Attachment-F5 Transfer Line Refacroty Repir Rev2. U340-R75822 (MHI)
Attachment-F5 Transfer Line Refacroty Repir Rev2. U340-R75822 (MHI)
For Discussion
METOR-Expansion
配 布 先
METOR
1
P M
-
E M
-
品 証 *
資 材 -
工 契 -
運 輸 -
コスト -
SCH -
炉 1
Process -
計 装 -
配 管 -
1 18/7/’14 Updated - 機 器 -
APP’D APP’D 機 械 -
NO. DATE DESCRIPTION REFERENCE NO.
SECTION PROJECT TEAM
533650 電 気 -
ORDER NO. CUSTOMER
PROJECT TEAM
APPROVED
METOR-Expansion
Y.Morinaga
METOR S.A. 土 建
INE
-
- -
T.Kondo MGC-NF -
PROJECT
SECTION Furnace Eng’g Gr.
REC -
APPROVED H.Tsutsumi
-
METOR-Expansion PROJECT
Technip -
-
- DWG. NO. REV. 現 地 -
T.Katayama 3827 U340-R75822 1 計
DRAWN DATE JUN. 16, 2014
2. Installation Procedure
3. Schedule
4. Dry Out
The refractory shall be replaced for both cold and hot layers as well as the
anchors for the repaired portion, thus not only for the refractory of both cold
and hot layers but also the anchors shall be demolished.
2. Installation Procedure
3.2 New anchors shall be welded as per the dwg in the Attachment-1.
Typical WPS is as per the attached (Attachment-2), and it is required to
prepare WPS/PQR with qualified welder accordingly. PWHT is not required.
1/26
3. Schedule
Typical schedule is as per the attached for reference. (Attachment-3)
4. Dry Out
Dry out of the refractory is required, which may be done during the start up
of the reformer. Typical instruction is as per the Attachment-4.
(note :temporary external insulation is required)
2/26
Attachment-1
3/26
4/26
5/26
6/26
7/26
8/26
9/26
10/26
11/26
12/26
13/26
14/26
15/26
16/26
17/26
18/26
19/26
20/26
21/26
22/26
23/26
Attachment-2
24/26
Metor-Exp / Transfer Line Refractory - Modification Work Attachment-3
WORK ITEM -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
TL : TransfurLine D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N
1 Internal Inspection
11 Finishing work
Refractory SV (1 person)
25/26
Attachment‐4
[℃]
TYPICAL / DRY‐OUT CURVE FOR REFORMER (AFTER REAPIR OF TRASMFER LINE REAFARCTORY) [MPa]
800 2.0
750 ― TI‐1226 (Reformer Bridge Wall Temperature)
― TI‐1207 (Reformer Outlet Temperature)
700 ― PC‐1206 (Reformer Outlet Pressure)
To Normal Operation at 30℃/hr
30℃/hr
650
600 1.5
④12hrs@550℃
550 Steaming operation will be
REMARKS
started after completion of 1) Insulation(50mm) around repired
500
step‐③ ④12hrs@510℃ portion is required. Insulation will be
15℃/hr To be controled by TI‐1207 removed when surface temp become
450
160‐170℃.
(0.96MPa) 2) During step‐② and ③, the level of
400 1.0
downstream vessel(V‐1221, V‐1203, and
350 V‐1204) and Transferline surface
③12 hrs@300℃2) temperature should be checked. Based
300 on this level variation, the duration and
temperature will be determined by MHI
250 15℃/hr ③12hrs@280℃2) SV. The level should be confirmed by
10℃/hr3) To be controled by TI‐1207 local LG.
200 (0.49MPa) 0.5 In case level keep increasing even after
holding hours (②:24hrs, ③:12hrs);
150 ①24hrs@120℃
A) Increase temperature 10℃ more
To be controled by TI‐1226 ②Min24hrs@150‐170℃2) 4)
To be controled by TI‐1207 B) Check water level
100 C) Repeat step‐A and B until no level
changes are observed.
50
10℃/hr3) 3) 10℃/hr will be achieved 15℃/hr +
0 0.0 30min hold.
0 6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0
1 st Day 2nd Day 3rd Day 4th Day 5th Day 6th Day
LT
N2 Circulation Steaming HT Steaming
26/26