Keterangan ; Analisa Produksi 6.25 14.17 18.75 23.33 27.92 32.

50
5,000,000 Volume Urugan
208,333 Volume per bulan Solusi :
6,944 Volume per hari Semua Armada harus masuk terutama Index 22
868 Ritase/Hari (Index 8) Jalan menuju Quarry harus masuk angkutan kelas 2
289 Jumlah Truck / hari Jalan menuju lokasi proyek harus membuat jalur proyek (Kelas 2)
72 Armada Truck/Quarry 1
72 Armada Truck/Quarry 2
72 Armada Truck/Quarry 3
72 Armada Truck/Quarry 4
58 Excavator Galian
14 Excavator Louding
9 Bulk Dozer
4 Vibrator Roller
4 Mobil Tangki

5,000,000 Volume Urugan


208,333 Volume per bulan
6,944 Volume per hari
316 Ritase/Hari (Index 22)
105 Jumlah Truck / hari
26 Armada Truck/Quarry 1
26 Armada Truck/Quarry 2
26 Armada Truck/Quarry 3
26 Armada Truck/Quarry 4
58 Excavator Galian
14 Excavator Louding
9 Bulk Dozer
4 Vibrator Roller
4 Mobil Tangki
STRUKTUR ORGANISASI PELAKSANAAN
PEKERJAAN PENGURUKAN LIMESTONE PADAT VIBRO (SATU LAYER)

PROJECT MANAGER
Ir. SARONI HAMID, MT. MM.

HSE Office Manager


Ketua K3 Lailatul Fitriyah
Account Manager
Anggota K3 (1)
Purchasing Manager
Anggota K3 (2)
Manager Umum

Manager Area 1 Manager Area 2


AHMAD WAFI

Chief Administrasi Chief Administrasi

Admin Keuangan Admin Keuangan


Chief Inspector/QE Chief Inspector/QE
Admin Teknik Admin Teknik

Purchasing Purchasing

Site Manager Quarry 1 Site Manager Quarry 2 Site Manager Quarry 3 Site Manager Quarry 4 Site Manager Zone 1 Site Manager Zone 2 Site Manager Zone 3 Site Manager Zone 4

Inspector/Surveyor Inspector/Surveyor Inspector/Surveyor Inspector/Surveyor Inspector/Surveyor Inspector/Surveyor Inspector/Surveyor Inspector/Surveyor

Kepala Labour Kepala Labour Kepala Labour Kepala Labour Kepala Labour Kepala Labour Kepala Labour Kepala Labour

PT. MICHELLINDO CAHAYA UTAMA