Perhitungan Biaya Import (Forwader)
Perhitungan Biaya Import (Forwader)
Perhitungan Biaya Import (Forwader)
DETAIL 1 2 3 4 5 CBM
CUSTOM Actual receipt
INSURANCE Actual receipt
DOC FEE 30 30 30 30 30 Per doc
THC 5.5 11 16.5 22 27.5 Per cbm
CFS 6.5 13 19.5 26 32.5 Per cbm
WHAFAGE 0.203 0.406 0.609 0.812 1.015 Per cbm
TRUCKING 125 125 125 125 125 Per cbm
ADM FEE 15 15 15 15 15 Per doc
TOTAL 182.203 194.406 206.609 218.812 231.015
NOTE :
1. Above rates Exclude VAT, DUTY AND TAX AS CNEE ACCOUNT
2. CREDIT TERM 2 WEEKS
3. Any extra charges will be based on your approval
ORIGIN CHG FOB LCL
DETAIL
4 5 CBM CUSTOM
45 60 USD 15/CBM Min 2 INSURANCE
700,000 700,000 Per 5 CBM DOC FEE
6,000,000 6,000,000 IDR / Trip RED LINE/YELLOW LINE (If Any)
250,000 250,000 IDR / Document INSPECTION (If Any)
2,000,000 2,000,000 IDR / Document PIB / EDI
100,000 100,000 IDR TRUCKING
36 54 USD ADM FEE
110 110 USD TOTAL
Actual receipt
Actual receipt Destination Charge (Lokal LCL)
2,000,000 2,000,000 per ship Detail
700,000 700,000 CBM Min 3
O/F
191 224 C/CLEARANCE
9,050,000 9,050,000 TRUCKING
LSS CHARGES 4X4.5 CBM X Rp 14,900
Devaning Charges (LCL)
4 5 CBM ADM Mechanic
900,000 900,000 per 5CBM CFS LCL (25 x 4.5 CBM x RP 14,900)
> 5 CBM IDR 75,000/CBM OTHERS
AS PER RECIPT MECHANIC Charge Rp 250,000x 5 CBM
2,000,000 2,000,000 Per Ship DUTY & TAX
2,000,000 2,000,000 Per Document RED Line / Yellow Line (If Any)
250,000 250,000 Per Document Warehouse Charges
6,000,000 6,000,000 IDR / Trip
500,000 500,000 Per Ship TOTAL USD
15 15 USD Per doc TOTAL IDR
15 15
11,650,000 11,650,000
4CBM 5CBM
206 239
20,700,000 20,700,000
PT. Inti Duta
1 2 3 4 5
USD
1 2 3 4 5
270,882
303,000
227,250
1,693,012.5
1,881,125
1,262,500
- - - -
5,637,769.5 - - - -
CBM
per 5CBM
> 5 CBM IDR 75,000/CBM
AS PER RECIPT
Per Ship
Per Document
Per Document
IDR / Trip
Per doc
CBM
Per 5 CBM
IDR / Trip
IDR / Document
IDR / Document
IDR
IDR
IDR
Actual receipt
Actual receipt
per ship
CBM Min 3