Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

TABLE OF CONTENTS

FOREWORD V. TESTING AND OPERATION


I. INTRODUCTION A. Operation of Nitrogen Purge System.......................29
A. Cold Box Basic Components.....................................6 1. Dehumidification Purge.....................................29
1. Frame Tubing.......................................................6 2. Continuous Purge..............................................29
2. Internal Support Members..................................6 B. Heat Exchangers......................................................29
3. Side Panels.........................................................6 C. Strainers...................................................................29
4. Roof and Floor Panels.........................................6 D. Initial Startup............................................................30
5. Flexible Closeout Boots......................................6 VI. MAINTENANCE
6. Lifting Lugs..........................................................6 A. General.....................................................................32
7. D-Rings................................................................6 B. Cleaning....................................................................32
8. Base Plates.........................................................6 C. Repairs and Service.................................................33
9. Combination Emergency Vent and Manway.......7 D. Disposal....................................................................33
10. Breather Valve...................................................7
11. Manway..............................................................7 TABLE OF FIGURES
12. Floor Drain.........................................................7 FIGURE I
13. Perlite Fill Connections......................................7 Basic Components of a Chart Cold Box.........................2
14. Perlite Drain Connections.................................8 FIGURE II
15. Stream Identification Tags.................................8 Flexible Closeout Boot....................................................6
16. Duplicate Pressure Vessel Nameplates............8 FIGURE III
17. Optional Equipment...........................................8 Breather Valve and Emergency Vent Hatch...................7
B. Codes and Materials of Construction ........................9 FIGURE IV
C. Nitrogen Purge System............................................10 Breather Valve................................................................7
D. Allowable Pipe Loads............................................... 11 FIGURE V
E. Handrails, Ladders, Platforms..................................12 Manway...........................................................................7
F. Standard Factory Testing..........................................13 FIGURE VI
1. Cold Box Piping Test.........................................13 Stream Identification Tags..............................................8
2. Standard Cold Box Casing Test........................13 FIGURE VII
G. Painting....................................................................13 Duplicate Pressure Vessel Nameplates.........................8
H. Loose Parts..............................................................13 FIGURE VIII
I. Valves and Instrumentation.......................................14 Nitrogen Purge with Fiberglass Wrapping....................10
1. Control Valves...................................................14 FIGURE IX
2. Temperature Elements......................................14 Installed Ladder, Handrails, and Platform....................12
3. Junction Box......................................................15 FIGURE X
4. Pressure Tubing................................................15 Control Valve Setup......................................................14
5. Flow Meters.......................................................15 FIGURE XI
6. Gas Detector.....................................................15 Control Valve Close-out................................................14
II. ARRIVAL INSPECTION AND STORAGE FIGURE XII
A. First Arrival...............................................................17 In-pipe and In-layer Thermowells.................................14
B. Storage.....................................................................18 FIGURE XIII
III. LIFTING AND HANDLING Temperature Element Shielding...................................15
A. Lifting and Handling.................................................20 FIGURE XIV
IV. INSTALLATION Unistrut ® for Wiring.......................................................15
A. Base Plate Installation..............................................23 FIGURE XV
B. General Setting Recommendations.........................23 Pressure Tubing............................................................15
C. Grounding.................................................................23 FIGURE XVI
D. Temporary Bracing...................................................24 Shipping Valve..............................................................17
E. Perlite Insulation.......................................................25 FIGURE XVII
F. Nitrogen Purge System.............................................25 Cold Box Lift onto Shipping Barge................................20
G. Flanged Connections...............................................26 FIGURE XVIII
1. Pressure Testing With Shipping Blinds.............26 Typical Lifting Drawing..................................................21
2. Gaskets and Bolting..........................................26 FIGURE XIX
3. Recommended Bolt Torques.............................27 Typical Nitrogen Purge System....................................25
4. G asket Recommendations for Use With FIGURE XX
Aluminum Flanges.............................................27 Junction Box Sealing Compound.................................28
H. Reinstalling Control Valve Actuators........................28
I. Junction Box Sealing Compound..............................28

JANUARY 2021 3
FOREWORD

This manual includes Chart’s instructions, practices, and This manual is updated periodically. Before attempting
procedures regarding installation, operation, and maintenance any procedure you should verify with Chart that you
of cold boxes. Please contact Chart Lifecycle for assistance in are using the current version.
the installation, commissioning, and startup services related to
this equipment. Chart highly recommends these OEM trained This manual cannot cover all possible variations in
services to assure a successful equipment startup. equipment design or provide answers to all specific
installation, operation, and maintenance questions that
This manual is based on extensive experience, including may arise. If for any reason, any variations or questions
more than 60 years in the design and manufacture of process arise that are not addressed in this manual, or any of
equipment for low temperature applications, including air these instructions, practices, and procedures cannot be
separation and liquefaction, natural gas processing and followed, the contractor or owner must contact Chart for
liquefaction, helium liquefaction, and hydrogen, ethylene, further information, interpretation, and guidance. Failure
and other light hydrocarbon product recoveries. to follow the instructions, practices, and procedures may
result in serious bodily injury or death, property damage,
THROUGHOUT THIS MANUAL, SAFETY ITEMS ARE irreparable damage to the Chart equipment, and the
HIGHLIGHTED IN CAPITAL LETTERS AND LABELED voiding of any warranties applicable to the equipment.
WITH THE CAUTION MARK SHOWN HERE.
When these instructions, practices, and procedures
are followed, extended and reliable service from the
equipment can be expected.

THESE ITEMS SHOULD BE READ WITH EXTREME CARE AND THOROUGHLY UNDERSTOOD BEFORE
COMMENCING ANY INSTALLATION, OPERATION, OR MAINTENANCE OF CHART EQUIPMENT.
FAILURE TO PROPERLY FOLLOW INSTRUCTIONS SO DESIGNATED COULD RESULT IN RUPTURES
OR EXPLOSIONS OR OTHER DANGEROUS SITUATIONS WHICH MAY RESULT IN SERIOUS BODILY
INJURY OR DEATH AND PROPERTY DAMAGE AS WELL AS IRREPARABLE DAMAGE TO THE CHART
EQUIPMENT AND THE VOIDING OF ANY WARRANTIES APPLICABLE TO THE EQUIPMENT.

DO NOT MODIFY THE EQUIPMENT OR DEVIATE FROM THE INSTRUCTIONS, PRACTICES, AND
PROCEDURES IN THIS MANUAL.

THE CONTRACTOR OR OWNER INSTALLING CHART EQUIPMENT MUST COMPLY WITH THESE
INSTRUCTIONS, PRACTICES, AND PROCEDURES ALONG WITH ANY LIFTING AND HANDLING AND
OTHER INSTRUCTIONS, PRACTICES, AND PROCEDURES PROVIDED WITH INDIVIDUAL UNITS.

JANUARY 2021 4

You might also like