ARRIVAL, INSTALLATION, AND STARTUP CHECKLISTS

The following checklists are for reference only, and are not intended to be comprehensive for all situations.

Plant Item Number:


Arrival, Installation,
Chart Energy & Chemicals, Inc. is an ISO:9001 and
and Startup
Cold Box Arrival IOM Section Checked By / Date
Checklists
1. Check for external damage II. A. ISO:14001 registered company
Inside
2. Verify cold box enclosure is air-tight (environmentally sealed) II. A.
3. Verify stream shipping pressure (typically 15 psig, if applicable) II. A.
Chart Energy & Chemicals, Inc.
2191 Ward Avenue 8665 New Trails Drive, Suite 100
Cold Box Storage
La Crosse, WI 54601 USA The Woodlands, TX 77381 USA
1. Verify cold box enclosure is air-tight and stream shipping pressure is intact II. B.
2. Store in the as-shipped position with weight concentrated at the II. B. Phone: 608-787-3333 Phone: 281-364-8700

structural frame members Fax: 608-787-2141 Fax: 281-364-8706


www.chartindustries.com
Cold Box Installation
1. Install base plates and lift into position following unit specific lifting instructions III. A. 3415 Earl B. Wilson Chart Lifecycle, Inc.
2. Ground the cold box casing IV. C.
New Iberia, LA 70560 USA E-mail: info@ChartLifecycle.com
3. Install nitrogen purge components, beginning with the breather
Phone: 337-369-9195 24/7 hotline: 1-844-GTLS-911 (1-844-485-7911)
valve and emergency vent IV. F.
Fax: 337-364-8758 www.ChartLifecycle.com
4. Verify no water or debris trapped in field piping to be attached to cold box V. E.
5. Connect all nozzles to plant piping IV. G.
6. Remove all temporary shipping supports per unit specific drawings IV. D.
7. Remove all BAHX vent plugs (if applicable) BAHX IOM
8. Install ladders, handrails, and platforms (if applicable) I. A. 17.
9. Perform field piping system leak / proof test using
dry gas (-40 °F dew point or lower) V. D.
10. Install perlite insulation IV. E.
INSTALLATION, OPERATION, AND INSTALLATION, OPERATION, AND
MAINTENANCE MANUAL MAINTENANCE MANUAL
Cold Box Initial Startup
1. Verify overpressure protection for all streams V. D.
2. Verify filters installed for all applicable streams BAHX IOM
3. Verify no water trapped in or upstream of cold box and purge all drain lines
4. Perform dehumidification purge of cold box enclosure
V. E.
V. A. 1.
FOR CHART COLD BOX ASSEMBLIES FOR CHART COLD BOX ASSEMBLIES
5. Commence continuous purge V. A. 2.
6. Bring to operating conditions per process equipment guidelines
7. Top off perlite insultation after 1 month IV. E.

JANUARY 2021 JANUARY 2021


ARRIVAL, INSTALLATION, AND STARTUP CHECKLISTS

The following checklists are for reference only, and are not intended to be comprehensive for all situations.

Plant Item Number:


Arrival, Installation,
Chart Energy & Chemicals, Inc. is an ISO:9001 and
and Startup
Cold Box Arrival IOM Section Checked By / Date
Checklists
1. Check for external damage II. A. ISO:14001 registered company
Inside
2. Verify cold box enclosure is air-tight (environmentally sealed) II. A.
3. Verify stream shipping pressure (typically 15 psig, if applicable) II. A.
Chart Energy & Chemicals, Inc.
2191 Ward Avenue 8665 New Trails Drive, Suite 100
Cold Box Storage
La Crosse, WI 54601 USA The Woodlands, TX 77381 USA
1. Verify cold box enclosure is air-tight and stream shipping pressure is intact II. B.
2. Store in the as-shipped position with weight concentrated at the II. B. Phone: 608-787-3333 Phone: 281-364-8700

structural frame members Fax: 608-787-2141 Fax: 281-364-8706


www.chartindustries.com
Cold Box Installation
1. Install base plates and lift into position following unit specific lifting instructions III. A. 3415 Earl B. Wilson Chart Lifecycle, Inc.
2. Ground the cold box casing IV. C.
New Iberia, LA 70560 USA E-mail: info@ChartLifecycle.com
3. Install nitrogen purge components, beginning with the breather
Phone: 337-369-9195 24/7 hotline: 1-844-GTLS-911 (1-844-485-7911)
valve and emergency vent IV. F.
Fax: 337-364-8758 www.ChartLifecycle.com
4. Verify no water or debris trapped in field piping to be attached to cold box V. E.
5. Connect all nozzles to plant piping IV. G.
6. Remove all temporary shipping supports per unit specific drawings IV. D.
7. Remove all BAHX vent plugs (if applicable) BAHX IOM
8. Install ladders, handrails, and platforms (if applicable) I. A. 17.
9. Perform field piping system leak / proof test using
dry gas (-40 °F dew point or lower) V. D.
10. Install perlite insulation IV. E.
INSTALLATION, OPERATION, AND INSTALLATION, OPERATION, AND
MAINTENANCE MANUAL MAINTENANCE MANUAL
Cold Box Initial Startup
1. Verify overpressure protection for all streams V. D.
2. Verify filters installed for all applicable streams BAHX IOM
3. Verify no water trapped in or upstream of cold box and purge all drain lines
4. Perform dehumidification purge of cold box enclosure
V. E.
V. A. 1.
FOR CHART COLD BOX ASSEMBLIES FOR CHART COLD BOX ASSEMBLIES
5. Commence continuous purge V. A. 2.
6. Bring to operating conditions per process equipment guidelines
7. Top off perlite insultation after 1 month IV. E.