ASAM-ASAM CFSPP (2X100MW) UNIT 5 & 6

Revision : 0

RFI (REQUEST FOR INSPECTION)


No. IKCP-SITE-EL-RFI-00524

To : PT PLN (Persero) Pusat Manajemen Proyek


Attn : Mr. Harrie A.S Pamunkkaz
CC : PT PLN (Persero) UPP Kalbagtim 4

Dear Gentlemen's
Here with we would like to invite you for inspecting accordingly to the following schedule :

Date of Inspection 2022-04-05 Reference drawing :


IKCP0-UMD-E-01-101, IKCP0-BFT-LVSE
Time 09:00
-09-001
Work location CCB GROUND FLOOR #2 Reference document :

Work Item DRY TRANSFORMER INSTALLATION ( 24BFT01&24BFT02 ) -

Inspection Activity Joint Inspection of DRY Transformer Installation at CCB Ground Floor #2

Originator Received By,


Participant
Consortium Truba - Hyundai - Itochu PT PLN (Persero) Pusmanpro

Name

Signature

Date

Inspection Result :

A : Inspection passed. The Contractor is allowed to procedd with the works.


B : Remedial works listed below to be completed and re-inspection is required after remedial works
C : Remedial works below to be completed but no further inspection required
D : Rejected

Remarks/comment :

Checked By, Prepare & Inspected By, Witnessed By, Approved By,

Participant
Sub - Contractor / QA QC Consortium PT PLN (Persero) PT PLN (Persero)
Main - Contractor Truba - Hyundai - Itochu PUSMANPRO UPP KALBAGTIM 4

Name

Signature

Date

Original : Consortium QA/QC

Copy : PT PLN (Persero) Pusmanpro