IEM - Precast Lifting and Connection

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
‘The instuton of Engineers Moai, 456062 faln 52/40. Bor 23 Voom Sultan, 46720 Petolg Joya, Selangor Darl san e1:087068 4001/2 Fan 03-7957 7678. Emel shahrul@lem orgimy REGISTRATION FORM HALF DAY SEMINAR ON “PRECAST LIFTING AND CONNECTION’ (SEPTEMBER 208 (Thursday) on SPEER 8 ‘er oune tecstaTon poet HUST 2 MISE OW REGSTRATON eB How and Mae ‘eon Sing eon ara yr Va Sime ta, canonoeiucn MasnONAMk DRATMOMEY ORD POSTAL “Sen PeMe mete etd Ste comment eve tar pt wl tbe {ebetnolr ihe prpt oat sar thea ae isn en see {Sevotrtty 00 p00 er nsrancrrasacon ‘ipeemmce comme ose San Pye ot tt Teoma my rcp we ele SIEM ‘halon agen Hye hit a ee HALF DAY SEMINARON “PRECAST LIFTING AND CONNECTION” organised and Hosted by Chand structural Engineering Technical Dison, ‘The Institution of Engineers, Malaysia In Colaboraton with Half Moment Sdn Bhd Date; 6* September 2018 (Thursday) Venue: Best Western Hotel, Petal Time: 830am.-1.00 p.m Speaker : Me Gary Connah cre os ee 0.00 ee 20.00 TEM Corporate Members 100.00 Non-IEM Members 350.00 synorsis inthe precast industry. three things count when components weighing Several fons axe transported, movable roof stuctues ore shied or enire buldings ore hela together Sotety. Safely. Safely. always hos to do with the efficient movement, reinfercoment. fastaring and connecting of Concrete. is important that precastes should only raly on ceed ting systems when il-comes 19 safely. AS the overall stably of © precast Structure Gepencs largely on its connections imporion! to consider the Gtfectvensss of these Connections in Wansfening the lerces between individual bulging elements and tothe stabizing cores and Foundation, Ths

You might also like