g GE POWER

Gas Power Systems


MAINTENANCE

CHAPTER 6
DISASSEMBLY OF THE INTERMEDIATE BEARING
PEDESTAL

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

en HTGD693025V9019- 77/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
6 DISASSEMBLY OF THE INTERMEDIATE BEARING PEDESTAL
The intermediate bearing pedestal is arranged between the IP turbine and the LP
turbine.
12
3
Illustrated parts list

Refer to parts list:


Æ MAD40

6.1 Preparations
Disconnect all electric connections of the instrumentation and thermocouples at the
bearing pedestal.
Mark all connections for subsequent re-connection.
WARNING

Automatic re-start
Oil pressure in the system could cause injury
Æ Tag-out/Lock-out the pumps for generating the pressure in the system to pre-
vent unexpected switching-on.

Prior to disassembly remove the transmitters for vibration measurement.


Note
When dismantling the bearing pedestal housing, keep all components that come
into contact with lube oil absolutely clean

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

78/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE

12 13 7 15
2
11

14

10

1 9
3
4
6
5
BLVI0112_
A3700_

Pos Designation Pos Designation


1 Bearing pedestal housing lower half 9 Foundation bolt
2 Bearing pedestal housing upper 10 Pedestal holding down claws
half
3 Rotor 11 Rotor vibration measurement
4 Vertical keyway 12 Lubricating oil inlet
5 Axial keyway 13 Splash guard
6 Oil baffle lower half 14 Lubricating oil outlet
7 Oil baffle upper half 15 Bracket
8 Support plate

Fig. 6-1 Overview of the bearing pedestal

Remove the bracket 15 before lifting the bearing pedestal, upper part 2. .

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

en HTGD693025V9019- 79/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
6.2 Blanking off the lube oil supply
Note
This is only required if operation of the bearing jacking oil system is necessary for
maintenance of turbine or oil system components.

The auxiliary oil system start-up is only necessary when during maintenance work:
- the rotor must be turned or displaced (axial clearance measurement)
- the bearing clearances must be measured.
6.2.1 Removing the orifice and fitting the blanking plate
- Refer to Fig. 6-2.
Remove the cover 1 of the splash guard 2.
Loosen the hex. head bolts 3, 4 remove bolts 4 at the connection flange according to
Fig. 6-2 and pull out the orifice 6.
Install the blanking plate 5.
Caution

Mark at the outer side of the splash guard indicating that the blanking plate (5) is
installed. Fasten the original orifice plate (6) to the oil line.

Refit and tighten the cover of the splash guard.

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

80/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE

6
4

5 1

2
3

MBLQ_0001_

Pos Designation Pos Designation


1 Cover 4 Hexagon head bolts
2 Splash guard 5 Blanking plate
3 Hexagon head bolts 6 Orifice

Fig. 6-2 Removing the orifice and fitting the blanking plate

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

en HTGD693025V9019- 81/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
6.3 Lifting off the bearing pedestal, upper part
6.3.1 Loosening the flange joints
Note
Remove the brackets, fitted between the bearing housing upper part and the LP-
turbine shaft seal casing upper part.

Remove the taper pins 801† from the upper part 2 and put them in the tool cabinet,
refer to Fig. 6-3
Fit jackscrews 802† into the appropriate tapped holes in the bearing pedestal upper
half.
Loosen the hexagon head bolts 4 in the bearing pedestal upper half..
Loosen the flange joint 5, 6 using the bolt tensioning device.
Hydraulic pre-tension values for elongation studs and elonga- Data sheet
tion bolts. HTGD 479 232

Use hoisting device for positioning the tensioning device.


WARNING

Suspended Load
Load or part of load can fall down and cause injury.
Æ Wear correct personal protective equipment, hard hat, safety boots.
Æ Do not stand under suspended loads.
Æ Make sure that persons not involved in the procedure are out of the danger ar-
ea.
Æ Do not overload the lift equipment.
Æ Use lifting points on the component.
Æ Do not let the slings and ropes get damaged on sharp edges.

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

82/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE

WARNING

Pressure hazard
Incorrect use of pressurised tools can cause serious injuries.
Æ Do not lean or bend over pressurised tools.
Æ Make sure that persons not involved in the procedure are out of the danger ar-
ea.
Æ Make sure to correctly follow the local and OEM (Original Equipment Manufac-
ture) regulations.

Caution

Obey fully the instruction "Hydraulic stretching of elongation bolts" when loosening
the elongation bolts. Take note of the instructions of the tool manufacturer.

Pull out the cylindrical bolts 7 using eyebolt.


Note
Clean the bolt tensioning device after use and store it in the tool cabinet.

6.3.2 Lifting off the upper part


Screw the jack screws 802† against the bearing pedestal lower part 1 and lift the
upper part by 1-2 mm. Refer to Fig. 6-3
Lift off carefully and vertically the bearing pedestal upper part 2. Do not damage the
threads of the elongation studs 3 and the oil shields in the upper part.
Keep the bearing pedestal upper part horizontal using chain hoists.

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

en HTGD693025V9019- 83/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
801 802
8

7
6

5
2

802
4

801
3

BLVI0113_
A3701_

Pos Designation Pos Designation


1 Pedestal housing lower half 5 Washer
2 Pedestal housing upper half 6 Nut
3 Elongation stud 7 Dowel pin
4 Hexagon head bolt 8 Chain hoist equipment
801† Taper pin 802† Jackscrew

Fig. 6-3 Lifting off the bearing pedestal upper part

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

84/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE

Caution

Make sure that the load is correctly secured. Keep upper part horizontal during
lifting it off.

WARNING

Suspended Load
Load or part of load can fall down and cause injury.
Æ Wear correct personal protective equipment, hard hat, safety boots.
Æ Do not stand under suspended loads.
Æ Make sure that persons not involved in the procedure are out of the danger ar-
ea.
Æ Do not overload the lift equipment.
Æ Use lifting points on the component.
Æ Do not let the slings and ropes get damaged on sharp edges.

Unscrew the elongation studs 3.


Cover the lube oil ports in the parting plane to keep unwanted material out of the
lube oil system, use coloured adhesive tape so that it is easily visible.
Note
Unscrew the jack screws from the upper part and put them in the tool cabinet.

6.4 Check measurements and inspections


6.4.1 Bearing pedestal, upper part
Check the oil shields for any damage.
6.4.2 Bearing pedestal, lower part
Measure the radial clearances of the oil shields and enter Test certificate
measurements in the test certificate. HTGD 499 343

Check the oil shields for any damage.

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

en HTGD693025V9019- 85/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
6.5 Removing the oil shields, lower parts
Unscrew bolts 3 in the lower parts of the oil shields 1 and 2, remove lower parts and
check for damages, refer to Fig. 6-4

BLVI0114_
A3702_

Pos Designation Pos Designation


1 Oil baffle, lower half 3 Hex. head bolt
2 Oil baffle, lower half

Fig. 6-4 Removing the oil baffle lower half

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

86/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE

6.6 Removing the journal bearing, upper part


12
3
Illustrated parts list

Refer to parts list:


Æ MAD41

6.6.1 Check measurements on the journal bearing


Note
To measure the bearing's clearance, mount the auxiliary rotor support before dis-
assembling the top bearing section.

Place a dial gauge on the bearing pedestal and position the dial gauge spindle on
the highest point of the rotor shaft. Use the auxiliary rotor support to slowly lift the ro-
tor and take a reading from the dial gauge.
Enter the measurement as clearance "V" taken at the bearing Test certificate
into the test certificate. IBSE 500 739

6.6.2 Removing the thermocouples


Unscrew the bearing temperature thermocouples from the lower part of the bearing
and unplug the socket connection from the bearing pedestal. Mark them with the cor-
rect KKS designations.

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

en HTGD693025V9019- 87/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
6.6.3 Lifting off the journal bearing, upper part
Loosen and remove the socket head screws 42 refer to Fig. 6-5
Arrange tools and carefully lift off upper part 41 using hoisting equipment.
908 44
917

42
41

43

40

BLVI0115_
A3703_

Pos Designation Pos Designation


1 Bearing pedestal, lower part 44 Locking pin
40 Journal bearing, lower part 45 Insulation ring, lower part
41 Journal bearing, upper part 908† Eyebolt
42 Socket head screw 917† Shackle
43 Cylindrical pin

Fig. 6-5 Lifting off the journal bearing upper part


© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)
All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

88/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE

WARNING

Suspended Load
Load or part of load can fall down and cause injury.
Æ Wear correct personal protective equipment, hard hat, safety boots.
Æ Do not stand under suspended loads.
Æ Make sure that persons not involved in the procedure are out of the danger ar-
ea.
Æ Do not overload the lift equipment.
Æ Use lifting points on the component.
Æ Do not let the slings and ropes get damaged on sharp edges.

6.7 Installing the auxiliary rotor support


Note
This is only required if the journal bearing lower part must be removed.

Install the rotor raising device 902† according to Fig. 6-6


Note
When the Auxiliary rotor support is installed only rotate or move the rotor by hand.

Attach the Inlay 1 upside down to a crane with two chain blocks using both Inlay
eyebolts 7. Orient the Inlay 1 in the correct position to the bearing housing. Coat the
Inlay 1 and shaft journal with lube oil. Put down the Inlay 1 onto the shaft. Make sure
that the Eyebolts 7 are diagonal (i.e.: front and back of the inlay). Gradually let up on
one of the hoists to allow the Inlay 1 to roll down around the shaft until it stabilizes in
the bottom of the bearing housing. In the final position the inlay 1 must be parallel
with the parting plane.
Insert the Threaded bars 3 into the Inlay 1. Lubricate the Threaded bars 3 the Wash-
ers 5 and the Hexagonal nuts 4 with Graphite Lubricant Paste. Attach the Bracket 2
to a crane with a chain block using the Eyebolt 6. Put down the bracket 2 over the
threaded bars 3 of the inlay 1 and onto the parting plane of the bearing pedestal 10.
Put the Washers 5 and the Hexagonal nuts onto the Threaded bars 3.
Tight the Hexagonal head screws 8 to fix the rotor raising device in the correct posi-
tion then slightly loosen the Hexagonal head screws 8 to allow the lifting process.
Insert sliding plate 9.

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

en HTGD693025V9019- 89/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g
Note
Monitor the lifting with a dial gauge. Make sure that there is a clearance between
the rotor and the journal bearing lower part.

Caution

Monitor the shaft seal and blade clearances when changing the axial position of the
turbine rotors.

Pos Designation Pos Designation


1 Inlay 7 Eyebolt, Inlay
2 Bracket 8 Hexagonal head screw
3 Threaded bar 9 Sliding plate
4 Hexagonal nut 10 Bearing pedestal, lower part
5 Washer 40 Journal bearing lower part
6 Eyebolt, Bracket 902† Rotor raising device

Fig. 6-6 Installing the auxiliary rotor support


© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)
All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

90/324 HTGD693025V9019- en
Feb 2017
g GE POWER
Gas Power Systems
MAINTENANCE

6.8 Removing the journal bearing, lower part


12
3
Illustrated parts list

Refer to parts list:


Æ MAD41

Turn out and carefully lift off the lower part of the journal bearing 40 from the bearing
pedestal, refer to Fig. 6-6.
WARNING

Suspended Load
Load or part of load can fall down and cause injury.
Æ Wear correct personal protective equipment, hard hat, safety boots.
Æ Do not stand under suspended loads.
Æ Make sure that persons not involved in the procedure are out of the danger ar-
ea.
Æ Do not overload the lift equipment.
Æ Use lifting points on the component.
Æ Do not let the slings and ropes get damaged on sharp edges.

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

en HTGD693025V9019- 91/324
Feb 2017
MAINTENANCE
GE POWER
Gas Power Systems
g

Blank Page

© Copyright 2016 GENERAL ELECTRIC COMPANY (USA)


All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric
Company and/or its legitimate affiliates.

92/324 HTGD693025V9019- en
Feb 2017

You might also like