Highly efficient and diligent Senior Inspection Engineer with 22+
years of experience in successfully managing small & large-scale
projects with minimum supervision and committed to providing high
quality service to every project.
Broad experience in engineering and technical functions in both
Onshore and Offshore in Inspection of Pressure Vessel, Piping, Valve
Testing, Structural, Painting Inspection, lifting equipment and lifting
accessories and monitoring of welding, NDT, PWHT, hydro test,
Offshore Installation, Jacket/Modules fabrication, Offshore Structures
anandsubbu_2000 Pipe line Installation, Subsea Spools, Jacket Installation, Subsea Valve
@yahoo.com Skid piping, Valve Skid Frame, Top side Modification, Steel Bridge,
Riser Support Structure, Pressure vessel Fabrication, Anode
inspection and Structural Fabrication Industry. Monitor pre heat and
+971 – 509 170 319 post weld heat treatments of pipelines and pressure vessels.

Al Qassimia, Sharjah, Insightfulness in planning and initiating improvements in quality


areas as needed to meet changing demands. Possesses sound
United Arab Emirates knowledge about QA/QC & NDT activities.

https://www.linkedin. Conversant with code, standard and project specification such as


ASME, API, AWS, ASNT, NACE, BS & ISO Standards.
com/in/anand-
subbiah-14457820 Quality Assurance and Control Inspection:
▪ Preparation of Project Quality Assurance & Quality Control Plan.
▪ Preparation of Inspection Test Plan
▪ Preparation of Welding Procedure specification
▪ Preparation of Procedure Qualification record
▪ Preparation of Welder Performance Qualification Report
▪ Verification of Material Certificates
▪ Preparation and Maintaining of Quality Records as per ISO
PROFESSIONAL 9001:2015 requirements
▪ KPI review and audits, recommending and implementing corrective
CERTIFICATION actions, providing accurate documentation of statistical reports,
and ensuring overall compliance.
▪ Involved in the activities related to Engineering, procurement,
technical bid, Vendor documents & Source inspection
▪ Involved in the vendor selection process
▪ Review of the Vendor documents
▪ Control of Non-Conformance, Root cause analysis and preventive
actions
CSWIP 3.2.1
Welding Inspector Strong planner and problem solver who readily adapts to change,
Certificate No.: 76705 works independently and exceeds expectations. Able to juggle multiple
priorities and meet tight deadlines without compromising quality.

CAREER OBJECTIVE: Seeking for an executive level assignment as a


Senior Inspection Engineer in Oil & Gas/Petrochemical/EPC Industry
to hone my technical and managerial abilities.
NACE CIP – 2
Coating Inspector EXPERIENCE
Certificate No.: 11271
CURRICULUM VITAE – ANAND SUBBIAH

SENIOR INSPECTION ENGINEER Nov. 2007 – 15th


Dec 2021
DNV GL, UAE
CLIENT’S HANDLED:
• ADNOC ONSHORE / OFFSHORE
• CPECC (CHINA PETROLEUM)
• JOHN ZINK HAMWORTHY COMBUSTION
• PETROGAS
LEEA PART 1
• ADNOC ONSHORE
(Lifting Equipment
• QATAR PETROLEUM, QATAR
Engineers Association)
• PDO , OMAN
• RASGAS, QATAR
• OCCIDENTAL OMAN GAS COMPANY LLC
• ADCO
• ADMA OPCO
• LEIGHTON OFFSHORE PTE LTD.
• AL HOSN GAS
• DODSAL ENGINEERING AND CONSTRUCTION PTE.LTD.
ASNT Level II • M/S SOLID STATE INDUSTRIES PTE LTD.
Ultrasonic Testing • MULTIVALVE TECHNOLOGY MIDDLE EAST
Radiography Testing • HYUNDAI ENGINEERING AND CONSTRUCTION CO.LTD.
Liquid Penetrant Testing • ARCHIRODON CONSTRUCTION (OVERSEAS)CO.SA
Magnetic Particle Testing • DUBAI PETROLEUM (DUSUP)
• CONSOLIDATED CONTRACTOR’S INTERNATIONAL
COMPANY – QATAR
• KUWAIT OIL COMPANY
• NATIONAL DRILLING COMPANY, UAE
• CHEVRON

SENIOR QA/QC ENGINEER Nov. 2006 – Nov. 2007


STOLT OFFSHORE ACERGY, ANGOLA
PROJECTS: FABRICATION OF OFFSHORE MODULES AND
STRUCTURES AND PIPING & STRUCTURES FOR OFFSHORE
JACKET, PLATFORM, BUOY, JUMPER, PILES AND MANIFOLDS.
ALSO INVOLVED IN FPSO MODIFICATION AND RISER TOWERS
FABRICATION
CLIENTS: TOTAL EXPLORATION, EXXON MOBILE, BP, TECHNIP,
SBM, FMC, VETCO GRAY, CAMERON, DII, CHEVRON,
SOTRAPLEX, ETC.
API 510 Pressure THIRD PARTY INSPECTOR Jun. 2006 – Oct. 2006
Vessel Inspector VELOSI CERTIFICATION SERVICES LLC, QATAR
Certificate No.: 68362
QA/QC ENGINEER Sep. 2005 – Jun. 2006
API 570 Piping Inspector DNVGL (FORMERLY GERMANISCHER LLOYDS), INDIA
Certificate No.: 77304
WELDING/COATING INSPECTOR Jul. 2005 – Sep. 2005
NPCC
API 653 PROJECT: WELL HEAD PLATFORM IS 07B QATAR PETROLEUM
Certificate No.: 87506 DEVELOPMENT –QPD, JAPAN FOR WELL HEAD PLATFORM KK1,
AN7, GAS INJECTION PLANT – (GIP) IN KARKARA FIELD

ASSISTANT QA/QC ENGINEER Mar. 2005 – Jun. 2005


CURRICULUM VITAE – ANAND SUBBIAH

VELOSI CERTIFICATION SERVICES LLC, ABU DHABI, UAE


SKILLS – SET
WELDING INSPECTOR Oct. 2004 – Jan. 2005
Technical CCIC, OMAN
Expertise PROJECT: OMAN INDO FERTILIZER PLANT

Project WELDING INSPECTOR Nov. 2003 – Aug. 2004


Management MURRAY & ROBERTS GENREC DIVISION & CCIC JOINT-
VENTURE, QATAR
Quality PROJECT: KHALIFA STADIUM
Management
WELDING INSPECTOR Jun. 2000 – Jun. 2003
Vendor
DORMAN ENGINEERING PVT. LTD., INDIA
Management
PROJECT: CONSTRUCTION OF OIL REFINERY AT JAMNAGAR,
GUJARAT
Coating
ENGINEER – QUALITY Mar. 1998 – May. 2000
Activities
VEESONS ENERGY PVT. LTD., INDIA
Inspection & Key Responsibilities Includes
Fabrication

Mechanical
Testing

Internal
Audits
Project Planning Welding Inspection Liaise with Reports
& Management & Quality Checks Authorities Preparation
ISO
Audits • Review of project quality requirements and project specifications.

Material • Review of vendor documentation: Manufacturing Procedures,


Procurement Quality Control Manual, TPI Inspection Coordination UAE and
Europe.
Process
Improvements • Review of PIM package and attend Pre-Inspection Meeting. Local
Vendor inspection, Interface with Client Project Quality Lead.
Safety
Management • Vendor Audit as per ADCO project Quality requirements

Risk • Internal and External Audit including Vendor and


Evaluation subcontractors.

Resources • CAR implementation and follow up.


Management
• Project Material Inspection, and Construction surveillance
Reports & inspection.
Documentation
• Project Quality KPI monitoring, Prepare weekly Month quality
Planning & Reports.
Organizing
• Interfacing with: Manager QA/QC, regional office/Site/Project
Problem Management, TPI, NDT subcontractor, Construction subcontractor
Solving QA/QC Rep’s. PMC and Client Quality/Inspection Rep’s, to ensure
project QA/QC requirements are effectively implemented.
CURRICULUM VITAE – ANAND SUBBIAH

• Review and comment, Inspection and test Plans, Procedures,


Analytical forms related to area of responsibility and issue findings as to any
errors, conflicts, gaps or improvements to Manager QA/QC and QC
MS – Office Manager.

Leadership • Review and comment on all subcontractor Project Quality Plans,


Inspection and test Plans, Procedures, PQT’s. (Inc. Quality, welding
Presentation WPS/PQR, NDT, Coatings etc.), Method Statements, Inspection and
Test Plans development programmed and issue to Manager
Time QA/QC, QC Manager, and local site/project management.
Management
• Monitor the QA/QC/Inspection activities of the Construction
Comm. subcontractors, NDT subcontractors and TPI as to their
effectiveness, performance and compliance, Fabrication, and
construction in civil, piping, mechanical, E&I, Telecoms, SCADA etc.
incl. fit up, welding, NDT, coatings, testing etc. and pre‐
commissioning and documentation Effectively manage
subordinate QA/QC function personnel.

• Raise Non-Conformance Reports (NCR’s) for activities, actions,


EDUCATIONAL
or product quality not in compliance with project procedures,
QUALIFICATION I&TP’s, project specifications and related standard.

BACHELOR OF ENGINEERING • Storage Tanks including Cone roof, Floating roof, Dome roof, &
(MECHANICAL ENGINEERING) Internal floating roof Construction & Refurbishment with pipelines
and appurtenances.
SASTRA DEEMED
• Inspection of Subsea pipelines, subsea valves, Calm buoy, Piping,
UNIVERSITY (1998)
Flow lines & Gathering systems construction. Refurbishment and
repair of Piping & Pipelines both UG/AG., offshore structures,

• Spearheading activities in working out various requirement &


monitoring overall project operations for ensuring timely
MAJOR PACKAGES completion.

HANDLED • Establish and monitor Project Quality KPIs; Ensure compliance


of all project functions, contractors and suppliers with the project
Quality Management System requirements.
OFFSHORE PACKAGES
• Subsea pipelines • Liaise with the appropriate vendor for technical discussion;
• subsea valves Coordinate with vendor to get the right specification and details at
right time for smooth execution of project as per project specific
• Calm buoy needs.
• Single Point Mooring System.
• Establish and maintain quality policy & objectives, manpower
• Flow lines & Gathering
& resources, procurement activities (TBE, RFQ, Vendor evaluation,
systems construction Pre-inspection meeting, Pre-production meeting, vendor site
• Floating Hoses inspection, FAT, and material receiving Inspection.
• Concrete coating, HSS & • Preparation of PQR, WPS, WQT & Hydrostatic Test Procedure
HDPUF. for client approval; Review of radiographic films, witnessing UT,
• Offshore field join welding of MPI, DPI, PMI Hardness testing, PWHT test reports.

subsea line pipes. • Monitoring/witnessing all the Welding, Fabrication & Erection
related activities as per client approved Inspection & test plans,
Inspection of materials identification as per isometric drawings.
CURRICULUM VITAE – ANAND SUBBIAH

• Offshore field joint coating


(HSS+HDPUF) • Carrying out Pre inspection (Joint Preparation Fit-up, alignment,
root gap), On process (root penetration, weaving, progression,
ONSHORE PACKAGES interpass temperature & weld reinforcement) and Post Inspection,
Banding, Peaking, Plumbness Visual inspection) of the welding
• Steam condensate pot crude activities.
flash drum overhead separator
vessels, Spools & Chemical • Inspects and tests welded joints of work in progress and of
Injection Skid Packages.
completed units for visible defects, correct dimensions, joint
• Desalter Package‐First stage
strength, bead formation, weld penetration, and conformance with
vessel & second stage vessel. layout, blueprint, and work order specifications.

• SEA WATER SANDFILTER • Raising Non-Conformity report (NCR) for defective materials,
VESSELS, Piping Spools, tanks resolving the same; Verification of welding consumables (property,
& GRE pipes. type, storage etc.); Reinstatement of piping systems after
completion of all hydro testing activities.
• Closed Drain Drum, Piping
Spools & structural. • Co-ordinate with NDT Subcontractors for execution of NDT
activities; Witnessing all the NDT activities like DPI, MPI, Vacuum
• WATER HYDRO CYCLONE
VESSELS & Piping spools. Box Testing, Ferrite Test, etc.

• GAS DEHYDRATION COLUMNS, • Stage wise inspection of painting and insulation / other
Valves, Piping spools, internal protective coating, review of new methods of corrosion protection.
lining vessels Checking atmospheric conditions before blasting, visual inspection
of blasting services.

• Witness of Lab testing of the FBE raw materials , 3 LPE raw


materials ,3 LPP raw materials such as Gel time ,Moisture content
,Indentation test, Melt flow rate test, Porosity evaluation ,density
PERSONAL DETAILS ,hot water absorption test, Impact testing ,Flexibility test,
Hardness, Cathodic disbandment testing, CWC -CUBE/CORE
D.O.B: September 30, 1976 strength test, water absorption Test, Concrete Density Test,
indentation test, Flexibility test , CWC density test.
Languages Known:
English, Hindi & Tamil • Witness of the qualification of the coating system for 3 LPE/3
LPP coating and CWC coating of various thickness according to the
Nationality: Indian client requirements. Witness of the Production coating of 3 LPP
/3 LPE coating and CWC and its various production test as
Marital Status: Married required and stated in the ITP and specification.

• Ensure that surfaces are prepared according to the set


specification and coatings are applied in the correct order, to the
PASSPORT DETAILS required thickness and within environmental limits set by the
specification; Maintaining work logs and daily reports of surface
Passport No.: Z 3862208
preparation, WFT reports and DFT reports.
Place of Issue: Dubai
• Undertake the test qualifications for spray & brush painters
abrasive blasters; Capable to develop the painting/coating,
Date of Issue: 13/01/2021
blasting and other paint testing procedures. Familiar with common
paint test like holiday test, cross cut test, contamination test,
Date of Expiry: 12/01/2031
adhesion test, dolly test, etc.

• Inspection of columns, pressure vessels, heat exchanger & fin


coolers, dye penetrant checks on weld overlays of SS316L, Inconel
625
CURRICULUM VITAE – ANAND SUBBIAH

• Control the workforce and all the activities of blasting &


painting on central complex, well heads including the internal
lining of storage tanks & vessels using a wide range application of
glass flake, solvent free epoxy etc.

• Recommends updates/revisions to policies and procedures


based on field observations where procedures may not be followed
because they are unclear, incorrect or non-existent

Anand Subbiah

You might also like