emergency Response & Management Team / Task Force).
Accidental spillages and leakages during handling of material and plant / equipment
failure causing severe health hazard due to employees exposure to the hazardous
substances.
7.7.1. Methodology
A major emergency occurring at a plant is one that may cause serious injuries, loss of life,
extensive damage to property or environment or serious disruption inside or outside the plants.
This may demand the rescue and relief measures on a war footing to handle it effectively and
quickly. Within the high-risk technology industries, the need for well-planned measures should
be self-evident.
No matter how well a process is controlled and safeguarded by instruments and process safety
procedures, it is inevitable that there is a residual risk, which is capable of causing a variety of
emergencies.
The Disaster Management Plan describes the Organization & procedures for dealing with
potential accidents arising from the operations of M/s. Maruti Polymer Incorporation.
Experiences of accidents that have occurred in various other similar plants were considered in
the preparation of DMP especially storing & handling the materials identical to this plant. This
plan will need periodic review & modification following emergency exercise, or include any new
information relating to changes to the facilities.
The Factories Act, 1948 as amended in the year 1987 under section 41B requires that every
occupier shall draw up a Disaster Management Plan and detailed disaster control measures for
his plant and make them know to the employees and to the general public living in the vicinity
of the plant.
Its objective is to reduce the severity of loss following particular hazardous incidents. At the
same time, it must be clearly understood that it is not a substitute for maintaining good
standards for working consistence with the requirements of safety and health inside the plants.
a. Fire or Explosion
b. Electrical Fire
e. Electrical Fire: The Electrical fire may be caused due to generation of static charge
during charging of materials. The other reasons for fire include use of faulty or
inappropriate electrical equipment, transformers, DG sets etc. Also dry grass is
normally avoided in the premises and it will be ensured that there is no grass (dry) at
any point of time by ensuring better housekeeping
f. Spillages and Leakages: During handling of material and plant / equipment failure
causing severe health hazard due to employees exposure to the hazardous
substances. Spillages and leakages of flammable substances may also lead to fire.
a. Flood
b. Earth quake
c. Cyclone/Storm
d. Heat Wave
a. Flood:
The nearest water body from the facility are Mahi River (approx. 1.05km in N direction). The
heavy rainfall and water released from the Dam may increase water level in the river bed
creating flood situation.
Four villages of Anand district were inundated while around 100 villagers of 13 villages
have been re-located to safer spots in the villages following discharge of 1.43 lakh cusecs
water from the Dharoi dam into Sabarmati River.
b. Earthquake:
c. Storm/Cyclone:
Cyclones make impact by killing people, damaging property, crops and infrastructure.
The area falls under category in which wind of 1-35 KMH air blown. So the chances are
there for storm & cyclone
d. Heat Wave:
The Anand region experienced the heat wave in the past history. Also it was observed
that the Anand Divisions comes under vulnerable area.
The action plan responding to an emergency situation depends very much on the level
of the emergency which, itself is defined by the consequences arising from the types of
hazard identified.
RECOMMENDATIONS
Flood:
• Find a clear spot away from buildings, trees, and power lines. Drop to the ground.
• Don’t Rush Indoors
• Stay Put remain there until the earth stops shaking
• Remain Calm until the earth stops shaking
Cyclone/Storm:
The above summarized results of an analysis of hazard, risk and disaster impact in AnandFor
more study of risk criteria please refer, Anand State Disaster Management Plan.
Disaster Preparedness
This section highlights the Organization for disaster preparedness. For an industry storing /
handling flammable substances, it is essential to prepare a good effective disaster plan to
control On Site – Off Site emergencies and to mitigate losses. The disaster management plan
(emergency response plan) ensures that all available resources, facilities etc., are enforced
into services at right time to tackle an emergency.
It is not possible to envisage and detail every action which should be taken in emergency and
to harness the basic elements of emergency preparedness such as Gravity of emergency,
Communication of information, on-site action for process and emergency controls, Mobilization
of internal and external resources for fire and spillage etc.
Emergency Organization is set up specifying duties and responsibilities of all to make best use
of all resources and to avoid confusion while tackling the emergency.
Disaster Management Plan / On-Site Emergency Plan (Emergency Response Plan) highlights
the flow of information and co-operation among various action groups within the factory. Off-
site Emergency Plan indicates various action groups at district levels which will be engaged in
case of off-site emergency.
This section is devised to suggest the organization for emergency preparedness. Key
personnel to combat emergency are nominated with specific responsibilities according to set
procedures and making best use of the resources available and to avoid confusion. Such key
personnel include Site Main Controller, Incident Controller; Services Coordination includes
Fire & Safety, security, engineering Services (maintenance),environment, Lab (QC/QA), HR &
Admin, Accounts & Finance, Store & purchase and Process.
All such key personnel (Annexure 1- Emergency Management Chart ) shall be available in all
the office timings and shall be called during emergency on holidays.
Assembly Point will be provided at the green belt area. The safe assembly points are selected
considering the distance from the hazardous/ flammable storage, wind direction, capacity to
accommodate the required number of people and availability of other resources in that area.
In case of emergency,it will be necessary to evacuate all personnel from effected area, except
personnel who will be directly involved in dealing with the incident. On evacuation people will
go to designated assembly points.
During Working Hours the Emergency Control Centre (ECC) will be situated at Reception
Building, and during Non-Working Hours the Emergency Control Centre (ECC) will be situated
at Security Cabin from where the operation to handle the emergency are directed and
coordinated.
The ECC will be equipped with all necessary emergency equipment, communication
arrangement to receive and transmit information and directions from and to the incident
controller and areas of the works as well as outside. 1 Direct Line with Emergency Contact
Numbers will be available at both the places.
The emergency contact numbers for the mutual aids like nearest police station, fire station,
hospital, ambulance service etc. & list of emergency team members and various activity
coordinators will be displayed at the emergency control Centre, security gate and other
prominent locations.
c. Stationeries
e. Details and location plans of firefighting equipment such as fire extinguisher, fire hoses
& nozzles etc.
f. Details and location plans of safety equipment such as SCBA, gum boots, gloves,
goggles, cover all etc.
A siren audible in all parts of the facility, to warn the people for the evacuation with different
sounds for declaration of emergency or emergency call off will be provided along associated
with manual call point are provided at prominent locations. Warning system will always be kept
in working order.
The mode of siren for evacuation is wailing pitch. On hearing the siren, people will disperse
from the work area and will evacuate to safe assembly points. Proper instruction will be given
to all the employees about the rising of siren and the emergencies. The same instructions will
also be displayed at prominent places within the plant area.
The employees will proceed to the predetermined assembly points on hearing the siren and the
support staff / security forces will instruct and divert the people away from the affected area
towards the assembly points.
The First aid team will play critical role in attending the victims in case of any accident.
First Aid boxes will be provided at prominent locations & trained first-aider will be available in
all working shifts. The list of trained first aiders will be displayed at prominent locations and is
also available at security gate office.
In case of any medical assistance other than first aid, the Admin In-charge/ Site- SHE
representative will arrange for a vehicle to shift the casualty to the company accredited
hospital, or call an ambulance to mobilize the casualty to the medical center/ hospital.
In a major emergency, it is essential to evacuate personnel from affected areas and to further
evacuate non-essential workers from areas likely to be affected,should the emergency
escalate.
The external emergency services which can be contacted for help during emergency include:
The above emergency services telephone numbers are displayed at emergency control room
and prominent locations within the plant.
Other Arrangements
For Emergency, Plant Operations and Emergency Lighting provisions will be made according
to requirements. A DG set of 220 KVA capacity will be provided as backup.
Electrical Supply
Electricity is considered as a major cause of fire in industries. To prevent fires due to electricity,
adequate control measures will be provided which includes regular inspections and preventive
maintenance. To prevent other electrical accidents such as electric shock etc. the adequate
safety precautions will be implemented including provision of Fuse, MCB, ELCB, rubber mats
in front of panels, proper laying of cables, etc.
Organization will be more concerned for environment protection and pollution abatement at all
times. Provision will be made to dispose Solid wastes. The company will dispose off all solid
waste in safe manner.
Emergency Action
In case of Fire
In case of declaration of onsite emergency (Hearing of emergency siren), evacuate the area as
per evacuation plan & exit signs on instruction of shift in-charge / incident controller as quickly
as possible after safe shutdown of the plant. See that the wind direction is in opposite direction
of assembly point by wind direction indicator. If not, change the assembly point.
Check the wind direction, then decide the assembly point and inform accordingly.
Attempt to isolate /extinguish the fire with the help of others with available appropriate
extinguishers.
Cordon the area and try to shift the drum of flammable material.
If fire beyond control call fire brigade after consultation with chief controller.
Give first aid to the injured person and check for further treatment is required.
Confirm the message of incident attend to the main controller & raise the all clear siren.
Special instruments for storing, Handling & emergency actions in case of spillage of
chemicals/materials are given separately in MSDS.
In case of declaration of onsite emergency (Hearing of emergency siren), evacuate the area as
per evacuation plan & exit signs on instruction of shift in-charge / incident Controller as quickly
as possible after safe shut down of the plant. See that the wind direction is in opposite direction
of assembly point by wind direction indicator. If not, change the assembly point.
In case of natural calamity like flood, Storm or earth quake (remote possibility) the
management may seek outside help. The help may be for firefighting, Evacuation (of
surrounding population), Medical treatment, shelter, food, transport or communications.
Assemble outside the office, away from Electric Poles & Wires.
Evacuate the areas after initiating (communication in working condition) off site
organization.
Intimate nearest police station & stimulate off site emergency plan
All personnel handling the emergency should wear PVC suit / alkali suit, gumboot, PVC
hand gloves, PVC goggles.
Flush the affected body parts with plenty of water and seek medical help.
Evacuation Plan
On hearing the siren all employees shall evacuate the area by safely closing down all operation
as per instructions from their Incident Controller or in nighttime Shift supervisor. After gathering
at assembly points, shift-in-charge should take the roll call & ensure that no person is left
trapped.
The Rescue Coordinator or Guard (who is inside the plant for duty) shall ensure that none is
trapped inside the plant. Security guards shall ensure total evacuation.
Main gate will be used for movement of personnel, movement of rescue, medical aid.
Traffic Control
The Security In-charge or Guard shall contact Service Coordinator and shall make himself
available at main gate for traffic control till local authorities help is available.
Unwanted traffic and public gathering shall be controlled & avoided by security personnel till
local help from police is available.
Public Relations
Inevitably a major incident will attract the attention of the press, television and radio services
and anxious inquiries from friends and relatives will be flooding the factory. It is essential to
make arrangements for authoritative release of information to them. SMC/IC who is familiar
with procedures of dealing with such situations, shall take charge of public Relations,
information etc. He will be the sole authoritative source of information to the news media and
others.
Only the Main Site Controller in consultation with Incident Controller and The Service
coordinator (Emergency Fire, Rescue & Security Co-ordinator etc.) will declare the cessation of
emergency ensuring that all the spillage are arrested or fires are extinguished and there is no
risk of re-ignition (in case of fire).
In the case of gas, the all clear will be declared only when the source of emission has been
effectively isolated and gas clouds dispersed well below safe level.
Even when the all clear Signal has been given, great care is needed while entering affected
areas and no work in connection with salvage, collection of evidence should be commenced
until a thorough examination of the area has been carried out.
The siren code will follow for declaring the cessation of an emergency.
The Onsite Emergency Plan Mock drills will be conducted for the appraisal and updating the
Onsite Emergency Plan.
The Onsite Emergency Plan Mock drills will review the adequacy and effectiveness of the
arrangements made / provided for emergency planning and will cover:
Any inadequacy observed during the mock drill will be corrected and incorporated, the Onsite
Emergency Plan will be updated and any changes made in the Onsite Emergency Plan will be
made known to all.
Safety is major consideration for M/s. Maruti Polymer Incorporation and the industry is
committed to mitigate the risk. Important mitigating measures will be provided to contain and
control the emergency are outlined below:-
Fire is the major risk at M/s. Maruti Polymer Incorporation because of storage handling and use
of flammable substances within the premises as raw material and products. Adequate control
measures will be provided to detect and fight fires. The major firefighting arrangements
provided include.
Emergency siren system and outside communication system provision will be made available.
Firefighting Arrangement: Fire Extinguishers, Foam type, Dry Chemical Powder Type, Water
sprinkler system and sand bucket will be installed at various locations in the premises.
The nearest fire brigade station is Sardargunj, Anand Fire Brigade Station. Approx.7km
The plant will be equipped with a comprehensive fire protection system. Following facilities will
be provided for the fire protection:-
M/s. Maruti Polymer Incorporation will comply the statutory requirements and provide safety
measures. The following points to be considered:
Lifting tools, tackles and machines and pressure systems will be tested and examined
as per statutory requirement.
Before restart up of the activities, assess the situation and ensure that it is safe to
restart the plant activities.
The policy of the company is to manufacture, handle and dispose off all substances safely and
without creating unacceptable risk to human health or the environment.'
Company is committed to complete safety and accident prevention policies for ensuring the
elimination of risk, accidents by conscientious involvement in Safety and Health Programme.
The industry will;
• Establishment and maintain programmes to ensure that laws and regulations applicable
to its products and operations are known as obeyed.
• Develop its own standards where laws or regulations may not be adequately protective
and adopt, where necessary, its own standard where laws do not exists.
• Stop manufacturing any product or any operation if hazards of the same, to the human
beings and environment are unacceptable.
• Each and every employee is expected to adhere to the spirit as well as letters of
company policy.
• Any hazards, adverse situation or environmental risk which comes to their attention
should be promptly reported for the corrective measures.
• Safety has been accepted as complete and separate functions like other functions such
as production, maintenance, marketing, etc.
• Auditing is necessary for an effective health and safety programmes, and periodical
auditing will be carried out.
• We believe safety is a team work and each and every employee of the company is
responsible and accountable for the safety.
Employee responsibility
Follow the policy and applicable laws and regulation to protect your own health and
safety as well as that of other workers, the public and the environment.
Promptly report concerns about possible violation of this policy to the persons listed or
to your manager.
Cooperate with the public, government and other interested parties to develop
appropriate regulatory and public policies that protect employee and public health and
the environment.
Implement effective programs, training and best practices for health, safety and
environment protection and for the elimination or reasonable reduction of materials.
Develop appropriate program for safety reviews of new and redesigned products prior
to sale and distribution to customers. Monitor after-sale safety performance to identify
and address significant product safety issues.
Work cooperatively with, contractors, business partners & suppliers to ensure that our
relationships with them are supportive of this policy.
Promptly report to medical Services, Environmental Program & your assigned legal
counsel any,
Work related employee facilities & other serious safety incidents requiring a report to a
governmental agency.
All employees should know the details of Disaster Management plan and they must receive
initial training in emergency procedures. At suitable intervals this knowledge must be exercised
and the basic plan reviewed and brought up-to-date. It is essential to establish the necessary
confident volunteers and better expertise, so the individuals can carry out their allocated duties.
Rehearsal of evacuation should be regularly carried out efficiently and should cause minimum
disruption to the normal activities. As per MFR, Mock Drill should be conducted six monthly.
An after-mock drill report may be prepared detailing the lacunas & strong points so as to make
improvements in the emergency action plan.
8.1. Introduction
Growth in the industrial sector creates new opportunities for employment and can also help
diversify the economy. This is especially important given the high level of urbanization, and
growing levels of unemployment and poverty in many cities. Unemployment is particularly high
and an important factor in continued levels of low human well being and slow growth.
Synergistic growth in the chemical industries could have positive spin offs for the socio
economic development. The use of chemical further leads to development in field of research
and development. This chapter describes about benefits of the project on improvements in the
physical infrastructure, social infrastructure, employment potential in the region.
From the very initial stage of the inception of the project, infrastructure development in and
around the project site has kept in consideration. Infrastructure development will be done based
on actual requirement socio economic development of the region. The infrastructure
development will be rolled out as part of company’s CSR activity.
• There will be more employment generated due to the proposed project both during the
construction phase and operation phase. On the basis of technical knowledge acquired
by the local village youths, they will be provided with suitable employment opportunity in
the company.
• The labour force required during construction and operation phase shall be sourced
from nearby village.
• Special Health awareness camp and medical camps for primary checkups will be
arranged at least once in a year in nearby villages for health checkups.
• Funds will be provided to arrange extracurricular activities for nearby schools and
colleges.
• Partnering with various NGOs to train under privileged women housewives in hospitality,
self grooming, housekeeping and laundry.
Budgetary Cost
Initially CSR Budget commitment will be approximately 2% of company’s annual profit.
• This project will increase the economic activities around the area, creating avenues for
direct/indirect employment during operation phase of the project. There would be a wider
economic impact in terms of generating opportunities for other business like workshops,
marketing, repair and maintenance tasks etc.
• This project will enhance India’s potential of supplying Synthetic Organic Resin and
Acrylic Base Emulsion leading to step-up of India’s position in global market sector and
strengthening of Indian economy.
• The continuous inflow of people will require local transport systems like autos, taxis etc
which would help economic boost.
The baseline settings of different relevant environmental components in the study area are
analysed and potential impacts on those components due to the proposed project are
document. The impacts on environment are found to be minimal during the study; however
additional measures are documented for operation phase for further improvement of
Environmental Quality in the form of an Environmental management plan (EMP).
Due to its complexity and implications, the implementation of the EMP must be executed
utilizing a specific EMS framework. Once an EMP has been approved, it should provide the
basis for environmental considerations of all the activities carried out on the site by the
appointed personnel.
With respect to the various environmental impacts identified during the EIA stage, mitigation
measures to prevent or minimize the impacts are suggested for all the environmental
components.
The environmental management plan for the proposed project aims to mitigate the potentially
detrimental impacts on the environment, both during construction and operation phases of the
project. It is also necessary that continued compliance with existing environmental regulations
is ensured. The construction and associated activities have been planned so as to minimize
impacts on the physical, biological and socio economic cultural environments. Even though it
be would naïve to expect that all detrimental impacts can be avoided, it is apparent that most of
the impacts will be localized and temporary in nature.
The primary aim of the environmental management plan is to eliminate environmental impacts
during designing wherever possible or minimize the risks through best engineering controls.
The measures that can be integrated into design, construction and operation for proposed
project can be broadly defined as:
The Central Pollution Control Board (CPCB) has set standards with regard to the ambient air
≤10μm) levels in
quality levels and emission levels. The particulate matter, PM10 (size
industrial, residential and rural area not to exceed 100 μg/m3. The vehicular emission
standards for Heavy diesel driven vehicles as per Bharat stage-III for Hydrocarbons: 1.6 g/ Km
hr; Carbon Monoxide: 2.1 g/km hr and Oxides of Nitrogen : 5 g/km hr and PM: 0.1 g/km hr.
These standards will be met. (Source:http://www.cpcb.nic.in/Vehicular_Exhaust.php).
Environmental pollution during construction phase will be mainly due to the construction
activities of new plant buildings, machinery installation for manufacturing of Bulk Drugs,
Intermediates & allied Products. One or more of the following measures may be implemented
to minimize impacts on air quality during construction and operation of the project.
• Construction equipment requiring minimum water for cooling and operation for optimum
effectiveness will be chosen.
• Steam curing of concrete will be done wherever possible.
• High pressure hose will be used for cleaning and dust suppression purpose.
• Drip and sprinkler system will be provided for spraying water in green belt.
• Surface water quality
• Rainy season will be avoided for cutting and filling of earth work.
• Soil binding and fast growing plants should be grown around the construction site
before commencement of construction activity to reduce soil erosion.
• Proper housekeeping should be adopted to prevent spillages and contaminated surface
run off going to storm water drains.
• Adopting prudent soil erosion control measures to prevent water pollution.
The following measures may be adopted to minimize the impact of noise during construction
phase of the project:
• Construction equipment generating minimum noise and vibrations will be chosen.
• Ear plugs and/muffs will be provided to construction workers working near the noise
generating activities/ machines/ equipment.
• Vehicles and construction equipment with internal combustion engines without proper
silencer will not be allowed to operate.
• Construction equipment meeting the norms specified by Environmental Protection Act,
1986 will only be used.
• Noise control equipment and baffling will be employed to generators especially when
they are operated near the residential and sensitive areas.
• Noise levels will be reduced by the use of adequate mufflers on all motorized
equipment.
Construction activities can lead to soli waste generation including sand, gravel, stone, plastic,
paper, wood, metal, glass , waste concrete, excavated soil, broken bricks, waste plaster,
metallic scrap etc. Solid waste from domestic use like papers, card boards, cans, bottles, food
waste etc. will be generated from the site labourers. This will be segregated into biodegradable
and non- biodegradable shall be handed over to authorized vendor. No trash or debris from
construction activities should be left at project site after construction is completed.
To minimize adverse impacts arising out due to the project activity, imitative measures are
suggested in the EMP. Proper implementation of EMP would mitigate adverse impacts in the
region. Prior information about the project should be given to locals in study area.
Construction workers
• Local people will be employed for construction work to the maximum extent possible.
• Proper facility for domestic water supply, sanitation and other essential services will be
made available to the construction workers.
• The facilities should be maintained in a clean, odour free condition and care should be
taken to avoid soil and groundwater contamination.
• Face masks, gloves and other personal protective equipments shall be provided to
workers to prevent health hazard during construction activities.
Routine operational activities of the project would be associated with the following potentially
significant environmental impacts. These activities associated with the impacts as listed here
under:
The operational phase activities due to proposed project have the potential to cause long term
environmental impacts. Cumulative impacts due to air and noise pollution are predicted using
simulation models as discussed in chapter 4.
Several control measures have been incorporated to minimize the generation of wastes and
subsequent environmental impacts during operation phase. Strict adherence to these pollution
prevention and control measures will moderate the environmental impacts to the minimum
possible level during operational phase. In general, the environmental management plan during
operational phase of the plant will be directed to the following:
• It will be ensured that all the pollution control/ environment management systems are
commissioned before the commencement of operation of the project.
• Wherever possible, the control systems will be interlinked with the operational units, so that
failure of the control system will shut down the respective operational unit.
• Regular performance evaluation of the control systems will be undertaken to ensure their
optimum performance.
• Preventive maintenance schedule of the control systems will be matching with that of the
respective operational unit
• Regular monitoring for various components of environment will be undertaken to ensure
effective functioning of pollution control measures as well as to safe guard against any
unforeseen changes in environment.
• Efforts will be made to ensure the maximum utilization of wastes generated
• During the operational phase, there will not be any significant impacts on various
environmental components. Hence, the following Management Plan is recommended to
mitigate adverse impacts during operation phase.
Emission at M/s. Maruti Polymers is in the form of the particulate matters and flue gases from
stack attached to Boiler, D G set and Thermic Fluid Heater.
• Regular monitoring of stacks will be carried out to check the emissions. In case emission
exceeds, the corrective measures shall immediately be taken and records of the same
will be maintained.
• Regular ambient air quality monitoring shall be carried out within premises and nearby
area for PM2.5, PM10, SO2, Nox etc.
• Emergency process Shut down existence in case of any pollution control system
deviation.
To minimize the noise pollution the following noise measures are proposed
• Manufacturers/suppliers of major noise generating machines /equipments like,........., shall
be instructed to make required design modifications wherever possible before supply and
installation to mitigate the noise generation and to comply with the national/ international
regulatory norms with respect to noise generation.
• Periodic maintenance of machinery and vehicles should be undertaken to reduce the
noise impact
• Noise suppression measures such as enclosures, buffers and /or protective measures
should be provided (wherever noise level is more than 75 dB (A)).
• Employees should be provided with Personal protective equipments like earplugs or ear
muffs, wherever required
• Extensive oiling, lubrication and preventive maintenance will be carried out for the
machineries and equipments to reduce noise generation.
• The selection of any new plant equipment will be made with specification of low noise
levels
• Areas with high noise levels will be identified and will include prominently displayed
caution boards
• The green belt area will be developed within industrial premises and around the periphery
to prevent the noise pollution in surrounding area.
• Noise monitoring shall be carried out to check the efficacy of maintenance schedules
undertaken to reduce noise levels and noise protection measures.
• The sources of intermittent noise generating equipment ( water pumping equipment, DG
set etc) will be provided with appropriate acoustic barriers so that the noise level within 1
m of these facilities when in operation will be less than 75 dB (A).
• It is recommended to measure and maintain records of noise level at various places
within and outside factory premises
• The source of water for the proposed project will meet through Ravdapura Gram
Panchayat. Total water requirement for proposed project will be 11.03 KLD. The total
waste water generation from industrial will be 1.31 KLD, while 0.324 KLD domestic waste
water generated will be disposed off in the septic tank.
The mitigation measures for minimizing the impacts on water environment in general
includes following:
• Optimum utilization of water resource
• Minimize waste generation
• Reuse/ recycle and disposal
• The domestic sewage will be disposed in septic tanks
Solid waste management is one of the most essential services for maintaining the quality of life
in the plant and for ensuring better standards of health and sanitation. Solid waste generated in
the plant area can be handled under two main categories, namely domestic wastes and
industrial wastes. Effective measures will be taken to effectively implement the solid waste
management systems in the plant. Solid waste will be handed over to authorized vendor for
disposal.
Hazardous Waste
• Waste inventory
• Classification of waste
• Packaging, Storing Transporting wastes to Disposal Site
• Data management and reporting- Personnel training
• Waste minimization
Waste Management:
Solid waste
• The solid waste shall be segregated as bio degradable and non biodegradable.
• The organic waste will be segregated and handed over to outside agency for disposal
• The non biodegradable (inorganic) waste shall be handed over to authorized recycler
for further handling and disposal
• Reuse of paper and plastic waste
• Planned system for waste collection, segregation and disposal
Hazardous waste
• Hazardous waste will be stored in proper storage room and handed over to authorized
vendor for final disposal
• The collection, treatment and disposal of hazardous waste will be as per Hazardous
and other wastes (Management and Trans boundary Movement) Rules, 2016, and
hence no adverse impact on land environment is envisaged
• Necessary PPE’s shall be provided to workers while handling of hazardous waste
• No trash/ non biodegradable materials should be dumped outside the project site
• Domestic waste water (sewage) will be disposed off into septic tank. No contaminated
water will be allowed to enter the surrounding environment or surface water body.
• Green belt will be developed all along the boundary of the installation by choosing fast
growing and resistant varieties suitable to the soil conditions in the site(native plants)
and special care will be taken to maintain it
• Survival rate of the planted trees will be closely monitored in the green belt and the
trees which could not survive should be continued
• There will be a waste management plan developed for categorization and handling of
wastes
In addition to the above suggested measures for management of air, water, soil, traffic etc
following additional measures shall be provided.
• Process record keeping in order to run the processes more efficiently and at lower
waste and emission generation rates
• Reuse of the wasted materials in the same process (if any) for another useful
application within the company
• Waste water from industrial process will be treated in ETP
Product Modification
Combination of water saving appliances and water management measures will be planned in
the plant. The message of water conservation will be spread to all occupiers on site by way of
awareness campaigns and circulars. Specific measures that will be implemented include the
following
Management Measures
• Reduce water delivery in taps and showers, through the installation of low flow devices
or aerators on shower heads
• Spring loaded taps
• Water efficient plumbing fixtures
It is proposed to plant local fast growing species for landscaping. Development of green belt
with carefully selected native plant species is of prime importance due to their capacity to
reduce noise and air pollution impacts by attenuation/ assimilation and for providing food and
habitat for local macro and micro fauna. This not only overcomes the problem but also
enhances the beauty of area that will attract bird and insect species and by this way ecology of
the area will maintain to a great extent. For developing the greenbelt in and around proposed
project sites care need to be taken to plant the evergreen species. The planting of evergreen
species may have certain advantages that may reduce the environmental pollution.
Greenbelt will be developed in 404.2 (33%) sq.m. area of the total plot area. Saplings will be
planted on the periphery of the boundary of the plot.
The plant species suitable for greenbelt development should be selected based on the
following characteristics:
The plant species identified for greenbelt development should be planted using pitting
technique. The pit size should be either 45cm x 45cm x 45 cm or 60cm x 60cmx 60 cm. Bigger
pit size is prepared on marginal and poor quality soil. Soil used for filling the pit should be
mixed with well decomposed farm yard manure for 45 cm x 45cm x 45 cm x and 60cm x 60cm
x 60cm size pits respectively. Healthy saplings of identified species should be planted in each
pit.
• Causes of odour can be bad sanitation, bacterial growth in the interconnecting pipes &
unattended drains etc.
Remedial Measures
• Green belt development in the buffer zone may help atleast partially to mitigate/ obfuscate
the odour.
• Ensuring that the operation is carried out under the best management practices
• If still the odour persists then the nozzles, sprayers and atomizers that spray ultra fine
particles of water or chemicals can be used along the boundary lines of area sources to
suppress odour.
• Electrical equipments will be properly earthed & lock out/ tag out, electrical isolation method
shall be developed & displayed at required locations
• Proper training shall be given to all the employees at regular time period to bring
awareness among the employees
dust
• Sprinkling of
water will be
done for dust
suppression
proposed for
smooth
vehicular
movement
• Approach
road side
plantation
will further
act as sink
to gaseous
emission
3 Noise Increase in Construction • Use of well No
Noise level phase: maintained significant
Operation of equipment impact
construction fitted with
equipments silencers
of vehicular • Providing
movement noise
shields near
the heavy
construction
operations
• Noisy
operations
will be
limited to
day time
only
• Ear plug and
muffs will
provided to
workers
Operation • Wide road No
phase: and ample significant
Vehicles parking impact
movement space will
be provided
• Vehicles
with inbuilt
silencer
shall be
allowed in
the site
DG set • Generators No impact
operations with inbuilt
mufflers
shall be
provided
• Ear plugs
shall be
provided to
operators of
DG set
• Periodic
maintenanc
e &
monitoring
of DG set for
noise level
4 Land Land Construction • Construction No
contamination Phase: debris will significant
by Disposal of be collected impact
construction construction and used for
debris and soil debris & solid levelling the
waste waste site
• Solid waste
from labour
use will be
collected in
collection
bins and
disposed off
to approve
sites by
GPCB
Excavated • Top soil will No
soil be used for significant
landscaping impact
Metallic • Metallic No
waste waste shall significant
be sold to impact
vendors for
reprocessin
g
Operation • Efficient No
phase: solid waste significant
Municipal collection impact
solid waste and storage
like rubbish, facility is
paper, plastic proposed
garbage etc. • Solid waste
Other non will be
hazardous generated
waste like and shall be
ash will be handed over
generated to
authorized
vendor
Hazardous • Discarded No
waste like containers & significant
Discarded Bags will be impacts
containers, sold to
bags with authorized
liner etc. vendors
The Environmental Management Plan shall be effectively implemented so that optimum benefit
could be achieved. The Environmental Management and Monitoring Plan shall be
synchronized with construction schedules.
Findings:
From the foregoing sections it is clear that environmental considerations are foremost during
development of the project, at all the following levels:
• Project sitting
• Planning and design
• Project construction
• Post project operations
• The project will have no significant environmental impacts during construction and
operations.
• The environmental and safety aspects of the Project are straight forward and well
understood
• A detailed environmental impact study is carried out and EMP. No further studies are
required to elaborate these subjects.
The EMP also provides for establishing, and maintaining a system of environmental monitoring
and auditing to ensure strict compliance of all the measures identified in the EMP, and
minimize adverse environmental and social impacts. Suitable provisions related to
environmental management will also be made in the construction contract agreement.
Conclusions
The project can cause minor impacts only during construction phase due to the various
activities involved during that phase. However, strict adherence to the various mitigation
measures as identified under the EMP, strengthened by adequate environmental monitoring
using best available technology (BAT) and auditing and good construction practices, including
the special construction methods as prescribed, will go a long way in effectively reducing the
impacts as to negligible levels.
During operation phase of the project, none of the routine activities will cause any noticeable
impact on any component of the environment, including the socio economic component.
Provision of green belt, storm water management and energy conservation shall further
facilitate in overall scenario management of environment.
Thus, it can be concluded on a positive note that after the implementation of the mitigation
measures and Environmental Management Plan, the proposed project shall have negligible
impact on environment and will benefit the local people and economy.
checkup, PPE & first aid kit and PPE, first aid
facility, safe drinking water plant & sanitation
Total 1.5
Operation Phase
Recurring Cost per Capital Cost Per
Sr no. Pollution Control Measures
annum Rs. (Lakhs) Annum (Lakhs)
1 Rain Water Harvesting 0.5 4.0
2 Air Pollution Control
3 Water Pollution 4.0 35.0
4 Noise Pollution Control
Environment Monitoring and
5 1.5 -
Management
6 Occupational health 1.0 3
7 Green Belt 1.0 1.5
8 Solid waste management 1.5 2.5
9 CSR activity - 4.0
Total 9.5 50
The present report is based on the work carried out by M/s. Green Circle Inc. Baseline data
collection carried out by them only. The EIA report contains in depth study on Environmental
quality and Environmental Management Plan to mitigate the impacts including Risk
Assessment and Disaster Management Plan. The project is technically, environmentally and
socio economically viable and is beneficial at local level, state level and national level.
The project M/s. Maruti Polymers seems to be safety conscious and aware about impacts of
industrial projects and is environmental friendly.
• The project proponent will follow all the statutory norms and guidelines as per EPA,
1986 to safe guard environment.
• Waste water generated from the proposed project will be sent to proposed ETP and the
after treatment the waste water will be used for cooling towers. Sewage will be
disposed off into Septic tank.
• Ambient Air Quality of the project site are concerned viz. SPM (PM10 & PM2.5), SO2
and NOx, their concentrations in the ambient air at the proposed site were found within
prescribed limits.
• The operational phase noise shall be within industrial premises which will not exceed 75
dB (A).
• The project will generate employment opportunities during construction stage and also
at operational stage. The standard of living of local people due to employment is likely
to be better, so we may say that it is positive socio economic impact. The region will get
economic boost.
Overall, the project will have positive impact for socio economic and cultural development.
The EIA team engaged in the preparation of EIA report consists of professionals with
multidisciplinary skills and experience required for undertaking this project. The EIA involved in
various stages of planning to final report preparation is given below in table:
Key
Name Designation Responsibility Signature
Area
Executive Report
Sadaf Shaikh
Environment Preparation
Report
Nirav Joshi Executive EIA & EHS
Preparation
Risk Assessment
Assistant Manager-
Deep Maheshwari Report
RMS
Preparation