List of Projects awarded till 31.03.

22 in FY 2021-22 (All Project types)


Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)

SATRA Services
6L of Chilkararupet bypass from and Solutions
BSCPL
km. 357.400 to km. 371.920 of NH- Private Limited 29/04/202 28/06/202 19/03/20 19/03/202 Amravati Andhra
1 16 16.38 HAM Infrastructure 712.44 29/04/2021 4 5.89
16 [Revived of earlier terminated JV with K&J 1 1 23 3 (AP) Pradesh
Ltd.
N/02004/27001/AP] Projects Pvt.
Ltd.

MSV
International
Inc. in
association
6L of Varadharajula to Kumarajapet
KCC Buildcon with ARMENGE 10/11/202 Andhra
2 from km 0.000 to km 43.800 of NH- 716B 43.80 HAM 1431.00 31/08/2021 Chittor
Pvt. Ltd. Engineering 1 Pradesh
716B (Pkg-I)
and
Management
Consultants
Pvt. Ltd.

Dhruv
Consultancy
Services Ltd. JV
6L of Veera Kaveri Raja Puram to KNR with Global
10/11/202 Andhra
3 Pondavakkam from km 61.380 to 716B 34.66 HAM Constructions Infra Solutions 1041.50 14/09/2021 Chittor
1 Pradesh
km 96.040 of NH 716B (Pkg-III) Limited & association
with Kaius
Consulting Pvt.
Ltd.

Dhruv
Consultancy
Services Ltd. JV
IRB
6L of Pondavakkam to Kannigaipair with Global
Infrastructure 21/12/202 Andhra
4 from km 96.040 to km 116.100 of 716B 20.06 HAM Infra Solutions 909.00 24/09/2021 Chittor
Developers 1 Pradesh
NH 716B (Pkg-IV) & association
Ltd.
with Kaius
Consulting Pvt.
Ltd.

Page 1 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
MSV
International
Inc. in
association
6L of Kumarajapet to Veera Kaveri EKK
with ARMENGE 26/11/202 Andhra
5 Raja Puram from km 43.800 to km 716B 17.58 HAM Infrastructure 577.00 28/08/2021 Chittor
Engineering 1 Pradesh
61.380 of NH-716B (Pkg-II) Limited
and
Management
Consultants
Pvt. Ltd.

Bangalore Chennai Expressway


(Phase-II Pkg-III) from km.127.000 Dilip Buildcon 07/02/202 Andhra
6 TBD 29.00 HAM 1060.00 15/09/2021 0 Chittor
to Km 156.000 (Bangarupalem to Ltd. 2 Pradesh
Gudipala section)

Bangalore Chennai Expressway


(Phase-II Pkg-I) from km.71.000 to Montecarlo 15/02/202 Andhra
7 TBD 25.00 HAM 1192.00 15/09/2021 0 Chittor
Km 96.000 (Bethamangala in the Limited 2 Pradesh
state of Karnataka to Byreddypalli)

Bangalore Chennai Expressway


APCO
(Phase-II Pkg-II) from km.96.000 to Andhra
8 TBD 31.00 HAM Infratech Pvt. 2007.00 15/09/2021 0 Chittor
Km 127.000 (Baireddypalle to Pradesh
Ltd.
Bangarupalem section)

Up gradation of Port Connectivity


NH Configuration of existing 2L to RK Infracorp
4L road from Achhampeta Junction Pvt Ltd -
Rajamahe Andhra
9 (NH-216) to Kakinada Anchorage 516F 13.20 EPC Suryodaya 90.20 10/11/2021
ndravaram Pradesh
Port Connecting Vakalpudi light Infra projects
house from Km. 0.000 to Km. (I) Pvt Ltd (JV)
13.198 of NH-516F

Khammam-Devarapalle Pkg IV [4L SATRA Service


Access Controlled (Greenfield) from and Solution
Bekem - Sri 27/01/202 Rajamahe Andhra
10 Recherla village to Gurvaygudem 365BG 27.43 HAM Pvt. Ltd. in JV 517.05 15/09/2021 0
Avantika (JV) 2 ndravaram Pradesh
village (Design Chainage 105+236 with Feedback
to 132+664)] Infra Pvt Ltd.

Page 2 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)

Khammam-Devarapalle Pkg V [4L SATRA Service


Access Controlled (Greenfield) from and Solution
Bekem - Sri 27/01/202 Rajamahe Andhra
11 Gurvaygudem village to 365BG 29.46 HAM Pvt. Ltd. in JV 622.00 15/09/2021 0
Avantika (JV) 2 ndravaram Pradesh
Devarapalle village (Design with Feedback
Chainage 132+664 to 162+126) Infra Pvt Ltd.

4L of Madanapalli to Pileru Section GR


Andhra
12 from Km 0.000 to Km 55.500 of NH- 71 55.90 HAM Infraprojects 1577.00 30/03/2022 0 0.00 Tirupati
Pradesh
71 (Package-I) Limited
Megha
4L of Pileru to Cherlopalli Section Engineering
Andhra
13 from Km 55.900 to Km 92.8 & 94.5 71 38.12 HAM and 778.61 29/03/2022 0 0.00 Tirupati
Pradesh
to 95.717 of NH-71 (Package-II) Infrastructure
Ltd.
4L Road from existing East break
water upto Convent Junction from
Sudharma
Phase 1 of the project start from 14/02/202 Visakhapa Andhra
14 TBD 3.49 EPC InfraTech Pvt . 35.79 02/11/2021
Km. 0.312 [End of Vishakhapatnam 2 tnam Pradesh
Ltd.
Port Trust (VPT)] to Km. 3.800
[VCTPL Exit Gate]
ISAN
Corporation -
6L Aluru - Jakkuva Section of NH- H.G. Infra
Chaitanya 14/10/202 31/03/202 30/03/20 30/03/202 Vizianagra Andhra
15 130CD Road from km 365.033 to 130CD 31.77 HAM Engineering 922.50 30/07/2021 0 0.00
Projects 1 2 24 4 m Pradesh
km 396.800 (Pkg. 1) Limited
Consultancy
Pvt. Ltd. (JV)
Dhruv
Consultancy
Services Ltd. JV
6L Kantakapalle – Sabbavaram NKC Projects with Global
21/12/202 Vizianagra Andhra
16 Section of NH-130CD Road from Km 130CD 19.56 HAM Private Infra Solutions 638.00 24/09/2021
1 m Pradesh
445.100 to Km 464.662 (Pkg-4) Limited & association
with Kaius
Consulting Pvt.
Ltd.

Page 3 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Dhruv
Consultancy
Services Ltd. JV
6L Korlam-Kantakapalle Section of Psk with Global
07/09/202 19/02/202 20/02/20 20/02/202 Vizianagra Andhra
17 NH-130CD Road from Km 421.100 130CD 24.00 HAM Infrastructure Infra Solutions 772.70 30/07/2021 0 0.00
1 2 24 4 m Pradesh
to Km 445.100 (Pkg-3) and Pvt. Ltd. & association
with Kaius
Consulting Pvt.
Ltd.

TPF
6L flyover at Boragaon, Gorchuk, Engineering
Dhariwal
Lokhra & Basistha Junction on Pvt. Ltd. in 13/01/202 03/03/202 31/08/20
18 27 16.45 EPC Buildtech 299.99 10/12/2021 0 Guwahati Assam
Guwahati Bypass section from Km association 2 2 24
Limited
146.172 to Km 162.620 of NH-27 with MAV
Associates LLP

Balance work of 4L of Dineshchandr


Narimbanglo–Jatinga Junction- a R. Agrawal
19 27 49.23 HAM 1674.00 10/03/2022 Haflong Assam
Harangajoroad section from Km Infracon Pvt.
0.000 to Km 49.230 of NH-27 Ltd.

4L Elevated Section and at-grade Altis Holding


improvements at Begusarai town Corporation -
20 (Simaria - Khagaria section) from 31 4.26 EPC Transrail 255.99 23/03/2022 Begusarai Bihar
Km. 221.047 to Km. 225.302 of NH- Lighting
31 Limited JV
Megha
4L Greenfield Alignment from Engineering
21 Kalyanapur to Tal Dashraha of NH- 119D 47.00 HAM and 1358.00 30/03/2022 Chhapra Bihar
119D (Pkg-III) Infrastructure
Ltd.
Ganeshgarhia
Balance work - WB-10 (Gandak
Item Construction Darbhang
22 Bridge) Km 402.00 to Km 440.00 27 2.75 137.23 31/03/2022 Bihar
Rate Private a
(Devanpur - Kotwa)
Limited

4L Elevated Highway and at grade


improvements at Gopalganj Town ASC Infratech Darbhang
23 27 2.75 EPC 184.90 24/11/2021 Bihar
from Km. 384.000 to Km. 386.750 Pvt. Ltd. a
on NH-27

Page 4 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Megha
4L Greenfield Alignment of Amas Engineering
24 to Shivrampur from 0.000 Km. to 119D 55.00 HAM and 1157.50 17/03/2022 Gaya Bihar
55.002 Km. of NH 119 D (Pkg-I) Infrastructure
Ltd.
Megha
4L Greenfield Alignment of
Engineering
Shivrampur to Ramnagar from Km.
25 119D 54.32 HAM and 1207.00 22/03/2022 Gaya Bihar
55.002 to Km. 109.300 of NH 119 D
Infrastructure
(Pkg-II)
Ltd.
6L of Aurangabad to Bihar-
Jharkhand border (Chordaha) Barbrik Project 24/02/202 29/03/202 19/03/20
26 19 29.83 EPC 461.57 27/12/2021 0 0.00 Sasaram Bihar
section from km. 180.000 to km. Limited 2 2 24
209.827 of NH-2 (PKG-01)
6L of Aurangabad to Bihar- VRC
Jharkhand border (Chordaha) Constructions 24/02/202
27 19 39.70 EPC 552.55 27/12/2021 Sasaram Bihar
section from km. 209.827 to Km. (India) Pvt. 2
249.525 of NH-19 (PKG-02) Ltd.
Ram Kripal
Umagaon-Saharsa (Package-I)
227L and Singh
28 Umagaon-Basopatti-Kaluahi & 47.75 HAM 1228.24 31/03/2022 0 Supaul Bihar
227J Construction
Sharghat-Benipatti-Rahika
Pvt. Ltd
Ram Kripal
Umagaon-Saharsa (Package-III)
Singh
29 Bideshwar Asthan (NH-27, E-W) to 527A 26.04 HAM 1224.00 30/03/2022 0 Supaul Bihar
Construction
Bheja
Pvt. Ltd
Ram Kripal
Umagaon-Saharsa (Package-II)
Singh
30 Rahika & Madhubani Bypass 527A 14.88 HAM 1224.00 31/03/2022 0 Supaul Bihar
Construction
(Rahika-Pokharauni-Rampatti)
Pvt. Ltd
Development of 6L of Basanwahi –
KMV Projects Chhattisg
31 Marangpuri Section from km 130CD 25.16 HAM 1084.65 30/03/2022 0 Dhamtari
Ltd. arh
99.500 to km 124.661 of NH-130-CD
Development of 6L Sargi –
Basanwahi Section from km 42.800 Dilip Buildcon Chhattisg
32 130CD 56.70 HAM 1255.00 28/02/2022 0 Dhamtari
to km 99.500 of NH-130CD (Pkg-CG- Ltd. arh
2)
Shalimar Corp
Limited -
Development of 6L of Jhanki – Sargi
APCO Chhattisg
33 Section Road from km 0.000 to km 130CD 42.80 HAM 1039.42 24/12/2021 0 Dhamtari
Infratech arh
42.800 of NH-130CD (Pkg-CG-1)
Private
Limited (JV)
Page 5 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Development of 6L UER II [Package - Ceigall India
URS Scott
II] (Karala Kanjhawala Road till Ltd. - Krishna 07/10/202 28/10/202 27/10/20 27/10/202
34 344M 13.45 EPC Wilson India 1026.00 23/07/2021 3 2.66 Dwarka Delhi
Nangloi - Najafgarh Road) from km. Constructions 1 1 23 3
Pvt. Ltd.
15.00 to km.28.45 (JV)

Gawar
Development of 6L UER II [Package -
Construction URS Scott
III] (Nangloi - Najafgarh Road till 27/09/202 28/10/202 27/10/20 27/10/202
35 344M 9.66 EPC Ltd. - E5 Wilson India 655.00 12/08/2021 16 15.26 Dwarka Delhi
Sector 24 Dwarka) from km. 28.45 1 1 23 3
Infrastructure Pvt. Ltd.
to km. 38.111
Pvt. Ltd (JV)
Development of 6L UER II [Package -
H.G. Infra URS Scott
I] (NH-1 Near Bakoli till Karala 08/09/202 28/10/202 27/10/20 27/10/202
36 344M 15.70 EPC Engineering Wilson India 1393.11 23/07/2021 4 3.60 Dwarka Delhi
Kanjhawala Road) from km. 0.70 to 1 1 23 3
Limited Pvt. Ltd.
km.15.00
S.S. Builders JV
Development of 4L UER II [Package - URS Scott
with Diamond 09/09/202 21/10/202 20/10/20 20/10/202
37 V] (Spur to Bahadurgarh Bypass) 344 N 7.30 EPC Wilson India 238.99 29/07/2021 5 Dwarka Delhi
Construction 1 1 23 3
(NH-10) from km. 0.00 to km.7.30 Pvt. Ltd.
Co.

Gawar
Construction LEA Associates
Akshardham - DL/UP Border (Pkg- 19/08/202
38 709B 14.75 EPC Ltd. - E5 South Asia Pvt. 1100.00 15/07/2021 0 Ghaziabad Delhi
01) 1
Infrastructure Ltd.
Pvt. Ltd (JV)

Improvement Works at Dumad


Junction at Merging of Ahmedabad LEA Associates
Apex Tarmac 06/10/202 21/12/202 21/12/20 Ahmedaba
39 Vadodara Section of NH-48, 48 2.69 EPC South Asia Pvt. 27.01 08/07/2021 0 Gujarat
Pvt. Ltd. 1 1 23 d
Ahmedabad Vadodara NE-1 & Ltd.
Sama-Savli Road
Atlas
Delhi-Vadodara Greenfield LEA Associates
Construction 03/02/202
40 Alignment (NH-148N) (Pkg-26) 148N 30.00 EPC South Asia Pvt. 1038.99 11/11/2021 0 Godhra Gujarat
Pvt. Ltd. - NKC 2
(Ch.696+890 to Ch.726+390) Ltd.
(JV)
Delhi-Vadodara Greenfield LEA Associates
GHV (India) 28/10/202 14/02/202 14/02/20
41 Alignment (NH-148N) (Pkg-27) 148N 29.00 EPC South Asia Pvt. 719.35 30/07/2021 4 Godhra Gujarat
Pvt Ltd. 1 2 24
(Ch.729.700 to Ch.756.052) Ltd.

Delhi-Vadodara Greenfield LEA Associates


GHV (India) 08/10/202 16/11/202 15/11/20
42 Alignment (NH-148N) (Pkg-28) 148N 26.00 EPC South Asia Pvt. 681.21 27/05/2021 8 Godhra Gujarat
Pvt Ltd. 1 1 23
(Ch.756+052 to Ch.781+282) Ltd.

Page 6 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Upgradation to 4L PS from
Bhimasar, Junction of NH-41 to GR
43 Anjar- Bhuj upto Airport Junction 341 59.75 HAM Infraprojects 1085.00 30/03/2022 Palanpur Gujarat
from Km 0.000 to Km 65.478 of NH- Limited
341
WAGAD
INFRAPROJECT
4L PS Divided Carriageway from
S PVT. LTD. -
Patan (Near Rajpur) to Gojariya
44 68 76.94 EPC RACHANA 741.00 28/03/2022 Palanpur Gujarat
From Km 52.000 to Km 128.940 of
INFRASTRUCT
NH-68
URE LIMITED
(JV)
Engineering
Widening to 6L of Existing 4L Jetpur Projects
45 - Gondal - Rajkot Section from Km. 27 67.40 EPC (India) Ltd. - 1204.81 31/03/2022 Rajkot Gujarat
117.600 to Km. 185.00 on NH-27 Varaha Infra
Limited (JV)
Vadodara Mumbai Expressway Roadway LEA Associates Surat
22/06/202
46 (Jujuwa to Gandeva) (Phase IB - Pkg NE-4 36.00 HAM Solutions India South Asia Pvt 1858.74 27/05/2021 0 Expresswa Gujarat
1
VIII) [Km 154.600 to Km 190.000] Infra Ltd. Ltd y

LEA Associates
South Asia Pvt.
Vadodara Mumbai Expressway Roadway Surat
Ltd. - Pioneer 01/11/202
47 (Karvad to Jujuwa) (Phase IB - Pkg NE-4 26.00 HAM Solutions India 1180.00 30/07/2021 0 Expresswa Gujarat
Infra 1
IX) [Km 128.000 to Km 154.600] Infra Ltd. y
Consultant Pvt.
Ltd. (JV)

Delhi-Amritsar-Katra Expressway SA
(Phase-I Pkg-V) from Junction with Infrastructure
Ambala-Kaithal-Hissar road (NH- Consultants
CDS Infra
152) near Kharak Pandwa village to 152 ,SH- Private Limited 20/09/202
48 37.67 HAM Projects 1366.00 07/06/2021 0 Bhiwani Haryana
Junction with Patiala-Samana- 10 in JV with 1
Limited
Patran road (SH-10) near Ghagga Upham
village (Km 120+250 to Km International
157+920) Corporation

Improvement of Dharuhera- CEMOSA in JV


Bhiwadi link road (NH-919) to 4L Shivalaya with
06/01/202 07/02/202 06/08/20
49 with Service Road, starting from km 919 4.30 EPC Construction ARKITECHNO 77.40 01/12/2021 0 Rewari Haryana
2 2 23
67.820 of NH-48 upto km 22.400 of Co. Pvt. Ltd. Consultants
NH-919 (India) Pvt Ltd

Page 7 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Ram Kumar
Contractor -
Development of 4L UER II [Package - URS Scott
Bharat 26/08/202 26/11/202 25/11/20 25/11/202
50 IV] (Spur to Sonipat Bypass) from 344P 29.60 EPC Wilson India 694.00 29/07/2021 8 0.00 Sonipat Haryana
Construction 1 1 23 3
km. 0.00 to km.29.60 Pvt. Ltd.
India Pvt. Ltd.
(JV)
Cemosa in
Strengthening and improvement of Kaluwala association
2/4L PS of Jind-Karnal section from Construction with G-Eng 27/12/202 11/02/202 10/08/20
51 709A 13.37 EPC 16.81 25/10/2021 Sonipat Haryana
km. 68.857 to km. 82.227 of NH- Private Advisory 1 2 22
709A Limited Services Pvt.
Ltd.
4L of Bhangbar (Near Ranital) to Intercontinent
Kangra Bypass Section of Old NH-88 Gawar al Consultants
22/06/202 Himachal
52 (New NH-303,503) up to 303503 18.13 HAM Construction and 1100.00 12/04/2021 0 Hamirpur
1 Pradesh
Intersection with NH-154 from Km Ltd Technocrats
175.270 to Km 193.400 (Pkg-VB) Pvt. Ltd.

Rehabilitation and Up-gradation of


existing road to 2L PS from End of
Hamirpur Bypass (near Chilbahal) NG Projects Himachal
53 88 36.98 HAM 435.00 28/03/2022 Hamirpur
to Bhangbar section from Km. Ltd. Pradesh
138.295 to Km.175.270 of NH-88
(Pkg-IV)
Kaluwala
4L Sundar Nagar Bypass from
Construction Himachal
54 Km.173.900 to Km.179.600 of NH- 21 6.68 EPC 99.69 31/03/2022 0 0.00 Mandi
Private Pradesh
21
Limited
Segmental
4L of Mo - Sihuni from km. 42.00 to Gawar
Consulting & 08/07/202 Himachal
55 km. 51.00 of Old NH-20 (new NH- 154 8.33 HAM Construction 529.00 24/05/2021 Palampur
Infrastructure 1 Pradesh
154) (Package-IB) Ltd
Advisory Pvt

Rehabilitation and Upgradation to


Gawar
4L configuration & Strengthening of Himachal
56 154 18.45 HAM Construction 389.00 25/03/2022 Palampur
Sihuni to Rajol from Km 51.000 to Pradesh
Ltd
Km 72.000 of NH-154

Chaitanya
4L of End of Pinjore Bypass - Baddi - Patel
Project 02/11/202 Himachal
57 Nalagarh section (km. 4.200 to km. 21A 31.00 EPC Infrastructure 469.00 30/09/2021 Shimla
Consultancy 1 Pradesh
35.370) of NH-21A Limited
Pvt. Ltd.
Page 8 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Delhi-Amritsar-Katra Expressway
(Phase-II Pkg-XIV) from Junction Megha
with Pathankot-Gurdaspur road Engineering Jammu
04/03/202
58 (NH-54) near Balsua to Junction 54 44.60 HAM and 1939.00 13/12/2021 0 Jammu and
2
with Hiranagar Road near village Infrastructure Kashmir
Gurha Baildaran (km 423+500 to Ltd.
km 468+100)

Delhi-Amritsar-Katra Expressway
(Phase-II Pkg-XV) [Junction with
Vishwa
Hiranagar Road near village Gurha Jammu
Samudra 31/01/202
59 Baildaran to Junction with Jammu 44 35.15 HAM 1870.00 15/12/2021 0 Jammu and
Engineering 2
Ring Road (NH-244A) near Jakh Kashmir
Pvt. Ltd.
village from Km 468+100 to Km
503+250]

Delhi-Amritsar-Katra Expressway
(Phase-II Pkg-XVI) Existing Jakh Theme
Shivalaya Jammu
(Vijaypur)-Kunjwani section of NH- Engineering 23/11/202
60 44 , 144A 21.00 HAM Construction 1765.00 06/10/2021 0 Jammu and
44 including spur Connectivity to Services Pvt. 1
Co. Pvt. Ltd. Kashmir
Jammu Airport ( NH-144A) [Km Ltd.
503+500 to km 514+500]

Rectification of 02 Nos. Black spots TPF Getinsa


at Maheshwar (From Km. 65.338 to Eurostudioes
Jammu
Km. 65.746, From Km. 66.175 to Ceigall India SL - Segmental 22/10/202 21/12/202 20/12/20 20/12/202
61 44 1.74 EPC 15.36 21/08/2021 Jammu and
Km. 66.885) & at Chichi Mata (From Ltd. Consulting & 1 1 22 2
Kashmir
Km. 70.684 to Km. 71.310) in Infrastructure
District Samba of NH-44(Pkg-IV) (JV)

TPF Getinsa
Eurostudioes
Rectification of Black Spot at Jammu
Shree SL - Segmental 10/09/202 14/10/202 13/10/20 13/10/202
62 Mansar Morh from Km. 69.780 to 44 0.91 EPC 15.95 14/07/2021 56 56.01 Jammu and
Associates Consulting & 1 1 22 2
Km. 70.690 of NH-44 Kashmir
Infrastructure
(JV)

Page 9 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
TPF Getinsa
Euroestudios,
S.L. in
Kaluwala association
Rectification of Black Spot at Jammu
Construction with 07/10/202 07/10/202 04/07/20 04/07/202
63 Samba from Km. 67.180 to Km 44 1.85 EPC 75.99 15/07/2021 73 73.31 Jammu and
Private Segmental 1 1 23 3
69.030 of NH-44 (Pkg-V) Kashmir
Limited Consulting &
Infrastructure
Advisory (P)
Ltd.
TPF Getinsa
Construction of Tunnels/Viaducts
Euroestudios,
at identified sliding/slip zones at
Bharat S.L. in
Km 130.550 to Km.130.750; Km.
Constructions association
131.170 to Km. 131.763; Km. Jammu
(India) Pvt. with 27/01/202
64 132.560 to Km. 133.168; Km. 44 2.22 EPC 371.00 15/12/2021 0 0.00 Ramban and
Ltd. in JV with Segmental 2
133.590 to Km. 133.743 and Km. Kashmir
Ram Kumar Consulting &
147.877 to Km. 148.715 of
Contractors Infrastructure
Udhampur-Ramban section of NH-
Advisory (P)
44
Ltd.
4L of twin tube tunnel
configuration including approaches
from Marog to Digdol (from
Jammu
Km.154.210 to Km.158.650 (North TATA Projects
65 44 4.38 EPC 1031.00 29/11/2021 Ramban and
Bound) and from Km.155.940 to Ltd.
Kashmir
Km.160.260 (South Bound)) of
Ramban to Banihal (Pkg-I) of Old
NH-1A (New NH-44)

Dineshchandr
a R. Aggarwal Rodic
Balance works of 4L of Ramban to Infracon Pvt Consultants Jammu
26/11/202 20/01/202 20/01/20
66 Banihal section from Km. 151.000 44 16.66 EPC Ltd in JV with Pvt. Ltd. - Euro 633.39 22/10/2021 0 0.00 Ramban and
1 2 24
to Km. 187.000 of NH-44 ABCI Studious Pvt. Kashmir
Infrastructures Ltd (JV)
Pvt. Ltd.

4L of Km.165.092 to Km.171.855
(North Bound) and from
Km.166.895 to Km.173.638 (South Jammu
Ceigall India 08/10/202 04/02/202 03/08/20 03/08/202
67 Bound), excl. certain reaches of 44 6.02 EPC 369.00 02/09/2021 0 0.00 Ramban and
Ltd. 1 2 24 4
North Bound and South Bound of Kashmir
Ramban to Banihal (Pkg-III) of Old
NH-1A (New NH-44)
Page 10 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
4L twin tube tunnel including
approaches from Digdol to Khuni
Nallah (North Bound connecting Ceigall India
Jammu
with existing major bridge on NB) Limited-Patel 08/10/202 01/02/202 07/06/20 07/06/202
68 44 3.20 EPC 846.00 03/09/2021 0 0.00 Ramban and
and South Bound connecting with Engineering 1 2 24 4
Kashmir
Tunnel T4 ,Single tube tunnel of Limited (JV)
Ramban to Banihal (Pkg-II) of Old
NH-1A (New NH-44)

Rodic
Overlay of Ramban to Banihal Gawar Consultants Jammu
Item 16/04/202 16/04/202 16/10/20 30/11/202
69 Section From KM. 151.000 to KM. 44 36.00 Construction Pvt. Ltd. - Euro 19.97 08/04/2021 100 100.00 Ramban and
Rate 1 1 21 1
187.000 of NH-44 Ltd Studious Pvt. Kashmir
Ltd (JV)
4L of Ormanjhi-Gola section from
Barbrik
70 Km 81.450 to Km 53.600 of NH- 320B 27.85 HAM 732.00 29/03/2022 Dhanbad Jharkhand
Projects Ltd.
320B(PKG-II)
4L of Gola-Bokaro(Jaina More)
NG Projects
71 section from Km 53.600 to Km 320 32.49 HAM 647.00 29/03/2022 Dhanbad Jharkhand
Ltd.
21.110 of NH-320(PKG-1)
6L Grade Separator at Km 36.530
with LVUP at Km 36.894 including PRL Projects Theme
approaches to grade separator & and Engineering 23/06/202 07/07/202 07/01/20 07/01/202 Hazaribag
72 20 1.40 EPC 42.71 20/04/2021 12 Jharkhand
LVUP from Km 35.840 to 37.240 in Infrastructure Services Pvt. 1 1 23 3 h
Barhi-Hazaribagh section Limited Ltd.
(Hazaribagh Bypass) of NH-20

Elevated Corridor in Ranchi city


from Km 0.00 to Km 3.260 of NH-75 KCC Buildcon
73 75 & 23 3.76 EPC 291.00 30/03/2022 0 Ranchi Jharkhand
including down ramp on NH-23 Pvt. Ltd.
from Km 0.100 to Km 0.600

Construction of ROB between


Anand
74 Piska and Itki Railway Station in 43 0.70 EPC 39.57 17/03/2022 Ranchi Jharkhand
Construction
Ranchi at Km 14.730 of NH-23

Bangalore Ring Road (STRR)-NH-


Bangalore-
948A- Package-I of Phase-III from Montecarlo
75 948A 35.49 HAM 912.60 30/03/2022 0 Expresswa Karnataka
Belagondapalli (TN) to TN/KNT Limited
y
border from km 144.480 to 179.969

Page 11 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
S&P
Infrastructure
Developers
76 Bangalore/TN border to Hoskote 648 21.00 EPC Pvt. Ltd. - 387.22 31/03/2022 Bengaluru Karnataka
Skylark Infra
Engineering
Pvt. Ltd. (JV)
MSV
International
H.G. Infra
Inc. - MSV Chitradurg
77 Tumkur - Nelamangala (6L) 4 45.50 EPC Engineering 844.11 31/01/2022 0 0.00 Karnataka
international a
Limited
Tech. Pvt. Ltd.
(JV)
Balance work of 2L PS from Km
30.800 to Km 70.800 and 2L with V.M. Matere
78 Rigid Carriageway from Km 70.800 4A 54.12 EPC Infrastructures 140.00 16/03/2022 Dharwad Karnataka
to km 84.120 of Khanapur- (India) Pvt.Ltd.
KA/GOA Border section of NH-4A
2L PS from km 0.000 to km 69.480
NSC Projects
79 of Sanquelim to Belagavi Section of 748AA 69.48 EPC 131.95 16/03/2022 Dharwad Karnataka
Pvt. Ltd.
NH-748AA
6L from Belgaum to Sankeshwar Ashoka
80 Bypass from Km. 515.000 to Km. 48 40.02 EPC Buildcon 829.49 24/01/2022 0 Dharwad Karnataka
555.017 of NH-48 (Pkg-I) Limited

6L from Sankeshwar Bypass to MH-


S M Autade
81 KNT Border from Km. 555.017 to 48 37.84 EPC 793.00 27/01/2022 Dharwad Karnataka
Pvt Ltd
Km. 592.853 of NH-48 (Pkg-II)
Theme
Ammapur
Engineering 29/12/202 12/01/202 04/04/20 04/04/202
82 Yekkambi-Haveri 766E 74.98 EPC Infrastructure 174.00 25/11/2021 0 Dharwad Karnataka
Services Pvt. 1 2 22 2
Pvt. Ltd.
Ltd.
6L of MH/KN Border (Nimbal
Village) to KN/TS Border (Singnodi
PNC Infratech
83 Village) from Km. 26.000 to Km. 150C 71.00 HAM 1437.72 30/03/2022 Gulbarga Karnataka
Pvt. Ltd.
97.000 in Gulbarga of NH-150C (Pkg-
II)
6L of MH/KN Border (Nimbal
Village) to KN/TS Border (Singnodi
Montecarlo
84 Village) from Km. 162.5 to Km. 150C 40.60 HAM 912.60 30/03/2022 Gulbarga Karnataka
Limited
203.100 in Raichur of NH-150C (Pkg-
IV)

Page 12 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Arjunvaishnavi
Short Term Recitification of 5 nos. Infrastructure
Item
85 of blackspots of Jewargi - Shahapur 150A 50.00 and 1.18 26/04/2021 0 Gulbarga Karnataka
Rate
from Km. 0.000 to Km. 50.000 Developers
Pvt. Ltd.
Road connectivity from Kasarkoda Viva
09/02/202
86 side of Honavar Port to NH-66 at 66 4.00 EPC Infraventure 87.50 08/12/2021 0 Mangalore Karnataka
2
Km 195.5 Pvt. Ltd.
Oriental
6L of Kodugallur to Edapppally
Structural 14/03/202
87 section from km 397.850 to km 66 25.15 HAM 1617.20 28/12/2021 Cochin Kerala
Engineers Pvt. 2
423.00 of NH - 66 (old NH-17)
Ltd.
6L of Kappirikkad to Thalikulam Shivalaya
15/11/202
88 section from km 335.85 to km 66 33.17 HAM Construction 1164.31 24/09/2021 Cochin Kerala
1
369.015 of NH - 66 (old NH-17) Co. Pvt. Ltd.

6L of Thalikulam to Kodugallur Shivalaya


15/11/202
89 section from km 369.015 to km 66 28.84 HAM Construction 1420.00 24/09/2021 Cochin Kerala
1
397.850 of NH - 66 (old NH-17) Co. Pvt. Ltd.
Thiruvana
KCC Buildcon 17/01/202 17/03/202 18/09/20 18/09/202
90 Thuravoor Thekku-Paravoor 66 37.90 EPC 1118.00 15/11/2021 0 nthapura Kerala
Pvt. Ltd. 2 2 24 4
m
SEW Thiruvana
91 Paravoor-Kottankulangara 66 37.50 EPC Infrastructure 1152.00 22/03/2022 0 nthapura Kerala
Limited m
Thiruvana
RDS Project
92 Kadambattukonam-Kazhakuttom 66 29.28 EPC 795.00 04/03/2022 nthapura Kerala
Limited
m
Vishwa
Samudra
Thiruvana
Kottankulangara- Start of Kollam Oachira 07/10/202
93 66 31.50 HAM 1580.00 06/08/2021 0 nthapura Kerala
Bypass Expressway 1
m
Private
Limited.
Kollam
Thiruvana
Start of Kollam Bypass - Highways 08/11/202
94 66 31.80 HAM 1284.70 14/09/2021 nthapura Kerala
Kadambattukonam Private 1
m
Limited
Bansal
4L of Obedullganj - Budni section
Construction Madhya
95 from Km. 8.400 to Km. 20.700 in 69 12.30 EPC 257.59 30/03/2022 Bhopal
Works Pvt. Pradesh
Ratanpani Wildlife area of NH - 69
Ltd.

Page 13 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
S&P
Infrastructure
4L of Harda - Betul (Pkg-II) from Developers
Madhya
96 Km. 30.00 to Km.81.00 [Temagaon 47 51.00 EPC Pvt. Ltd. - 283.24 31/03/2022 0 Harda
Pradesh
to Chicholi] Skylark Infra
Engineering
Pvt. Ltd. (JV)
4L of Indore - Boregaon (Pkg-III)
Highway
[Balwara to Dhangaon] from km. GHV (India) 19/01/202 Madhya
97 347BG 40.35 EPC Engineering 599.00 23/06/2021 0 Indore
42.260 to km. 82.6810 of NH347BG Pvt Ltd. 2 Pradesh
Consultant
& 753L
6L flyover at Rau circle at from km Vindhya
Madhya
98 11.700 to Km 12.920 in 6L Indore 52 1.22 EPC Construction 29.79 11/03/2022 Indore
Pradesh
–Dewas Section of NH-52 Company

Indore - Harda (Pkg-I) [Indore to PD AGRAWAL


Madhya
99 Raghav Garh from km. 0.00 to km. 47 29.60 EPC INFRASTRUCT 358.74 30/03/2022 0 Indore
Pradesh
29.30] URE LIMITED

Megha
Engineering
Indore - Edlabad (Pkg-II) Madhya
100 347BG 34.00 HAM and 924.44 31/03/2022 0 Indore
[Tejajinagar to Balwara] Pradesh
Infrastructure
Ltd.
2L PS of Satna - Maihar Section of Highway
GRTCPL- 03/01/202 21/02/202 20/02/20 Madhya
101 NH-135BG from Km 80.800 to Km 135BG 39.33 EPC Engineering 328.77 14/09/2021 7 0.00 Jabalpur
AIPL(JV) 2 2 24 Pradesh
120.125 Consultant
Bansal
Highway
4L of Sagar - Mohari from Km.8 to Construction 22/02/202 Madhya
102 934 42.30 EPC Engineering 346.36 22/07/2021 0 Sagar
Km.50 (Pkg-I) Works Pvt. 2 Pradesh
Consultant
Ltd.

PD AGRAWAL
INFRASTRUCT
URE LIMITED -
Berkhedi to Godpehra on NH-44 Prakash Madhya
103 146 28.52 EPC 287.82 31/03/2022 0 Sagar
(Sagar link road) Asphaltings & Pradesh
Toll Highways
(India) Ltd.
(JV)

GR
4L of Ujjain to Badnawar from km Madhya
104 752D 69.10 HAM Infraprojects 907.00 24/03/2022 0 Ujjain
26.900 to km 96.00 of NH-752D Pradesh
Page 14 of 31
Limited
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
4L of Suhagadi to Bardiya Amra MKC
Madhya
105 from Km. 89.200 to Km. 135.351 of 752D 46.15 HAM Infrastructure 598.00 07/03/2022 Ujjain
Pradesh
NH-148NG (Pkg-III) Ltd.
4L of Chandesara to
Khedakhajuriya from Km. 0.000 to (- GHV (India) Madhya
106 752D 42.15 HAM 617.25 28/02/2022 Ujjain
) 750 & Km 0.000 to km 41.400 of Pvt Ltd. Pradesh
NH-148NG (Pkg-I)

Ravi Infrabuild
4L of Khedakhajuriya to Suhagadi
Projects Madhya
107 from Km. 41.400 to Km. 89.200 of 148NG 47.80 HAM 601.09 28/02/2022 0 Ujjain
Private Pradesh
NH-148NG (Pkg-II)
Limited
Dristti
4L bypass to Mozari town (Taluka- Structural
Amravati Maharash
108 Tiwasa) from km. 0.000 to km. 53 6.10 EPC Engineering 52.00 30/03/2022
(MH) tra
6.100 of NH-53 Private
Limited
4L of Bamni - Rajura - Warur -
GR
Devada upto M.S. Border of NH - Chandrap Maharash
109 930D 33.43 EPC Infraprojects 790.28 30/03/2022 0
930D (from km 19.000 to km ur tra
Limited
52.425)
4L of Rajura-Korpana-Adilabad GR
Chandrap Maharash
110 Road upto M.S. Border from km 353B 56.18 EPC Infraprojects 851.77 30/03/2022 0
ur tra
32.910 to km 89.090 of NH-353B Limited

4L of Ratnagiri - Kolhapur section of Ravi Infrabuild


NH-166 from km 0.000 to km Projects Maharash
111 166 55.91 HAM 930.00 29/03/2022 0 Kolhapur
19.769 and km 31.000 to km 67.140 Private tra
(Pkg – I) Limited
Megha
4L of Ratnagiri - Kolhapur section Engineering
Maharash
112 from km 112.340 to km 145.300 of 166 32.96 HAM and 986.00 29/03/2022 0 Kolhapur
tra
NH-166 (Pkg–III) Infrastructure
Ltd.
J M Mhatre
4L of Ratnagiri - Kolhapur section Infra Pvt Ltd -
Maharash
113 from km 67.140 to km 112.340 of 166 45.20 HAM Thakur 839.00 30/03/2022 0 Kolhapur
tra
NH-166 (Pkg – II) Infraprojects
Pvt. Ltd. (JV)
6L of Kagal-Satara section from Km
BOT Adani Road Maharash
114 658.000 to Km 725.000 of NH-48 48 67.00 2008.47 30/03/2022 0 Kolhapur
Toll Transport Ltd. tra
(Pkg-II)

Page 15 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Design and Construction of Service
Uday D.
Road for improvement of Accident 27/05/202 15/06/202 14/12/20 Maharash
115 48 1.40 EPC Jadhav 4.44 23/04/2021 Kolhapur
Black spot at Kashil (km. 708.000) 1 1 21 tra
Constructions
on Kagal - Satara section of NH-48

Design and Construction of


Raj
Standalone VUP for the
Infrastructure 17/05/202 15/06/202 14/12/20 Maharash
116 rectification of Accident Blackspot 48 1.18 EPC Not Assign 31.38 23/04/2021 Kolhapur
Development 1 1 22 tra
at Indoli Phata (Km. 704.200) on
(I) Pvt. Ltd.
Kagal - Satara section of NH-48

Design and Construction of


Raj
Standalone VUP for the
Infrastructure 17/05/202 16/06/202 15/12/20 Maharash
117 rectification of Accident Blackspot 48 1.06 EPC 32.64 23/04/2021 0 Kolhapur
Development 1 1 22 tra
at Masur Phata (km. 697.800) Kagal
(I) Pvt. Ltd.
- Satara section of NH-48

6L of Wainganga Bridge - Bhandara


Shri Swami TPF
(including Bhandara Bypass) 27/01/202 Nagpur Maharash
118 53 14.80 EPC Samarth Engineering 421.40 22/12/2021
section from km 485.000 to km 2 (PD-1) tra
Engineers Ltd. Pvt. Ltd.
499.800 of NH-53 (old NH-6)
Thakur
4L of existing 2/4L stretch from
Infraprojects
Lonand to Dive Ghat (Km 166.400 08/03/202 Maharash
119 965 54.50 EPC Pvt. Ltd. - T & 519.93 31/01/2022 0 Pune
to Km 220.900 ) of Mohol – Alandi 2 tra
T Infra Limited
section of NH-965 (Pkg - V)
(JV)
Vadodara Mumbai Expressway Shivalaya
22/12/202 Maharash
120 (Phase II - Pkg XVI) [Km. 43.000 to NE 4 26.80 HAM Construction 1450.00 29/10/2021 0 Thane
1 tra
Km. 69.800 of Spur] (Amne - Bhoj) Co. Pvt. Ltd.
Vadodara Mumbai Expressway
IRCON
(Phase II - Pkg XIV) [Km. 3.000 to 27/01/202 Maharash
121 NE 4 17.20 HAM International 1124.00 30/11/2021 0 Thane
Km. 20.200 of Spur] (Shirsad - 2 tra
Limited
Akloli)
Agroh
Vadodara Mumbai Expressway
Infrastructre & 31/01/202 Maharash
122 (Phase II - Pkg XV) [Km. 20.200 to NE 4 22.80 HAM 990.00 30/11/2021 0 Thane
Developer Pvt. 2 tra
Km. 43.000 of Spur] (Akloli - Amne)
Ltd.
Vadodara Mumbai Expressway IRCON
18/02/202 Maharash
123 (Phase II - Pkg XVII) [Km. 69.800 to NE 4 9.98 HAM International 1436.00 24/12/2021 0 Thane
2 tra
Km. 79.783 of Spur] (Bhoj - Morbe) Limited

Page 16 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
SA
Infrastructure
6L Greenfield Baunsaguar - Baraja Consultants
H.G. Infra
Section of NH-130-CD Road from Pvt. Ltd. in 14/12/202
124 130CD 45.50 HAM Engineering 1123.11 25/10/2021 Koraput Odisha
km 293+000 to km 338+500 Association 1
Limited
(Package – OD-6) with Rotrans
Infra Projects
Pvt. Ltd.

SA
Infrastructure
6L Greenfield Kaliagura – Consultants
H.G. Infra
Baunsaguar Section of NH-130-CD Pvt. Ltd. in 14/12/202
125 130CD 44.00 HAM Engineering 1492.11 25/10/2021 Koraput Odisha
Road from km 249+000 to km Association 1
Limited
293+000 (Package – OD-5) with Rotrans
Infra Projects
Pvt. Ltd.
Max Infra (I)
6L Greenfield Kandili - Aluru Limited -
Section of NH-130-CD Road from Bekem Infra
126 130CD 22.53 HAM 1396.09 31/01/2022 Koraput Odisha
km 342+500 to km 365+033 Projects Pvt.
(Package-OD-8) Ltd.
(Consortium)
6L Greenfield Baraja - Kandili Dineshchandr
Section of NH- 130-CD Road from a R. Agrawal
127 130CD 4.00 HAM 618.10 31/01/2022 Koraput Odisha
km 338+500 to km 342+500 Infracon Pvt.
(Package-OD-7) Ltd.
6L Major Bridge including L.N. Malviya
Barbrik 27/07/202 18/09/202 17/03/20 17/03/202
128 Approaches from Km.172.895 to 520 0.77 EPC infra projects 62.00 05/05/2021 3 0.00 Rourkela Odisha
Projects Ltd. 1 1 23 3
Km.173.670 of NH-520 Pvt. Ltd.
Construction of 6L VUP at Km.
245.900 including approaches Vijay Kumar Theme
between Km. 245.545 to Km. Sahu Engineering 22/12/202 20/01/202 19/01/20
129 143 0.79 EPC 14.89 21/10/2021 0 Rourkela Odisha
246.330 and FOB at Km. 246.760 Infrastructure Services Pvt. 1 2 23
on Brahamani Bypass - Rajamunda Pvt . Ltd. Ltd.
Section of NH-143
Megha
Engineering
130 2/4L of Ghoman-Tanda 503A 31.50 HAM and 639.00 31/03/2022 0 Amritsar Punjab
Infrastructure
Ltd.

Page 17 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)

G-Eng Advisory
Services Pvt.
Ltd. in JV with
SKS Infra
Voyants
Projects Pvt.
Amritsar Bypass (Pkg III) from km. Solutions 21/02/202
131 354 49.94 EPC Ltd. - KRC Infra 741.00 10/05/2021 0 Amritsar Punjab
71.496 to km. 105.158 Private Limited 2
Projects Pvt.
in association
Ltd. (JV)
with Nu-Infra
Engineers Pvt.
Ltd.

4L of Beas-Mehta-Batala-Dera Baba
Nanak from intersection with Ganeshgarhia
Jalandhar-Amritsar Highway (NH-3) Construction
132 TBD 31.30 EPC 440.00 25/03/2022 Amritsar Punjab
near Beas till start of Batala Bypass Private
near Village Acchhal (from Km. Limited
0.000 to Km. 31.300) (Pkg-1)

4L of existing Beas – Baba Bakala -


Dera Baba Nanak Section from start
of Batala Bypass till intersection
with Ajnala Gurdaspur Highway Varaha Infra
133 NH - 503D 47.80 EPC 519.79 31/03/2022 Amritsar Punjab
(NH 354) near Dera Baba Nanak ( Ltd.
from Km. 31.300 to Km. 69.100 )
with Additional batala Bypass (Pkg-
II)

Delhi-Amritsar-Katra Expressway
(Phase-I Spur-I) from Jn. with
Kapurthala - Sultanpur Lodhi Road
S.P. Singla
(NH-703A) near Isharwal village to
134 3 17.00 EPC Construction 973.77 25/03/2022 0 Amritsar Punjab
Jn. with Kapurthala - Tarn Taran
Pvt. Ltd
road (NH-703AA) near Goinwal
Sahib [Km 24+000 to Km 41+000 of
Amritsar connectivity]

Page 18 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Delhi-Amritsar-Katra Expressway
(Phase-I Spur-II) from Junction with
Kapurthala- TarnTaran Ceigall India
road(NH703AA) near Goinwal Sahib Ltd. - Krishna
135 3 30.00 EPC 1071.00 12/05/2021 0 Amritsar Punjab
to Junction with AmritsarJalandhar Constructions
road (NH-3) near Bhishambarpura (JV)
[Km 41+000 to Km 71+000 of
Amritsar connectivity]

Delhi-Amritsar-Katra Expressway
(Phase-I Spur-III) from Junction
Joint Stock
with Amritsar-Jalandhar road (NH-
Company
3) near Bhishambarpura to
136 54 28.00 EPC Industrial 925.03 12/08/2021 0 Amritsar Punjab
Junction with Amritsar-Anjala road
Association
(NH-354) near Amritsar Airport [Km
Vozrozhdenie
71+000 to Km 99+000 of Amritsar
connectivity]
Construction of 6L Flyover at km
TPF Getinsa
417.374 and 6L VUP at Km 416.700
Eurostudioes
i/c construction of new service MYC Infra
SL - Segmental 03/08/202 07/01/202 06/07/20
137 road at location of flyover and VUP 03 1.50 EPC Private 31.58 31/05/2021 Amritsar Punjab
Consulting & 1 2 23
on Jalandhar-Amritsar section of Limited
Infrastructure
NH-03 for rectification of
(JV)
Blackspots
6L flyover at existing km 430.625
TPF Getinsa
near Tangra town and 6L VUP at
Eurostudioes
existing km 435.170 near Mallian MYC Infra
SL - Segmental 03/08/202 07/01/202 06/07/20
138 town inc. construction of new 03 1.50 EPC Private 37.33 28/05/2021 Amritsar Punjab
Consulting & 1 2 23
service road at location of flyover & Limited
Infrastructure
VUP for blackspot rectification of
(JV)
NH-03

6L of existing Taran Taran flyover to


Golden Gate stretch of NH-03 inc. TPF Getinsa
6L flyover at Km 446.590 (in front Eurostudioes
of best price) & Km 448.100 (in DMR Builders SL - Segmental 01/06/202 07/01/202 08/07/20
139 3 3.50 EPC 77.09 16/04/2021 Amritsar Punjab
front of the Daboorja Road) and Pvt. Ltd. Consulting & 1 2 23
VUP at Km 448.590 and Major Infrastructure
bridge at Km 445.957 for Blackspot (JV)
rectification

Page 19 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
TPF Getinsa
6L elevated structure in Rayya at
Eurostudioes
km 419.690 of NH-03 with service
DMR Builders SL - Segmental 01/06/202 20/09/202 19/03/20
140 road on both sides including 03 1.50 EPC 57.07 16/04/2021 Amritsar Punjab
Pvt. Ltd. Consulting & 1 1 23
approaches for rectification of
Infrastructure
blackspots
(JV)

URS SCOTT
WILSON INDIA
PRIVATE
VRC LIMITED in
Moga - Bagha Purana - Bajakhana Constructions Association
141 105B 43.32 HAM 574.69 31/12/2021 0 Bhatinda Punjab
from km. 0.00 to km. 43.32 (India) Pvt. with G-ENG
Ltd. ADVISORY
SERVICES
PRIVATE
LIMITED

4L of Malout-Mandi Dabwali Gawar


142 section (Pkg-02) including Malout 09 27.00 EPC Construction 337.16 28/03/2022 Bhatinda Punjab
bypass and Mandi-Dabwali bypass Ltd
Dhruv
Consultancy
6L Amritsar-Bathinda Greenfield Services Ltd. in
section from Jn. with Bhagta Bhai JV with
Ka-Bhadaur Road near Dyalpura Arkitechno
Krishna
143 Bhai Ka to Jn. with Mandi Dabwali NH-754A 61.87 HAM Consultants (I) 1400.00 22/09/2021 Bhatinda Punjab
Constructions.
Bathinda Road on NH-54 near Pvt. Ltd. in
Sangat Kalan from km 93.000 to km association
154.866 of NH-754A (Pkg-3) with Kaius
Consulting Pvt.
Ltd.
Voyants
Solutions Pvt.
Ashoka
6L of IT City Chowk to Kurali Ltd. in JV with 18/08/202 Chandigar
144 205A 31.23 EPC Buildcon 726.00 12/07/2021 0 Punjab
Chandigarh Road G-Eng Advisory 1 h
Limited
Services Pvt.
Ltd.

Page 20 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Upham
International
4/6L Greenfield
corporation in
Ludhiana–Rupnagar highway from
JV with SA
Jn. with NE-5 village near to
Infrastructure
Manewal(Ludhiana) to Jn. with NH- IRCON
Consultant Pvt 25/03/202 Chandigar
145 205 near Bheora Village (Rupnagar) 205K 43.26 HAM International 1107.00 22/12/2021 Punjab
Ltd in 2 h
from Km 66.0 to Km 91.0 i/c spur to Limited
association
Kharar from Km 0.0 to Km 19.5 with
with Quest
Ludhiana bypass of NH-205K (Pkg-
Engineers &
3)
Consultants
Pvt.Ltd
Development of 6L (Greenfield)
Jalandhar Bypass starting from
Kahlwan (NH-03) ending at Kang Krishna 07/03/202
146 - 46.50 HAM 1365.00 30/09/2021 0 Jalandhar Punjab
Sahbu (NH-703) via Sarmastpur Constructions. 2
(NH-44) - Madara (NH-03) -
Khajurla (NH-44)
Chaitanya
Projects
Consultancy
6L Amritsar-Bathinda Greenfield
Pvt. Ltd. in JV
section from village Tiba on NE-5A
GR with K&J
to Jn. with Moga Jalandhar road 15/12/202
147 NH-754A 39.00 HAM Infraprojects Projects Pvt. 927.00 23/09/2021 0 Jalandhar Punjab
(NH-703) near Dharamkot from km 1
Limited Ltd. & in
0.000 to km 39.000 of NH-754A
association
(Pkg-1)
with
Infrailluminati
ons LLP
Chaitanya
Projects
6L Amritsar-Bathinda Greenfield Consultancy
section from Jn. with Moga Pvt. Ltd. in JV
Jalandhar road (NH-703) near with K&J
Krishna
148 Dharamkot to Jn. with Bhagta Bhai NH-754A 54.00 HAM Projects Pvt. 1275.00 23/09/2021 0 Jalandhar Punjab
Constructions.
Ka-Bhadaur Road near Dyalpura Ltd. & in
Bhai Ka from km 39.000 to km association
93.000 of NH-754A (Pkg-2) with
Infrailluminati
ons LLP

Page 21 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)

Costruction of 3L ROB at Km. 0.440


i/c widening construction of VUP at
KRC
Km. 0.400 & ramps at LHS & RHS
149 44 0.00 EPC Infraprojects 20.80 20/04/2021 0 Jalandhar Punjab
and merging of alignment with PAP
Pvt. Ltd.
flyover at Km. 0.710 on Panipat -
Jalandhar section of NH-44

4/6L Greenfield Ludhiana–


Rupnagar highway from Jn. with NE-
5 village near to
GR
Manewal(Ludhiana) to Jn. with NH- 14/12/202
150 205K 37.70 HAM Infraprojects 951.00 30/09/2021 0 Ludhiana Punjab
205 near Bheora Village (Rupnagar) 1
Limited
from Km. 0.00 to Km. 37.7 including
spur to Kharar with Ludhiana
bypass of NH-205K (Pkg-1)

4/6L Greenfield
Ludhiana–Rupnagar Highway from
Jn. with NE-5 village near to
Manewal (Ludhiana) to Jn. with NH-
Ceigall India
151 205 near Bheora Village (Rupnagar) 205K 47.24 HAM 1035.00 31/12/2021 0 Ludhiana Punjab
Ltd.
from Km 37.7 to Km 66.0 i/c spur to
Kharar with Ludhiana bypass from
Km 0.0 to Km 18.5 of NH-205K(Pkg-
2)
Chaitanya
Projects
6L Access Controlled Ludhiana-
Consultancy
Bathinda Greenfield highway from
Pvt. Ltd. in JV
Jn. with Moga-Barnala Road (NH-
with K&J
703) near village Tallewal to Jn. NH- Ceigall India
152 45.24 HAM Projects Pvt. 917.00 09/11/2021 0 Ludhiana Punjab
with Delhi-Katra Expressway (NE-5) 754AD Ltd.
Ltd. & in
near Ludhiana (village Ballowal)
association
from Km 30.300 to Km 75.543 of NH-
with
754AD (Pkg-2)
Infrailluminati
ons LLP

Page 22 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Chaitanya
Projects
6L Access Controlled Ludhiana-
Consultancy
Bathinda Greenfield highway from
Pvt. Ltd. in JV
Jn. with Amritsar-Bathanda
with K&J
Greenfield Road (NH-754A) near Ram Kumar
153 NH754AD 30.30 HAM Projects Pvt. 623.05 11/11/2021 0 Ludhiana Punjab
Rampura Phul to Jn. with Moga- Contractor
Ltd. & in
Barnala Road (NH-703) near village
association
Tallewal from Km 0.0 to Km 30.3 of
with
NH-754AD (Pkg-1)
Infrailluminati
ons LLP
Delhi-Amritsar-Katra Expressway OJSC Euro-
(Phase-I Pkg-XII) from Junction with Asian
Amritsar-Mehta-SriHargobindpur- Construction
Ludhiana
Tanda road (NH-503A) near Corporation 04/03/202
154 503A , 54 35.28 EPC 853.66 23/04/2021 0 (Expressw Punjab
SriHargobindpur to Junction with Evrascon - 2
ay)
Pathankot-Gurdaspur road (NH-54) MKC
near Gurdaspur (Km 362+420 to km Infrastructure
397+700) Ltd. (JV)

Delhi-Amritsar-Katra Expressway OJSC Euro-


(Phase-I Pkg-XI) from Junction with Asian
Jalandhar - Kapurthala road (NH- Construction
Ludhiana
703A) near khojewal village to Corporation 04/03/202
155 3 , 503A 43.02 EPC 1269.96 28/05/2021 0 (Expressw Punjab
Junction with Amritsar-Mehta- Evrascon - 2
ay)
SriHargobindpur-Tanda road (NH- MKC
503A) near SriHargobindpur (Km Infrastructure
319+400 to km 362+420) Ltd. (JV)

Delhi-Amritsar-Katra Expressway OJSC Euro-


(Phase-I Pkg-X) from Jn. with Asian
Jalandhar - Moga road (NH-703) to Construction
Ludhiana
Jn. with Jalandhar-Kapurthala road Corporation 04/03/202
156 3 39.50 EPC 1094.46 28/05/2021 0 (Expressw Punjab
(NH-703A) and to Jn. with Evrascon - 2
ay)
Kapurthala - Sultanpur Lodhi road MKC
(NH-703A) (km 0+00 to km 24+000 Infrastructure
to Amritsar connectivity) Ltd. (JV)

Page 23 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
SA
OJSC Euro-
Delhi-Amritsar-Katra Expressway Infrastructure
Asian
(Phase-I Pkg-IX) from Junction with Consultants
Construction
Ludhiana-Moga road (NH-5) near Pvt. Ltd. in Ludhiana
Corporation 04/03/202
157 Mullanpur Dakha to Junction with 5 43.04 EPC association 1234.40 20/04/2021 0 (Expressw Punjab
Evrascon - 2
Jalandhar - Moga road (NH-703) with Upham ay)
MKC
near Kang Sahibu village (Km International
Infrastructure
260+860 to km 303+900) Corporation
Ltd. (JV)
Ltd.

SA
OJSC Euro-
Delhi-Amritsar-Katra Expressway Infrastructure
Asian
(Phase-I Pkg-VIII) from Junction Consultants
Construction
with Ludhiana-Malerkotla (SH-11) Pvt. Ltd. in Ludhiana
Corporation 04/03/202
158 near Bhogiwal village to Junction 5 , SH-11 35.09 EPC association 989.66 12/07/2021 0 (Expressw Punjab
Evrascon - 2
with Ludhiana-Moga road (NH-5) with Upham ay)
MKC
near Mullanpur Dakha (Km International
Infrastructure
225+770 to km 260+860) Corporation
Ltd. (JV)
Ltd.

Delhi-Amritsar-Katra Expressway
(Phase-I Pkg-VII) from Junction with Intercontinent
Patiala-Bathinda road (NH-7) near al Consultants Ludhiana
Ceigall India 25/02/202
159 Bhawanigarh to Junction with 7 ,SH-11 36.94 EPC and 881.00 20/07/2021 0 (Expressw Punjab
Ltd. 2
Ludhiana-Malerhkotla (SH-11) near Technocrats ay)
Bhogiwal village (Km 188+830 to Pvt. Ltd.
km 225+770)

Delhi-Amritsar-Katra Expressway
(Phase-I Pkg-VI) from Junction with Shiv BuildIndia Intercontinent
Patiala-Samana-Patran road (SH- Pvt. Ltd. - al Consultants Ludhiana
160 10) near Ghagga village to Junction 7 ,SH-10 30.91 EPC Mehta and 733.00 12/07/2021 0 (Expressw Punjab
with Patiala-Bathinda road (NH-7) construction Technocrats ay)
near Bhawanigarh (Km 157+250 to Co. (JV) Pvt. Ltd.
Km 188+830)

4L Greenfield spur from Delhi- GR


161 Vadodara Greenfield expressway NE4C 67.00 HAM Infraprojects 1368.00 30/03/2022 Dausa Rajasthan
near Bandikui to Jaipur Limited
VRC
Constructions 10/12/202 Hanumang
162 Sriganganagar-Pugal (Package 6) 911 102.00 HAM 553.89 29/10/2021 Rajasthan
(India) Pvt. 1 arh
Ltd.
Page 24 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Spetsdorstroy
4L of Karwar (Km. 281.980 of NH-62 LLC - OSS
163 Nagaur road) to Dangiyavas of 125A 30.09 EPC Construction 298.78 31/03/2022 0 Jodhpur Rajasthan
Jodhpur Ring Road (Pkg-II) Private
Limited (JV)
Bangalore Chennai Expressway
Phase-III – Package III (Arakkonam KCC Buildcon Kanchipur Tamil
164 TBD 25.50 HAM 832.00 14/09/2021
to Kancheepuram) from Km Pvt. Ltd. am Nadu
204.500 to Km 230.000
Bangalore Chennai Expressway
Phase-III – Package I (Gudipala to Montecarlo 06/12/202 Kanchipur Tamil
165 TBD 24.00 HAM 1023.00 16/09/2021
Walajajhpet) from Km 156.000 to Limited 1 am Nadu
Km 180.000
Bangalore Chennai Expressway
Phase-III – Package II (Walajahpet KCC Buildcon 17/11/202 Kanchipur Tamil
166 TBD 24.50 HAM 832.00 16/09/2021
to Arakkonam) from Km 180.000 to Pvt. Ltd. 1 am Nadu
Km 204.500

4L Bangalore-Chennai Expressway Ramalingam


from Km. 230.000 to Km. 261.705 Construction 15/11/202 Kanchipur Tamil
167 TBD 31.71 HAM 1580.00 16/09/2021
of Kanchepuram to Sriperumbudur Company Pvt. 1 am Nadu
Section (Phase-III/Package-IV) Ltd

LN Malviya
Infra Projects
SPL Pvt. Limited in
Mahabalipuram - Pondicherry (Pkg- Kanchipur Tamil
168 332A 31.00 HAM Infrastructure association 792.00 10/11/2021 0
II) [Mugaiyur to Marakkanam] am Nadu
Pvt. Ltd with Intratech
Civil Solutions
& Consultant

6L of Maduravoyal to
Sriperumbudur Section from Km.
Item 21/01/202 13/02/20 13/02/202 Kanchipur Tamil
169 13.800 to Km. 37.000 of NH-4 48 23.20 State PWD 380.80 22/11/2021
Rate 2 23 3 am Nadu
through State Highways
Department
SCC
Hosur to Dhamrapuri (Pkg-1) Infrastructure Tamil
170 844 23.35 HAM 485.47 27/01/2022 0 Krishnagiri
[Neraluru - Thorapalli Agraharam] Private Nadu
Limited

Page 25 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
S&P
4L of Thirumangalam to
Infrastructure Tamil
171 Vadugapatti section from km 0.000 744 36.00 EPC 541.61 31/03/2022 Madurai
Developers(P) Nadu
to km 36.000 of NH-744
Ltd

4L of Vadugapatti to
KMC
Therkuvenganallur (Rajapalyam) Tamil
172 744 35.60 EPC Construction 723.33 31/03/2022 Madurai
section from km 36.000 to km Nadu
Ltd.
71.600 of NH-744
Megha
Engineering
Hyderaba
173 Hyderabad - Maneguda 163 46.39 HAM and 785.00 17/03/2022 Telangana
d
Infrastructure
Ltd.
Megha
6L Access Controlled Greenfield
Engineering
Highway of Julekal village to Hyderaba
174 TBD 38.20 HAM and 943.50 30/03/2022 Telangana
Dinnedevarapadu village from Km d
Infrastructure
242.200 to Km 280.400 (Pkg-2)
Ltd.
Megha
6L Access Controlled Greenfield
Engineering
Highway of Nandinne village to Hyderaba
175 TBD 39.30 HAM and 779.50 30/03/2022 Telangana
Julekal village from Km 202.900 to d
Infrastructure
Km 242.200 (Pkg-1)
Ltd.
Khammam-Devarapalle Pkg II [4L
Access Controlled (Greenfield) from H.G. Infra
176 Somavaram village to Chintagudem 365BG 29.51 HAM Engineering 637.11 15/09/2021 0 Khammam Telangana
village (Design Chainage 33+604 to Limited
63+117)]

Khammam-Devarapalle Pkg III [4L


Access Controlled (Greenfield) from
KMV Projects
177 Chintagudem village to Recherla 365BG 42.12 HAM 804.69 15/09/2021 Khammam Telangana
Ltd.
village (Design Chainage 63+117 to
105+236)]

Khammam-Devarapalle Pkg I [4L


Access Controlled (Greenfield) from H.G. Infra
178 Thallampadu village to Somavaram 365BG 33.06 HAM Engineering 772.11 16/09/2021 0 Khammam Telangana
village (Design Chainage 0+000 to Limited
33+604)]

Page 26 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
6L of existing 4L from Lakshmi
Gundlapochampally to Bowenpally Infrastructure
179 44 10.03 EPC 401.18 15/03/2022 Nirmal Telangana
from km 471.300 to km 481.331 of & Developers
NH-44 Pvt Ltd

4L VUP at Aler-Jeedikal Cross Road Theme


Rockeira
at Km 72.010 along with Engineering 03/08/202 01/09/202 05/03/20 05/03/202
180 163 1.68 EPC Engineering 29.70 02/07/2021 36 0.00 Warangal Telangana
Slip/Service Roads on Hyderabad- Services Pvt. 1 1 23 3
LLP
Warangal section of NH-163 Ltd.

4L from Gaju Village at Km. 32.982


PNC Infratech Uttar
181 to Devinagar Bypass (End) at Km. 530B 33.02 HAM 738.00 25/03/2022 Agra
Pvt. Ltd. Pradesh
208.000 of NH-530B (Pkg-1C).
4L from Mathura Bypass (Start) at
Existing Km. 154.20 of NH-44 to PNC Infratech Uttar
182 530B 32.98 HAM 885.00 29/03/2022 0 Agra
Gaju Village at Km 32.982 of NH- Pvt. Ltd. Pradesh
530B (Pkg-IB)
HILLWAYS
CONSTRUCTIO
6L of Agra Bypass (Northern) N COMPANY
connecting Km. 174.500 of NH-2 PVT. LTD. - Uttar
183 TBD 12.67 EPC 305.00 28/03/2022 Agra
(new NH-19) to Km. 141.000 of VELJI RATNA Pradesh
Yamuna Expressways SORATHIA
INFRA PVT.
LTD. (JV)

Special Repair and Maintenance of MSV


Phephna (Ballia) - Chiraiya More Item International 03/02/202 03/02/202 03/08/20 03/08/202 Uttar
184 31 45.10 41.00 03/01/2022 28 Azamgarh
(Barria) Section from Km 473.400 Rate Inc. - MSPARK 2 2 22 2 Pradesh
to Km 518.500 on NH-31 (Pkg-2) (JV)

Repair and Maintenance of Rouza MSV


Chouraha (Ghazipur)- Phephna Item International 03/02/202 03/02/202 03/08/20 03/08/202 Uttar
185 31 68.37 57.00 03/01/2022 33 Azamgarh
(Ballia) Section from Km 405.030 to Rate Inc. - MSPARK 2 2 22 2 Pradesh
Km 473.400 on NH-31 (Pkg-1) (JV)

Special Repair and Maintenance of


MSV
Chiraiya More (Barria) to Jayprabha Item Jaiprakesh 03/02/202 03/02/202 03/08/20 03/08/202 Uttar
186 31 16.80 International 20.00 03/01/2022 0 Azamgarh
Setu Section from Km 518.500 to Rate Associates Ltd. 2 2 22 2 Pradesh
Inc.
Km 535.300 on NH-31 (Pkg-3)

Page 27 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
L N Malviya
Infra Projects
RCC Pvt. Ltd. in
10/11/202 04/04/202 04/04/20 Uttar
187 Muzzafarnagar - Miranpur 709AD 27.25 EPC Developers Association 465.00 24/09/2021 0 0.00 Baghpat
1 2 24 Pradesh
Ltd. with Casta
Engineers Pvt.
Ltd.
Brij Gopal
4L Spur of Panipat - Shamli
Construction
connecting NH-709AD (Panipat –
Co. Pvt. Ltd. - Uttar
188 Shamli – Muzaffarnagar) and NH- 709AD 8.00 EPC 111.55 15/03/2022 Baghpat
Ramkey Pradesh
709A (Karnal – Meerut) bypassing
Infrastructure
Shamli district (UP)
Ltd.(JV)
Dhruv
6L access control Greenfield Consultancy
highway of Vill-Khyawari to Vill- Services Ltd. -
Krishna Uttar
189 Latifpur at Saharanpur Bypass TBD 37.79 EPC Chaitanya 612.00 28/08/2021 0 Baghpat
Constructions. Pradesh
from Km. 82.000 to Km. 119.790 Projects
(Pkg-4) Consultancy
Pvt. Ltd. (JV)
6L access control Greenfield
highway of Vill-Lohadda to Vill- Krishna Uttar
190 TBD 29.50 EPC 503.00 28/08/2021 0 Baghpat
Karaunda Mahajan from Km. Constructions. Pradesh
27.000 to Km. 56.500 (Pkg-2)
6L access controlled Greenfield
Raj Shyama
highway of Junction of EPE (Vill.- Uttar
191 TBD 27.00 EPC Constructions 464.00 24/12/2021 0 0.00 Baghpat
Mavikalan) to Vill.-Lohadda from Pradesh
Pvt. Ltd.
Km. 0.000 to Km. 27.000 (Pkg-1)
Dhruv
Shiv Build
Consultancy
6L access control Greenfield India Pvt. Ltd. -
Services Ltd. -
highway of Vill-Karaunda Mahajan Jandu 06/01/202 Uttar
192 TBD 25.50 EPC Chaitanya 434.99 28/08/2021 0 Baghpat
to Vill-Khyawari from Km. 56.500 Construction 2 Pradesh
Projects
to Km. 82.000 (Pkg-3) India Pvt. Ltd.
Consultancy
(JV)
Pvt. Ltd. (JV)
APS Hydro Pvt.
Ltd. - L.N. Malviya
09/09/202 01/11/202 02/05/20 02/05/202 Uttar
193 Bijnor-Kotawali 709AD 21.68 EPC Mathiyan infra projects 188.60 22/07/2021 8 0.00 Baghpat
1 1 23 3 Pradesh
Construction Pvt. Ltd.
Pvt. Ltd. (JV)

Page 28 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
R.P.
Improvement and Up-Gradation of
INFRAVENTUR
Existing Road to 4L PS from Km
E PVT. LTD. - Uttar
194 229.070 to 260.800, End of Hardoi 731 31.73 EPC 280.72 14/03/2022 0 Bareilly
SOBTI Pradesh
District to Lucknow Ring road of NH
INFRATECH
731 (Pkg-4)
LTD. (JV)
Improvement and Up-Gradation of
Existing Road to 4L PS from Km
PNC Infratech Uttar
195 175.080 to 229.070, from End of 731 53.99 HAM 864.00 16/03/2022 0 Bareilly
Pvt. Ltd. Pradesh
Hardoi Bypass to End of Hardoi
District of NH 731 (Pkg-3)
APS Hydro Pvt.
Construction of 4L Connector from
Ltd. -
Delhi Meerut Expressway (Km 17/01/202 Uttar
196 03 14.60 EPC Mathiyan 525.00 15/11/2021 Ghaziabad
50.000 of Pkg IV) to Km 8.520 of NH- 2 Pradesh
Construction
235 (Pkg-5)
Pvt. Ltd. (JV)
PNC Infratech Uttar
197 4L of Sonauli - Gorakhpur 29 80.00 HAM 1458.00 30/03/2022 0 Gorakhpur
Pvt. Ltd. Pradesh

Greenfield Kanpur - Lucknow PNC Infratech Uttar


198 27 63.00 HAM 2926.00 15/03/2022 0 Lucknow
(Expressway) Pvt. Ltd. Pradesh
2L PS of Najibabad Kotdwar section
AJAY PRAKASH Uttar
199 from 112.575 to Km. 138.635 of NH 119 15.56 EPC 51.88 23/03/2022 Meerut
ASSOCIATES Pradesh
119
HILLWAYS
CONSTRUCTIO
4L of Najibabad Bypass from Km. N COMPANY
105.423 to Km. 118.373 (excluding PVT. LTD. - Uttar
200 119 10.50 EPC 225.50 23/03/2022 Meerut
2.45 Km. of NH-74 Bypass) of NH- VELJI RATNA Pradesh
119 SORATHIA
INFRA PVT.
LTD. (JV)

4L Spur of Meerut-Garh-
Raj Shyama
Mukteshwar section connecting NH- Uttar
201 709 A 13.40 EPC Constructions 224.96 23/03/2022 Meerut
119 and NH-58 bypassing Meerut Pradesh
Pvt. Ltd.
Town of NH 709 A
OSS
Construction
4L Rampur Bypass from Km. Pvt. Ltd. In JV Moradaba Uttar
202 9 10.19 EPC 188.91 30/03/2022
181.000 to Km. 189.500 WITH d Pradesh
SPETSDORSTO
Page 29 of 31
RY LLC
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Dev Yash
4L (Greenfield) Western Side spur Projects and
of Rampur-Rudrapur Section from Infrastructure
Moradaba Uttar
203 Km 0.000 to Km 13.700 connecting - 13.70 EPC Pvt. Ltd. - Raj 240.40 04/03/2022
d Pradesh
NH-24 to NH-87 bypassing rampur Shyama
town Constructions
Pvt. Ltd. (JV)
SKS Infra
2L PS of Raebareli - Jagdishpur with 26/10/202 07/01/202 01/06/20 01/06/202 Uttar
204 330A 46.02 EPC Projects Pvt. 369.71 02/08/2021 0 0.00 Raebareli
4L Jagdishpur Bypass Spur 1 2 24 4 Pradesh
Ltd.
One Time Improvement &
Maintenance of Ghaghra Bridge -
Item Uma 08/07/202 08/07/202 17/02/20 Uttar
205 Varanasi section from km 180.420 28 21.05 16.59 15/06/2021 19 Varanasi
Rate Associates 1 1 22 Pradesh
to km 299.350 of NH-233(New NH-
28) ( Pkg. II & III )

One Time Improvement &


SRSC INFRA
Maintenance of Sultanpur to Item 20/05/202 20/05/202 15/04/20 Uttar
206 731 71.16 PRIVATE 61.59 09/04/2021 99 Varanasi
Varanasi Section from km 134.70 to Rate 1 1 22 Pradesh
LIMITED
km 263.00 of NH-56(New NH-731)
4/6L of Spur to Haridwar Krishna
Uttarakha
207 (Greenfield) from Km. 0.000 to Km. TBD 49.00 HAM Constellation 1475.00 24/12/2021 Roorkee
nd
49.000 Pvt. Ltd.
4L of Dudhadhari Elevated Flyover
(Muzaffarnagar –Haridwar section) SEC Buildtech Uttarakha
208 34 2.65 EPC 111.99 30/11/2021 Roorkee
from Km 356.450 to Km 353.800 of Pvt. Ltd. nd
NH-34

SA
2L PS of Khatima bypass from km Infrastructure 29/06/202 21/07/202 16/04/20 28/04/202 Uttarakha
209 9 8.26 EPC APS Infra 36.78 18/05/2021 48 47.03 Rudrapur
24+720 to km. 32+975 Consultants 1 1 22 2 nd
Pvt. Ltd.

Upgradation and 4L of Haridwar


IRCON VasantVih
Bypass from Km 0.000 (Km 188.100 Uttarakha
210 TBD 15.10 HAM International 861.00 06/01/2022 arDehradu
of NH-58) to Km. 15.100 (Km 5.100 nd
Limited n
of NH 74) (PKg-1)
L.N. Malviya
4L of Purulia Bypass section from Varaha Infra 20/10/202 05/02/202 04/08/20 West
211 32 10.32 EPC infra projects 172.50 18/08/2021 3 0.00 Durgapur
Km 84.030 to Km 94.345 of NH-32 Ltd. 1 2 23 Bengal
Pvt. Ltd.

Page 30 of 31
List of Projects awarded till 31.03.22 in FY 2021-22 (All Project types)
Cumulati Cumulati
Appointe
ve ve Schedul
Name of Total Agreeme d
Physical Financial ed Likely
Sr. NH(New Total Mod Concessionai Name of Awarde LOA Date - nt Date- Date/Star
Project Name progress progress Complet Completi PIU State
No. ) Length e re/ IE/AE/ SC d Cost Civil Work Contracto t Date-
till last till last iom on Date
Contractor (Rs Cr) r Contracto
month month Date
r
(%) (%)
Construction of Pedestrian
Underpass (PUP), Box Culvert (BC),
Minor Bridge (MNB) and other LEA Associates
K K Narsaria 03/09/202 05/10/202 29/03/20 West
212 Road Works From Km. 34.510 to 16 0.59 EPC South Asia Pvt. 11.11 07/06/2021 0 Kharagpur
Construction 1 1 23 Bengal
Km. 35.100 near Vellora Chawk on Ltd.
Balasore - Kharagpur Section of NH-
60(New NH-16)

Page 31 of 31