RESUMEN DE METRADOS - ENCENADA

Item Descripción Und. Metrado

01 OBRAS PROVISIONALES

01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS glb 1.00

01.02 ALMACEN Y GUARDIANIA glb 1.00

01.03 CERCO PROVISIONAL CON ARPILLERA m 24.00

01.04 SEGURIDAD, SALUD Y PROTECCION CONTRA EL COVID 19 glb 1.00

01.05 CARTEL DE OBRA 3.60x2.40M und 1.00

02 ESTRUCTURAS

02.01 OBRAS PRELIMINARES

02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 24.80

02.01.02 TRAZO NIVELACION Y REPLANTEO m2 24.80

02.01.03 DESMONTAJE DE CASETA EXISTENTE glb 1.00

02.02 MOVIMIENTO DE TIERRAS

02.02.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO MANUAL m3 11.85

02.02.02 ELIMINACION DE MATERIAL EXCEDENTE + 30% ESPONJAMIENTO m3 16.34

02.02.03 APISONADO, COMPACTACION Y NIVELACION m2 25.15

02.03 CONCRETO SIMPLE

02.03.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" m2 5.76

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%


02.03.02 m3 4.94
PIEDRA

ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO


02.03.03 m2 8.97
HASTA 0.30 m

02.03.04 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS m3 0.67

02.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON e=3" m2 13.40

02.03.06 VEREDA DE CONCRETO F'C= 175 KG/CM2. FROT. Y BRUÑADO m2 3.15

02.04 CONCRETO ARMADO

02.04.01 ZAPATAS

02.04.01.01 CONCRETO ZAPATAS f'c=210 kg/cm2 m3 3.46

02.04.01.02 ZAPATAS - ACERO DE REFUERZO fy=4,200 kg/cm2 kg 70.40

02.04.02 COLUMNAS

02.04.02.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 2.48

02.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 33.12

02.04.02.03 COLUMNAS - ACERO DE REFUERZO fy=4,200 kg/cm2 kg 340.86


02.04.03 VIGAS

02.04.03.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 2.68

02.04.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 31.95

02.04.03.03 VIGAS - ACERO DE REFUERZO fy=4,200 kg/cm2 kg 411.78

02.04.04 LOSAS ALIGERADAS

02.04.04.01 CONCRETO LOSAS f'c= 210 kg/cm2 m3 2.01

02.04.04.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 22.11

02.04.04.03 LOSA ALIGERADA - ACERO DE REFUERZO fy=4,200 kg/cm2 kg 151.02

02.04.04.04 LADRILLO HUECO DE ARCILLA h=15 cm PARA TECHO ALIGERADO pza 185.00

03 ARQUITECTURA Y ACABADOS

03.01 MUROS Y TABIQUES

03.01.01 MURO DE LADRILLO KK ARCILLA SOGA M:1:5 E=1.5 CM m2 50.83

03.02 REVOQUES Y REVESTIMIENTOS

03.02.01 TARRAJEO MUROS PRIMARIO m2 6.00

03.02.02 TARRAJEO MUROS INTERIORES m2 54.75

03.02.03 TARRAJEO MUROS EXTERIORES m2 88.31

03.02.04 VESTIDURA DE DERRAMES A=0.15 m.MORTERO 1:3 m 88.51

03.02.05 CIELO RASO CON MEZCLA C:A 1:5 m2 24.58

03.03 PISOS Y PAVIMENTOS

03.03.01 CONTRAPISO DE 4cm m2 24.68

03.03.02 PISO PORCELANATO 60 x 60 m2 24.68

03.03.03 PISO DE CEMENTO PULIDO E=2'' MEZCLA 1:4 m2 12.89

03.04 ZOCALOS

03.04.01 PORCELANATO EN PAREDES DE SSHH 60 X 60 CM m2 6.00

03.04.02 CONTRAZOCALO DE PORCELANATO m 31.54

03.05 PUERTAS Y VENTANAS

03.05.01 PUERTAS DE TRIPLAY DE 2.10 x 0.70 M INC. BISAGRAS Y CERRADURA und 1.00

PUERTA PRINCIPAL 1.00X2.40M APANELADA INC. CERRADURA E


03.05.02 und 1.00
INSTALACION

VENTANAS CORREDIZAS EN SISTEMA NOVA DE 0.85 X 0.50, VIDRIO


03.05.03 und 1.00
CRUDO DE 6 MM

VENTANAS CORREDIZAS EN SISTEMA NOVA DE 3.40 X 1.50M, VIDRIO


03.05.04 und 1.00
TEMPLADO DE 6 MM

VENTANAS CORREDIZAS EN SISTEMA NOVA DE 3.40 X 1.90, VIDRIO


03.05.05 und 1.00
TEMPLADO DE 6 MM

VENTANAS CORREDIZAS EN SISTEMA NOVA DE 1.00 X 1.50, VIDRIO


03.05.06 und 1.00
TEMPLADO DE 6 MM

VENTANAS CORREDIZAS EN SISTEMA NOVA DE 2.00 X 1.50, VIDRIO


03.05.07 und 1.00
TEMPLADO DE 6 MM
VENTANAS CORREDIZAS EN SISTEMA NOVA DE 2.00 X 1.90, VIDRIO
03.05.08 und 1.00
TEMPLADO DE 6 MM

VENTANAS CORREDIZAS EN SISTEMA NOVA DE 1.65 X 1.50, VIDRIO


03.05.09 und 1.00
TEMPLADO DE 6 MM

VENTANAS CORREDIZAS EN SISTEMA NOVA DE 1.65 X 1.90, VIDRIO


03.05.10 und 1.00
TEMPLADO DE 6 MM

03.05.11 BARANDAS CON TUBO DE FIERRO SEGÚN DISEÑO m 1.63

HABILITACIÓN E INSTALACIÓN DE ESCALERA CARACOL PARA UN


03.05.12 und 1.00
NIVEL

03.05.13 HABILITACIÓN E INSTALACIÓN DE ESCALERA DE GATO H=2.40M und 1.00

03.06 PINTURA

03.06.01 PINTURA LATEX 2 MANOS EN INTERIORES m2 68.02

03.06.02 PINTURA LATEX 2 MANOS EN EXTERIORES m2 88.31

03.06.03 PINTURA LATEX 2 MANOS EN CIELORASO m2 24.58

03.07 APARATOS Y ACCESORIOS SANITARIOS

03.07.01 INODORO BLANCO STANDARD (INC. ACCESORIOS) und 1.00

03.07.02 LAVATORIO BLANCO ESTANDAR (INC.ACCESORIOS) und 1.00

03.07.03 COLOCACION DE APARATOS SANITARIOS und 2.00

04 INSTALACIONES SANITARIAS

04.01 SISTEMA DE DESAGUE

04.01.01 RED DE DESAGUE

04.01.01.01 SALIDA DESAGUE DE PVC SAL 2" pto 3.00

04.01.01.02 SALIDA DESAGUE DE PVC-SAL 4" pto 2.00

04.01.01.03 SALIDA VENTILACION DE PVC-SAL 2" pto 1.00

04.01.01.04 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 2" m 9.00

04.01.01.05 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 4" m 18.00

04.01.01.06 REGISTRO ROSCADO DE BRONCE Ø 4'' und 1.00

04.01.01.07 SUMIDERO DE BRONCE ROSCADO 2" und 1.00

04.01.01.08 SOMBRERO DE VENTILACION 2" und 1.00

INSTALACION DE BIODIGESTOR DE 600L INC. EXCAV., ELIM.,


04.01.01.09 glb 1.00
INSTALACIÓN Y ACCESORIOS, REGISTRO

04.02 SISTEMA DE AGUA

04.02.01 RED DE AGUA

04.02.01.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 O 1/2" pto 2.00

04.02.01.02 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 O 1/2" m 6.00

04.02.01.03 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 O 3/4" m 13.00

04.02.01.04 CONEXIONES Y ACCESORIOS DE TUBERIAS glb 1.00

04.02.01.05 VALVULA COMPUERTA DE 3/4" und 1.00


04.02.01.06 TANQUE ELEVADO PVC 600 LTS INCLUYE ACC. E INSTALACION und 1.00

04.02.01.07 PRUEBA HIDRAULICA Y DESINFECCION PARA AGUA Y DESAGUE glb 1.00

05 INSTALACIONES ELECTRICAS

05.01 SALIDA PARA CENTRO DE LUZ pto 3.00

05.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 8.00

05.03 SALIDA PARA INTERRUPTOR SIMPLE pto 3.00

05.04 SALIDA PARA CAMARA DE VIGILANCIA, INCLUYE PLACA pto 6.00

05.05 TUBERIA PVC SAP (ELECTRICAS) Ø20mm (3/4") m 11.00

05.06 TUBERIA PVC SAP (ELECTRICAS) Ø25mm (1") m 33.00

05.07 CONDUCTOR LSOH DE 2-1x2.5 mm2 + 1x2.5mm2 (T) ILUMINACIÓN m 11.00

05.08 CONDUCTOR LSOH DE 2-1x4 mm2 + 1x4mm2 (T) TOMACORRIENTE m 16.00

05.09 CABLE UTP CAT05 HPDE PARA CAMARA DE VIGILANCIA m 17.00

05.10 LUMINARIA CIRCULAR PARA ADOSAR und 1.00

SUMINISTRO E INSTALACION EQUIPO ILUMINACION RECTANGULAR CON


05.11 und 2.00
REJILLA DE ALUMINIO 2x36W

05.12 TABLERO GENERAL und 1.00

05.13 TABLERO DE DISTRIBUCION und 2.00

05.14 POZO DE PUESTA A TIERRA und 1.00


PLANILLA DE METRADOS - ENCENADA

CONSTRUCCION DE CENTRALES DE VIGILANCIA SEGURIDAD ZONAS DE C.P.R. LA ENCENADA DE COLLANAC, ASENTAMIENTO HUMANO EL MIRADOR DE CIENEGUILLA Y
PROYECTO :
ASOCIACION DE VIVIENDAS LAS CUMBRES DE CIENEGUILLA

ITEM PARTIDA ELEMENTO CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD

01 OBRAS PROVISIONALES

01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

1.00 1.00

1.00 GLB

01.02 ALMACEN Y GUARDIANIA

1.00 1.00

1.00 GLB

01.03 CERCO PROVISIONAL CON ARPILLERA

1.00 24.00 24.00

24.00 ML

01.04 SEGURIDAD, SALUD Y PROTECCION CONTRA EL COVID 19

1.00 1.00

1.00 GLB

01.05 CARTEL DE OBRA 3.60x2.40M

1.00 1.00

1.00 UND

02 ESTRUCTURAS

02.01 TRABAJOS PRELIMINARES

02.01.01 LIMPIEZA DEL TERRENO MANUAL

CASETA 1.00 16.00 16.00

VEREDAS 1.00 4.00 0.70 2.80

AREA BIODIGESTOR 1.00 6.00 6.00

24.80 GLB

02.01.02 TRAZO, NIVELES Y REPLANTEO DE OBRA

CASETA 1.00 16.00 16.00

VEREDAS 1.00 4.00 0.70 2.80

AREA BIODIGESTOR 1.00 6.00 6.00

24.80 M2

02.01.03 DESMONTAJE DE CASETA EXISTENTE

Total 1.00 1.00

1.00 glb

02.02 MOVIMIENTO DE TIERRAS

02.02.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO MANUAL

CASETA

Z-1 4.00 1.20 1.20 1.20 6.91

ZANJAS

EJE 01 1.00 2.50 0.50 0.80 1.00

EJE 02 1.00 1.15 0.50 0.80 0.46

EJE 03 1.00 2.50 0.50 0.80 1.00

EJE A 1.00 2.50 0.50 0.80 1.00

EJE B 1.00 1.20 0.50 0.80 0.48

EJE C 1.00 2.50 0.50 0.80 1.00

11.85 M3

02.02.02 ELIMINACION DE MATERIAL EXCEDENTE + 30% ESPONJAMIENTO

1.30 11.85 15.41

1.30 0.72 0.94

16.34 M3

02.02.03 APISONADO, COMPACTACION Y NIVELACION

1.00 24.80 24.80

24.80 M3

02.03 CONCRETO SIMPLE


PLANILLA DE METRADOS - ENCENADA

CONSTRUCCION DE CENTRALES DE VIGILANCIA SEGURIDAD ZONAS DE C.P.R. LA ENCENADA DE COLLANAC, ASENTAMIENTO HUMANO EL MIRADOR DE CIENEGUILLA Y
PROYECTO :
ASOCIACION DE VIVIENDAS LAS CUMBRES DE CIENEGUILLA

ITEM PARTIDA ELEMENTO CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD

02.03.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=2"

Z-1 4.00 1.20 1.20 5.76

5.76 M2

02.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

EJE 01 1.00 2.50 0.50 0.80 1.00

EJE 02 1.00 1.15 0.50 0.80 0.46

EJE 03 1.00 2.50 0.50 0.80 1.00

EJE A 1.00 2.50 0.50 0.80 1.00

EJE B 1.00 1.20 0.50 0.80 0.48

EJE C 1.00 2.50 0.50 0.80 1.00

4.94 M3

02.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m

EJE 01 2.00 3.40 0.30 2.04

EJE 02 2.00 1.15 0.30 0.69

EJE 03 2.00 2.40 0.30 1.44

EJE A 2.00 3.40 0.30 2.04

EJE B 2.00 1.20 0.30 0.72

EJE C 2.00 3.40 0.30 2.04

8.97 M2

02.03.04 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS

EJE 01 1.00 3.40 0.15 0.30 0.15

EJE 02 1.00 1.15 0.15 0.30 0.05

EJE 03 1.00 2.40 0.15 0.30 0.11

EJE A 1.00 3.40 0.15 0.30 0.15

EJE B 1.00 1.20 0.15 0.30 0.05

EJE C 1.00 3.40 0.15 0.30 0.15

0.67 M3

02.03.05 CONCRETO EN FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON e=3"

1.00 13.40 13.40

13.40 M2

02.03.06 VEREDA DE CONCRETO F'C= 175 KG/CM2. FROT. Y BRUÑADO

1.00 2.80 2.80

2.80 M2

02.04 CONCRETO ARMADO

02.04.01 ZAPATAS

02.04.01.01 ZAPATAS, CONCRETO F'c= 210 KG/CM2

Z-1 4.00 1.20 1.20 0.60 3.46

3.46 M3

02.04.01.02 ACERO Fy=4,200 KG/CM2 REND:250 KG/DIA

Z-1 4.00 8.00 1.10 1.00 35.20 1/2"

4.00 8.00 1.10 1.00 35.20 1/2"

TOTAL 70.40 KG

02.04.02 COLUMNAS

02.04.02.01 CONCRETO COLUMNAS f'c=210 kg/cm2

C-1 4.00 0.30 0.30 6.30 2.27

columnetas 8.00 0.15 0.20 0.90 0.22

2.48 M3

02.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS

C1 (30x30) 4.00 1.20 6.30 30.24

columnetas 8.00 0.40 0.90 2.88

33.12 M2

02.04.02.03 COLUMNAS - ACERO DE REFUERZO fy=4,200 kg/cm2

C-1 PESO
PLANILLA DE METRADOS - ENCENADA

CONSTRUCCION DE CENTRALES DE VIGILANCIA SEGURIDAD ZONAS DE C.P.R. LA ENCENADA DE COLLANAC, ASENTAMIENTO HUMANO EL MIRADOR DE CIENEGUILLA Y
PROYECTO :
ASOCIACION DE VIVIENDAS LAS CUMBRES DE CIENEGUILLA

ITEM PARTIDA ELEMENTO CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD

ACERO (VERTICALES) 4.00 4.00 6.45 1.55 159.96 5/8"

ACERO (ESTRIBOS) 4.00 54.00 1.15 0.56 139.10 3/8"

Ca columnetas PESO

ACERO (VERTICALES) 8.00 4.00 1.00 1.00 32.00 1/2"

ACERO (ESTRIBOS) 8.00 7.00 0.70 0.25 9.80 1/4"

TOTAL 340.86 KG

02.04.03 VIGAS

02.04.03.01 CONCRETO VIGAS f'c=210 kg/cm2

VP-101 (20X40) 1ER NIVEL 4.00 3.40 0.20 0.40 1.09

2DO NIVEL 4.00 3.40 0.20 0.40 1.09

VIGA 101 1.00 5.75 0.20 0.20 0.23

VIGUETA 1.00 18.00 0.10 0.15 0.27

2.68 M3

02.04.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS

VP-101 (20X40) 1ER NIVEL 4.00 3.40 1.00 13.60

2DO NIVEL 4.00 3.40 1.00 13.60

VIGA 101 1.00 5.75 0.20 1.15

VIGUETA 1.00 18.00 0.20 3.60

31.95 M2

02.04.03.03 VIGAS - ACERO DE REFUERZO fy=4,200 kg/cm2

VP-101 (20X40)

primer nivel 4.00 6.00 4.00 1.55 148.80 5/8"

segundo nivel 4.00 6.00 4.00 1.55 148.80 5/8"

2.00 27.00 1.35 0.56 40.82 3/8"

VIGA 101

1.00 4.00 5.75 1.00 23.00 1/2"

1.00 48.00 0.90 0.56 24.19 3/8"

V-B (15X20)

2.00 1.00 18.00 0.56 20.16 3/8"

1.00 120.00 0.20 0.25 6.00 1/4"

411.78 KG

02.04.04 LOSA ALIGERADA

02.04.04.01 LOSAS ALIGERADAS, CONCRETO F'c= 210 KG/CM2

PRIMER NIVEL 1.00 10.17 0.0910 0.93

SEGUNDO NIVEL 1.00 11.94 0.0910 1.09

2.01 M3

02.04.04.02 LOSAS ALIGERADAS, ENCOFRADO Y DESENCOFRADO

PRIMER NIVEL 1.00 10.17 10.17

SEGUNDO NIVEL 1.00 11.94 11.94

22.11 M2

02.04.04.03 ACERO Fy=4,200 KG/CM2 REND:250 KG/DIA

PRIMER NIVEL

FIERROS PRINCIPALES 1.00 12.00 3.90 1.00 46.80 1/2"

1.00 12.00 3.10 0.56 20.83 3/8"

FIERRO DE TEMPERATURA 12.00 3.90 0.25 11.70 1/4"

-1.00 3.00 1.80 1.00 -5.40 1/2"

-1.00 2.00 0.80 0.56 -0.90 1/2"

SEGUNDO NIVEL

FIERROS PRINCIPALES 1.00 12.00 3.90 1.00 46.80 1/2"

1.00 12.00 3.10 0.56 20.83 3/8"

FIERRO DE TEMPERATURA 12.00 3.90 0.25 11.70 1/4"

-1.00 3.00 0.80 0.56 -1.34 1/2"

151.02 KG
PLANILLA DE METRADOS - ENCENADA

CONSTRUCCION DE CENTRALES DE VIGILANCIA SEGURIDAD ZONAS DE C.P.R. LA ENCENADA DE COLLANAC, ASENTAMIENTO HUMANO EL MIRADOR DE CIENEGUILLA Y
PROYECTO :
ASOCIACION DE VIVIENDAS LAS CUMBRES DE CIENEGUILLA

ITEM PARTIDA ELEMENTO CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD

02.04.04.04 LADRILLO ARCILLA PARA TECHO 15x30x30 CM

1.00 22.11 8.33 184.18

185.00 UND

03 ARQUITECTURA

03.01 MUROS Y TABIQUES

03.01.01 MURO DE LADRILLO KK ARCILLA SOGA M:1:5 E=1.5 CM

PRIMER NIVEL

EJE 01 1.00 3.40 2.10 7.14

-1.00 2.00 1.50 -3.00

EJE 02 1.00 1.15 2.30 2.65

EJE 03 1.00 3.40 2.10 7.14

-1.00 1.00 1.50 -1.50

-1.00 1.00 2.40 -2.40

EJE A 1.00 3.40 2.10 7.14

-1.00 1.65 1.50 -2.48

-1.00 0.85 0.50 -0.43

EJE B 1.00 1.00 2.30 2.30

EJE C 1.00 3.40 2.10 7.14

-1.00 3.40 1.50 -5.10

SEGUNDO NIVEL

EJE 01 1.00 3.40 2.40 8.16

-1.00 2.00 1.90 -3.80

EJE 02 1.00 1.30 1.00 1.30

EJE 03 1.00 3.40 2.40 8.16

-1.00 2.00 1.90 -3.80

EJE A 1.00 3.40 2.40 8.16

-1.00 1.65 1.90 -3.14

EJE C 1.00 3.40 2.40 8.16

-1.00 3.40 1.90 -6.46

PARAPETO 1.00 18.00 0.90 16.20

-4.00 0.20 0.90 -0.72

50.83 M2

03.02 REVOQUES Y REVESTIMIENTOS

03.02.01 TARRAJEO MUROS PRIMARIO

1.00 5.00 1.20 6.00

6.00 M2

03.02.02 TARRAJEO MUROS INTERIORES

PRIMER NIVEL

total primer piso 1.00 14.80 2.65 39.22

-1.00 2.00 1.50 -3.00

-1.00 3.40 1.50 -5.10

-1.00 1.50 1.00 -1.50

-1.00 2.40 1.00 -2.40

-1.00 1.50 1.65 -2.48

-1.00 0.85 0.50 -0.43

-1.00 2.10 0.70 -1.47

S.H. 1.00 5.00 1.45 7.25

SEGUNDO NIVEL

total segundo piso 1.00 14.80 2.65 39.22

1.00 2.62 1.00 2.62

-1.00 2.00 1.90 -3.80

-1.00 3.40 1.90 -6.46

-1.00 2.00 1.90 -3.80

-1.00 1.65 1.90 -3.14


PLANILLA DE METRADOS - ENCENADA

CONSTRUCCION DE CENTRALES DE VIGILANCIA SEGURIDAD ZONAS DE C.P.R. LA ENCENADA DE COLLANAC, ASENTAMIENTO HUMANO EL MIRADOR DE CIENEGUILLA Y
PROYECTO :
ASOCIACION DE VIVIENDAS LAS CUMBRES DE CIENEGUILLA

ITEM PARTIDA ELEMENTO CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD

54.75 M2

03.02.03 TARRAJEO MUROS EXTERIORES

PRIMER NIVEL

total primer piso 1.00 16.00 2.80 44.80

-1.00 2.00 1.50 -3.00

-1.00 3.40 1.50 -5.10

-1.00 1.50 1.00 -1.50

-1.00 2.40 1.00 -2.40

-1.00 1.50 1.65 -2.48

-1.00 0.85 0.50 -0.43

SEGUNDO NIVEL

total segundo piso 1.00 16.00 2.80 44.80

-1.00 2.00 1.90 -3.80

-1.00 3.40 1.90 -6.46

-1.00 2.00 1.90 -3.80

-1.00 1.65 1.90 -3.14

parapeto 1.00 16.00 1.00 16.00

1.00 14.80 1.00 14.80

88.31 M2

03.02.04 VESTIDURA DE DERRAMES

1.00 88.51 88.51

88.51 M

03.02.05 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA

1.00 11.57 11.57

1.00 13.01 13.01

24.58 M2

03.03 PISOS Y PAVIMENTOS

03.03.01 CONTRAPISO DE 2"

1.00 13.40 13.40

1.00 11.28 11.28

24.68 M2

03.03.02 PISO PORCELANATO 60 x 60

1.00 13.40 13.40

1.00 11.28 11.28

. 24.68 M2

03.03.03 PISO DE CEMENTO PULIDO E=2'' MEZCLA 1:4

1.00 1.00 12.89 12.89

. 12.89 M2

03.04 ZOCALOS Y CONTRAZOCALOS

03.04.01 PORCELANATO EN PAREDES DE SSHH 60 X 60 CM

1.00 6.00 6.00

6.00 M2
PLANILLA DE METRADOS - ENCENADA

CONSTRUCCION DE CENTRALES DE VIGILANCIA SEGURIDAD ZONAS DE C.P.R. LA ENCENADA DE COLLANAC, ASENTAMIENTO HUMANO EL MIRADOR DE CIENEGUILLA Y
PROYECTO :
ASOCIACION DE VIVIENDAS LAS CUMBRES DE CIENEGUILLA

ITEM PARTIDA ELEMENTO CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD

03.04.02 CONTRAZOCALO DE PORCELANATO

1.00 17.90 17.90

1.00 13.64 13.64

31.54 M

03.05 PUERTAS Y VENTANAS

03.05.01 PUERTAS DE TRIPLAY DE 2.10 x 0.70 M INC. BISAGRAS Y CERRADURA

1.00 1.00

1.00 UND

03.05.02 PUERTA PRINCIPAL 1.00X2.40M APANELADA INC. CERRADURA E INSTALACION

1.00 1.00

1.00 UND

03.05.03 VENTANAS CORREDIZAS EN SISTEMA NOVA DE 0.85 X 0.50, VIDRIO CRUDO DE 6 MM

1.00 1.00

1.00 UND

03.05.04 VENTANAS CORREDIZAS EN SISTEMA NOVA DE 3.40 X 1.50M, VIDRIO TEMPLADO DE 6 MM

1.00 1.00

1.00 UND

03.05.05 VENTANAS CORREDIZAS EN SISTEMA NOVA DE 3.40 X 1.90, VIDRIO TEMPLADO DE 6 MM

1.00 1.00

1.00 UND

03.05.06 VENTANAS CORREDIZAS EN SISTEMA NOVA DE 1.00 X 1.50, VIDRIO TEMPLADO DE 6 MM

1.00 1.00

1.00 UND

03.05.07 VENTANAS CORREDIZAS EN SISTEMA NOVA DE 2.00 X 1.50, VIDRIO TEMPLADO DE 6 MM

1.00 1.00

1.00 UND

03.05.08 VENTANAS CORREDIZAS EN SISTEMA NOVA DE 2.00 X 1.90, VIDRIO TEMPLADO DE 6 MM

1.00 1.00

1.00 UND

03.05.09 VENTANAS CORREDIZAS EN SISTEMA NOVA DE 1.65 X 1.50, VIDRIO TEMPLADO DE 6 MM

1.00 1.00

1.00 UND

03.05.10 VENTANAS CORREDIZAS EN SISTEMA NOVA DE 1.65 X 1.90, VIDRIO TEMPLADO DE 6 MM

1.00 1.00

1.00 UND

03.05.11 BARANDAS CON TUBO DE FIERRO SEGÚN DISEÑO

1.00 1.63 1.63

1.63 ML

03.05.12 HABILITACIÓN E INSTALACIÓN DE ESCALERA CARACOL PARA UN NIVEL

1.00 1.00

1.00 UND

03.05.13 HABILITACIÓN E INSTALACIÓN DE ESCALERA DE GATO H=2.40M

1.00 1.00

1.00 UND

03.06 PINTURA

03.06.01 PINTURA LATEX 2 MANOS EN INTERIORES

1.00 54.75 54.75

DERRAMES Y ESCALERAS 1.00 13.28 13.28

68.02 M2
PLANILLA DE METRADOS - ENCENADA

CONSTRUCCION DE CENTRALES DE VIGILANCIA SEGURIDAD ZONAS DE C.P.R. LA ENCENADA DE COLLANAC, ASENTAMIENTO HUMANO EL MIRADOR DE CIENEGUILLA Y
PROYECTO :
ASOCIACION DE VIVIENDAS LAS CUMBRES DE CIENEGUILLA

ITEM PARTIDA ELEMENTO CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD

03.06.02 PINTURA LATEX 2 MANOS EN EXTERIORES

1.00 88.31 88.31

88.31 M2

03.06.03 PINTURA LATEX 2 MANOS EN CIELORASO

1.00 24.58 24.58

24.58 M2

03.07 APARATOS Y ACCESORIOS SANITARIOS

03.07.01 INODORO BLANCO STANDARD (INC. ACCESORIOS)

1.00 1.00

1.00 UND

03.07.02 LAVATORIO BLANCO ESTANDAR (INC.ACCESORIOS)

1.00 1.00

1.00 UND

03.07.03 COLOCACION DE APARATOS SANITARIOS

2.00 2.00

2.00 UND

04 INSTALACIONES SANITARIAS

04.01 SISTEMA DE DESAGUE

04.01.01 RED DE DESAGUE

04.01.01.01 SALIDA DESAGUE DE PVC SAL 2"

3.00 3.00

3.00 PTO

04.01.01.02 SALIDA DESAGUE DE PVC SAL 4"

2.00 2.00

2.00 PTO

04.01.01.03 SALIDA VENTILACION DE PVC-SAL 2"

1.00 1.00

1.00 PTO

04.01.01.04 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 2"

9.00 9.00

9.00 ML

04.01.01.05 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 4"

18.00 18.00

18.00 ML

04.01.01.06 REGISTRO ROSCADO DE BRONCE Ø 4''

1.00 1.00

1.00 UND

04.01.01.07 SUMIDERO DE BRONCE ROSCADO Ø 2''

1.00 1.00

1.00 UND

04.01.01.08 SOMBRERO DE VENTILACION 2"

1.00 1.00

1.00 UND

04.01.01.09 INSTALACION DE BIODIGESTOR DE 600L INC. EXCAV., ELIM., INSTALACIÓN Y ACCESORIOS, REGISTRO

1.00 1.00

1.00 GLB

04.02 SISTEMA DE AGUA FRIA

04.02.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 O 1/2"

2.00 2.00
PLANILLA DE METRADOS - ENCENADA

CONSTRUCCION DE CENTRALES DE VIGILANCIA SEGURIDAD ZONAS DE C.P.R. LA ENCENADA DE COLLANAC, ASENTAMIENTO HUMANO EL MIRADOR DE CIENEGUILLA Y
PROYECTO :
ASOCIACION DE VIVIENDAS LAS CUMBRES DE CIENEGUILLA

ITEM PARTIDA ELEMENTO CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD

2.00 PTO

04.02.02 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 O 1/2"

6.00 6.00

6.00 ML

04.02.03 RED DE DISTRIBUCION INTERNA CON TUBERIA PVC C-10 Ø 3/4"

13.00 13.00

13.00 ML

04.02.04 CONEXIONES Y ACCESORIOS DE TUBERIAS 1/2" Y 3/4",

1.00 1.00

1.00 GLB

04.02.05 VALVULA COMPUERTA DE 3/4"

1.00 1.00

1.00 UND

04.02.06 TANQUE ELEVADO PVC 600 LTS INCLUYE ACC. E INSTALACION

1.00 1.00

1.00 UND

04.02.07 PRUEBA HIDRAULICA Y DESINFECCION PARA AGUA Y DESAGUE

1.00 1.00

1.00 GLB

05 INSTALACIONES ELECTRICAS

05.01 SALIDA PARA CENTRO DE LUZ

3.00 3.00

3.00 PTO

05.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

8.00 8.00

8.00 PTO

05.03 SALIDA PARA INTERRUPTORES SIMPLES, INCLUYE PLACA

3.00 3.00

3.00 PTO

05.04 SALIDA PARA CAMARA DE VIGILANCIA, INCLUYE PLACA

6.00 6.00

6.00 PTO

05.05 TUBERIA PVC SAP (ELECTRICAS) Ø20mm (3/4")

11.00 11.00

11.00 ML

05.06 TUBERIA PVC SAP (ELECTRICAS) Ø25mm (1")

33.00 33.00

33.00 ML

05.07 CONDUCTOR LSOH DE 2-1x2.5 mm2 + 1x2.5mm2 (T) ILUMINACIÓN

11.00 11.00

11.00 ML

05.08 CONDUCTOR LSOH DE 2-1x4 mm2 + 1x4mm2 (T)

16.00 16.00

16.00 ML

05.09 CABLE UTP CAT05 HPDE PARA CAMARA DE VIGILANCIA

17.00 17.00

17.00 ML
PLANILLA DE METRADOS - ENCENADA

CONSTRUCCION DE CENTRALES DE VIGILANCIA SEGURIDAD ZONAS DE C.P.R. LA ENCENADA DE COLLANAC, ASENTAMIENTO HUMANO EL MIRADOR DE CIENEGUILLA Y
PROYECTO :
ASOCIACION DE VIVIENDAS LAS CUMBRES DE CIENEGUILLA

ITEM PARTIDA ELEMENTO CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD

05.10 LUMINARIA CIRCULAR PARA ADOSAR

1.00 1.00

1.00 UND

05.11 SUMINISTRO E INSTALACION EQUIPO ILUMINACION RECTANGULAR CON REJILLA DE ALUMINIO 2x36W

2.00 2.00

2.00 UND

05.12 TABLERO GENERAL

1.00 1.00

1.00 UND

05.13 TABLERO DISTRIBUCION

2.00 2.00

2.00 UND

05.14 POZO DE PUESTA A TIERRA

1.00 1.00

1.00 UND
MODULO BASICO 26 M2
ELEMENTO CANTIDAD LARGO
HORIZONTALES
muro 1 2 0.55
muro 2 1 1.20
muro 3 1 0.60
muro 4 1 0.95
muro 5 1 0.60
muro 6 1 0.80
muro 7 1 2.50
muro 8 1 0.50
muro 9 1 1.50
muro 10 1 0.30
muro 11 1 0.58
muro 12 1 1.20
muro 13 1 0.58
VERTICALES
MURO 14 1 3.90
MURO 15 1 1.96
MURO 16 1 2.15
MURO 17 1 1.20
MURO 18 1 2.78

MODULO BASICO 33 M2
ELEMENTO CANTIDAD LARGO
HORIZONTALES
muro 1 1 0.90
muro 2 1 1.20
muro 3 1 0.90
muro 4 1 1.20
muro 5 1 0.90
muro 6 1 2.85
muro 7 1 2.85
muro 8 1 0.45
muro 9 1 0.75
muro 10 1 1.20
muro 11 1 0.75
muro 12 1 1.50
muro 13 1 0.20
VERTICALES
MURO 14 1 6.30
MURO 15 1 1.30
MURO 16 1 0.65
MURO 17 1 1.75
MURO 18 1 5.00
BASICO 26 M2
ANCHO ALTO PARCIAL TOTAL

2.45 2.70
0.9 1.08
2.45 1.47
2.45 2.33
2.25 1.35
2.45 1.96
2.45 6.13
2.45 1.23
0.4 0.60
2.45 0.74
2.45 1.42
0.95 1.14
2.45 1.42

2.45 9.56
2.45 4.80
2.45 5.27
2.45 2.94
2.45 6.81
52.93 M2

BASICO 33 M2
ANCHO ALTO PARCIAL TOTAL

2.45 2.21
1.10 1.32
2.45 2.21
1.10 1.32
2.45 2.21
2.45 6.98
2.45 6.98
2.45 1.10
2.45 1.84
1.05 1.26
2.45 1.84
0.25 0.38
2.45 0.49

2.45 15.44
2.45 3.19
2.45 1.59
2.45 4.29
2.45 12.25
66.87 M2