Perihal : Pemasangan Tray Kabel 600 - 800 mm Bongkar Existing / Instal Baru

Project : CIREBON ELECTRIC POWER , Jawa Barat


Up , Bp HENDRIK

Satuan Quot
Kategori Item Deskripsi Unit VOL TOTAL
UNIT JASA
A PRELIMINARY WORK
1 Site . SV ( K.3 Listrik ) org 1 1 7.000.000
2 Peparition Work lot 1 1 6.500.000
3 Mobilisasi lot 1 1 3.000.000
4 Tools Schafolding , Etc set 10 10 400.000 4.000.000
5 Protection Blues Sheet ( Kelengkapan APD ) lot 1 1 6.500.000
6 Penginapan / Mess MAN POWER ( 8 Orang ) Unit 1 1 6.500.000
TOTAL Preliminary Work 33.500.000
B MATERIAL SUPPORT ( CONSUMABLE )
1 Plate UNP ( 50 x 38 x 5 ) mm m 360 360 32.000 11.520.000
2 Cat Zinchromate kg 15 15 28.000 420.000
3 Cat Besi kg 15 15 22.000 330.000
4 Thinner kg 7 7 12.000 84.000
5 Kawat Las RD 2,6 kg 10 10 55.000 550.000
6 Mata Gerinda Potong 4" pcs 36 36 12.000 432.000
7 Mata Gerinda Poles pcs 20 20 15.000 300.000
8 Travo Las Set 1 1 - 0
9 Body Harnest Set 1 1 - 0
10 Helm Set 1 1 - 0
11 Sarung Tangan Set 1 1 - 0
12 Rompi Set 1 1 - 0
13 Eyes Glow Set 1 1 - 0
14 Fire Blanket Set 1 1 - 0
15 Apar Set 1 1 - 0
16 Safety Shoes Set 8 8 - 0
TOTAL Pekerjaan Material Support ( Consumable ) 13.636.000
C PEKERJAAN PEMASANGAN TRAY
1 Bongkar Tray Existing Lot 1 1 17.500.000
2 Pemasangan Tray Baru m 300 300 40.000 19.500.000
Total Pekerjaan Pemasangan Tray 37.000.000

Sub Total Item Deskripsi TOTAL QUOT

A Total Preliminary Work 33.500.000


B Total Pekerjaan Material Support ( Consumable ) 13.636.000
C Total Pekerjaan Pemasangan Tray 37.000.000
Jumlah 84.136.000
Ppn 10 % -
Discount -
Grand Total 84.136.000