Curriculum Vitae: General Information Pham Quang Nguyen
Curriculum Vitae: General Information Pham Quang Nguyen
CURRICULUM VITAE
GENERAL INFORMATION
EXPERIENCE
From 4-2016 to Now : Huyndai engineering & construction Corporation
Responsibilities:
Management project, control schedule, cash flow, cost project, control and monitoring
quality project to the ensure complete project successful, operation stack holder, contractor
Manage status of all project, Check daily jobs of all project management team members\
Responsible for checking the phases of all projects including phases closing reports, - Reparse
and update Business Plan relating to PM
Project manager Process, Management MEP , Administrate Design, construction,
commissioning, service for process , electrical MV, LV system, automation system,
utility system, waste water treatment , water supply system , guide line design PCS
7,
Feature project
2017 : Jimah power plant at Malaysia
Page: 2
Responsibilities:
Management project, control schedule, cash flow, cost project, control and monitoring
quality project to the ensure complete project successful ,operation stack holder , contractor
Manage status of all project, Check daily jobs of all project management team members\
Responsible for checking the phases of all projects including phases closing reports,- Reparse
and update Business Plan relating to PM
Project manager Process , Management MEP , Administrate Design, construction,
commissioning, service for process , electrical MV, LV system, automation system,
utility system, waste water treatment , water supply system , guide line design PCS
7, DCS for projects EPC for oil and gas, food and beverages factory
Feature project
2011 : Manufacture oil soya Bunge plant
Owner : Bunge group USA
+ scope of work: construction electrical system, automation system, ELV system,
utility system, process system
* Main duty
: Project engineering manage, check drawings, revise design to comply with IEEE,
ANSI , NFPA, ASHREA, NEMA, API standards, issue BOQ, to manage technical
project
Project manager process for manufacture to comply owner required
2012 : Manufacture nestle
- Owner : Nesle switzerland
- Production : milk , coffe milk, coffe
+ scope of work: construction electrical system, automation system, ELV system,
utility system,process system
* Main duty
Page: 3
: Project engineering manage, check drawings, revise design to comply with IEC ,
NFPA, ASHREA, NEC, LEED standards, issue BOQ, to manage technical project
Project manager process for manufacture to comply owner required at wet process,
dry process, packaging process
2013 Project COCA-COLA MASTER PLANT HCM
- Product : beverages, milk
- main duty :
Management project, control schedule, cash flow, cost project, control and
monitoring quality project to the ensure complete project successful ,operation
stack holder , contractor Manage status of all project
Check daily jobs of all project management team members\
Responsible for checking the phases of all projects including phases closing
reports
Reparse and update Business Plan relating to PM
Setup and to guide design electrical system, ELV system, firefighting, , waste
water treatment, water supply, automation system, pneumatic system, HVAC
comply with standards IEC,IEEE, ANSI, NFPA, ASHREA,SMACNA,
ASPE ,LEED
Issue specification for MEAP project, issue BOM for project, Check and approval
shop drawing, spec equipment for MEAP
Isuue data sheet equipment, process, check design and offer from suppliers for
electrical, HVAC, process, testing and commisioning for process ,
setup process such as syrup, syrup final, can line, pet line , cold room, CIP
2014 Project COCA-COLA GREEN FIELD MYANMAR
main duty :
Management project, control schedule, cash flow, cost project, control
and monitoring quality project to the ensure complete project
successful ,operation stack holder , contractor Manage status of all project
- Check daily jobs of all project management team members\
Responsible for checking the phases of all projects including phases
closing reports
Reparse and update Business Plan relating to PM
Setup and to guide design electrical system, ELV system, utility system
automation system, comply with standards IEC,IEEE, ANSI,
ASHREA,SMACNA, NEC, ASPE ,LEED
Issue specification for MEAP project
issue BOM for project
Check and approval shop drawing, spec equipment for MEAP
Page: 4
Setup process included syrup, syrup final, CIP , crushser , wahouse, cold
room, can line, pet line , packaging …
EDUCATION
Certificate of Supervision.
SKILLS
Foreign languages: English
Computer knowledge:
+ Microsoft Office
+ AutoCAD
+ Ecodial
+ Doc win
+ PDMS