CHAPTER 6
DISASSEMBLY OF THE INTERMEDIATE BEARING
PEDESTAL
en HTGD693025V9019- 77/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
6 DISASSEMBLY OF THE INTERMEDIATE BEARING PEDESTAL
The intermediate bearing pedestal is arranged between the IP turbine and the LP
turbine.
12
3
Illustrated parts list
6.1 Preparations
Disconnect all electric connections of the instrumentation and thermocouples at the
bearing pedestal.
Mark all connections for subsequent re-connection.
WARNING
Automatic re-start
Oil pressure in the system could cause injury
Æ Tag-out/Lock-out the pumps for generating the pressure in the system to pre-
vent unexpected switching-on.
78/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE
12 13 7 15
2
11
14
10
1 9
3
4
6
5
BLVI0112_
A3700_
Remove the bracket 15 before lifting the bearing pedestal, upper part 2. .
en HTGD693025V9019- 79/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
6.2 Blanking off the lube oil supply
Note
This is only required if operation of the bearing jacking oil system is necessary for
maintenance of turbine or oil system components.
The auxiliary oil system start-up is only necessary when during maintenance work:
- the rotor must be turned or displaced (axial clearance measurement)
- the bearing clearances must be measured.
6.2.1 Removing the orifice and fitting the blanking plate
- Refer to Fig. 6-2.
Remove the cover 1 of the splash guard 2.
Loosen the hex. head bolts 3, 4 remove bolts 4 at the connection flange according to
Fig. 6-2 and pull out the orifice 6.
Install the blanking plate 5.
Caution
Mark at the outer side of the splash guard indicating that the blanking plate (5) is
installed. Fasten the original orifice plate (6) to the oil line.
80/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE
6
4
5 1
2
3
MBLQ_0001_
Fig. 6-2 Removing the orifice and fitting the blanking plate
en HTGD693025V9019- 81/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
6.3 Lifting off the bearing pedestal, upper part
6.3.1 Loosening the flange joints
Note
Remove the brackets, fitted between the bearing housing upper part and the LP-
turbine shaft seal casing upper part.
Remove the taper pins 801 from the upper part 2 and put them in the tool cabinet,
refer to Fig. 6-3
Fit jackscrews 802 into the appropriate tapped holes in the bearing pedestal upper
half.
Loosen the hexagon head bolts 4 in the bearing pedestal upper half..
Loosen the flange joint 5, 6 using the bolt tensioning device.
Hydraulic pre-tension values for elongation studs and elonga- Data sheet
tion bolts. HTGD 479 232
Suspended Load
Load or part of load can fall down and cause injury.
Æ Wear correct personal protective equipment, hard hat, safety boots.
Æ Do not stand under suspended loads.
Æ Make sure that persons not involved in the procedure are out of the danger ar-
ea.
Æ Do not overload the lift equipment.
Æ Use lifting points on the component.
Æ Do not let the slings and ropes get damaged on sharp edges.
82/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE
WARNING
Pressure hazard
Incorrect use of pressurised tools can cause serious injuries.
Æ Do not lean or bend over pressurised tools.
Æ Make sure that persons not involved in the procedure are out of the danger ar-
ea.
Æ Make sure to correctly follow the local and OEM (Original Equipment Manufac-
ture) regulations.
Caution
Obey fully the instruction "Hydraulic stretching of elongation bolts" when loosening
the elongation bolts. Take note of the instructions of the tool manufacturer.
en HTGD693025V9019- 83/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
801 802
8
7
6
5
2
802
4
801
3
BLVI0113_
A3701_
84/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE
Caution
Make sure that the load is correctly secured. Keep upper part horizontal during
lifting it off.
WARNING
Suspended Load
Load or part of load can fall down and cause injury.
Æ Wear correct personal protective equipment, hard hat, safety boots.
Æ Do not stand under suspended loads.
Æ Make sure that persons not involved in the procedure are out of the danger ar-
ea.
Æ Do not overload the lift equipment.
Æ Use lifting points on the component.
Æ Do not let the slings and ropes get damaged on sharp edges.
en HTGD693025V9019- 85/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
6.5 Removing the oil shields, lower parts
Unscrew bolts 3 in the lower parts of the oil shields 1 and 2, remove lower parts and
check for damages, refer to Fig. 6-4
BLVI0114_
A3702_
86/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE
Place a dial gauge on the bearing pedestal and position the dial gauge spindle on
the highest point of the rotor shaft. Use the auxiliary rotor support to slowly lift the ro-
tor and take a reading from the dial gauge.
Enter the measurement as clearance "V" taken at the bearing Test certificate
into the test certificate. IBSE 500 739
en HTGD693025V9019- 87/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
6.6.3 Lifting off the journal bearing, upper part
Loosen and remove the socket head screws 42 refer to Fig. 6-5
Arrange tools and carefully lift off upper part 41 using hoisting equipment.
908 44
917
42
41
43
40
BLVI0115_
A3703_
88/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE
WARNING
Suspended Load
Load or part of load can fall down and cause injury.
Æ Wear correct personal protective equipment, hard hat, safety boots.
Æ Do not stand under suspended loads.
Æ Make sure that persons not involved in the procedure are out of the danger ar-
ea.
Æ Do not overload the lift equipment.
Æ Use lifting points on the component.
Æ Do not let the slings and ropes get damaged on sharp edges.
Attach the Inlay 1 upside down to a crane with two chain blocks using both Inlay
eyebolts 7. Orient the Inlay 1 in the correct position to the bearing housing. Coat the
Inlay 1 and shaft journal with lube oil. Put down the Inlay 1 onto the shaft. Make sure
that the Eyebolts 7 are diagonal (i.e.: front and back of the inlay). Gradually let up on
one of the hoists to allow the Inlay 1 to roll down around the shaft until it stabilizes in
the bottom of the bearing housing. In the final position the inlay 1 must be parallel
with the parting plane.
Insert the Threaded bars 3 into the Inlay 1. Lubricate the Threaded bars 3 the Wash-
ers 5 and the Hexagonal nuts 4 with Graphite Lubricant Paste. Attach the Bracket 2
to a crane with a chain block using the Eyebolt 6. Put down the bracket 2 over the
threaded bars 3 of the inlay 1 and onto the parting plane of the bearing pedestal 10.
Put the Washers 5 and the Hexagonal nuts onto the Threaded bars 3.
Tight the Hexagonal head screws 8 to fix the rotor raising device in the correct posi-
tion then slightly loosen the Hexagonal head screws 8 to allow the lifting process.
Insert sliding plate 9.
en HTGD693025V9019- 89/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
Note
Monitor the lifting with a dial gauge. Make sure that there is a clearance between
the rotor and the journal bearing lower part.
Caution
Monitor the shaft seal and blade clearances when changing the axial position of the
turbine rotors.
90/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE
Turn out and carefully lift off the lower part of the journal bearing 40 from the bearing
pedestal, refer to Fig. 6-6.
WARNING
Suspended Load
Load or part of load can fall down and cause injury.
Æ Wear correct personal protective equipment, hard hat, safety boots.
Æ Do not stand under suspended loads.
Æ Make sure that persons not involved in the procedure are out of the danger ar-
ea.
Æ Do not overload the lift equipment.
Æ Use lifting points on the component.
Æ Do not let the slings and ropes get damaged on sharp edges.
en HTGD693025V9019- 91/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
Blank Page