Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 13

AL-HAMAD BLDG. CONT. COMPANY L.L.

C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 1 of 13 October 18, 2018
FORM/RA-15

Project Title:  SHARJAH AIRPORT EXPANSION PROGRAM Scope / Activity: Chilled Water Supply Piping

Project No.: AHJ – 587 Location: Project site

RA Reference AHC/RA/587/018 People: Workers, Foremen, Engineers, Public & Visitors


Drilling machine, Cutting machine, Grinder, Threading
RA Date 01-03-2022 Equipment: machine, Welding machine, Tool Box

RA Revision No. 00 Production: -

SEVERITY RATING: MATRIX 

Health Safety Loss & Environmental Impact Probability

RATING OH&S Environmental   1 2 3

1-2 Low - L Slight injury (No lost time). First Aid Case. Slight Incident 1 1 2 3

3-4 Medium - M Moderate/ Minor injury / Illness Minor Incident Severity 2 2 4 6

Fatal / Permanent disability /Serious injury /


6-9 High - H Major Incident 3 3 6 9
illness
 
REVIEW DATE: _________________________    Unlikely Likely Very Likely
 
Assessed by: Verified by:

Name: Rana Taimoor Ahmad (Safety Officer) Signature: ______________ Date 01-03-2022 Sr. Project Manager: Eng. Wasel Mouaz

Name: Eng. Amjad (Construction Manager) Signature: ______________ Date


Signature: ___________ Date

Distribution: Original to Site HSE File Cc: HSE Department ; Project File HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 2 of 13 October 18, 2018
FORM/RA-15

Residual
Identified Risk
Risk Responsible
No. Hazard /Aspect Risk / Impact at risk Rating Control Measures
Rating Person
(property, people) (LxS=RR)
(LxS=RR)
1 Not wearing personal Struck by falling object Engineers, 3x3=9 Employees to be inducted in the use of 1x1=1 Engineer
protective equipment. or debris, impact and foremen, PPE and its maintenance. Foreman,
collision, cuts, workers, visitors Worker.
punctures, chemical Engineer to ensure the adequate supply
burns, electric shocks, of PPE.
exposure to excessive
noise or vibration, eye Foreman to monitor the use of PPE.
injuries,
Campaigns and TBT to be conducted
frequently for the use and compliance of
PPE.

2 foremen, 3x3=9 Workers to be inducted. 1x1=1 Foreman,


Manual handling and Strains and sprain,
workers Engineer,
shifting. neck and back injuries,
Load to be lifted according to workers worker
slip, falls, crush
injuries, cuts, bruises, capacity and one person shall not lift
chronic pain more than 25 kg alone.

Proper PPE to be worn e.g. hand gloves.

Area to be kept clear of any obstacles.

TBT on manual handling to be conducted.

Supervisor to ensure the compliance of


HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 3 of 13 October 18, 2018
FORM/RA-15

safe working procedures.

Route of carrying the load should be


identified, communicated and checked
for any hurdles

All information about the load such as


height, width, weight, shape needs to be
assessed prior lifting the load

One should not try to exceed his capacity


of lifting load.
Any person with a history of same sort of
incident due to some medical problem
should not be given the same task again.

Rest breaks to be given as per the labour


law and or upon individual requirement.

3 Foremen, 3x2=6 Ensure MSDS (Material Safety Data 1x1=1 Foreman,


Use of chemicals Health hazard,
workers Sheet) of all chemicals being used is Engineer,
breathing difficulty,
available and instruction is worker
personal injury,
communicated to working crews.
skin irritation, cement
burn, eye injury COSHH assessment to be carried out.

Use correct PPE-Use dust mask, rubber


hand gloves, safety goggles coverall.

HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 4 of 13 October 18, 2018
FORM/RA-15

workers to be trained on safe manual


handling.

Use sufficient number of workers to do


manual lifting.

Store material separately.

Give training on handling of chemicals.

4 foremen, 3x3=9 Instruction manual to obtain from 3x1=3 Engineer,


Use of bending \ Injury to all parts of
workers supplier. Foreman,
threading machine the body, imputation,
worker
crush injuries, cuts,
bruises, Electrical 3rd party inspection to be carried out by
shock approved 3rd party and proper fitness
certificate to be obtained.

Ensure all electrical connections are


made correctly proper industrial sockets,
tripping device are used.

Drip tray to be provided to control any


type of oil spillage.

Work to be carried out in designated


area only.

Always secure the machine and


HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 5 of 13 October 18, 2018
FORM/RA-15

disconnect the power if not in use.

Additional support to be given for long


pipes.

Proper maintenance to be carried out


and record to be maintained by
competent person.

Always ensure that the handles are dry


and clean free from any oil or grease

Competent workers to be assigned to


operate the machine.

Ensure the use of mandatory and task


related PPE.

Ensure the workers indulge in task is not


having any loose clothing or jewellery.

Timely job rotation to be carried out.

5 Engineers, 3x3=9 Hot work to be carried out in separate 3x1=3 Engineer,


Hot works Burn injuries, electric
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 6 of 13 October 18, 2018
FORM/RA-15

foremen, designated area isolated from other Foreman,


shocks, exposure to
workers, activities and equipped with good Worker.
dangerous fumes,
respiratory health visitors, ventilation, lightning and fire fighting
conditions, flu like Property equipment’s.
symptoms and damage
damage to eyes 3rd party trained and competent workers
to be appointed to carry out the task.

Hot work permit shall be obtained and


signed by safety dept. and construction
manager

Any combustible or flammable material


shall be removed from the welding area.

Fire extinguishers and water shall be


available.

Proper PPE (welding mask, leather gloves)


shall be provided.

Any combustible or flammable material


which can’t be moved shall be covered
with non-combustible blankets.

All walls, floors and equipment’s openings


and cracks shall be tightly sealed.

If working on enclosed equipment all


combustible materials shall be cleaned
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 7 of 13 October 18, 2018
FORM/RA-15

out.

Suspend non-combustible blankets


beneath work to catch sparks.

Fire watchman shall be assigned.

All below levels shall be under vigilant


monitoring of fire watch/stand by
persons for 30 minutes after work
completion.

6 Injury to employee’s Engineers, 3x3=9 pipe fitter shall be trained and 3x1=3 Foreman,
Hydrostatic testing
due line break/failure foremen, competent. Engineer.
of packing workers
permit to be obtained from the HSE Dept.

Ensure proper barricade around the area


of testing, watchmen to be assigned by
the concern team.

Workers involved in activity must use


mandatory and task related PPE

Proper warning signage’s to be installed.

Ensure proper communication and during


testing.

Ensure air ventilation is provided at the


highest point.

HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 8 of 13 October 18, 2018
FORM/RA-15

Gradual filling of lines and with open


ventilation.

Make sure the line ventilation is open to


eliminate the air pockets before
pressurizing.

All hose/pipes/joints and


connectors/clamps should be of
adequate pressure rating

Tool box talk to be conducted regarding


the use of all hand tools.

Pressure relive valve to be install.

First aid kit and stand by emergency car


to be available.

Continuous supervision required by


concern foreman.

7 Workers, 3x3=9 All garbage or extra material shall be 1x1=1 Engineer,


House keeping Injuries due to slips,
removed immediately.
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 9 of 13 October 18, 2018
FORM/RA-15

foremen, Foreman,
trips and falls.
engineers, Collected garbage shall be taken to the Worker.
visitors waste collection area on site.

Hazardous and non-hazardous material


shall be segregated.

Unwanted materials shall be removed


from the site on regular basis.

8 Workers, 3x3=9 3rd party Trained scaffolders to be 1x3=3 Engineer,


Working at height. Fall of person or
foremen, appointed to erect the scaffolding. Foreman,
materials from height.
engineers Worker.
Safe access/ladders, working platforms,
toe boards, guard rails, and bracing must
be provided.

Scaffolding inspection tags to be used


mentioning the status of scaffolding by a
competent 3rd party trained scaffolding
inspector.

Full body harness to be worn and


anchored at all times.

All tools to be kept secured to prevent fall


from height and taglines shall be fixed
with the tools
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 10 of 13 October 18, 2018
FORM/RA-15

Barricade the beneath area.

No alteration shall be done without


permission.

TBT to be conducted for safe working at


height and Foreman to monitor activity at
all times.
9 Workers, 3x3=9 All electrical DBs, tools, connections and 1x3=3 Engineer,
Electricity Fire, burns & electric
foremen, cables etc. should be inspected weekly by Foreman,
shock
engineers, the competent person. Worker.
visitors
TBT to be conducted for safe work.

Trained and competent worker carry out


the activities.

Use of standard and proper type of cables


hang the cable other than laying on
floors.

Avoid passing through or near water, oil,


flammable gases.

Buried cables must be identified with


signs, make cover for the open cables.

Use of appropriate rated electrical


devices like Breakers, ELCB, RCD and
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 11 of 13 October 18, 2018
FORM/RA-15

MCCB etc.

Use of standard type of sockets, proper


cables used with proper cable
termination Use splash proof sockets and
kept in safe place.

10 Workers, 3x3=9 Ensure the good quality of tools without 1x1=1 Engineer,
Hand tools and power Injury to all parts of
foremen any damage. Foreman,
tools the body, imputation,
crush injuries, cuts, Worker.
Appropriate PPEs (hand gloves, dust
bruises, Electrical
mask, goggles) to be used while using
shock
hand tools and power tools.

Inspect the condition of the hand tools


and power tools prior to use.

Monthly inspection by a competent


person of all hand tools and power tools
to be done and records to be maintained.

Damaged hand tools and power tools


should be immediately removed and
replaced with the good one.

11 Health hazard All personnel 3x3=9 Adequate information to be given to all 3x1=3 All personnel
COVID-19 (Corona
( respiratory illness the employees through emails, display
virus) General work
cause by covid-19 posters, notices etc.
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 12 of 13 October 18, 2018
FORM/RA-15

infection that may


place hazard
lead to fatality All receiving material to be kept isolated
for certain hours as per specification of
material to reduce the risk of contact and
impact of virus and disease.

In site store area a separate isolated area


will be provided cleaning and disinfection
operation will be done to receiving
material at site.

To limit closer contact avoid shaking


hands and hugging etc

Handshaking, high five or first bump


should be strictly avoided in office and
site

All visitors to submit a self-declaration


and proof of being vaccinated at site.

Infection symptoms, travel history,


purpose of visit etc to be revealed.

Employees to be encouraged to report


any changes with their health condition
like headache, breathing difficulties,
fever, cough or tiredness.

Employees health monitoring is


mandatory prior to send them to work.

HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 13 of 13 October 18, 2018
FORM/RA-15

Hygiene practices must be followed like


washing of hands frequently, use of hand
sanitizers, cough or sneeze in tissues and
discard use tissue, avoid touching eyes,
nose or mouth.

12 Emergency. Health effect, injury Workers, 3x3=9 Safety department to be informed 1x1=1 Engineer,
foremen, immediately in case of any Foreman
engineers emergency/accident.

Affected person will be brought to the


site clinic where the site nurse will
attend.

Ambulance shall be called if required.

HCC/HSE-FORM/RA-15

You might also like