3. Management projects: Which include the organization or reorganization of work without necessarily
producing a tangible result. Examples would be the design and testing of a new computer software pack-
age, relocation of a company’s headquarters or the production of a stage show.
Here the project manager has minimal role to play or may not have any designated position.
9 How the profitability of project is calculated. write the steps
10 List out various types of clearances
----------------------------------------------------------------------------------------
Attainment of Course Outcomes through University Exam: X1
CHC404.2 2
Acquire knowledge of flow through packed bed and filtration
calculation
Chc303 PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12
Target 3 3 2.839 3 2.616 2.744 2.616 - 2.616 - -- 3
Direct Method
(Y1) 3 3 2.798 3 2.52- 2.68 2.52 - 2.52 - -- 3
Indirect
Method (Y2) 3 3 2..8 3 2.52 2.868 2.572 - 2.572 - - 3
Attainment
(0.8Y1+0.2Y2) 3 3 2.68 3 2.52 2.68 2..52 2.52 - - 3
Observations: